Breaking hammer device in cast-in-place pile pipe

By introducing gravel barrier and fixing mechanism into the crusher device in the cast pile pipe, the problems of gravel jamming and crushing hammer are solved, and work efficiency and stability are improved.

CN222065470UActive Publication Date: 2024-11-26GUANGDONG NANGONG MASCH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420344041.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-11-26
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

The existing crushing hammer device in the cast pile pipe is prone to jam when the crushed stone is too large, which reduces working efficiency. In addition, the fixed and moving steel strands of the crane will cause the crushing hammer to shake and cannot directly enter the cast pile.

Method used

A device including a breaker body, a first shell, a gravel blocking mechanism and a breaker fixing mechanism is designed to prevent gravel from being stuck by incomplete gears and rack systems, and to fix the breaker body through a worm and gear system. , make sure not to shake when moving.

Benefits of technology

有效避免了碎石卡住的问题,提高了破碎锤的工作效率,并通过固定机构确保破碎锤在移动时稳定性高,提高了工作质量。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065470U_ABST
    Figure CN222065470U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cast-in-place pile construction, in particular to a breaking hammer device in a cast-in-place pile pipe, which comprises a breaking hammer main body, the upper end of the breaking hammer main body is fixedly connected with a first shell, and a broken stone blocking mechanism is arranged in the first shell. Through cooperation of the first shell and the broken stone blocking mechanism, the first motor drives the incomplete gear to rotate, the upper portion of the protective cover is blocked by the check block, broken stones large in size can be prevented from being clamped between the crusher body and the protective cover in the mode, and therefore the working efficiency of the breaking hammer device is improved; through cooperation of the first shell and the breaking hammer fixing mechanism, the second motor drives the worm to rotate, the worm drives the worm gear to rotate, and the worm gear drives the gear to rotate, in this way, the clamping plate can drive the breaking hammer body to be fixed to the lower portion of a crane, shaking is avoided during moving, and therefore the working quality of the breaking hammer device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cast-in-place pile construction, in particular to a cast-in-place pile pipe breaker device. Background Art

[0002] Cast-in-place piles have the advantages of no vibration, no soil squeezing, low noise, and suitable for use in densely built urban areas during construction. They are widely used in construction. According to different hole-forming processes, cast-in-place piles can be divided into cast-in-place piles with dry drilling, cast-in-place piles with mud wall drilling, and cast-in-place piles with manual excavation. Among them, cast-in-place piles refer to piles formed in the foundation soil by mechanical drilling, steel pipe squeezing, or manual excavation during the construction process, and steel cages and concrete are placed in the drilled pile holes. During the drilling process of cast-in-place piles, internal filling stones, riprap, rocks, etc. are likely to affect the subsequent drilling or expansion process.

[0003] For example, a cast-in-place pile pipe breaker hammer device with the authorization announcement number "CN219808378U" can conveniently protect the breaker hammer body by setting a protective sleeve to avoid collision between the breaker hammer body and the steel sleeve, and multiple protective springs are connected to the outer surface of the protective sleeve, and the protective springs are connected to a stopper. When a collision occurs, the protective springs will be squeezed to reduce the collision between the protective sleeve and the steel sleeve, and effective protection is provided. However, when the breaker hammer body enters the cast-in-place pile, the crushed stone will be crushed, but when the size of the crushed stone is too large, it will be stuck between the breaker hammer body and the protective sleeve, which will cause the breaker hammer body to be unable to work, which reduces the working efficiency of the breaker hammer device. At the same time, the cast-in-place pile pipe breaker hammer device is fixed and moved by the steel strand of the crane, but when the steel strand moves the breaker hammer, the breaker hammer will shake, which causes the breaker hammer body to be unable to directly enter the cast-in-place pile, and it needs to wait for the shaking to stop before entering the cast-in-place pile, which reduces the working efficiency of the breaker hammer device. Utility Model Content

[0004] The purpose of the utility model is to solve the problem that when the size of the crushed stone is too large, it will be stuck between the breaker hammer body and the protective cover, which makes the breaker hammer body unable to work, thus reducing the working efficiency of the breaker hammer device and fixing and moving the steel strands of the crane, but the steel strands will cause the breaker hammer to shake when moving the breaker hammer, which makes the breaker hammer body unable to directly enter the cast-in-place pile, and needs to wait for the shaking to stop before entering the cast-in-place pile, thus reducing the working efficiency of the breaker hammer device, and a breaker hammer device in a cast-in-place pile pipe is proposed.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A breaker hammer device in a bored pile pipe is designed, comprising a breaker hammer body, the upper end of which is fixedly connected to a first shell, a stone blocking mechanism is provided inside the first shell, a breaker hammer fixing mechanism is provided at the upper end of the first shell, the upper end of the first shell is fixedly connected to a second shell, and the outer wall of the breaker hammer body is fixedly connected to a protective cover through a bracket.

[0007] Preferably, the gravel blocking mechanism includes a first motor, an outer wall of the first motor is fixedly connected to the first shell through a bracket, the output shaft of the first motor is fixedly connected to the incomplete gear, the outer wall of the incomplete gear is meshingly connected to the first rack, the upper end of the first rack is fixedly connected to one end of two springs, the other ends of the two springs are fixedly connected to the first shell, the lower end of the first rack is fixedly connected to a cross plate, the two ends of the cross plate are respectively slidably connected to two blocks, the outer walls of the two blocks are slidably connected to the first shell through through holes, and the outer walls of the two blocks pass through the first shell through the through holes.

[0008] Preferably, the breaker hammer fixing mechanism includes a second motor, the outer wall of the second motor is fixedly connected to the outer wall of the first shell through a bracket, the output shaft of the second motor is fixedly connected to the worm, the outer wall of the worm is meshingly connected to the worm wheel, the outer wall of the worm wheel is fixedly connected to the gear through the bracket, the outer wall of the gear is rotatably connected to the first shell through a pin shaft, the outer wall of the gear is meshingly connected to two second racks, and the outer walls of the two second racks are fixedly connected to the clamping plate.

[0009] Preferably, the outer walls of the two clamping plates are slidably connected to the second shell through a slide groove, the outer walls of the two clamping plates penetrate the second shell through the slide groove, the outer wall of the worm is rotationally connected to the second shell through a bearing, and the outer walls of the two clamping plates are tightly pressed against the crane.

[0010] Preferably, the outer wall of the protective cover is fixedly connected to a plurality of fixing rings, and the outer walls of the plurality of fixing rings are fixedly connected to a plurality of supporting columns.

[0011] Preferably, a buffer spring is wound around the outer wall of the plurality of support columns, one end of the buffer spring is fixedly connected to the fixing ring, the other end of the buffer spring is fixedly connected to the cushion block, and the outer wall of the cushion block is sleeved with the support column.

[0012] The utility model proposes a breaker hammer device in a bored pile pipe, which has the beneficial effects of: through the cooperation of the first shell and the gravel blocking mechanism, the first motor drives the incomplete gear to rotate, the incomplete gear drives the first rack to move, the first rack drives the spring to compress, when the incomplete gear is not engaged with the first rack, the two springs will push the first rack downward, the first rack drives the cross plate to move, the cross plate drives the stopper to move, the stopper blocks the top of the protective cover, and the above method can avoid large-sized gravel from being stuck between the crusher body and the protective cover, which improves the working efficiency of the breaker hammer device.

[0013] Through the cooperation of the first shell and the breaker hammer fixing mechanism, the second motor drives the worm to rotate, the worm drives the worm wheel to rotate, the worm wheel drives the gear to rotate, the gear drives the two second racks to move, the two second racks respectively drive the two clamping plates to move, and the clamping plates are pressed against the surface of the crane. Through the above method, the clamping plates can drive the breaker hammer body to be fixed under the crane, and there will be no shaking during movement, which improves the working quality of the breaker hammer device. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 for Figure 1 A schematic front cross-sectional view of

[0016] Figure 3 for Figure 2 A partial enlarged schematic diagram of the middle A part;

[0017] Figure 4 for Figure 2 A partial three-dimensional schematic diagram of the middle gravel blocking mechanism;

[0018] Figure 5 for Figure 2 Schematic diagram of top view and section of the fixing mechanism of the middle breaker hammer.

[0019] In the figure: 1. breaker body, 2. first shell, 3. gravel blocking mechanism, 301. first motor, 302. incomplete gear, 303. first rack, 304. spring, 305. cross plate, 306. stopper, 4. breaker fixing mechanism, 401. second motor, 402. worm, 403. worm wheel, 404. gear, 405. second rack, 406. clamping plate, 5. second shell, 6. crane, 7. protective cover, 8. fixing ring, 9. support column, 10. buffer spring, 11. pad. DETAILED DESCRIPTION

[0020] The utility model is further described below in conjunction with the accompanying drawings:

[0021] See attached Figure 1-5 In the present embodiment, a breaker hammer device in a cast-in-place pile pipe includes a breaker hammer body 1, the upper end of the breaker hammer body 1 is fixedly connected to a first shell body 2, the breaker hammer body 1 fixes the position of the first shell body 2, a crushed stone blocking mechanism 3 is provided inside the first shell body 2, a breaker hammer fixing mechanism 4 is provided at the upper end of the first shell body 2, the upper end of the first shell body 2 is fixedly connected to a second shell body 5, the outer wall of the breaker hammer body 1 is fixedly connected to a protective cover 7 through a bracket, the outer walls of two clamping plates 406 are slidably connected to the second shell body 5 through a slide groove, the clamping plates 406 slide on the second shell body 5, the outer walls of the two clamping plates 406 penetrate the second shell body 5 through the slide groove, and the outer wall of the worm 402 rotates with the second shell body 5 through a bearing The worm gear 402 rotates on the second shell 5, the outer walls of the two clamping plates 406 are tightly pressed against the crane 6, the clamping plates 406 are fixed on the crane 6, the outer wall of the protective cover 7 is fixedly connected to multiple fixing rings 8, the outer walls of the multiple fixing rings 8 are fixedly connected to multiple support columns 9, the outer walls of the multiple support columns 9 are wrapped with buffer springs 10, and the elastic coefficient of the buffer spring 10 is selected according to actual needs, and it is sufficient to select one that meets the work needs. One end of the multiple buffer springs 10 is fixedly connected to the fixing ring 8, and the other end of the multiple buffer springs 10 is fixedly connected to the cushion block 11. The cushion block 11 drives the buffer spring 10 to be pressed, and the outer walls of the multiple cushion blocks 11 are socketed with the support column 9.

[0022] See attached Figure 2 , Figure 3 and Figure 4 In the present embodiment, a crushing hammer device is provided in a cast-in-place pile pipe, and the crushed stone blocking mechanism 3 comprises a first motor 301, the outer wall of the first motor 301 is fixedly connected to the first shell 2 through a bracket, the first motor 310 is fixed to the shell 2, the size of the first motor 301 is selected according to actual needs, and the selection can meet the working needs, the output shaft of the first motor 301 is fixedly connected to the incomplete gear 302, the first motor 301 drives the incomplete gear 302 to rotate, the outer wall of the incomplete gear 302 is meshed and connected with the first rack 303, the incomplete gear 302 drives the first rack 303 to move, and the upper end of the first rack 303 is fixedly connected to one end of two springs 304, The first rack 303 drives the spring 304 to move. The elastic coefficient of the spring 304 is selected according to actual needs and can be selected to meet the working needs. The other ends of the two springs 304 are fixedly connected to the first shell 2, and the spring 304 is fixed on the first shell 2. The lower end of the first rack 303 is fixedly connected to the cross plate 305. The first rack 303 drives the cross plate 305 to move. The two ends of the cross plate 305 are respectively slidably connected to the two blocks 306. The cross plate 305 drives the block 306 to move. The outer walls of the two blocks 306 are slidably connected to the first shell 2 through the through holes. The block 306 moves on the first shell 2, and the outer walls of the two blocks 306 pass through the first shell 2 through the through holes.

[0023] See attached Figure 1 , Figure 2 and Figure 5 In the present embodiment, a breaker hammer device is provided in a cast-in-place pile pipe. The breaker hammer fixing mechanism 4 includes a second motor 401. The outer wall of the second motor 401 is fixedly connected to the outer wall of the first housing 2 through a bracket. The second motor 410 is fixed to the first housing 2. The size of the second motor 401 is selected according to actual needs and can be selected to meet the working needs. The output shaft of the second motor 401 is fixedly connected to the worm 402. The second motor 401 drives the worm 402 to rotate. The outer wall of the worm 402 is meshed and connected with the worm wheel 403. 402 drives the worm wheel 403 to rotate, the outer wall of the worm wheel 403 is fixedly connected to the gear 404 through the bracket, the worm wheel 403 drives the gear 404 to rotate, the outer wall of the gear 404 is rotationally connected to the first housing 2 through the pin shaft, the gear 404 rotates on the first housing 2, the outer wall of the gear 404 is meshed and connected with the two second racks 405, the gear 404 drives the two second racks 405 to move, the outer walls of the two second racks 405 are fixedly connected to the clamping plate 406, and the second rack 405 drives the clamping plate 406 to move.

[0024] Working principle:

[0025] When using this cast-in-place pile pipe breaker device:

[0026] Fixed stage:

[0027] First, place the fixed block of the crane 7 between the two clamping plates 406, then connect the external power supply of the second motor 401, start the second motor 401, the second motor 401 drives the worm 402 to rotate, the worm 402 drives the worm wheel 403 to rotate, the worm wheel 403 drives the gear 404 to rotate, the gear 404 drives the two second racks 405 to move, the two second racks 405 respectively drive the two clamping plates 406 to move, after the clamping plates 406 are pressed against the surface of the crane 7, the second motor 401 stops working.

[0028] Protection phase:

[0029] When the size of the crushed stone in the cast-in-place pile is large, the external power supply of the first motor 301 is connected, the first motor 301 is started, the first motor 301 drives the incomplete gear 302 to rotate, the incomplete gear 302 drives the first rack 303 to move, the first rack 303 drives the spring 304 to press, when the incomplete gear 302 is not engaged with the first rack 303, the two springs 304 will push the first rack 303 downward, the first rack 303 drives the cross plate 305 to move, the cross plate 305 drives the stopper 306 to move, the stopper 306 blocks the top of the protective cover 7 to prevent the large-sized crushed stone from being stuck between the crusher body 1 and the protective cover 7, and then the first motor 301 stops working. The crushing work of the breaker in the cast-in-place pile is completed.

[0030] Although the present invention has been shown and described with reference to the preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein within the scope of the claims.

Claims

1. A breaker hammer device for a bored pile, comprising a breaker hammer body (1), characterized in that: The upper end of the breaker hammer body (1) is fixedly connected to the first housing (2), a stone blocking mechanism (3) is provided inside the first housing (2), a breaker hammer fixing mechanism (4) is provided at the upper end of the first housing (2), the upper end of the first housing (2) is fixedly connected to the second housing (5), the outer wall of the breaker hammer body (1) is fixedly connected to the protective cover (7) via a bracket, the stone blocking mechanism (3) comprises a first motor (301), the outer wall of the first motor (301) is fixedly connected to the first housing (2) via a bracket, the output shaft of the first motor (301) is fixedly connected to the incomplete gear (302), the outer wall of the incomplete gear (302) is meshedly connected to the first rack (303), the upper end of the first rack (303) is fixedly connected to one end of two springs (304), the other ends of the two springs (304) are fixedly connected to the first housing (2), the lower end of the first rack (303) is fixedly connected to the cross plate (301), and the lower end of the first rack (303) is fixedly connected to the cross plate (301). 5) is fixedly connected, the two ends of the transverse plate (305) are respectively slidably connected to the two stoppers (306), the outer walls of the two stoppers (306) are slidably connected to the first housing (2) through through holes, the outer walls of the two stoppers (306) penetrate the first housing (2) through the through holes, the breaker hammer fixing mechanism (4) comprises a second motor (401), the outer wall of the second motor (401) is fixedly connected to the outer wall of the first housing (2) through a bracket, the output shaft of the second motor (401) is fixedly connected to the worm (402), the outer wall of the worm (402) is meshingly connected to the worm wheel (403), the outer wall of the worm wheel (403) is fixedly connected to the gear (404) through the bracket, the outer wall of the gear (404) is rotatably connected to the first housing (2) through a pin shaft, the outer wall of the gear (404) is meshingly connected to the two second racks (405), and the outer walls of the two second racks (405) are fixedly connected to the clamping plate (406).

2. A cast-in-place pile in-pipe breaker device according to claim 1, characterized in that: The outer walls of the two clamping plates (406) are slidably connected to the second shell body (5) via a slide groove, the outer walls of the two clamping plates (406) penetrate the second shell body (5) via the slide groove, the outer wall of the worm (402) is rotationally connected to the second shell body (5) via a bearing, and the outer walls of the two clamping plates (406) are tightly pressed against the crane (6).

3. A cast-in-place pile in-pipe breaker device according to claim 2, characterized in that: The outer wall of the protective cover (7) is fixedly connected to a plurality of fixing rings (8), and the outer walls of the plurality of fixing rings (8) are fixedly connected to a plurality of supporting columns (9).

4. A cast-in-place pile in-pipe breaker device according to claim 3, characterized in that: The outer walls of the plurality of support columns (9) are wound with buffer springs (10), one end of the plurality of buffer springs (10) is fixedly connected to the fixing ring (8), the other end of the plurality of buffer springs (10) is fixedly connected to the cushion block (11), and the outer walls of the plurality of cushion blocks (11) are sleeved with the support columns (9).