Pile foundation reinforcement cage lowering and pile grouting platform capable of being adjusted in multiple directions

By designing a multi-directional adjustment pile foundation steel cage lowering and pile filling platform, adjustable legs, slide seats and telescopic beams and other components, the problem of settlement deformation of the pile foundation hole guard barrel is solved, and the construction is safe and efficient Completed, suitable for large diameter ultra-deep drilled cast piles.

CN222065476UActive Publication Date: 2024-11-26NINGBO MUNICIPAL ENG CONSTR GROUP +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323507586.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-11-26
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

During the construction of drilling piles, the pouring process of pile foundation steel cages and concrete causes the pile foundation hole guard to settle and deform, causing the quality accident of pouring concrete, and the existing construction platform is difficult to adapt to the construction needs in complex environments.

Method used

A multi-directional adjustment pile-based steel cage lowering and pile filling platform is designed, using adjustable legs, slide seats, telescopic beams and adjustment pads. The multi-platform platform is achieved by welding the hanging bars on the steel cage. Adjust the direction and precise elevation control to avoid settlement and deformation of the guard casing and adapt to different construction conditions.

Benefits of technology

It effectively avoids settlement deformation of the pile foundation hole guard, improves construction safety and efficiency, and ensures pile quality. It is suitable for drilling and filling pile construction with diameters of 1.0~1.8m and pile length of 64~83m.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065476U_ABST
    Figure CN222065476U_ABST
Patent Text Reader

Abstract

The utility model relates to a platform capable of adjusting descending and pile grouting of a pile foundation reinforcement cage in multiple directions. The lifting device comprises an operation platform with a lifting opening, a plurality of adjustable supporting legs which are arranged at the bottom of the operation platform and arranged around the lifting opening, a plurality of sliding seats which are arranged at the top of the operation platform and arranged around the lifting opening, and telescopic beams which are inserted into the sliding seats in a clearance sliding manner, the adjusting base plate is selectively arranged between the operation platform and the telescopic beam, and the hanging bar is arranged on the telescopic beam in a hooked mode and connected to the hoisting opening in an inserted mode. The platform is installed on the ground through the adjustable supporting legs and the operation platform, first-stage elevation adjustment is carried out with the assistance of the adjustable supporting legs, second-stage elevation adjustment is carried out with the assistance of the sliding seats, the telescopic beams and the adjusting base plates, the pile forming quality is guaranteed, meanwhile, the platform elevation requirements under different construction conditions can be met, and the construction efficiency is improved. The lifting and butt joint of the reinforcement cage of the cast-in-situ bored pile, the fixation after the reinforcement cage is in place and the concrete pouring construction are safely and efficiently completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge pile foundation construction, in particular to a multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform. Background Art

[0002] During the construction of bored cast-in-place piles, the casing at the mouth of the pile foundation plays a role in positioning the drilling and stabilizing the hole wall. In the actual construction process, the steel cage is hoisted and docked, fixed in place, and concrete is poured, all of which are completed on the casing at the mouth of the hole. For bored cast-in-place piles with a diameter of more than 1m and a pile depth of more than 60m, the pile foundation steel cage weighs tens of tons. When pouring concrete, the initial pouring volume is large, and the pouring hopper and concrete weigh more than 10 tons. Therefore, during the pile formation process, the continuous pressure on the casing by the pile foundation steel cage and the bored cast-in-place pile foundation concrete often causes different degrees of settlement and deformation of the casing at the mouth of the hole. In severe cases, it may cause the hole to collapse, resulting in a quality accident of the poured concrete, which brings great quality and safety hazards to the construction of large-diameter and ultra-deep bored cast-in-place piles.

[0003] In the prior art, a construction platform is set up at the opening of the pile foundation to temporarily hang the steel cage and pour concrete. However, this construction platform is usually placed directly on the top of the casing to implement concrete pouring, which is still easy to cause the casing to sink and deform. If the platform is installed on the ground, due to the uneven flatness of the ground around the casing and the long length of the bored pile, when the elevation difference between the four corner points of the platform is greater than 10mm, the bottom of the 64m bored pile will be offset by 0.21m in the plane position, and the bottom of the 80m bored pile will be offset by 0.27m in the plane position. This will cause the bored pile to have no protective layer or the conduit will get stuck in the steel bar and cannot be lowered to the bottom, which seriously affects the quality of the pile and is difficult to meet temporary construction in complex environments. Utility Model Content

[0004] The problem to be solved by the utility model is to provide a multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform in view of the above-mentioned deficiencies in the prior art, which has the advantages of avoiding the casing settlement and deformation of the pile foundation hole and facilitating safe and efficient construction.

[0005] The above utility model object of the utility model is achieved through the following technical solutions:

[0006] A multi-directionally adjustable pile foundation steel cage lowering and pile pouring platform, comprising an operating platform with a lifting port, a plurality of adjustable legs arranged at the bottom of the operating platform and around the lifting port, a plurality of slide seats arranged at the top of the operating platform and around the lifting port, a telescopic beam inserted into the slide seat with a gap, an adjustment pad selectively arranged between the operating platform and the telescopic beam, and hanging bars hooked on the telescopic beam and inserted into the lifting port, wherein the lifting port is arranged relative to the pile foundation hole and is arranged with a gap between it and the steel cage, and these hanging bars are used for welding to the steel cage.

[0007] By adopting the above technical scheme, in the actual construction process, the adjustable legs are first installed around the pile foundation hole to make the operating platform leveled for the first time, and the elevation of the adjustable legs is measured to control its error within 10mm; then the telescopic beam is placed on the operating platform through the slide, and according to the elevation of the adjustable legs, an adjustment pad is set between the telescopic beam with a lower installation position and the operating platform, and the thickness of the adjustment pad is less than 10mm, thereby forcing the telescopic beam to be raised so that the elevation between these telescopic beams meets the predetermined elevation control requirement; then the hanging bar is welded to the steel cage, and the steel cage is lowered to the inner mouth of the pile foundation hole through the lifting port, and the hanging bar hook is set on the telescopic beam, and the tops of these hanging bars are approximately at the same height, and finally concrete is poured through the lifting port; in this process, The platform is installed on the ground through adjustable legs and operating platform, which directly avoids the defect of the original platform being directly placed on the top of the casing to implement concrete pouring, which causes the casing settlement and deformation of the pile foundation hole. It is assisted by adjustable legs for first-stage elevation adjustment, and slide seats, telescopic beams and adjusting pads for second-stage elevation adjustment. It can not only avoid large-scale leveling, backfilling and compaction of the ground around the pile foundation hole, but also accurately control and adjust the elevation of the hanging rod. The platform can also be recycled. While ensuring the quality of the pile, it can adapt to the platform elevation requirements under different construction conditions, and safely and efficiently complete the steel cage lifting and docking, post-position fixing, and concrete pouring construction of bored cast-in-place piles. It has been widely used in the construction of bored cast-in-place piles with a diameter of 1.0~1.8m and a pile length of 64~83m.

[0008] The utility model is further configured as follows: the operating platform includes a plurality of platform main beams arranged around the pile foundation holes and connected end to end, a diagonal bracing beam arranged between two adjacent platform main beams, and a platform plate arranged on the platform main beam and the two adjacent diagonal bracing beams, and a gap is reserved between two adjacent platform plates for the installation of a slide seat.

[0009] By adopting the above technical solution, the main beam of the platform is a double-jointed 32a I-beam, which is connected end to end to form a U-shaped frame. The diagonal bracing beam is a double-jointed 32a I-beam and is set at the four corners of the U-shaped frame, which is conducive to forming a stable platform foundation. Working on the raised platform plate can largely prevent workers from falling into the pile foundation hole. Based on this, a platform plate is welded on the U-shaped frame. The platform plate uses a 10mm thick patterned steel plate, and the hoisting opening size (hollow size between platform plates) is about 1.9mm×1.9m It is suitable for the splicing of steel cages and concrete pouring of bored piles with a pile diameter of 1 to 1.8m. If there are piles with larger or smaller diameters, it can be changed as needed. When the pile diameter is 1m, the minimum distance between the edge of the platform plate and the steel cage is 0.45m, which meets the maximum distance requirements for workers to splice the steel cage while ensuring that the workers will not fall into the pile hole. When the pile diameter is 1.8m, the minimum distance between the edge of the platform plate and the steel bars is 0.05m, which just meets the requirements for assembling the steel cage and will not affect the pouring of the pile.

[0010] The utility model is further configured as follows: the slide seat includes a narrow-mouth fixing plate arranged on the platform main beam, and a wide-mouth fixing plate arranged on the diagonal support beam, there is a drop between the opening top walls of the wide-mouth fixing plate and the narrow-mouth fixing plate, and the adjustment pad is arranged between the diagonal support beam and the telescopic beam.

[0011] Alternatively, the slide seat includes a wide-mouth fixing plate arranged on the platform main beam, and a narrow-mouth fixing plate arranged on the diagonal support beam, there is a drop between the opening top walls of the wide-mouth fixing plate and the narrow-mouth fixing plate, and the adjustment pad is arranged between the platform main beam and the telescopic beam.

[0012] By adopting the above technical scheme, the narrow fixed plate of the telescopic beam adopts a 30mm thick steel plate in the shape of "∏", and a gap of only 5mm is left between the telescopic beam, so that the telescopic beam can basically only move forward or backward within the fixed mouth; the wide fixed plate of the telescopic beam adopts a 30mm thick steel plate in the shape of "∏", and a gap of 30mm is left between the telescopic beam, so that the telescopic beam can move vertically within 25mm. Adjustment pads of different thicknesses are arranged under the telescopic beam to realize the vertical elevation fine-tuning function.

[0013] The utility model is further configured as follows: the adjustable legs include a lower support seat, a coarse sand layer embedded in the lower support seat, and an upper support seat arranged at the bottom of the operating platform, the upper support seat is plugged into the lower support seat and abuts against the surface of the coarse sand layer.

[0014] By adopting the above technical solution, upper supporting seats can be respectively set at the four corners of the main beam of the operating platform. After the lower supporting seat is filled with coarse sand, the coarse sand is compacted and leveled to form a coarse sand layer. The elevation of the coarse sand layer is measured respectively, and the error is controlled within 10 mm. Then, the operating platform is placed through the upper supporting seat and inserted into the lower supporting seat to achieve one-stage elevation adjustment.

[0015] The utility model is further configured as follows: the lower support seat includes a base plate, a lower steel column arranged on the base plate, and a plurality of stiffening plates arranged between the base plate and the lower steel column, the coarse sand layer is embedded in the lower steel column, and the upper support seat is plugged into the lower steel column.

[0016] By adopting the above technical solution, better supporting strength is achieved.

[0017] The utility model is further configured as follows: the upper support seat includes an upper steel column arranged at the bottom of the operating platform, and a fine stone concrete layer embedded on the upper steel column, the upper steel column is inserted into the lower support seat, and the upper steel column and the fine stone concrete layer are in contact with the surface of the coarse sand layer.

[0018] By adopting the above technical solution, better supporting strength is achieved.

[0019] The utility model is further configured as follows: a lifting ring is arranged at one end of the telescopic beam away from the lifting opening.

[0020] By adopting the above technical solution, the telescopic beam, as the only support for the suspension of the steel cage, can adopt a rectangular cross-section with a good cross-sectional inertia moment. The telescopic beam is arranged diagonally at the four corner points of the platform main beam on the plane to reduce its bending pressure. Based on this, a lifting ring is set at the tail of the telescopic beam. The lifting ring adopts HPB300 steel bar. The lifting ring can be used to lift the platform as a whole or pull the telescopic beam forward and backward.

[0021] The utility model is further configured as follows: at least two limit blocks are arranged in parallel at one end of the telescopic beam close to the lifting port, and the hanging rod is arranged between two adjacent limit blocks.

[0022] By adopting the above technical solution, the limit block is welded to the end of the telescopic beam with two 50mm×15mm×15mm small steel bars, with a spacing of about 50mm. After the welding of the steel cage and the hanging rod is completed, it passes through the lifting port and is placed between the two limit blocks; the hanging rod is limited by the two limit blocks, and the position of the steel cage can be adjusted by pulling the tail of the telescopic beam to ensure the thickness of the protective layer of the pile foundation steel cage.

[0023] The utility model is further configured to include a driving cone slope arranged on one side of the operating platform.

[0024] By adopting the above technical solution, since the adjustable feet further raise the elevation of the operating platform, after the conduit and the hopper are installed between the telescopic beams, the height of the unloading chute of the concrete mixer truck is lower than the height of the hopper, resulting in the concrete mixer truck being unable to pour piles by self-unloading concrete. For this reason, a driving cone slope is set to raise the height of the concrete mixer truck so that the concrete mixer truck can approach the pile position; in addition, the driving cone slope can be composed of a "steel + steel plate" structure, and the panel is provided with anti-slip grooves to increase its friction.

[0025] To sum up, the beneficial technical effect of the utility model is as follows: the platform is installed on the ground through adjustable legs and an operating platform, which directly avoids the defect that the original platform is directly placed on the top of the casing to implement concrete pouring, resulting in the casing settlement and deformation of the pile foundation hole. The adjustable legs are used to adjust the elevation in the first stage, and the sliding seat, telescopic beam and adjusting pad are used to adjust the elevation in the second stage. It can not only avoid the large-scale leveling, backfilling and compaction of the ground around the pile foundation hole, but also can accurately control and adjust the elevation of the hanging bar. The platform can also be recycled. While ensuring the quality of the pile, it can adapt to the platform elevation requirements under different construction conditions, and safely and efficiently complete the steel cage lifting and docking, post-position fixing and concrete pouring construction of bored cast-in-place piles. It has been widely used in the construction of bored cast-in-place piles with a diameter of 1.0~1.8m and a pile length of 64~83m. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 The utility model is a three-dimensional structural schematic diagram of a multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform.

[0027] Figure 2 The utility model is a schematic diagram of the top view of the structure of the multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform.

[0028] Figure 3 It is a structural schematic diagram of the adjustable supporting leg of the utility model.

[0029] Figure 4 The utility model is a side view structural schematic diagram of a multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform.

[0030] In the figure, 1. operating platform; 11. lifting port; 12. platform main beam; 13. diagonal bracing beam; 14. platform plate; 2. adjustable legs; 21. bottom plate; 22. lower steel column; 23. stiffening plate; 24. coarse sand layer; 25. upper steel column; 26. fine stone concrete layer; 3. slide seat; 31. narrow-mouth fixed plate; 32. wide-mouth fixed plate; 4. telescopic beam; 41. lifting ring; 42. limit block; 5. adjustment pad; 6. lifting rod; 7. driving cone slope. DETAILED DESCRIPTION

[0031] In order to make the technical means, creative features, objectives and functions achieved by the present invention clearer and easier to understand, the present invention is further described below in conjunction with the accompanying drawings and specific implementation methods.

[0032] Reference Figure 1 , which is a multi-directional adjustable pile foundation steel cage lowering and pile pouring platform disclosed in the utility model, comprises an operating platform 1 with a lifting port 11, four adjustable legs 2 arranged at the bottom of the operating platform 1 and arranged around the lifting port 11, four slide seats 3 arranged at the top of the operating platform 1 and arranged around the lifting port 11, a telescopic beam 4 inserted on the slide seat 3 with a gap sliding, an adjustment pad 5 selectively arranged between the operating platform 1 and the telescopic beam 4, a hanging bar 6 hooked on the telescopic beam 4 and inserted on the lifting port 11, and a driving cone slope 7 arranged on one side of the operating platform 1. Among them, the lifting port 11 is arranged relative to the pile foundation hole and is arranged with a gap between it and the steel cage, and these hanging bars 6 are used to be welded on the steel cage.

[0033] During the actual construction process, the adjustable legs 2 are first installed around the pile foundation hole to make the operating platform 1 leveled for the first time, and the elevation of the adjustable legs is measured to control its error within 10 mm; then the telescopic beam 4 is placed on the operating platform 1 through the slide 3, and according to the elevation of the adjustable legs 2, an adjustment pad 5 is set between the telescopic beam 4 with a lower installation position and the operating platform 1, and the thickness of the adjustment pad 5 is correspondingly less than 10 mm, thereby forcing the telescopic beam 4 to be raised so that the elevation between these telescopic beams 4 meets the predetermined elevation control requirement; then the hanging rod 6 is welded to the steel cage, and the steel cage is lowered to the inner mouth of the pile foundation hole through the lifting port 11, and the hanging rod 6 is hooked on the telescopic beam 4, and the tops of these hanging rods 6 are approximately at the same height, and finally concrete is poured through the lifting port 11. In this process, the platform is installed on the ground through the adjustable legs 2 and the operating platform 1, which directly avoids the defect that the original platform is directly placed on the top of the casing to implement concrete pouring, resulting in the casing settlement and deformation of the pile foundation hole. The adjustable legs 2 are used to adjust the first stage of elevation, and the slide 3, telescopic beam 4 and adjustment pad 5 are used to adjust the second stage of elevation. It can not only avoid large-scale leveling, backfilling and compaction of the ground around the pile foundation hole, but also accurately control and adjust the elevation of the hanging rod 6. The platform can also be recycled. While ensuring the quality of the pile, it can adapt to the platform elevation requirements under different construction conditions, and safely and efficiently complete the steel cage lifting and docking, post-position fixing and concrete pouring construction of bored cast-in-place piles. It has been widely used in the construction of bored cast-in-place piles with a diameter of 1.0~1.8m and a pile length of 64~83m.

[0034] Reference Figure 2The operating platform 1 includes four platform main beams 12 arranged around the pile foundation hole and connected end to end, a diagonal bracing beam 13 arranged between two adjacent platform main beams 12, and a platform plate 14 arranged on the platform main beam 12 and two adjacent diagonal bracing beams 13. A gap for the installation of the slide 3 is reserved between two adjacent platform plates 14. The platform main beams 12 are double-jointed 32a I-beams, which are connected end to end to form a mouth-shaped frame. The diagonal bracing beams 13 are double-jointed 32a I-beams and are arranged at the four corners of the mouth-shaped frame, which is conducive to forming a stable platform foundation. Working on the raised platform plate 14 can largely prevent workers from falling into the pile foundation hole. Based on this, a platform plate 14 is welded on the mouth-shaped frame. The platform plate 14 uses a 10mm thick patterned steel plate. The size of the hoisting port 11 (the hollow size between the platform plates 14) is about 1.9mm×1.9m. It is suitable for the needs of splicing steel cages and pouring concrete for bored piles with a pile diameter of 1 to 1.8m. If there is a pile foundation with a larger or smaller diameter, it can be changed as needed; when the pile foundation diameter is 1m, the minimum distance between the edge of the platform plate 14 and the steel cage is 0.45m, which meets the maximum distance requirements for workers to splice the steel cage while ensuring that the workers will not fall into the pile hole; when the pile foundation diameter is 1.8m, the minimum distance between the edge of the platform plate 14 and the steel bars is 0.05m, which just meets the requirements for assembling the steel cage and will not affect the pouring of the pile.

[0035] Reference Figure 3 The adjustable leg 2 includes a bottom plate 21, a lower steel column 22 disposed on the bottom plate 21, four stiffening plates 23 disposed between the bottom plate 21 and the lower steel column 22, a coarse sand layer 24 embedded on the lower steel column 22, an upper steel column 25 disposed at the bottom of the platform main beam 12, and a fine stone concrete layer 26 embedded on the upper steel column 25. The upper steel column 25 is plugged into the lower support seat, and the upper steel column 25 and the fine stone concrete layer 26 are in contact with the surface of the coarse sand layer 24. The bottom plate 21, the lower steel column 22 and the stiffening plate 23 together form a lower supporting seat. Upper supporting seats can be respectively arranged at the four corners of the platform main beam 12 of the operating platform 1. After the lower supporting seat is filled with coarse sand, the coarse sand is compacted and leveled to form a coarse sand layer 24. The elevation of the coarse sand layer 24 is measured respectively, and the error is controlled within 10 mm. The upper steel column 25 and the fine stone concrete layer 26 together form an upper supporting seat. Then the operating platform 1 is placed through the upper supporting seat and inserted into the lower supporting seat to achieve a one-stage elevation adjustment.

[0036] Reference Figure 4The slide 3 includes a narrow-mouth fixing plate 31 arranged on the platform main beam 12, and a wide-mouth fixing plate 32 arranged on the diagonal bracing beam 13. There is a drop between the opening top wall of the wide-mouth fixing plate 32 and the narrow-mouth fixing plate 31. The adjusting pad 5 is arranged between the diagonal bracing beam 13 and the telescopic beam 4. The narrow fixing plate of the telescopic beam 4 adopts a 30mm thick steel plate in the shape of "∏", and the gap between the telescopic beam 4 and the telescopic beam 4 is only 5mm, so that the telescopic beam 4 can basically only move forward or backward in the fixed opening. The wide fixing plate of the telescopic beam 4 adopts a 30mm thick steel plate in the shape of "∏", and the gap between the telescopic beam 4 and the telescopic beam 4 is 30mm, so that the telescopic beam 4 can move vertically within 25mm. The adjusting pads 5 of different thicknesses are arranged under the telescopic beam 4 to realize the vertical elevation fine-tuning function.

[0037] The telescopic beam 4 is provided with a lifting ring 41 at one end away from the lifting port 11, and two limit blocks 42 are arranged in parallel at one end of the telescopic beam 4 close to the lifting port 11, and the hanging rod 6 is arranged between the two limit blocks 42. As the only support for the steel cage suspension, the telescopic beam 4 can adopt a rectangular cross-section with a good cross-sectional inertia moment. The telescopic beam 4 is arranged diagonally at the four corner points of the platform main beam 12 on the plane to reduce its bending pressure; based on this, a lifting ring 41 is provided at the tail of the telescopic beam 4, and the lifting ring 41 adopts HPB300 steel bars. Through the lifting ring 41, the platform can be hoisted as a whole or the telescopic beam 4 can be pulled forward and backward. The limit block 42 is made of two 50mm×15mm×15mm small steel bars welded to the end of the telescopic beam 4, with a spacing of about 50mm. After the steel cage and the hanging rod 6 are welded, they pass through the lifting port 11 and are placed between the two limit blocks 42; the hanging rod 6 is limited by the two limit blocks 42, and the position of the steel cage can be adjusted by pulling the tail of the telescopic beam 4 to ensure the thickness of the protective layer of the pile foundation steel cage.

[0038] The implementation principle of this embodiment is:

[0039] (1) After the bored piles are cleaned and tested, the site is initially leveled at the adjustable leg 2 and the driving cone slope 7;

[0040] (2) Place the lower support bases of the four corner adjustable legs 2 on the site, initially fill the lower steel column 22 with coarse sand and compact it, measure the height of the compacted coarse sand, and ensure that the heights of the coarse sand at the four corners are basically consistent. If the height error is large, continue to fill or dig out the coarse sand, compact it, and remeasure until the height meets the requirements;

[0041] (3) Pass the steel wire rope through the four lifting rings 41 to lift the platform as a whole;

[0042] (4) Align the upper support seat of the adjustable leg 2 with the lower support seat, and slowly lower the platform until the upper support seat is completely inserted into the lower support seat. Place some heavy objects on the operating platform 1 to compact it initially;

[0043] (5) Pull the four telescopic beams 4 to the far side through the lifting rings 41;

[0044] (6) Workers weld the steel cage step by step on the platform plate 14 of the operating platform 1. During the lowering of the upper and lower steel cages and the switching of welding processes, the four telescopic beams 4 can be pulled inward so that the steel cages can be temporarily placed on the telescopic beams 4;

[0045] (7) After the last section of the steel cage is welded and lowered, the hanger bars 6 are welded on the main bars of the steel cage;

[0046] (8) The crane passes the wire rope through the suspension rod 6 and lifts it into the air, passes the four telescopic beams 4 through the gaps of the suspension rod 6, and re-measures whether the elevations of the four ends of the telescopic beams 4 are flat and consistent. If the elevations are inconsistent (the error is within 25 mm), an adjustment pad 5 is set under the telescopic beam 4 until the elevation error is within 5 mm;

[0047] (9) Lower the steel wire rope so that the steel cage and the hanging rod 6 are completely placed on the telescopic beam 4, and ensure that the hanging rod 6 is between the two limit blocks 42;

[0048] (10) Check the center position of the steel cage. If there is a deviation in the plane position, pull the four telescopic beams 4 outward or push them inward so that the plane position of the steel bars can meet the design requirements and ensure the thickness of the steel cage protective layer;

[0049] (11) Lower the guide tubes into the steel cage section by section and splice them together, and perform a secondary cleaning of the pile position;

[0050] (12) After the secondary cleaning is completed and the inspection is qualified, the driving cone slope 7 and the safety hopper are placed;

[0051] (13) The concrete mixer truck drives up the driving cone slope 7 in reverse, straightens the discharge chute, and allows the concrete in the mixer truck to freely fall into the hopper through the discharge chute;

[0052] (14) After the pile is poured, the guide tube and hopper are removed. After a period of time after the pile concrete is finally set (usually 24 hours after pouring the concrete to prevent the steel cage from falling), the adjustment pad 5 is knocked open and the four telescopic beams 4 are unloaded onto the platform main beam 12. A gap appears between the telescopic beam 4 and the suspension bar 6. At this time, the telescopic beam 4 can be pulled outward to the far side to completely separate the platform structure from the steel cage.

[0053] (15) Pass the steel wire rope through the four lifting rings 41 to lift the platform superstructure away from the pile position;

[0054] (16) Adjust the lower supports of the adjustable legs 2 at the four corner points away from the pile position;

[0055] (17) Lift the driving cone slope 7 away from the pile position;

[0056] (18) Place the platform on the next pile.

[0057] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform, characterized in that: The invention comprises an operating platform (1) with a lifting opening (11), a plurality of adjustable legs (2) arranged at the bottom of the operating platform (1) and arranged around the lifting opening (11), a plurality of slide seats (3) arranged at the top of the operating platform (1) and arranged around the lifting opening (11), a telescopic beam (4) inserted into the slide seat (3) with a gap, an adjustment pad (5) selectively arranged between the operating platform (1) and the telescopic beam (4), and a hanging rod (6) hooked on the telescopic beam (4) and inserted into the lifting opening (11), wherein the lifting opening (11) is arranged relative to the hole of the pile foundation and is arranged with a gap between it and the steel cage, and the hanging rod (6) is used for welding to the steel cage.

2. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 1, characterized in that: The operating platform (1) comprises a plurality of platform main beams (12) arranged around the pile foundation holes and connected end to end, a diagonal bracing beam (13) arranged between two adjacent platform main beams (12), and a platform plate (14) arranged on the platform main beam (12) and the two adjacent diagonal bracing beams (13), wherein a gap is reserved between two adjacent platform plates (14) for installing a slide seat (3).

3. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 2, characterized in that: The slide seat (3) comprises a narrow-mouth fixing plate (31) arranged on the platform main beam (12), and a wide-mouth fixing plate (32) arranged on the diagonal bracing beam (13), there is a height difference between the opening top walls of the wide-mouth fixing plate (32) and the narrow-mouth fixing plate (31), and the adjustment pad (5) is arranged between the diagonal bracing beam (13) and the telescopic beam (4).

4. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 2, characterized in that: The slide seat (3) comprises a wide-mouth fixing plate (32) arranged on the platform main beam (12), and a narrow-mouth fixing plate (31) arranged on the diagonal support beam (13), there is a height difference between the opening top walls of the wide-mouth fixing plate (32) and the narrow-mouth fixing plate (31), and the adjustment pad (5) is arranged between the platform main beam (12) and the telescopic beam (4).

5. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 1, characterized in that: The adjustable support leg (2) comprises a lower support seat, a coarse sand layer (24) embedded in the lower support seat, and an upper support seat arranged at the bottom of the operating platform (1); the upper support seat is inserted into the lower support seat and contacts the surface of the coarse sand layer (24).

6. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 5, characterized in that: The lower support seat comprises a base plate (21), a lower steel column (22) arranged on the base plate (21), and a plurality of stiffening plates (23) arranged between the base plate (21) and the lower steel column (22); the coarse sand layer (24) is embedded in the lower steel column (22), and the upper support seat is plugged into the lower steel column (22).

7. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 5, characterized in that: The upper support seat comprises an upper steel column (25) arranged at the bottom of the operating platform (1), and a fine stone concrete layer (26) embedded in the upper steel column (25); the upper steel column (25) is plugged into the lower support seat, and the upper steel column (25) and the fine stone concrete layer (26) are in contact with the surface of the coarse sand layer (24).

8. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 1, characterized in that: A lifting ring (41) is provided at one end of the telescopic beam (4) away from the lifting opening (11).

9. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 8, characterized in that: At least two limit blocks (42) are arranged in parallel at one end of the telescopic beam (4) close to the lifting opening (11), and the hanging rod (6) is arranged between two adjacent limit blocks (42).

10. The multi-directionally adjustable pile foundation reinforcement cage lowering and pile pouring platform according to claim 1, characterized in that: It also includes a driving cone slope (7) arranged on one side of the operating platform (1).

Citation Information

Cited By

  • Reinforcement cage lowering and fixing device

    CN122446713A