Slurry returning system
By designing mud pools, slurry outlet pipes and slurry return pipe systems at pile foundation construction site, and using its own gravity and pumping mechanism to extract overflowed mud, the problems of mud waste and pipeline mess on the construction site are solved, and construction efficiency is improved and in winter Prevent the pipeline from freezing.
Patent Information
- Application Number
- CN202420741876.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-11
AI Technical Summary
During the pile foundation construction process, waste of mud and messy pipelines on the construction site lead to low construction efficiency.
A system including a mud pool, a slurry outlet tube and a slurry return tube was designed. The slurry return tube is buried underground in the construction site, and the side wall is equipped with branch pipes. The slurry pump is hoisted in the slurry overflow pool through a bracket, and is sent by its own gravity and pump. The mechanism draws overflowing mud into the mud pool, branch pipes and turn tubes are optimized for easy installation and flow.
The rationalization of the pipeline layout on the construction site and the improvement of construction efficiency have been achieved, mud waste has been reduced, and pipeline icing has been prevented in winter.
Smart Images

Figure CN222065478U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, in particular to a mud slurry return system. Background Art
[0002] During the construction of pile foundation, mud wall protection is required, so fresh mud needs to be continuously injected during the hole forming process. However, due to the displacement of concrete during the pouring process, if the mud in the hole is not pumped out in time, the mud will overflow from the hole mouth, causing the entire site to be full of mud, and causing mud waste. Then, during the construction process, a mud extraction system will be installed in each pile hole, and each will be independently connected to the mud pool to extract the mud from the pile hole. This will cause a large number of pipelines to appear on site, which will appear very messy in the construction site, resulting in the import pipelines in the mud pool being very messy, greatly affecting the construction efficiency. Utility Model Content
[0003] The utility model aims to overcome the shortcomings of the prior art and provide a mud slurry return system with reasonable pipeline layout and high construction efficiency.
[0004] The purpose of the utility model is achieved through the following technical scheme. The mud return system includes a mud pool, a slurry outlet pipe and a slurry return pipe. The slurry return pipe and the slurry outlet pipe are both connected to the side wall of the mud pool. The mud pool is built in the construction site, and the horizontal elevation of the mud pool is lower than the horizontal elevation of the slurry return pipe. The slurry return pipe is buried under the construction site, and a plurality of branch pipes are provided on the side wall of the slurry return pipe. The branch pipes are exposed in the construction site, and each of the branch pipes is connected to a branch pipe. A mud pump for pumping mud to the mud pool is connected to the end of the branch pipe. The mud pump is hoisted in the overflow pool by a bracket, and the overflow pool is communicated with the top of the pile hole.
[0005] The beneficial effects of the utility model are as follows: compared with the prior art, by providing a return slurry pipe and a branch pipe provided on the return slurry pipe, the mud overflowing from the pile hole flows into the overflow pool, and is pumped by a mud pump and pumped into the mud pool through the branch pipe and the return slurry pipe; the pipeline layout on the construction site is reasonable and the construction efficiency is more efficient.
[0006] Preferably, a plurality of branch pipes are provided on both sides of the circumferential wall of the return slurry pipe, and adjacent branch pipes are distributed at equal intervals, and the branch pipes are fixed to the branch pipes by clamps; through the above structure, the layout between the branch pipes and the return slurry pipe is more reasonable, one branch pipe can cover a part of the pile hole, and the construction efficiency is more efficient.
[0007] Preferably, the branch connecting pipe and the side wall of the return slurry pipe are integrally welded via a turning pipe, and the angle of the turning pipe is 45° to 60°; by providing a turning pipe, not only the installation between the branch connecting pipe and the branch pipe is facilitated, but also the smoothness of the mud flow process is facilitated.
[0008] Preferably, one end of the return slurry pipe is connected to the side wall of the mud pool, and the other end of the return slurry pipe is a closed end and is provided with a connecting pipe, which is connected to the exhaust port of the air compressor through the connecting pipe; the arrangement of the above structure not only facilitates the acceleration of the return slurry, but also can prevent ice from forming in the pipe during construction in winter.
[0009] Preferably, the return slurry pipe and the discharge slurry pipe are both located at the top of the side wall of the mud pool, the return slurry pipe is located on one side wall of the mud pool, and the discharge slurry pipe is located on the other side wall of the mud pool, and the horizontal plane at which one end of the return slurry pipe located in the mud pool is lower than the horizontal plane at which the other end of the return slurry pipe is located; through the arrangement of the above structure, the pipeline layout on the mud pool is more reasonable, and at the same time, through such arrangement of the return slurry pipe, the return slurry efficiency is better.
[0010] Preferably, the return slurry pipe and the branch pipe are both hard steel pipes, and the branch pipe is a high-pressure hose; this makes it easy to bury the return slurry pipe and the branch pipe under the construction site, and facilitates the connection between the branch pipe and the branch pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the main structure of the mud return system of the utility model.
[0012] Figure 2 It is a schematic diagram of the layout structure between the mud pool, the return slurry pipe and the branch pipe of the utility model.
[0013] Figure 3 It is a schematic diagram of the structure between the mud pool, the return slurry pipe and the slurry discharge pipe of the utility model.
[0014] The numbers in the attached drawings are: 1, mud pool; 2, slurry discharge pipe; 3, slurry return pipe; 4, construction site; 5, branch pipe; 6, branch pipe; 7, mud pump; 8, overflow pool; 9, pile hole; 10, turning pipe; 11, connecting pipe. DETAILED DESCRIPTION
[0015] The following is a detailed introduction to the utility model in conjunction with the accompanying drawings: Figures 1 to 3As shown, the utility model includes a mud pool 1, a slurry discharge pipe 2 and a return slurry pipe 3. The return slurry pipe 3 and the slurry discharge pipe 2 are both connected to the side wall of the mud pool 1. The mud pool 1 is built in the construction site 4, and the horizontal elevation of the mud pool 1 is lower than the horizontal elevation of the return slurry pipe 3, so that the mud in the return slurry pipe 3 has a tendency to flow to the mud pool 1 by its own gravity. The return slurry pipe 3 is buried under the construction site 4, and a plurality of branch pipes 5 are provided on the side wall of the return slurry pipe 3. The branch pipes 5 are exposed in the construction site 4, and each branch pipe 5 is connected to a branch pipe 6. A mud pump 7 for pumping mud to the mud pool 1 is connected to the end of the branch pipe 6. The mud pump 7 is hoisted in the overflow pool 8 through a bracket. The overflow pool 8 is communicated with the top of the pile hole 9. The overflow pool 8 is built in the construction site 4, and the horizontal elevation is lower than the horizontal elevation of the top of the pile hole 9, so that the mud in the pile hole 9 can flow into the overflow pool 8 by its own gravity.
[0016] A plurality of branch pipes 5 are provided on both sides of the circumferential wall of the return slurry pipe 3 , and adjacent branch pipes 5 are distributed at equal intervals, and the branch pipes 5 are fixed to the branch pipes 6 by clamps.
[0017] The branch pipe 5 and the side wall of the slurry return pipe 3 are integrally welded through a bend pipe 10, and the angle of the bend pipe 10 is 45° to 60°.
[0018] One end of the return pipe 3 is connected to the side wall of the mud pool 1, and the other end of the return pipe 3 is a closed end and is provided with a connecting pipe 11, which is connected to the exhaust port of the air compressor through the connecting pipe 11. The air compressor can use the existing air compressor in the construction site, without adding additional equipment, avoiding many unnecessary costs.
[0019] The return slurry pipe 3 and the discharge slurry pipe 2 are both located at the top of the side wall of the mud pool 1. The return slurry pipe 3 is located on one side wall of the mud pool 1, and the discharge slurry pipe 2 is located on the other side wall of the mud pool 1. The horizontal plane at one end of the return slurry pipe 3 located in the mud pool 1 is lower than the horizontal plane at the other end of the return slurry pipe 3.
[0020] The return slurry pipe 3 and the branch pipe 5 are both hard steel pipes, and the branch pipe 6 is a high-pressure hose.
[0021] The working principle of the utility model is as follows: during the pile foundation construction process, the mud in the pile hole 9 flows into the overflow pool 8 by its own gravity, the mud in the overflow pool 8 is pumped to the branch pipe 6 by the mud pump 7 and flows through the branch pipe 5 to the return pipe 3, and the mud flows into the mud pool 1 through the return pipe 3.
[0022] The present invention is not limited to the above-mentioned embodiments. Regardless of any changes in shape or material composition, any structural design provided by the present invention is a variation of the present invention and should be considered within the protection scope of the present invention.
Claims
1. A mud return system, comprising a mud pool (1), a mud outlet pipe (2) and a mud return pipe (3), characterized in that: The return slurry pipe (3) and the discharge slurry pipe (2) are both connected to the side wall of the mud pool (1). The mud pool (1) is built in the construction site (4), and the horizontal elevation of the mud pool (1) is lower than the horizontal elevation of the return slurry pipe (3). The return slurry pipe (3) is buried under the construction site (4), and a plurality of branch pipes (5) are provided on the side wall of the return slurry pipe (3). The branch pipes (5) are exposed in the construction site (4), and each of the branch pipes (5) is connected to a branch pipe (6). A mud pump (7) for pumping mud to the mud pool (1) is connected to the end of the branch pipe (6). The mud pump (7) is hoisted in the overflow pool (8) through a bracket, and the overflow pool (8) is communicated with the top of the pile hole (9).
2. The mud return system according to claim 1, characterized in that: A plurality of branch pipes (5) are provided on both sides of the circumferential wall of the return slurry pipe (3), and adjacent branch pipes (5) are distributed at equal intervals. The branch pipes (5) are fixed to the branch pipe (6) by means of clamps.
3. The mud return system according to claim 1 or 2, characterized in that: The branch pipe (5) and the side wall of the slurry return pipe (3) are integrally welded via a turning pipe (10), and the angle of the turning pipe (10) is 45° to 60°.
4. The mud return system according to claim 1, characterized in that: One end of the return slurry pipe (3) is connected to the side wall of the mud pool (1), and the other end of the return slurry pipe (3) is a closed end and is provided with a connecting pipe (11), which is connected to the exhaust port of the air compressor through the connecting pipe (11).
5. The mud return system according to claim 1, characterized in that: The return slurry pipe (3) and the discharge slurry pipe (2) are both located at the top of the side wall of the mud pool (1), the return slurry pipe (3) is located on one side wall of the mud pool (1), and the discharge slurry pipe (2) is located on the other side wall of the mud pool (1), and the horizontal plane at which one end of the return slurry pipe (3) located in the mud pool (1) is lower than the horizontal plane at which the other end of the return slurry pipe (3) is located.