Life line tying and hanging device for steel structure construction

By designing a lifeline hanging device including a fixed part, an elongated pole and a tie-up part in the construction of steel structure construction, the problem of the main beam purlin affecting the lifeline is solved, the construction safety is improved and the frequency of hanging points is reduced. , realizes the safety mount effect in steel structure construction.

CN222066243UActive Publication Date: 2024-11-26SOUTHWEST ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420711534.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-11-26
Estimated Expiration
2034-04-08

AI Technical Summary

Technical Problem

In steel structure construction, high-level fall accidents often occur due to the lack of safety mount points or lifelines, and the purlins on the main beam will affect the suspension of the lifelines, resulting in unsafe construction workers when replacing the mount points.

Method used

Design a steel structure construction lifeline hanger device, including a fixing part, an elongated rod and a hanger part. The fixing part is fixed to the main beam by locking crossbar, contact crossbar and locking bolts, so as to avoid the influence of purlins. , and set up the device every 5-10 meters on the main beam, adding pressure sensors and alarms to ensure stability and safety.

Benefits of technology

It effectively avoids the impact of purlins on the lifeline, reduces the frequency of construction workers changing the hanging points, improves construction safety, and promptly calls the alarm when a fall occurs to prevent secondary injuries.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066243U_ABST
    Figure CN222066243U_ABST
Patent Text Reader

Abstract

The utility model discloses a lifeline tying and hanging device for steel structure construction, which comprises a fixing part, an extension rod and a tying and hanging part. According to the utility model, the hanging device is fixed on the main beam, and the hanging part extends out through the extension rod, so that the influence of the purline above the main beam on the lifeline can be avoided; meanwhile, the hanging devices are arranged on the main beam every 5-10 meters, so that the constructors can conveniently move in the lifeline range, the frequency of replacing lifeline hanging points by the constructors is reduced, and the safety effect is guaranteed; the lifeline is erected on the main beam, so that secondary injury caused by collision between the falling personnel and the main beam can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction safety, and more specifically, to a lifeline hanging device for steel structure construction. Background Art

[0002] During the construction process, the incidence rate of falling accidents from heights is the highest and the danger is greatest. One of the reasons is that there is a lack of safety belt hanging points or lifelines in the high-altitude working areas. In order to improve construction safety, construction workers are required to wear safety belts or lifelines.

[0003] During the construction of steel structure buildings, in order to ensure the effective hanging of the lifeline, the lifeline needs to be hung on the main beam. However, since there are purlins on the main beam, when the construction workers move on the main beam, the lifeline hanging on the main beam is easily affected by the purlins, affecting the efficiency of the construction workers' activities. In order to reduce the impact of the purlins on the lifeline, the construction workers need to frequently change the hanging points, which results in the construction workers not being under the protection of the safety rope when changing the hanging points, which is prone to accidents. Utility Model Content

[0004] The utility model overcomes the problem of inconvenience in hanging a lifeline in the prior art and provides a lifeline hanging device for steel structure construction, in the hope of solving the above problem.

[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0006] A lifeline hanging device for steel structure construction, comprising a fixing part, an extension rod, and a hanging part;

[0007] The fixing part is used to fix the hanging device on the main beam;

[0008] One end of the extension rod is a fixing portion, and the other end is a hanging portion;

[0009] The hanging part is used for hanging a lifeline.

[0010] By fixing the hanging device on the main beam and extending the hanging part through the extension rod, the influence of the purlin above the main beam on the lifeline can be avoided. At the same time, by setting a hanging device every 5-10 meters on the main beam, construction workers can move conveniently within the lifeline range, reducing the frequency of construction workers changing the lifeline hanging point and ensuring safety.

[0011] A further technical solution is that the fixing part includes a locking cross bar, a contact cross bar, a vertical bar, and a locking bolt;

[0012] The locking cross bar and the contact cross bar are both connected to the vertical bar, and the locking cross bar has a through hole;

[0013] The locking bolt passes through the through hole.

[0014] When the locking bolt passes through the through hole on the locking cross bar and is tightened, a large friction force is generated between the locking bolt, the contact cross bar and the main beam, ensuring that the hanging device is fixed on the main beam.

[0015] A further technical solution is that the locking cross bar and the contact cross bar are parallel;

[0016] A non-slip pad is arranged on one side of the contact cross bar close to the locking cross bar.

[0017] A further technical solution is that a pressure sensor and a warning device are provided on the locking bolt;

[0018] The pressure sensor is connected to the warning device.

[0019] The pressure sensor can be used to determine whether the locking bolt has appropriate pressure. If the pressure is insufficient, it means that the mooring device is not stable enough. At this time, the warning device will alarm to remind the construction workers or installers to reinforce the mooring device.

[0020] A further technical solution is that the hanging part includes a hanging rod and a through hole;

[0021] The through hole is arranged on the hanging rod.

[0022] Compared with the existing direct bundling technical solution, by setting the through hole, the lifeline can be directly passed through the through hole to complete the installation and fixation, which is simpler and more convenient.

[0023] A further technical solution is that the tie rod and the extension rod are arranged vertically;

[0024] The number of via holes is 2.

[0025] A further technical solution is that the lifeline hanging device also includes an alarm;

[0026] The alarm is arranged on the hanging device, and when there is an impact on the hanging device, the alarm sounds an alarm.

[0027] When a person falls, it will impact the hanging device. The alarm will sound the alarm in time after detecting the impact, which can remind other staff to rescue the fallen construction personnel in time.

[0028] Compared with the prior art, the utility model has at least the following beneficial effects: the utility model can avoid the influence of the purlin above the main beam on the lifeline by fixing the hanging device on the main beam and then extending the hanging part through the extension rod; at the same time, by arranging a hanging device every 5-10 meters on the main beam, it is convenient for construction workers to move within the range of the lifeline, reducing the frequency of construction workers changing the lifeline hanging point and ensuring the safety effect; by installing the lifeline on the main beam, it can avoid secondary injuries caused by collision with the main beam after falling. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the side structure of the utility model;

[0030] Figure 2 This is a schematic diagram of the utility model being installed on an I-beam main beam structure.

[0031] In the figure, 1-fixing part, 11-locking cross bar, 12-contact cross bar, 13-vertical bar, 14-locking bolt, 141-warning device, 2-extension rod, 3-hanging part, 31-hanging rod, 32-through hole, 4-alarm. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0033] A lifeline hanging device for steel structure construction, see Figure 1 , including a fixing part 1, an extension rod 2, a hanging part 3, and an alarm 4;

[0034] The fixing part 1 is used to fix the hanging device on the main beam;

[0035] The fixing part 1 can be a tension bolt, an openable and closable annular fixing ring, a flat lifting belt binding, etc. In this embodiment, the fixing part 1 includes a locking cross bar 11, a contact cross bar 12, a vertical bar 13, and a locking bolt 14;

[0036] The locking cross bar 11 and the contact cross bar 12 are both connected to the vertical bar 13, the locking cross bar 11 and the contact cross bar 12 are parallel, and the locking cross bar 11 has a through hole;

[0037] A non-slip pad is provided on one side of the contact cross bar 12 close to the locking cross bar 11 .

[0038] The locking bolt 14 passes through the through hole, and a pressure sensor and a warning device 141 are provided on the locking bolt 14;

[0039] The pressure sensor is connected to the warning device 141 .

[0040] One end of the extension rod 2 is a fixing portion 1, and the other end is a hanging portion 3;

[0041] The hanging part 3 is used to hang a lifeline. The hanging part 3 can be a hook, a rope loop, etc. In this embodiment, the hanging part 3 includes a hanging rod 31 and a through hole 32. The hanging rod 31 is connected to the vertical rod 13, and the hanging rod 31 is perpendicular to the vertical rod 13. The through hole 32 is arranged on the hanging rod 31.

[0042] The hanging rod 31 is vertically arranged with respect to the extension rod 2 , and the number of the through holes 32 is two.

[0043] The alarm device 4 is arranged on the hanging device, and when there is an impact on the hanging device, the alarm device 4 will sound an alarm.

[0044] When in use, first fix the fixing part 1 on the main beam. In this embodiment, the main beam is an I-beam. First, the contact cross bar 12 is set above the upper surface of the I-beam. At this time, the locking cross bar 11 is located below the upper surface of the I-beam. By tightening the locking bolt 14, the anti-skid pad on the contact cross bar 12 is fixed to the upper surface of the I-beam by friction, so that the overall fixing of the hanging device is realized, and the lifeline is installed on the lifeline hanging device. See Figure 2 .

[0045] Before construction workers start construction, they hang their safety ropes on the lifeline. When the construction workers move, the safety ropes are not affected by the purlins, and they can still move within a certain range without changing the safety rope hanging points.

[0046] If the locking bolt 14 of the hook device is not installed and locked, or becomes loose during use, the pressure sensor on the locking bolt 14 can detect that the pressure does not meet the safety condition, and the warning device 141 will give an alarm, which can be a light alarm or a sound alarm. After the alarm, the security personnel will deal with the locking bolt 14 as soon as possible to avoid failure.

[0047] If a construction worker falls during construction, the safety rope of the construction worker can ensure that the construction worker is suspended on the lifeline and does not fall and get injured. At the same time, the impact caused by the falling person will impact the hanging device. After the alarm 4 detects the impact, it will alarm in time, which can remind other workers to rescue the fallen construction worker in time.

[0048] Although the utility model is described herein with reference to the illustrative embodiments of the utility model, it should be understood that those skilled in the art can design many other modifications and implementations, which will fall within the scope and spirit of the principles disclosed in the present application. More specifically, within the scope disclosed in the present application, multiple variations and improvements can be made to the components and / or layout of the subject combination layout. In addition to the variations and improvements made to the components and / or layout, other uses will also be obvious to those skilled in the art.

Claims

1. A lifeline hanging device for steel structure construction, characterized in that: It includes a fixing part, an extension rod, and a hanging part; The fixing part is used to fix the hanging device on the main beam; One end of the extension rod is a fixing portion, and the other end is a hanging portion; The hanging part is used for hanging a lifeline.

2. A lifeline hanging device for steel structure construction as claimed in claim 1, characterized in that: The fixing part comprises a locking cross bar, a contact cross bar, a vertical bar, and a locking bolt; The locking cross bar and the contact cross bar are both connected to the vertical bar, and the locking cross bar has a through hole; The locking bolt passes through the through hole.

3. A lifeline hanging device for steel structure construction as claimed in claim 2, characterized in that: The locking cross bar and the contact cross bar are parallel; A non-slip pad is arranged on one side of the contact cross bar close to the locking cross bar.

4. A lifeline hanging device for steel structure construction as claimed in claim 2, characterized in that: The locking bolt is provided with a pressure sensor and a warning device; The pressure sensor is connected to the warning device.

5. A lifeline hanging device for steel structure construction as claimed in claim 1, characterized in that: The hanging part includes a hanging rod and a through hole; The through hole is arranged on the hanging rod.

6. A lifeline hanging device for steel structure construction as claimed in claim 5, characterized in that: The tie rod is arranged perpendicularly to the extension rod; The number of vias is 2.

7. A lifeline hanging device for steel structure construction as claimed in any one of claims 1 to 6, characterized in that: Also includes alarm; The alarm is arranged on the hanging device, and when there is an impact on the hanging device, the alarm sounds an alarm.