Large-stroke bestriding drill carriage with telescopic drill boom
By designing a large-stroke drill boom telescopic straddle riding vehicle, using the U-shaped channel structure of track walking and beam assembly, the full-section permanent support of the anchor rod in coal seam excavation is achieved, solving the problem of coordination and cooperation of existing equipment, and improving the problem of improvement. Construction efficiency and safety.
Patent Information
- Application Number
- CN202420836216.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-22
AI Technical Summary
During the coal seam excavation process of existing coal equipment, it is difficult for independent individuals such as support equipment and drilling rigs to coordinate and cooperate, which affects construction efficiency and safety.
A large-stroke drill boom telescopic straddle riding drilling bike is designed, using a crawler walking part and beam assembly, and is ridden on the boring machine through a U-shaped channel to realize anchor support in the absence of the engine, and combined with the oil cylinder pushing structure to realize anchoring The full-section permanent support is provided, and is equipped with coal cleaning devices and flip-flopable pedals, which enhances safety and operational convenience.
It greatly improves the support efficiency and quality, shortens the support operation time, enhances construction safety and tunnel boring efficiency, is highly adaptable, and is simple in structure and cost-saving.
Smart Images

Figure CN222066722U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of coal equipment, in particular to a long-stroke drill arm telescopic straddled drill vehicle. Background Art
[0002] The construction methods for coal tunneling mainly include the following: drilling and blasting method, which is applicable to coal seams. Coal tunnels are excavated by drilling holes and placing explosives for blasting. In coal seams with gas or coal dust, millisecond detonators should be used to achieve full-section one-time blasting, and the delay time should be strictly controlled; pneumatic pick method, which is applicable to situations where the coal seams are soft or broken, and pneumatic picks are used to directly break the coal; mechanical or hydraulic tunneling method, using tunneling machines for coal tunneling, which can control the top control distance and avoid empty top operations, and is applicable to situations with good geological conditions; continuous coal mining machine tunneling method, which is applicable to coal seams, can realize functions such as coal dropping, coal loading, and coal transportation, and is applicable to coal tunneling with small coal seam slopes and rectangular or trapezoidal sections;
[0003] During the construction process, it is also necessary to select a suitable construction method according to the specific conditions of the coal seam. For example, in a coal seam with gas or coal dust, blasting equipment and blasting methods should be carefully selected to prevent gas or coal dust explosions. At the same time, the stability of the tunnel roof must be considered, and roof management should be done according to different rock breaking methods. Therefore, excavation equipment is very important. In the prior art, support equipment, drilling rigs, excavation equipment and other equipment are usually independent individuals, which are not convenient for coordination and cooperation with each other, affecting construction efficiency and safety. Therefore, the utility model proposes a large-stroke drill arm telescopic straddle drill vehicle to solve the problems existing in the prior art. Utility Model Content
[0004] In view of the above problems, the utility model proposes a long-stroke drill arm telescopic straddle drill vehicle, which can complete two-row anchor support operations without a machine, greatly shortening the support operation time and improving the support efficiency and support quality.
[0005] To achieve the purpose of the utility model, the utility model is implemented through the following technical solutions: a long-stroke drill arm telescopic straddle drilling vehicle, including a crawler walking part and a crossbeam assembly, the crossbeam assembly is arranged above the crawler walking part, and the inner side of the crossbeam assembly forms a U-shaped channel, the front end of the crossbeam assembly is provided with a front support, the front support includes an inner sleeve, a connecting front beam and a connecting frame, the inner sleeve is movably inserted at the front end of the crossbeam assembly, the connecting front beam is arranged at the front end of the inner sleeve, the connecting frame is arranged on both sides of the front end of the connecting front beam, and the front ends of the two groups of the connecting frames are provided with lower supports, the front ends of the two groups of the lower supports are provided with lifting sleeves, and the output end of the lifting sleeve is provided with a crossbeam;
[0006] A top beam is rotatably provided at the front end of the cross beam, and a cantilever beam is rotatably provided at the front end of the top beam. A top beam supporting cylinder is hinged at the middle position of the front end of the cross beam, and the output end of the top beam supporting cylinder is hinged to the top beam. Cantilever beam supporting cylinders are hinged on both sides of the front end of the cross beam, and the output end of the cantilever beam supporting cylinder is hinged to the cantilever beam. Displacement components are provided on both sides of the front end of the connecting front beam, and a drilling rig is provided on the displacement component.
[0007] Further improvements are: the crossbeam assembly includes a main beam and a support frame, the support frame is arranged on both sides of the main beam, and protective covers are provided below the outer sides of the two groups of support frames, an intermediate beam is provided at the middle position on the main beam, the inner sleeve is movably inserted into the interior of the intermediate beam, an oil cylinder barrel is provided above the intermediate beam, and a pushing cylinder is provided inside the oil cylinder barrel, and the output end of the pushing cylinder is hinged to the top of the inner sleeve.
[0008] A further improvement is that a flap is provided below the front end of the lifting sleeve, and a first pedal is provided at the rear end of the lower support.
[0009] Further improvements are: an oil tank pump station and a vacuum electromagnetic starter are respectively provided on both sides of the rear end of the top of the crawler walking part, and a coal cleaning device is provided at the front and rear ends of the crawler walking part, an upper support is provided at the rear end of the top of the crawler walking part, and a second pedal is provided on the coal cleaning device at the rear end.
[0010] A further improvement is that the coal cleaning device includes an outer sleeve and an inner sleeve, the inner sleeve is movably inserted into the interior of the outer sleeve, and a retracting and extending cylinder is connected to the upper part of the interior of the outer sleeve, the output end of the retracting and extending cylinder is connected to the bottom of the inner sleeve, and a coal cleaning shovel is provided below the inner sleeve.
[0011] A further improvement is that the upper support comprises a pressure-bearing oil cylinder and an extension rod, the extension rod is arranged at the output end of the pressure-bearing oil cylinder, and a supporting top plate is arranged above the extension rod.
[0012] A further improvement is that the displacement assembly includes left and right adjustment rails and up and down adjustment rails, a first slider is movably provided on the left and right adjustment rails, the up and down adjustment rails are fixed on the first slider, a second slider is movably provided on the up and down adjustment rails, and a swing cylinder is provided on the second slider, and the output end of the swing cylinder is connected to the drilling rig.
[0013] A further improvement is that grooves are provided on the inner sides of the left and right adjustment rails and the upper and lower adjustment rails, and driving parts for driving the first slider and the second slider to move are provided in the grooves. The left and right adjustment rails and the upper and lower adjustment rails are fixed parts, and the first slider and the second slider are movable parts.
[0014] A further improvement is that the driving part includes a bidirectional cylinder and a sprocket, sprockets are rotatably provided at both ends of the bidirectional cylinder, chains are wound around the two groups of sprockets on the same side, first chain clips are provided below the chains on both sides, and second chain clips are provided above the chains on both sides, the first chain clips are used to connect to the fixed part, and the second chain clips are used to connect to the movable part.
[0015] The beneficial effects of the utility model are:
[0016] 1. The utility model adopts a straddle-type walking mode. Through the function of the U-shaped channel, the machine can always straddle the tunnel boring machine and synchronously follow the tunnel boring machine to perform support operations. The excavation and anchoring are operated in parallel without affecting each other. The two sets of drilling rigs at the front end of the drilling vehicle can operate simultaneously and independently. A large-stroke drill arm telescopic structure is simultaneously adopted to integrate the front support with the drilling rig. The top beam and the cantilever beam are driven by the oil cylinder to rotate and lift, so as to complete the anchor support operation without the need for a machine, realize the permanent support of the top wall of the full-section anchor bolts and anchor cables of the tunnel at the same time, enhance the safety of construction, greatly shorten the support operation time, and improve the support efficiency and support quality.
[0017] 2. The utility model is provided with coal cleaning devices at the front and rear. The coal cleaning shovel is lowered to the bottom plate of the tunnel by retracting and extending the oil cylinder. It can not only stabilize the machine body during drilling operation, but also clean the floating coal on both sides of the tunnel and the crawler walking path during the moving operation, ensuring smooth travel and enhancing safety performance.
[0018] 3. The utility model can bear a large load, has good stability, simple structure, saves processing costs, and is provided with a flippable first pedal and a second pedal at the front and back, so that the operator's working space is increased and the operation is convenient.
[0019] 4. The utility model greatly improves the efficiency of tunnel excavation and improves the adaptability of supporting equipment to tunnel excavation.
[0020] 5. The utility model is provided with a liftable front support and a lower support at the front, and an upper support at the rear. It adopts a top-support and ground-support structure, making the whole machine safer and more stable during operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is the front view of the utility model;
[0022] Figure 2 It is a schematic diagram of the opening of the utility model;
[0023] Figure 3 This is a schematic diagram of the front support of the utility model;
[0024] Figure 4 It is a schematic side view of the front support of the utility model;
[0025] Figure 5 It is a schematic diagram of the upper structure of the crawler walking part of the utility model;
[0026] Figure 6 It is a schematic diagram of the crossbeam assembly of the utility model;
[0027] Figure 7 This is a schematic diagram of a coal cleaning device of the utility model;
[0028] Figure 8 This is a schematic diagram of the upper support of the utility model;
[0029] Fig. 9 It is a schematic diagram of the displacement assembly of the utility model;
[0030] Fig.10 It is a schematic diagram of the driving member of the utility model.
[0031] Among them: 1. crawler walking part; 2. crossbeam assembly; 3. front support; 4. U-shaped channel; 5. inner sleeve; 6. connecting front beam; 7. connecting frame; 8. lower support; 9. lifting sleeve; 10. crossbeam; 11. top beam; 12. cantilever beam; 13. top beam support cylinder; 14. cantilever beam support cylinder; 15. drilling rig; 16. main beam; 17. support frame; 18. shield; 19. middle beam; 20. cylinder barrel; 21. flap; 22. first pedal; 23. Oil tank pump station; 24. Vacuum electromagnetic starter; 25. Coal cleaning device; 26. Upper support; 27. Second pedal; 28. Outer sleeve; 29. Inner sleeve; 30. Retracting and extending cylinder; 31. Coal cleaning shovel; 32. Pressure cylinder; 33. Extension rod; 34. Support top plate; 35. Left and right adjustment rails; 36. Up and down adjustment rails; 37. First slider; 38. Second slider; 39. Bidirectional cylinder; 40. Sprocket; 41. Chain; 42. First chain clip; 43. Second chain clip. DETAILED DESCRIPTION
[0032] In order to deepen the understanding of the present invention, the present invention will be further described in detail below in conjunction with an embodiment. The embodiment is only used to explain the present invention and does not constitute a limitation on the protection scope of the present invention.
[0033] Embodiment 1
[0034] according to Figure 1-10As shown, this embodiment proposes a long-stroke drill arm telescopic straddle drilling vehicle, including a crawler walking part 1 and a crossbeam assembly 2, wherein the crossbeam assembly 2 is arranged above the crawler walking part 1, and a U-shaped channel 4 is formed on the inner side of the crossbeam assembly 2, and a front support 3 is provided at the front end of the crossbeam assembly 2, and the front support 3 includes an inner sleeve 5, a connecting front beam 6 and a connecting frame 7, wherein the inner sleeve 5 is movably inserted at the front end of the crossbeam assembly 2, the connecting front beam 6 is arranged at the front end of the inner sleeve 5, and the connecting frame 7 is arranged on both sides of the front end of the connecting front beam 6, and the front ends of the two groups of the connecting frames 7 are both provided with lower supports 8, and the front ends of the two groups of the lower supports 8 are both provided with lifting sleeves 9, and the output end of the lifting sleeve 9 is provided with a crossbeam 10;
[0035] A top beam 11 is rotatably provided at the front end of the cross beam 10, and a cantilever beam 12 is rotatably provided at the front end of the top beam 11. A top beam supporting cylinder 13 is hinged at the middle position of the front end of the cross beam 10, and the output end of the top beam supporting cylinder 13 is hinged to the top beam 11. Cantilever beam supporting cylinders 14 are hinged on both sides of the front end of the cross beam 10, and the output end of the cantilever beam supporting cylinder 14 is hinged to the cantilever beam 12. Displacement components are provided on both sides of the front end of the connecting front beam 6, and a drilling rig 15 is provided on the displacement component. When in use, a large-span U-shaped channel 4 structure is adopted. A U-shaped channel 4 with a width of 3.1 meters and a height of 1.9 meters is set in the middle of the fuselage, which can always straddle the tunnel boring machine. A front support 3 and two sets of drilling rigs 15 are set in front of the drilling vehicle, which can work simultaneously and independently for drilling holes for anchor support operations. The front support 3 is driven to extend and retract as a whole through the inner sleeve 5, and the maximum stroke can reach 1.6 meters. The top beam 11 and the cantilever beam 12 are driven to rotate and lift through the top beam support cylinder 13 and the cantilever beam support cylinder 14, and the lifting sleeve 9 is lifted and lowered, and the lower support 8 is extended downward. The top beam 11 can adapt to the tunnel roof with different degrees of inclination, and the cantilever beam 12 can swing up and down. When constructing the first row, the cantilever beam 12 is raised to increase the support area. When constructing the second row, the front support 3 is extended forward as a whole, and the cantilever beam 12 is retracted to protect the front. The two sets of drilling rigs 15 are symmetrically arranged on the left and right, and can be adjusted left and right, up and down, and rotated at multiple angles, so as to realize the anchor hole and anchor cable hole operations in the tunnel roof, as well as the anchor hole and support operations in the tunnel side walls with different height ranges.
[0036] The crossbeam assembly 2 includes a main beam 16 and a support frame 17. The support frame 17 is arranged on both sides of the main beam 16, and a shield 18 is provided below the outer sides of the two groups of support frames 17. An intermediate beam 19 is provided at the middle position on the main beam 16. The inner sleeve 5 is movably inserted into the interior of the intermediate beam 19. A cylinder barrel 20 is provided above the intermediate beam 19, and a push cylinder is provided inside the cylinder barrel 20. The output end of the push cylinder is hinged to the top of the inner sleeve 5. A flap 21 is provided below the front end of the lifting sleeve 9, and a first pedal 22 is provided at the rear end of the lower support 8. The main body adopts a combined welding structure of square steel and steel plate, which can withstand a large load, has good stability, simple structure, and saves processing costs; flip-over pedals and flaps 21 are provided at the front and back. When operating, the pedals are unfolded to increase the operating space of the operator and facilitate operation.
[0037] The two sides of the rear end of the top of the crawler walking part 1 are respectively provided with a tank pump station 23 and a vacuum electromagnetic starter 24 to provide power, and the front and rear ends of the crawler walking part 1 are provided with a coal cleaning device 25, and the rear end of the top of the crawler walking part 1 is provided with an upper support 26, and the coal cleaning device 25 at the rear end is provided with a second pedal 27. The front and rear are provided with flip-over pedals and flaps 21, and the pedals are unfolded during operation to increase the operating space of the operator and facilitate operation. The front part is provided with a liftable front support and a lower support, and the tail is provided with an upper support. The structure of supporting the top and supporting the ground is adopted, so that the whole machine is safer and more stable during operation.
[0038] The coal cleaning device 25 includes an outer sleeve 28 and an inner sleeve 29, the inner sleeve 29 is movably inserted inside the outer sleeve 28, and a retracting and extending oil cylinder 30 is connected to the upper part of the inner sleeve 28, the output end of the retracting and extending oil cylinder 30 is connected to the bottom of the inner sleeve 29, and a coal cleaning shovel 31 is provided below the inner sleeve 29. Coal cleaning devices 25 are provided at the front and rear, and the coal cleaning shovel 31 is lowered to the bottom plate of the tunnel by the retracting and extending oil cylinder 30, which can not only stabilize the machine body during drilling operations, but also clean the floating coal on both sides of the tunnel and the crawler walking path during traveling operations, ensuring smooth travel and enhancing safety performance.
[0039] The upper support 26 includes a pressure-bearing oil cylinder 32 and an extension rod 33. The extension rod 33 is arranged at the output end of the pressure-bearing oil cylinder 32, and a support top plate 34 is arranged above the extension rod 33. A front support and a lower support that can be raised and lowered are arranged at the front, and an upper support is arranged at the rear. The structure of supporting the top and supporting the ground is adopted, so that the whole machine is safer and more stable during operation.
[0040] Embodiment 2
[0041] according to Figure 1-10As shown, this embodiment proposes a long-stroke drill arm telescopic straddle drilling vehicle, including a crawler walking part 1 and a crossbeam assembly 2, wherein the crossbeam assembly 2 is arranged above the crawler walking part 1, and a U-shaped channel 4 is formed on the inner side of the crossbeam assembly 2, and a front support 3 is provided at the front end of the crossbeam assembly 2, and the front support 3 includes an inner sleeve 5, a connecting front beam 6 and a connecting frame 7, wherein the inner sleeve 5 is movably inserted at the front end of the crossbeam assembly 2, the connecting front beam 6 is arranged at the front end of the inner sleeve 5, and the connecting frame 7 is arranged on both sides of the front end of the connecting front beam 6, and the front ends of the two groups of the connecting frames 7 are both provided with lower supports 8, and the front ends of the two groups of the lower supports 8 are both provided with lifting sleeves 9, and the output end of the lifting sleeve 9 is provided with a crossbeam 10;
[0042] A top beam 11 is rotatably provided at the front end of the cross beam 10, and a cantilever beam 12 is rotatably provided at the front end of the top beam 11. A top beam supporting cylinder 13 is hinged at the middle position of the front end of the cross beam 10, and the output end of the top beam supporting cylinder 13 is hinged to the top beam 11. Cantilever beam supporting cylinders 14 are hinged on both sides of the front end of the cross beam 10, and the output end of the cantilever beam supporting cylinder 14 is hinged to the cantilever beam 12. Displacement components are provided on both sides of the front end of the connecting front beam 6, and a drilling rig 15 is provided on the displacement component. When in use, a large-span U-shaped channel 4 structure is adopted. A U-shaped channel 4 with a width of 3.1 meters and a height of 1.9 meters is set in the middle of the fuselage, which can always straddle the tunnel boring machine. A front support 3 and two sets of drilling rigs 15 are set in front of the drilling vehicle, which can work simultaneously and independently for drilling holes for anchor support operations. The front support 3 is driven to extend and retract as a whole through the inner sleeve 5, and the maximum stroke can reach 1.6 meters. The top beam 11 and the cantilever beam 12 are driven to rotate and lift through the top beam support cylinder 13 and the cantilever beam support cylinder 14, and the lifting sleeve 9 is lifted and lowered, and the lower support 8 is extended downward. The top beam 11 can adapt to the tunnel roof with different degrees of inclination, and the cantilever beam 12 can swing up and down. When constructing the first row, the cantilever beam 12 is raised to increase the support area. When constructing the second row, the front support 3 is extended forward as a whole, and the cantilever beam 12 is retracted to protect the front. The two sets of drilling rigs 15 are symmetrically arranged on the left and right, and can be adjusted left and right, up and down, and rotated at multiple angles, so as to realize the anchor hole and anchor cable hole operations in the tunnel roof, as well as the anchor hole and support operations in the tunnel side walls with different height ranges.
[0043] The displacement assembly includes a left-right adjustment rail 35 and an up-down adjustment rail 36, a first slider 37 is movably provided on the left-right adjustment rail 35, the up-down adjustment rail 36 is fixed on the first slider 37, a second slider 38 is movably provided on the up-down adjustment rail 36, and a swing cylinder is provided on the second slider 38, and the output end of the swing cylinder is connected to the drilling rig 15. The two sets of drilling rigs 15 are arranged symmetrically in left and right, and the drilling rig 15 can be adjusted left and right, up and down, and rotated at multiple angles through the left-right adjustment rail 35, the up-down adjustment rail 36 and the swing cylinder.
[0044] The inner sides of the left and right adjustment rails 35 and the upper and lower adjustment rails 36 are provided with grooves, and the grooves are provided with driving parts for driving the first slider 37 and the second slider 38 to move. The left and right adjustment rails 35 and the upper and lower adjustment rails 36 are fixed parts, and the first slider 37 and the second slider 38 are movable parts. The driving parts include a two-way oil cylinder 39 and a sprocket 40. The two ends of the two-way oil cylinder 39 are provided with sprockets 40 for rotation. Chains 41 are wound around the two groups of sprockets 40 on the same side. The lower sides of the chains 41 on both sides are provided with first chain clips 42, and the upper sides of the chains 41 on both sides are provided with second chain clips 43. The first chain clips 42 are used to connect with the fixed parts, and the second chain clips 43 are used to connect with the movable parts. When in use, the two-way oil cylinder 39 moves, because the first chain clips 42 are connected with the fixed parts, so that the chain 41 is pulled and operated, driving the second chain clips 43 to move, driving the movable parts to move, and the drilling rig 15 can be adjusted left and right and up and down to achieve a larger sliding stroke.
[0045] The large-stroke drill arm telescopic straddle drilling vehicle adopts a straddle walking mode. Through the function of the U-shaped channel 4, it can always straddle the tunnel boring machine and synchronously follow the tunnel boring machine to perform support operations. The digging and anchoring are operated in parallel without affecting each other. The two sets of drilling rigs 15 at the front end of the drilling vehicle can work simultaneously and independently. The large-stroke drill arm telescopic structure is synchronously adopted to integrate the front support 3 with the drilling rig 15. The top beam 11 and the cantilever beam 12 are driven by the oil cylinder to rotate and lift up to complete the anchor support operation without the machine, and the full-section anchor bolt and anchor cable top side of the tunnel is permanently supported at the same time, which enhances the safety of construction, greatly shortens the support operation time, and improves the support efficiency and support quality. In addition, the front and rear of this product are equipped with coal cleaning devices 25. The coal cleaning shovel 31 is lowered to the bottom plate of the tunnel by the retracting and expanding oil cylinder 30, which can not only stabilize the machine body during drilling operations, but also clean the floating coal on both sides of the tunnel and the crawler walking path during the traveling operation, ensuring smooth travel and enhancing safety performance. At the same time, this product can withstand a large load, has good stability, simple structure, and saves processing costs. It is equipped with a reversible first pedal 22 and a second pedal 27 at the front and back, which increases the operator's working space and facilitates operation. In addition, this product uses a solenoid valve plus remote control to achieve remote control, which is convenient for the staff to observe the route of the equipment when it is moving, avoids collisions between the unit and the conveyor belt or tunnel, and avoids unsafe accidents. The entire machine is hydraulically controlled. This product greatly improves the efficiency of tunnel excavation and the adaptability of support equipment to tunnel excavation. It is the preferred equipment for realizing fast, efficient and mechanized tunnel excavation support. This product is driven by high-power hydraulic motor drive technology to achieve anchor rod and anchor cable construction operations, improve equipment efficiency, and improve the working environment.
[0046] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A long-stroke drill arm telescopic straddle drilling vehicle, comprising a crawler walking part (1) and a crossbeam assembly (2), characterized in that: The crossbeam assembly (2) is arranged above the crawler walking part (1), and a U-shaped channel (4) is formed on the inner side of the crossbeam assembly (2). A front support (3) is arranged at the front end of the crossbeam assembly (2). The front support (3) comprises an inner sleeve (5), a connecting front beam (6) and a connecting frame (7). The inner sleeve (5) is movably inserted at the front end of the crossbeam assembly (2). The connecting front beam (6) is arranged at the front end of the inner sleeve (5). The connecting frame (7) is arranged on both sides of the front end of the connecting front beam (6). The front ends of the two groups of the connecting frames (7) are both provided with lower supports (8). The front ends of the two groups of the lower supports (8) are both provided with lifting sleeves (9), and the output end of the lifting sleeve (9) is provided with a crossbeam (10). The front end of the cross beam (10) is rotatably provided with a top beam (11), and the front end of the top beam (11) is rotatably provided with a cantilever beam (12); a top beam supporting oil cylinder (13) is hingedly connected at the middle position of the front end of the cross beam (10), and the output end of the top beam supporting oil cylinder (13) is hingedly connected to the top beam (11); cantilever beam supporting oil cylinders (14) are hingedly connected to both sides of the front end of the cross beam (10), and the output end of the cantilever beam supporting oil cylinder (14) is hingedly connected to the cantilever beam (12); displacement components are provided on both sides of the front end of the connecting front beam (6), and a drilling rig (15) is provided on the displacement component.
2. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 1, characterized in that: The crossbeam assembly (2) comprises a main beam (16) and a support frame (17), wherein the support frame (17) is arranged on both sides of the main beam (16), and a protective cover (18) is arranged below the outer sides of the two groups of the support frames (17), an intermediate beam (19) is arranged at the middle position on the main beam (16), the inner sleeve (5) is movably inserted into the interior of the intermediate beam (19), an oil cylinder barrel (20) is arranged above the intermediate beam (19), and a pushing oil cylinder is arranged inside the oil cylinder barrel (20), and the output end of the pushing oil cylinder is hinged to the top of the inner sleeve (5).
3. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 1, characterized in that: A flap (21) is provided below the front end of the lifting sleeve (9), and a first pedal (22) is provided at the rear end of the lower support (8).
4. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 1, characterized in that: An oil tank pump station (23) and a vacuum electromagnetic starter (24) are respectively provided on both sides of the rear end of the top of the crawler walking part (1), and a coal cleaning device (25) is provided at the front and rear ends of the crawler walking part (1). An upper support (26) is provided at the rear end of the top of the crawler walking part (1), and a second pedal (27) is provided on the coal cleaning device (25) at the rear end.
5. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 4, characterized in that: The coal cleaning device (25) comprises an outer sleeve (28) and an inner sleeve (29), wherein the inner sleeve (29) is movably inserted into the interior of the outer sleeve (28), and a retractable oil cylinder (30) is connected to the upper part of the interior of the outer sleeve (28), and the output end of the retractable oil cylinder (30) is connected to the bottom of the interior of the inner sleeve (29), and a coal cleaning shovel (31) is provided below the inner sleeve (29).
6. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 5, characterized in that: The upper support (26) comprises a pressure-bearing oil cylinder (32) and an extension rod (33). The extension rod (33) is arranged at the output end of the pressure-bearing oil cylinder (32), and a supporting top plate (34) is arranged above the extension rod (33).
7. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 1, characterized in that: The displacement assembly comprises a left and right adjustment rail (35) and an up and down adjustment rail (36); a first slider (37) is movably provided on the left and right adjustment rail (35); the up and down adjustment rail (36) is fixed on the first slider (37); a second slider (38) is movably provided on the up and down adjustment rail (36); a swing cylinder is provided on the second slider (38); an output end of the swing cylinder is connected to a drilling rig (15).
8. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 7, characterized in that: The inner sides of the left and right adjustment rails (35) and the upper and lower adjustment rails (36) are both provided with grooves, and driving parts for driving the first slider (37) and the second slider (38) to move are provided in the grooves. The left and right adjustment rails (35) and the upper and lower adjustment rails (36) are fixed parts, and the first slider (37) and the second slider (38) are movable parts.
9. The long-stroke drill arm telescopic straddle drilling vehicle according to claim 8, characterized in that: The driving member comprises a bidirectional oil cylinder (39) and a sprocket (40), sprockets (40) are rotatably provided at both ends of both sides of the bidirectional oil cylinder (39), chains (41) are wound around two groups of sprockets (40) on the same side, first chain clips (42) are provided below the chains (41) on both sides, and second chain clips (43) are provided above the chains (41) on both sides, the first chain clips (42) are used to connect with the fixed member, and the second chain clips (43) are used to connect with the movable member.