Lap joint type mine roadway supporting steel arch
By segmenting the supporting steel arch frame of the mine tunnel and connecting it with U-shaped card and bolts, and setting a transition gap to allow sliding, the problem of steel arch frame breakage is solved, and the repairability of the material and the continuity of the construction period is achieved.
Patent Information
- Application Number
- CN202420672712.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-03
AI Technical Summary
The existing mine tunnel supporting steel arch frame is prone to break when under stress, resulting in waste of materials and impact on construction period, and cannot be repaired and utilized.
The steel arch frame is divided into multiple sections, adopting a fastening connection between U-shaped cards and bolts, setting a transition gap to allow the arch to slide, avoid breakage, and quickly recovered by removing and replacing the steel arch frame.
It extends the service life of the steel arch frame, avoids waste of materials after breaking, ensures the continuity of the construction period, and realizes rapid replacement and recovery of the steel arch frame.
Smart Images

Figure CN222066788U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of mining equipment, in particular to an overlapped mine tunnel supporting steel arch frame. Background Art
[0002] During the mining process, the excavated tunnels need to be supported. In the existing construction, steel arch frames are often used for support. During the support, the arch and the arch foot are fixed to the outer wall with bolts. The force is applied in a vertical axis. When the arch is subjected to a large pressure, the steel arch is prone to breakage. Since the steel arch is an integrally formed one, it cannot be repaired and utilized after being broken and can only be discarded. This not only wastes materials, but also affects the normal construction period. Utility Model Content
[0003] The utility model aims to overcome the disadvantages of the prior art and provides an overlapping type mine tunnel supporting steel arch frame.
[0004] The purpose of the utility model is achieved through the following technical solutions: a lap-jointed mine tunnel supporting steel arch frame, the steel arch frame is divided into at least five sections, namely the arch frame top section at the top and the arch frame bottom section and arch frame middle section symmetrical on both sides; the top of the arch frame bottom section abuts with the bottom end of the arch frame middle section, and a second U-shaped clip is provided at the abutment point to wrap and fasten it to the outer wall of the mine tunnel; a transition gap is provided between the arch frame top section and the arch frame middle section, and the bottom end of the arch frame top section is fastened and connected with the top end of the arch frame middle section by a first U-shaped clip and wrapped and fastened to the outer wall of the mine tunnel; the arch frame top section and the arch frame bottom section are fastened to the outer wall of the mine tunnel by U-shaped bolts.
[0005] Optionally, the second U-shaped clip and the first U-shaped clip are fastened to the outer wall of the mine tunnel by screws.
[0006] Optionally, a U-shaped blocking piece is provided in the first U-shaped card, and the bottom of the top section of the arch frame abuts against the blocking piece.
[0007] Optionally, a third U-shaped clip is provided in the middle of the middle section of the arch frame and is fastened to the outer wall of the mine tunnel by screws.
[0008] Optionally, the cross-section of the steel arch frame is set to a trapezoid, and the first U-shaped clip, the second U-shaped clip, and the third U-shaped clip are set to a shape that matches the cross-section of the steel arch frame.
[0009] Optionally, the top section of the middle section of the arch gradually increases in circumference from top to bottom.
[0010] The utility model has the following advantages: in this scheme, the steel arch frame is divided into sections, and a transition gap is set between the top section of the arch frame and the middle section of the arch frame. The bottom end of the top section of the arch frame and the top end of the middle section of the arch frame are fastened and connected with the first U-shaped clip and wrapped and fastened on the outer wall of the mine tunnel. In this way, at this place, due to the fastening and pulling of the first U-shaped clip at the beginning, even if there is a gap, under the premise that the friction between the first U-shaped clip and the top section of the arch frame is greater than the downward pressure of the top section of the arch frame, the transition gap can be preserved while having a certain expenditure capacity. When the pressure of the arch increases, the steel frame of the arch can slide downward for a certain distance. When the deformation displacement of the arch top is large, the steel arch frame can be dismantled and the arch can be restored to continue using it. This not only avoids the inability to repair and utilize after fracture and damage, but also avoids affecting the normal construction period by quickly replacing and quickly resuming construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. It is obvious that the drawings described below are only some embodiments of the utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0012] Figure 1 It is a structural schematic diagram of the utility model.
[0013] Figure 2 It is a front view of the utility model.
[0014] Figure 3 It is a partial enlarged view of the side view of the utility model.
[0015] Figure 4 This is a schematic diagram of the first U-shaped card result of the utility model.
[0016] In the figure, the arch frame bottom section (1), the arch frame top section (2), the arch frame middle section (3), the first U-shaped clip (4), the second U-shaped clip (5), the third U-shaped clip (6), the transition gap (7), and the baffle (41). DETAILED DESCRIPTION
[0017] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0018] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0019] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0020] like Figure 1 , Figure 2 , Figure 3 , Figure 4 The illustrated embodiment shows a lap-jointed steel arch frame for supporting mine tunnels. In this scheme, the steel arch frame is divided into at least five sections, namely, the top arch frame section 2, the bottom arch frame section 1 and the middle arch frame section 3, which are symmetrical on both sides. Since most steel arch frames are actually arc-shaped frames, the top of the bottom arch frame section 1 is abutted against the bottom end of the middle arch frame section 3, and a second U-shaped clip 5 is provided at the abutment point to wrap and fasten the arch frame to the outer wall of the mine tunnel. In this way, although the bottom arch frame section 1 and the middle arch frame section 3 are wind-opened and segmented, they are connected as a whole by being wrapped and fastened by the second U-shaped clip 5 when subjected to force. When it is necessary to replace one of the sections, the corresponding U-shaped clip can be opened and separated for replacement. After the segmentation of this scheme, it is important to set a transition gap 7 between the arch frame top section 2 and the arch frame middle section 3. The bottom end of the arch frame top section 2 and the top end of the arch frame middle section 3 are fastened and connected by the first U-shaped clip 4 and wrapped and fastened on the outer wall of the mine tunnel. In this way, at this place, due to the fastening and pulling of the first U-shaped clip 4 at the beginning, even if there is a gap, under the premise that the friction between the first U-shaped clip 4 is greater than the downward pressure of the arch frame top section 2, the transition gap 7 can be preserved while having a certain expenditure capacity. When the arch pressure increases, the arch steel frame can slide downward for a certain distance. When the deformation displacement of the arch top is large, the steel arch frame can be removed and the arch can be restored to continue to use the steel arch frame, which not only avoids the inability to repair and use after the fracture and damage, but also avoids affecting the normal construction period by quickly replacing and quickly restoring the construction. At the same time, if necessary, the arch frame top section 2 and the arch frame bottom section 1 are fastened to the outer wall of the mine tunnel by U-shaped bolts for positioning to avoid excessive dislocation.
[0021] In another embodiment, a fastening method of the second U-shaped clip 5 and the first U-shaped clip 4 is to fasten them to the outer wall of the mine tunnel by screws, so as to facilitate connection and removal.
[0022] In another embodiment, a connection structure for increasing the size of the first U-shaped card 4 and the arch top section 2 is that a U-shaped baffle 41 is provided in the first U-shaped card 4, and the bottom of the arch top section 2 abuts against the baffle 41. At the same time, the top section of the arch middle section 3 gradually increases in circumference from top to bottom.
[0023] In another embodiment, in order to enhance the stability of the arch middle section 3, a third U-shaped clip 6 is provided in the middle of the arch middle section 3 and is fastened to the outer wall of the mine tunnel by screws.
[0024] In another embodiment, in order to enhance the stability of the overall arch frame, the cross-section of the steel arch frame is set to a trapezoid, and the first U-shaped card 4, the second U-shaped card 5, and the third U-shaped card 6 are set to a shape that matches the cross-section of the steel arch frame.
[0025] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A lap-jointed mine tunnel support steel arch frame, characterized in that: The steel arch frame is divided into at least five sections, namely, a top arch frame section (2) and two symmetrical arch frame bottom sections (1) and an arch frame middle section (3); the top of the arch frame bottom section (1) is abutted against the bottom of the arch frame middle section (3), and a second U-shaped clip (5) is provided at the abutment point to wrap and fasten the arch frame to the outer wall of the mine tunnel; a transition gap (7) is provided between the arch frame top section (2) and the arch frame middle section (3), and the bottom end of the arch frame top section (2) is fastened to the top of the arch frame middle section (3) by a first U-shaped clip (4) and is wrapped and fastened to the outer wall of the mine tunnel; the arch frame top section (2) and the arch frame bottom section (1) are fastened to the outer wall of the mine tunnel by U-shaped bolts.
2. The overlapping type mine tunnel support steel arch frame according to claim 1 is characterized in that: The second U-shaped clamp (5) and the first U-shaped clamp (4) are fastened to the outer wall of the mine tunnel by means of screws.
3. The overlapping type mine tunnel support steel arch frame according to claim 1 or 2, characterized in that: A U-shaped blocking piece (41) is arranged in the first U-shaped clamp (4), and the bottom of the arch frame top section (2) abuts against the blocking piece (41).
4. The overlapping type mine tunnel support steel arch frame according to claim 1 is characterized in that: A third U-shaped clamp (6) is arranged in the middle of the arch frame middle section (3) and is fastened to the outer wall of the mine tunnel by means of screws.
5. The overlapping type mine tunnel support steel arch frame according to claim 1 is characterized in that: The cross section of the steel arch is set to be a trapezoid, and the first U-shaped clip (4), the second U-shaped clip (5), and the third U-shaped clip (6) are set to a shape that matches the cross section of the steel arch.
6. The overlapping type mine tunnel support steel arch frame according to claim 1 is characterized in that: The top cross section of the arch frame middle section (3) has a circumference that gradually increases from top to bottom.
