Pretreatment device for bottled gas
By designing a gas pretreatment device including a gas collector, a fixing frame, a communication pipe and a valve, a pressure plate and a needle can be used to degass multiple sets of gas cylinders at the same time and directly transported to the rotary kiln for incineration, the gas in the prior art has been solved The problems of low pretreatment efficiency and waste of resources have achieved more efficient gas collection and output.
Patent Information
- Application Number
- CN202420336989.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-02-23
AI Technical Summary
The existing gas pretreatment efficiency is low and gas loss occurs during the transfer process, resulting in waste of resources.
A pretreatment device for bottled gas is designed, including a gas collecting box, a fixing frame, a communication pipe and a valve. By setting up a pressure plate and a needle, multiple sets of gas cylinders are deflated simultaneously, and gas collection is accelerated and directly conveyed through the communication pipe and valve. Go to the rotary kiln for incineration to avoid gas loss.
Improves gas pretreatment speed and efficiency, reduces resource waste, and ensures efficient gas output.
Smart Images

Figure CN222068259U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pretreatment, in particular to a pretreatment device for bottled gas. Background Art
[0002] When producing bottled gas, the required gas needs to be produced first, either by extracting it from the atmosphere or by making it through chemical reactions or other methods. The produced gas usually needs to be purified to remove impurities and other impurities. After the gas is produced, the steps before the gas is compressed and filled into the bottle are called gas pretreatment steps.
[0003] However, the existing gas pretreatment is the discharge of a single group of gases, which makes the entire pretreatment slow and inefficient. In addition, after the gas is pretreated, the gas needs to be transferred to a subsequent device. Gas is lost during the pretreatment and transfer operations, which further reduces the final output of the gas and causes a waste of resources. In view of the above problems, a pretreatment device for bottled gas is proposed. Utility Model Content
[0004] The utility model aims to solve the problems of low pretreatment efficiency and leakage waste caused by transportation after treatment in the prior art, and proposes a pretreatment device for bottled gas.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a pretreatment device for bottled gas, comprising a gas collecting box, two groups of fixed frames, a connecting pipe and a valve, wherein ten groups of sleeves are installed through the top of the gas collecting box, a fixing ring is fixedly installed on the outer wall of the connecting pipe, a fixing rod is fixedly installed on the top of the fixing ring, a rotating rod is rotatably connected inside the fixing rod, two groups of limiting ears are fixedly installed on the outer wall of the rotating rod, a connecting ring is provided on the outer wall of the rotating rod, a connecting rod is rotatably connected to the bottom of the connecting ring, a supporting frame is fixedly installed on the bottom of the connecting rod, a pressing plate is fixedly installed on the bottom of the supporting frame, a fixing seat is fixedly installed inside the ten groups of sleeves, a ventilation pipe is installed through the inside of the fixing seat, and a needle is fixedly installed on the top of the ventilation pipe.
[0006] Preferably, one side of the two groups of fixing frames are respectively fixedly connected to the two sides of the air collecting box, and one end of the connecting pipe is installed through one side of the air collecting box.
[0007] Preferably, the connecting pipe is installed through the interior of the valve, and the connecting ring is arranged between the two groups of limiting ears.
[0008] Preferably, the connecting ring passes through the interior of the connecting rod, and one side of the fixing ring is fixedly mounted to one side of the air collecting box.
[0009] Preferably, one end of the ventilation pipe is arranged to penetrate the interior of the air collecting box, and the needle is arranged inside the sleeve.
[0010] Preferably, two groups of limit rods are fixedly installed on the top of the air collecting box, and the two groups of limit rods pass through the interior of the pressure plate.
[0011] Compared with the prior art, the advantages and positive effects of the utility model are:
[0012] 1. In the utility model, by setting a pressure plate and a needle, multiple groups of gas cylinders can be deflated at the same time, which accelerates the collection of gas and makes the entire pretreatment faster and more efficient. In addition, after the gas is pretreated, it directly enters the rotary kiln through a connecting pipe and a valve for the next step of incineration, thereby further improving the gas output efficiency and avoiding waste of resources.
[0013] 2. In the utility model, two sets of limit rods are provided to limit the position of the pressure plate when the pressure plate squeezes the gas cylinder, so that the pressure plate can only move in the vertical direction. Since the connecting ring is in a state of being suspended on the outer wall of the rotating rod, when the rotating rod makes a fan-shaped circular motion, a vertical downward pressure is provided to the pressure plate, ensuring that the needle can smoothly pierce the gas cylinder to achieve the effect of fast and efficient deflation. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The utility model provides a three-dimensional structural schematic diagram of a bottled gas pretreatment device;
[0015] Figure 2 This is a top view of the three-dimensional structure of a bottled gas pretreatment device proposed by the utility model;
[0016] Figure 3 The utility model provides a schematic structural diagram of a gas collecting box of a bottled gas pretreatment device;
[0017] Figure 4 The utility model provides a three-dimensional structural schematic diagram of a vent pipe of a bottled gas pretreatment device.
[0018] Legend: 1. Gas collecting box; 2. Fixed frame; 3. Sleeve; 4. Limit rod; 5. Connecting pipe; 6. Valve; 7. Fixed ring; 8. Fixed rod; 9. Rotating rod; 10. Limit ear; 11. Connecting ring; 12. Connecting rod; 13. Support frame; 14. Press plate; 15. Fixed seat; 16. Ventilation pipe; 17. Needle. DETAILED DESCRIPTION
[0019] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0020] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0021] Embodiment 1
[0022] like Figure 1-4 As shown, the utility model provides a pretreatment device for bottled gas, including a gas collecting box 1, two groups of fixing frames 2, a connecting pipe 5 and a valve 6. Ten groups of sleeves 3 are installed through the top of the gas collecting box 1, a fixing ring 7 is fixedly installed on the outer wall of the connecting pipe 5, a fixing rod 8 is fixedly installed on the top of the fixing ring 7, a rotating rod 9 is rotatably connected inside the fixing rod 8, two groups of limiting ears 10 are fixedly installed on the outer wall of the rotating rod 9, a connecting ring 11 is provided on the outer wall of the rotating rod 9, a connecting rod 12 is rotatably connected to the bottom of the connecting ring 11, a supporting frame 13 is fixedly installed on the bottom of the connecting rod 12, and a pressing plate 14 is fixedly installed on the bottom of the supporting frame 13. A fixing seat 15 is fixedly installed inside the ten groups of sleeves 3, and a ventilation pipe 16 is installed through the inside of the fixing seat 15. A needle 17 is fixedly installed on the top of the ventilation pipe 16. One side of the two groups of fixing frames 2 are respectively fixedly connected to the two sides of the gas collecting box 1, one end of the connecting pipe 5 is installed through one side of the gas collecting box 1, and the connecting pipe 5 is installed through the inside of the valve 6. The connecting ring 11 is arranged between the two groups of limiting ears 10, and the connecting ring 11 passes through the inside of the connecting rod 12. One side of the fixing ring 7 is fixedly installed with one side of the gas collecting box 1, one end of the ventilation pipe 16 is installed through the inside of the gas collecting box 1, and the needle 17 is arranged inside the sleeve 3.
[0023] The specific settings and functions of this embodiment are described in detail below. When it is necessary to pre-treat the bottled gas, firstly, ten groups of bottles filled with gas are placed inside the sleeve 3, and the inner wall of the sleeve 3 is in contact with the outer wall of the bottle. Then, the rotating rod 9 is manually rotated so that the pressing plate 14 is placed on the top of the multiple groups of bottles. Then, the rotating rod 9 is pressed downward so that the connecting rod 12 and the supporting frame 13 move downward, and then the pressing plate 14 applies a downward pressure to the multiple groups of bottles. During the downward movement of the bottle, the needle 17 punctures the bottom of the bottle, and then the gas flows out from the hole, and then enters the several groups of through holes opened inside the ventilation pipe 16, and finally enters the interior of the gas collecting box 1. Since the outer wall of the bottle is in close contact with the inner wall of the sleeve 3, The amount of gas that overflows can be ignored until the gas inside the ten groups of bottles enters the gas collecting box 1, and then the gas is transported to the rotary kiln for incineration through the connecting pipe 5 and the valve 6. When collecting gas from bottles of different sizes, the sleeve 3 can be selected as the device of different models, so as to realize the collection of gas inside different bottles. By setting the pressure plate 14 and the needle 17, multiple groups of gas cylinders can be deflated at the same time, which accelerates the collection of gas and makes the whole pretreatment faster and more efficient. In addition, after the gas is pretreated, it directly enters the rotary kiln through the connecting pipe 5 and the valve 6 for the next step of incineration, thereby further improving the gas output efficiency and avoiding waste of resources.
[0024] Embodiment 2
[0025] like Figure 1 and Figure 2 As shown, two groups of limit rods 4 are fixedly installed on the top of the air collecting box 1 , and the two groups of limit rods 4 pass through the interior of the pressure plate 14 .
[0026] The effect achieved by the entire embodiment is that after placing multiple groups of gas cylinders inside the sleeve 3, the rotating rod 9 is manually rotated so that the pressure plate 14 is placed on the top of the multiple groups of gas cylinders. At this time, two groups of limit rods 4 penetrate the top of the pressure plate 14. By setting two groups of limit rods 4, when the pressure plate 14 squeezes the gas cylinder, the position of the pressure plate 14 is restricted, so that the pressure plate 14 can only move in the vertical direction. Since the connecting ring 11 is in a state of being suspended on the outer wall of the rotating rod 9, when the rotating rod 9 makes a fan-shaped circular motion, a vertical downward pressure is provided to the pressure plate 14 to ensure that the needle 17 can smoothly pierce the gas cylinder to achieve the effect of fast and efficient deflation.
[0027] The use method and working principle of the device: when it is necessary to pre-treat the bottled gas, firstly, ten groups of bottles filled with gas are placed inside the sleeve 3, and the inner wall of the sleeve 3 is in contact with the outer wall of the bottle, and then the rotating rod 9 is manually rotated to place the pressing plate 14 on the top of the multiple groups of bottles. At this time, the two groups of limit rods 4 penetrate the top of the pressing plate 14, and then the rotating rod 9 is pressed downward to make the connecting rod 12 and the supporting frame 13 move downward, and then the pressing plate 14 provides a downward pressure on the multiple groups of bottles. In the process of the bottles moving downward, The needle 17 punctures the bottom of the bottle, and then the gas flows out from the hole, and then enters the several groups of through holes opened inside the ventilation pipe 16, and finally enters the interior of the gas collecting box 1. Since the outer wall of the bottle is in close contact with the inner wall of the sleeve 3, when collecting gas from bottles of different sizes, the sleeve 3 can be selected as the device of different models, so as to realize the collection of gas inside different bottles, until the gas inside ten groups of bottles enters the interior of the gas collecting box 1, and then the gas is transported to the rotary kiln for incineration through the connecting pipe 5 and the valve 6.
[0028] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A bottled gas pretreatment device, comprising a gas collecting box (1), two sets of fixing frames (2), a connecting pipe (5) and a valve (6), characterized in that: Ten groups of sleeves (3) are installed through the top of the air collecting box (1); a fixing ring (7) is fixedly installed on the outer wall of the connecting pipe (5); a fixing rod (8) is fixedly installed on the top of the fixing ring (7); a rotating rod (9) is rotatably connected inside the fixing rod (8); two groups of limiting ears (10) are fixedly installed on the outer wall of the rotating rod (9); a connecting ring (11) is provided on the outer wall of the rotating rod (9); a connecting rod (12) is rotatably connected to the bottom of the connecting ring (11); a supporting frame (13) is fixedly installed at the bottom of the connecting rod (12); a pressing plate (14) is fixedly installed at the bottom of the supporting frame (13); a fixing seat (15) is fixedly installed inside the ten groups of sleeves (3); a ventilation pipe (16) is installed through the inside of the fixing seat (15); and a needle (17) is fixedly installed on the top of the ventilation pipe (16).
2. A bottled gas pretreatment device according to claim 1, characterized in that: One side of the two groups of fixing frames (2) are respectively fixedly connected to the two sides of the air collecting box (1), and one end of the connecting pipe (5) is installed through one side of the air collecting box (1).
3. A bottled gas pretreatment device according to claim 1, characterized in that: The connecting pipe (5) is installed through the inside of the valve (6), and the connecting ring (11) is arranged between the two groups of limiting ears (10).
4. A bottled gas pretreatment device according to claim 1, characterized in that: The connecting ring (11) passes through the interior of the connecting rod (12), and one side of the fixing ring (7) is fixedly mounted to one side of the air collecting box (1).
5. The bottled gas pretreatment device according to claim 1, characterized in that: One end of the ventilation pipe (16) is arranged to penetrate the interior of the gas collecting box (1), and the needle (17) is arranged inside the sleeve (3).
6. The bottled gas pretreatment device according to claim 1, characterized in that: Two groups of limit rods (4) are fixedly mounted on the top of the air collecting box (1), and the two groups of limit rods (4) penetrate the interior of the pressure plate (14).
