Mutual inductor insulation test bench
By setting up an electric heating tube and a temperature monitoring probe on the transformer insulated test bench, diversified parameter data acquisition is achieved, data error problems in traditional tests are solved, and safety and efficiency are improved through flame retardant plates and double-head motors.
Patent Information
- Application Number
- CN202420532552.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-19
AI Technical Summary
There is a lack of diversified testing during the insulation test of traditional transformers, which leads to a great impact on the insulation resistance and leads to errors in the measurement data.
A transformer insulation test bench was designed, including the installation of a housing, an electric heating tube, a guide fan and a temperature monitoring probe. The electric heating tube is controlled by the control panel to quickly heat up the insulation test, and the flame retardant plate and a double-head motor are used. Achieve safety and fast line separation.
It realizes the acquisition of diversified parameter data, avoids data errors, and improves safety and operational efficiency, prevents open flames from spreading and human operation risks.
Smart Images

Figure CN222070682U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of mutual inductors, in particular to a mutual inductor insulation test bench. Background Art
[0002] A transformer is a special transformer used to convert high voltage and high current in power systems or measuring instruments. A transformer can reduce high voltage or high current to a measurable and processable range, while isolating high voltage circuits from low voltage circuits to improve the safety of equipment and operations. In power systems, transformers are widely used in high voltage, extra-high voltage and ultra-high voltage energy metering, relay protection, control and monitoring.
[0003] In the prior art, the main purpose of measuring the insulation resistance of the winding is to check whether its insulation is damp or deteriorated as a whole, and the temperature change has a great influence on the insulation resistance. However, since there is no diversified test in the traditional transformer insulation test process, the measured data has errors.
[0004] After searching, it is found that Chinese patent literature discloses a transformer insulation test bench (Announcement No.: CN202815163U), a transformer insulation test bench, characterized in that it includes a metal plate and an insulating base plate; the metal plate is fixed on the upper surface of the insulating base plate, and the upper surface of the metal plate is a smooth plane. The insulating base plate is a wooden board, and the lower end of the insulating base plate is provided with horizontally arranged strip legs. The lower end of the insulating base plate is provided with three mutually parallel strip legs. The beneficial effects of the utility model are as follows: a transformer insulation test bench is provided, which has a simple structure, reduces the cost of special insulation test equipment, greatly optimizes the construction process, saves labor, is suitable for batch insulation testing of current transformers, greatly reduces test time, and improves work efficiency. The strip legs ensure the stability of the entire test bench and facilitate the forklift to operate the entire test bench and the transformer as a whole, but the following defects still exist:
[0005] The above transformer insulation test bench has reduced the cost of special insulation test equipment, greatly optimized the construction process, saved labor, and is suitable for batch insulation testing of current transformers, greatly reducing test time and improving work efficiency. The strip legs ensure the stability of the entire test bench and facilitate the forklift to operate the entire test bench and the transformer as a whole. However, the temperature change has a great impact on the insulation resistance. However, since there is no diversified test in the traditional transformer insulation test process, the measured data has errors. Utility Model Content
[0006] In order to solve the problems raised in the above background technology, the utility model provides a transformer insulation test bench, which has the advantage of being able to perform diversified tests so as to obtain diversified parameter data.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a transformer insulation test bench, comprising a transformer insulation test bench body, an insulating pad is arranged at the top of the transformer insulation test bench body, and a mounting cavity is fixedly connected to the middle of the top of the insulating pad, a mounting shell is arranged above the mounting cavity, and a plurality of guide fans are installed at the inner top of the mounting shell, a plurality of electric heating tubes are arranged below the guide fans, the guide fans and the electric heating tubes are electrically connected to a control panel, and the control panel is mounted on the outer wall of the mounting shell.
[0008] Preferably, a filling bag is bonded to the inner side wall of the installation cavity, and the inner side wall of the filling bag is filled with flame retardant particles.
[0009] Preferably, a connecting plate is fixedly connected to the top of the mounting shell, and a rotating wheel is installed at the bottom of one end of the connecting plate. The rotating wheel is movably connected inside the movable cavity, and the bottom end of the movable cavity is connected to the transformer insulation test bench body through the first mounting plate.
[0010] Preferably, a second mounting plate arranged parallel to the middle of the mounting cavity is fixedly connected to an outer wall on one side of the transformer insulation test bench body, and a temperature monitoring probe is installed on an outer side wall of the second mounting plate corresponding to the mounting cavity.
[0011] Preferably, movable sleeves are provided on the outside of both sides of the transformer insulation test bench body and the insulation pad, and the top of the movable sleeves is fixedly connected to a third mounting plate, a plurality of combing cavities are installed on the top of the third mounting plate, and the inner side walls of the combing cavities are installed with flame retardant plates.
[0012] Preferably, one end of the combing cavity is fixedly connected to a connecting plate, and a return spring is symmetrically installed on the top of the connecting plate, the top of the return spring is connected to the bottom end of the mounting frame, and damping bearings are installed on the inner walls on both sides of the mounting frame, and resistance rollers are installed between the damping bearings through connecting shafts, the bottom end of the mounting frame is fixedly connected to a guide sleeve rod, and the bottom end of the guide sleeve rod is movably connected to the inside of a guide sleeve, and the guide sleeve is installed through the inside of the connecting plate.
[0013] Preferably, a double-headed motor is installed in the middle of the bottom end of the transformer insulation test bench body, and transmission screws are installed on both side output ends of the double-headed motor. The outer side walls of the transmission screws are meshed and connected with screw sleeves, and the screw sleeves are respectively installed at the bottom ends of the corresponding movable sleeves.
[0014] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0015] 1. The utility model is provided with an installation shell, so that during use, the electric heating tube is controlled to heat through the control panel, and then the heat is transferred to the transformer undergoing insulation test through the guide fan, so that the transformer is quickly heated up, and the insulation test of the transformer at different temperature ends is performed, thereby obtaining diversified parameter data, thus avoiding the problem of errors in the measured data.
[0016] 2. The utility model is provided with a flame-retardant plate, so that when an open flame is generated in the connected line during the insulation test of the transformer, the flame-retardant plate can be used to effectively retard the flame, thereby avoiding further spread of the open flame. A double-headed motor is provided, so that during use, the two output ends of the double-headed motor rotate synchronously, so that a screw transmission structure is formed between the transmission screw and the screw sleeve, which drives the movable sleeve to move. In this way, the line connected to the transformer can be quickly separated from it, avoiding the spread of disasters caused by open flames, and also avoiding the risks of human operation, thereby improving safety and practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the main structure of the utility model;
[0018] Figure 2 It is a schematic diagram of the structure of the combined parts of the installation cavity and the filling bag in the utility model;
[0019] Figure 3 This is a schematic diagram of the structure of the assembled parts of the housing, guide fan, electric heating tube and connecting plate installed in the utility model;
[0020] Figure 4 This is a schematic diagram of the structure of the combined parts of the combing line cavity, the connecting plate, the return spring, the mounting frame, the damping bearing and the abutment roller in the utility model;
[0021] Figure 5 The utility model is a schematic diagram of the structure of the combined parts of the transformer insulation test bench body, the movable sleeve, the double-head motor, the transmission screw and the screw sleeve.
[0022] In the figure: 1. Transformer insulation test bench body; 2. Insulation pad; 3. Installation cavity; 4. Filling bag; 5. Installation shell; 6. Guide fan; 7. Electric heating tube; 8. Control panel; 9. Connection plate; 10. Rotating wheel;
[0023] 11. movable cavity; 12. first mounting plate; 13. second mounting plate; 14. temperature monitoring probe; 15. movable sleeve; 16. third mounting plate; 17. combing cavity; 18. flame retardant plate; 19. connecting plate; 20. reset spring; 21. mounting frame;
[0024] 22. Damping bearing; 23. Resistance roller; 24. Guide sleeve; 25. Guide sleeve rod; 26. Double-headed motor; 27. Transmission screw; 28. Screw sleeve. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] like Figures 1 to 5 As shown, the utility model provides a transformer insulation test bench, including a transformer insulation test bench body 1, the top of the transformer insulation test bench body 1 is fixedly connected with an insulating pad 2 with the same size as the top of the transformer insulation test bench body 1, and the middle of the top of the insulating pad 2 is fixedly connected with an installation cavity 3, the inner side wall size of the installation cavity 3 is adapted to the size of the transformer to be tested, the inner side wall of the installation cavity 3 is fixedly connected with a filling bag 4 filled with flame retardant particles, an installation shell 5 is arranged above the installation cavity 3, and a guide fan 6 and an electric heating pipe 7 are respectively installed inside the installation shell 5, and the guide fan 6 and the electric heating pipe 7 are fixedly connected to the inner side wall of the installation cavity 3. The guide fan 6 is fixedly connected to the inner top of the mounting shell 5, the electric heating tube 7 is arranged below the guide fan 6, and the two ends are fixedly connected to the inner walls of the mounting shell 5 on both sides, and the outer wall of the mounting shell 5 is fixedly connected with a control panel 8 electrically connected to the guide fan 6 and the electric heating tube 7. Through the setting of the mounting shell 5, the heating of the electric heating tube 7 is controlled by the control panel 8 during use, and the heat is then transferred to the mutual inductor undergoing insulation test through the guide fan 6, so that the mutual inductor is quickly heated up, and the insulation test of the mutual inductor at different temperature ends is performed to obtain diversified parameter data.
[0027] Specifically, the outer walls on both sides of the transformer insulation test bench body 1 are respectively fixedly connected with a first mounting plate 12 and a second mounting plate 13 arranged parallel to the middle of the mounting cavity 3, and the top of the first mounting plate 12 is fixedly connected with an active cavity 11 internally rotatably connected with a rotating wheel 10, the rotating wheel 10 is fixedly connected to the bottom end of one end of the connecting plate 9, and the bottom end of the other end of the connecting plate 9 is fixedly connected to the top of the mounting shell 5. Through the arranged rotating wheel 10, when installing or disassembling the transformer, the mounting shell 5 covered above the transformer can be rotated through the connecting plate 9 in cooperation with the rotating wheel 10, so that it can be flexibly switched.
[0028] Furthermore, a temperature monitoring probe 14 is fixedly connected to the outer side wall of the second mounting plate 13 corresponding to the mounting cavity 3. The model of the temperature monitoring probe 14 is BN-TH485. Through the temperature monitoring probe 14, the temperature of the tested mutual inductor can be monitored in real time during use.
[0029] Furthermore, the outer sides of the transformer insulation test bench body 1 and the insulating pad 2 are movably connected with movable sleeves 15, the movable sleeves 15 are arranged in a rectangular hollow structure, and the top of the movable sleeves 15 are fixedly connected with a third mounting plate 16, the top of the third mounting plate 16 is evenly fixedly connected with four combing cavities 17, and the inner walls of the four combing cavities 17 are fixedly connected with flame retardant plates 18 fitted with the inner walls thereof, and the flame retardant plates 18 are arranged in a circular structure. By setting the flame retardant plates 18, when an open flame is generated in the connected circuit during the transformer insulation test, the flame retardant plates 18 can be used for effective flame retardancy, thereby avoiding further spread of the open flame.
[0030] It is worth mentioning that one end of the combing cavity 17 is fixedly connected to a connecting plate 19, and the top of the connecting plate 19 is fixedly connected to the bottom ends of two symmetrically arranged return springs 20, the tops of the return springs 20 are fixedly connected to the bottom end of the mounting frame 21, and the inner walls on both sides of the mounting frame 21 are fixedly connected to the outer walls of the damping bearing 22, the inner walls of the damping bearing 22 are fixedly connected to a connecting shaft, and the connecting shaft is fixedly installed on both sides of the conflicting roller 23, through the conflicting roller 23, so that during use, the mounting frame 21 connected to the conflicting roller 23 is moved upward by the return spring 20 until the conflicting roller 23 conflicts with the circuit for mutual inductor detection, so that the circuit for mutual inductor detection can be quickly limited during use.
[0031] It is worth noting that a guide sleeve 24 is fixedly connected to the interior of the connecting plate 19, and a guide sleeve rod 25 is movably connected to the top end of the guide sleeve 24. The top end of the guide sleeve rod 25 is fixedly connected to the bottom end of the mounting frame 21. By providing the guide sleeve 24 and the guide sleeve rod 25, the mounting frame 21 is guided by the potential energy of the return spring 20 during use.
[0032] It is worth mentioning that the bottom end of the movable sleeve 15 is fixedly connected with a screw sleeve 28, and the inner side wall of the screw sleeve 28 is meshed with a transmission screw 27, and the middle part of the bottom end of the transformer insulation test bench body 1 is fixedly connected with a double-headed motor 26, and the output ends on both sides of the double-headed motor 26 are respectively connected to the corresponding transmission screw 27 through couplings. By setting the double-headed motor 26, the two output ends of the double-headed motor 26 rotate synchronously during use, so that a screw transmission structure is formed between the transmission screw 27 and the screw sleeve 28, so that it drives the movable sleeve 15 to move.
[0033] Principle and process of this utility model:
[0034] First, the installation cavity 3 for installing the transformer for insulation test is installed on the transformer insulation test bench body 1, and the lines for connecting the test are respectively passed through the combing cavity 17 and connected to the insulator, and at the same time, the conflicting roller 23 is set, so that during use, the installation frame 21 connected with the conflicting roller 23 is moved upward by the reset spring 20 until the conflicting roller 23 conflicts with the line for transformer detection;
[0035] Secondly, it is powered on for insulation test, and the installation shell 5 is set, so that during use, the electric heating tube 7 is controlled by the control panel 8 to heat, and then the heat is transferred to the transformer undergoing insulation test through the guide fan 6, so that the transformer is quickly heated up, and the insulation test of the transformer at different temperature ends is carried out to obtain diversified parameter data. During the test, the temperature of the transformer under test is monitored by the temperature monitoring probe 14. At the same time, the rotating wheel 10 is set, so that when installing or disassembling the transformer, the installation shell 5 covered above the transformer can be rotated through the connecting plate 9 in cooperation with the rotating wheel 10, so that it can be flexibly switched;
[0036] Afterwards, when an open flame occurs in the mutual inductor during the test, the flame retardant particles filled in the filling bag 4 are used for flame retardancy, and the power is cut off. Then, the double-headed motor 26 is set, so that during use, the two output ends of the double-headed motor 26 rotate synchronously, so that a screw transmission structure is formed between the transmission screw 27 and the screw sleeve 28, so that the movable sleeve 15 is driven to move, so that the connected line is quickly separated from the mutual inductor;
[0037] Finally, by setting up the flame retardant plate 18, when the connected line generates open flames during the transformer insulation test, the flame retardant plate 18 can effectively retard the flame, thereby avoiding further spread of the open flame. Similarly, by setting up the double-headed motor 26, the two output ends of the double-headed motor 26 rotate synchronously during use, so that a screw transmission structure is formed between the transmission screw 27 and the screw sleeve 28, so that the movable sleeve 15 can be driven to move, so that the connected line can be quickly separated from the transformer. In this way, a transformer insulation test bench is ready for use.
[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A transformer insulation test bench, comprising a transformer insulation test bench body (1), characterized in that: An insulating pad (2) is arranged at the top of the transformer insulation test bench body (1), and a mounting cavity (3) is fixedly connected to the middle of the top of the insulating pad (2), a mounting shell (5) is arranged above the mounting cavity (3), and a plurality of guide fans (6) are installed at the top of the mounting shell (5), and a plurality of electric heating tubes (7) are arranged below the guide fans (6), the guide fans (6) and the electric heating tubes (7) are both electrically connected to a control panel (8), and the control panel (8) is mounted on the outer wall of the mounting shell (5).
2. The transformer insulation test bench according to claim 1, characterized in that: A filling bag (4) is bonded to the inner side wall of the installation cavity (3), and the inner side wall of the filling bag (4) is filled with flame retardant particles.
3. The transformer insulation test bench according to claim 1, characterized in that: A connecting plate (9) is fixedly connected to the top of the mounting shell (5), and a rotating wheel (10) is installed at the bottom of one end of the connecting plate (9); the rotating wheel (10) is movably connected inside the movable cavity (11), and the bottom end of the movable cavity (11) is connected to the transformer insulation test bench body (1) through a first mounting plate (12).
4. The transformer insulation test bench according to claim 1, characterized in that: A second mounting plate (13) arranged parallel to the middle of the mounting cavity (3) is fixedly connected to one side outer wall of the transformer insulation test bench body (1), and a temperature monitoring probe (14) is installed on the outer side wall of the second mounting plate (13) corresponding to the mounting cavity (3).
5. The transformer insulation test bench according to claim 1, characterized in that: The transformer insulation test bench body (1) and the insulating pad (2) are both externally sleeved with movable sleeves (15), and the top of the movable sleeves (15) are fixedly connected to a third mounting plate (16), the top of the third mounting plate (16) is installed with a plurality of combing cavities (17), and the inner side walls of the combing cavities (17) are installed with flame retardant plates (18).
6. The transformer insulation test bench according to claim 5, characterized in that: One end of the combing line cavity (17) is fixedly connected to a connecting plate (19), and a return spring (20) is symmetrically installed on the top of the connecting plate (19), the top of the return spring (20) is connected to the bottom end of the mounting frame (21), and damping bearings (22) are installed on the inner walls of both sides of the mounting frame (21), and a resistance roller (23) is installed between the damping bearings (22) via a connecting shaft, the bottom end of the mounting frame (21) is fixedly connected to a guide sleeve rod (25), and the bottom end of the guide sleeve rod (25) is movably connected to the inside of a guide sleeve tube (24), and the guide sleeve tube (24) is installed through the inside of the connecting plate (19).
7. The transformer insulation test bench according to claim 1, characterized in that: A double-headed motor (26) is installed in the middle of the bottom end of the transformer insulation test bench body (1), and transmission screws (27) are installed at both output ends of the double-headed motor (26), and the outer side walls of the transmission screws (27) are meshedly connected with screw sleeves (28), and the screw sleeves (28) are respectively installed at the bottom ends of the corresponding movable sleeves (15).
