Conveying device and production line
By designing a conveyor device that can drive multiple vehicles to move simultaneously, the problem of low conveying efficiency in the prior art is solved, and efficient conveying of multiple vehicles and efficient operation of production lines is achieved.
Patent Information
- Application Number
- CN202420653613.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The existing conveyor devices cannot transport multiple sets of vehicles at the same time, resulting in insufficiency in battery processing.
A conveying device is designed, including a first conveying assembly and a second conveying assembly, through the first drive assembly and the second drive assembly, respectively, to move a plurality of first vehicles and the second vehicles along the track, and to realize using a connecting assembly Transfer between vehicles ensures that multiple vehicles can be transported simultaneously.
The simultaneous delivery of multiple vehicles is realized, which improves the production efficiency of the production line and improves the efficiency of battery processing.
Smart Images

Figure CN222081629U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of product conveying, in particular to a conveying device and a production line. Background Art
[0002] In the related technology, the battery needs to go through multiple processes during the processing and production process. For example, in process one, the battery cell is installed in the shell; in process two, the tab and the cover are welded; in process three, the cover and the shell are welded. Among them, the operation of the battery in each process can be completed by a conveying device.
[0003] Specifically, the battery cells are placed in a carrier, and the conveying device drives the carrier for transportation. It is conceivable that in order to improve processing efficiency, the conveying device needs to transport multiple groups of carriers so that multiple battery cells can be processed by the processing equipment at the same time. However, the existing conveying device cannot transport multiple groups of carriers at the same time. Utility Model Content
[0004] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model provides a conveying device capable of conveying multiple carriers at the same time.
[0005] The utility model also provides a production line.
[0006] According to the first embodiment of the present invention, the conveying device comprises:
[0007] A first conveying assembly, the first conveying assembly comprising:
[0008] Track 1;
[0009] A plurality of first carriers, wherein the first carriers are used to place workpieces, and the first carriers are movably connected to the first rails, and the first carriers are provided with first connecting parts;
[0010] A plurality of first connection components, including a first driving member and a first connection member, wherein the first connection member is fixedly connected to the first driving member, and the first driving member can drive the first connection member to move so that the first connection member switches between a first state and a second state, and when the first connection member is in the first state, the first connection member is connected to the first connection portion, and when the first connection member is in the second state, the first connection member is separated from the first connection portion;
[0011] The first driving component is connected to the first connecting component, and the first driving component is used to simultaneously drive a plurality of the first connecting components to move along the length direction of the first track.
[0012] The conveying device according to the embodiment of the utility model has at least the following beneficial effects: after the first driving member drives the first connecting member to move, the first connecting member is in the first state, that is, the first connecting member is connected to the first connecting part, specifically, each first connecting member is connected to a first connecting part, that is, each first connecting component is connected to a first carrier, and after the first driving component drives multiple first connecting components to move simultaneously in the length direction of the first track, multiple first carriers can be driven to move simultaneously by the first driving component, specifically, the conveying device can convey multiple carriers simultaneously.
[0013] According to some embodiments of the conveying device of the present invention, the first driving component includes a first moving member, a first guide rail and a second driving member, the first moving member is movably connected to the first guide rail, the first connecting component and the second driving member are both connected to the first moving member, the second driving member is used to drive the first moving member to move on the first guide rail, the first moving member drives the first connecting component to move, and the first connecting component drives the first carrier to move.
[0014] According to the conveying device of some embodiments of the utility model, the conveying device further comprises a second conveying assembly, and the second conveying assembly comprises: a second track;
[0015] A plurality of second carriers, wherein the second carriers are used to place workpieces, and the second carriers are movably connected to the second track, and the second carriers are provided with second connecting parts;
[0016] A plurality of second connection components, including a third driving member and a second connection member, wherein the second connection member is fixedly connected to the third driving member, and the third driving member can drive the second connection member to move so that the second connection member switches between a third state and a fourth state, when the second connection member is in the third state, the second connection member is connected to the second connection portion, and when the second connection member is in the fourth state, the second connection member is separated from the second connection portion;
[0017] The second driving component is connected to the second connecting component, and the second driving component is used to simultaneously drive a plurality of the second connecting components to move along the length direction of the second track.
[0018] According to some embodiments of the conveying device of the present invention, the conveying device further comprises a docking assembly, wherein the docking assembly is used to transfer the first carrier on the first track to the second track; and / or,
[0019] The docking assembly is used to transfer the second carrier on the second track to the first track.
[0020] According to the conveying device of some embodiments of the utility model, the docking assembly includes a second moving member, a second guide rail and a fourth driving member, the second moving member has a third guide rail, the third guide rail is used for the first carrier to move or for the second carrier to move, the second moving member is movably connected to the second guide rail, the second moving member is connected to the fourth driving member, the fourth driving member is used to drive the second moving member to move on the second guide rail so that the second moving member switches between a first docking state and a second docking state, when the second moving member is in the first docking state, the third guide rail is docked with the first rail, when the second moving member is in the second docking state, the third guide rail is docked with the second rail.
[0021] According to the conveying device of some embodiments of the present utility model, the first driving assembly is further used to drive the first carrier to move from the first track to the third guide rail; and / or,
[0022] The second driving assembly is further used to drive the second carrier to move from the second track to the third guide rail.
[0023] According to the conveying device of some embodiments of the present invention, the movement direction of the first carrier is opposite to the movement direction of the second carrier.
[0024] According to the conveying device of some embodiments of the present utility model, two docking assemblies are provided, and the two docking assemblies are respectively located at two ends of the first track.
[0025] According to the conveying device of some embodiments of the present utility model, the first connecting portion is configured as a slot, and when the first connecting member is in the first state, the first connecting member is engaged with a slot wall of the slot.
[0026] The production line according to the second embodiment of the utility model comprises the conveying device described in any one of the first embodiment.
[0027] The production line according to the embodiment of the utility model has at least the following beneficial effects: after the first driving member drives the first connecting member to move, the first connecting member is in the first state, that is, the first connecting member is connected to the first connecting portion, specifically, each first connecting member is connected to a first connecting portion, that is, each first connecting assembly is connected to a first carrier, after the first driving assembly drives multiple first connecting assemblies to move simultaneously in the length direction of the first track, multiple first carriers can be driven to move simultaneously by the first driving assembly, specifically, the conveying device can convey multiple carriers simultaneously. Furthermore, the production efficiency of the production line with the conveying device is higher.
[0028] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The present invention is further described below with reference to the accompanying drawings and embodiments, wherein:
[0030] Figure 1 Schematic diagram of a conveying device in some embodiments of the present utility model;
[0031] Figure 2 for Figure 1 The enlarged schematic diagram of point A in the middle;
[0032] Figure 3 for Figure 1 The enlarged schematic diagram of point B in the middle;
[0033] Figure 4 It is a partial schematic diagram of the conveying device of the first embodiment of the utility model;
[0034] Figure 5 It is a partial schematic diagram of a conveying device according to the second embodiment of the utility model.
[0035] Reference numerals:
[0036] The conveying device 10, the first conveying component 100, the first track 110, the first carrier 120, the first connecting part 121, the first connecting component 200, the first driving member 210, the first connecting member 220, the first driving component 300, the first moving member 310, the first guide rail 320, the second conveying component 400, the second track 410, the second carrier 420, the second connecting part 421, the second connecting component 500, the third driving member 510, the second connecting member 520, the docking component 600, the second moving member 610, the third guide rail 611, and the second guide rail 620. DETAILED DESCRIPTION
[0037] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0038] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0039] In the description of the present utility model, "several" means more than one, "many" means more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used to distinguish the technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0040] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0041] In the description of the utility model, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0042] Please refer to Figures 1 to 5In some embodiments, the conveying device 10 includes: a first conveying assembly 100, a docking assembly 600 and a second conveying assembly 400 (described below). The first conveying assembly 100 includes: a first track 110, a plurality of first carriers 120, a plurality of first connecting assemblies 200 and a first driving assembly 300. The first carrier 120 is used to place workpieces. For example, a placement slot is provided on the first carrier 120, and the battery cell can be placed in the placement slot, so that the battery cell is loaded and transported by the first carrier 120. The first carrier 120 is movably connected to the first track 110. Specifically, the first carrier 120 is movably connected to the first track 110, and the first carrier 120 can be slidably connected to the first track 110, so that the first carrier 120 can slide on the first track 110. The first carrier 120 is provided with a first connecting portion 121, and the first connecting portion 121 is used to connect with the first connecting member 220, so that the first connecting member 220 drives the first carrier 120 to move. The first connecting assembly 200 includes a first driving member 210 and a first connecting member 220. The first connecting member 220 is fixedly connected to the first driving member 210, and the first driving member 210 can drive the first connecting member 220 to move, so that the first connecting member 220 switches between the first state and the second state. When the first connecting member 220 is in the first state, the first connecting member 220 is connected to the first connecting portion 121, and when the first connecting member 220 is in the second state, the first connecting member 220 is separated from the first connecting portion 121. Figure 2 The first connecting member 22 is in the second state. Specifically, the first connecting member 220 can be located below the first carrier 120. When the first driving member 210 drives the first connecting member 220 to rise, the first connecting member 220 can be connected to the first connecting portion 121, and the first connecting member 220 is in the first state. When the first driving member 210 drives the first connecting member 220 to descend, the first connecting member 220 and the first connecting portion 121 are separated, and the first connecting member 220 is in the second state. The first driving assembly 300 is connected to the first connecting assembly 200, and the first driving assembly 300 is used to simultaneously drive multiple first connecting assemblies 200 to move along the length direction of the first track 110. Specifically, after the first driving member 210 drives the first connecting member 220 to move, the first connecting member 220 is in the first state, that is, the first connecting member 220 is connected to the first connecting portion 121. Specifically, each first connecting member 220 is connected to a first connecting portion 121, that is, each first connecting component 200 is connected to a first carrier 120. After the first driving component 300 drives multiple first connecting components 200 to move simultaneously in the length direction of the first track 110, multiple first carriers 120 can be driven simultaneously by the first driving component 300 to move. Specifically, the conveying device 10 can convey multiple carriers at the same time.
[0043] It should be added that there are multiple first carriers 120, for example, there can be four first carriers 120, and the four first carriers 120 are arranged at intervals in the length direction of the first track 110. Similarly, there are also four first connecting components 200, and each first connecting component 200 corresponds to a first carrier 120, so that when the first driving component 300 drives the four first connecting components 200 to move, the four first carriers 120 can move at the same time. Among them, the distance between two adjacent first carriers 120 can be the same as the distance between two adjacent processing equipment, which can enable the battery cell on a first carrier 120 to be processed by the processing equipment and then connected to another processing equipment for processing. For example, after the battery cell is cleaned and blown by the processing equipment, the battery cell can be welded with the pole ear and the top cover by the processing equipment. In addition, the first driving component 300 can also drive the first connecting component 200 to move back and forth, that is, after the first connecting component 200 transports the first carrier 120 out of the first track 110, the first driving component 300 moves back and forth, and then drives the new first carrier 120 out of the first track 110, for example, to the third guide rail 611.
[0044] It should be further supplemented that the first connecting member 220 can be in a first state and connected to the first connecting portion 121, or the first connecting member 220 can be in a second state and separated from the first connecting portion 121. Therefore, when the first carrier 120 is being transported, the first carrier 120 can be recycled. For example, the first carrier 120 can move on the first track 110, and then the first carrier 120 can move on the second track 410. This will be described in detail below.
[0045] Further, the following describes how the first driving assembly 300 drives the first connecting assembly 200 to move. Figure 2 and Figure 4In some embodiments, the first driving component 300 includes a first moving member 310, a first guide rail 320, and a second driving member. The first moving member 310 is movably connected to the first guide rail 320, and the first moving member 310 can be slidably connected to the first guide rail 320, so that the first moving member 310 can slide on the first guide rail 320. The first connecting component 200 and the second driving member are both connected to the first moving member 310, and the first moving member 310 can be a slide plate, and a plurality of first connecting components 200 are fixed on the first moving member 310. The second driving member is used to drive the first moving member 310 to move on the first guide rail 320, the first moving member 310 drives the first connecting component 200 to move, and the first connecting component 200 drives the first carrier 120 to move. Specifically, the second driving member can be a motor, and after the motor drives the first moving member 310 to move, the first moving member 310 can drive the first connecting component 200 to move, the first connecting component 200 can drive the first carrier 120 to move, and the first carrier 120 can transport the workpiece. The workpiece can be a battery cell or other processed parts.
[0046] Furthermore, it is described above that the first conveying assembly 100 can transport the workpiece through the first carrier 120, wherein, in order to improve the conveying efficiency, the workpiece can also be transported through the second carrier 420. For details, please refer to Figure 1 and Figure 5In some embodiments, the conveying device 10 further includes a second conveying assembly 400, which includes: a second track 410, a plurality of second carriers 420, a plurality of second connecting assemblies 500, and a second driving assembly. The second carrier 420 is used to place workpieces. For example, a placement groove is provided on the second carrier 420, and the battery cell can be placed in the placement groove, so that the battery cell is transported by the second carrier 420. The second carrier 420 is movably connected to the second track 410, and the second carrier 420 can be slidably connected to the second track 410, so that the second carrier 420 can slide on the second track 410. The second carrier 420 is provided with a second connecting portion 421, and the second connecting portion 421 is used to connect with the second connecting member 520, so that the second connecting member 520 drives the second carrier 420 to move. The second connecting assembly 500 includes a third driving member 510 and a second connecting member 520. The second connecting member 520 is fixedly connected to the third driving member 510, and the third driving member 510 can drive the second connecting member 520 to move so that the second connecting member 520 switches between the third state and the fourth state. When the second connecting member 520 is in the third state, the second connecting member 520 is connected to the second connecting portion 421, and when the second connecting member 520 is in the fourth state, the second connecting member 520 is separated from the second connecting portion 421. Specifically, the second connecting member 520 can be located below the second carrier 420, and when the third driving member 510 drives the second connecting member 520 to rise, the second connecting member 520 can be connected to the second connecting portion 421, and the second connecting member 520 is in the third state. When the third driving member 510 drives the second connecting member 520 to descend, the second connecting member 520 is separated from the second connecting portion 421, and the second connecting member 520 is in the fourth state. The second driving assembly is connected to the second connecting assembly 500, and the structure of the second driving assembly can be consistent with the structure of the first driving assembly 300, so the second driving assembly can refer to Figure 2 , the second driving assembly is used to simultaneously drive multiple second connecting assemblies 500 to move along the length direction of the second track 410. Specifically, after the third driving member 510 drives the second connecting member 520 to move, the second connecting member 520 is in the third state, that is, the second connecting member 520 is connected to the second connecting portion 421, specifically, each second connecting member 520 is connected to a second connecting portion 421, that is, each second connecting assembly 500 is connected to a second carrier 420, after the second driving assembly drives multiple second connecting assemblies 500 to move simultaneously in the length direction of the second track 410, multiple second carriers 420 can be driven by the second driving assembly to move simultaneously. Specifically, more workpieces can be transported simultaneously through the first carrier 120 and the second carrier 420, so that the conveying device 10 has a higher conveying efficiency.
[0047] Furthermore, the existing conveying device 10 will be provided with two conveying lines to improve the conveying efficiency. In addition, when two conveying lines are provided, the two conveying lines can also be connected so that the workpiece can be processed through multiple processing equipment at one time. Specifically, after the battery cell completes the conveying processing on one conveyor line, the battery cell will then be transferred to another conveyor line for further conveying processing. Among them, the method of transferring the battery cell from one conveyor line to another conveyor line is to clamp the battery cell on one conveyor line by a robot, and then place the battery cell into the carrier of another conveyor line. However, this method will result in a slower conveying efficiency of the conveying device 10. In order to improve the conveying efficiency, the first carrier 120 on the first track 110 can be transferred to the second track 410 through the docking assembly 600. For details, please refer to Figure 1 and Figure 3 In some embodiments, the conveying device 10 further includes a docking assembly 600, which is used to transfer the first carrier 120 on the first track 110 to the second track 410; and / or, the docking assembly 600 is used to transfer the second carrier 420 on the second track 410 to the first track 110. Specifically, the docking assembly 600 can transfer the first carrier 120 on the first track 110 to the second track 410, and the docking assembly 600 can transfer the second carrier 420 on the second track 410 to the first track 110. In this case, a loading position and a unloading position can be set on the sides of the first track 110 and the second track 410, so that the unprocessed workpiece is conveyed and processed by the conveying device 10, and the processed workpiece is conveyed to the unloading position by the conveying device 10. The docking assembly 600 can also transfer the first carrier 120 on the first track 110 to the second track 410, or the docking assembly 600 can transfer the second carrier 420 on the second track 410 to the first track 110. This can make the conveying device 10 very flexible, thereby adapting to different production requirements.
[0048] Further, the specific structure of the docking assembly 600 is described below. Figure 1 and Figure 3 , Figure 3 The third guide rail 611 is shown to be connected to the second rail 410. Since the first rail 110 and the second rail 410 have the same structure, the connection between the first rail 110 and the third guide rail 611 can also be referred to. Figure 3In some embodiments, the docking assembly 600 includes a second moving member 610, a second guide rail 620, and a fourth driving member. The second moving member 610 has a third guide rail 611, and the third guide rail 611 is used for the first carrier 120 to move or for the second carrier 420 to move. The second moving member 610 is movably connected to the second guide rail 620, and the second guide rail 620 can be perpendicular to the first track 110. The second moving member 610 is connected to the fourth driving member, and the fourth driving member is used to drive the second moving member 610 to move on the second guide rail 620, so that the second moving member 610 switches between the first docking state and the second docking state. When the second moving member 610 is in the first docking state, the third guide rail 611 docks with the first track 110, and when the second moving member 610 is in the second docking state, the third guide rail 611 docks with the second track 410. Specifically, the first carrier 120 can move on the first track 110 at the beginning, and then when the second moving member 610 is in the first docking state, the third guide rail 611 docks with the first track 110, and at this time, the first carrier 120 can move from the first track 110 to the third guide rail 611. Afterwards, the fourth driving member drives the second moving member 610 to move, so that the second moving member 610 switches from the first docking state to the second docking state, and at this time, the third guide rail 611 docks with the second track 410, and the first carrier 120 on the third guide rail 611 can move from the third guide rail 611 to the second track 410, so that the first carrier 120 is transferred from the first track 110 to the second track 410. Similarly, the second carrier 420 can move on the second track 410 at the beginning, and then when the second moving member 610 is in the second docking state, the third guide rail 611 docks with the second track 410, and at this time, the second carrier 420 can move from the second track 410 to the third guide rail 611. Afterwards, the fourth driving member drives the second moving member 610 to move, so that the second moving member 610 switches from the second docking state to the first docking state. At this time, the third guide rail 611 and the first track 110 are docked, and the second carrier 420 on the third guide rail 611 can move from the third guide rail 611 to the first track 110. In this way, the transfer of the second carrier 420 from the second track 410 to the first track 110 is completed.
[0049] Further, the following describes how the first carrier 120 moves from the first track 110 to the third rail 611, and how the second carrier 420 moves from the second track 410 to the third rail 611. Specifically, in some embodiments, the first drive assembly 300 is also used to drive the first carrier 120 to move from the first track 110 to the third rail 611; and / or, the second drive assembly is also used to drive the second carrier 420 to move from the second track 410 to the third rail 611. It is conceivable that when the second moving member 610 is in the first docking state, the first track 110 and the third rail 611 are docked. At this time, the first drive assembly 300 can continue to drive the first carrier 120 to move on the first track 110. Due to the docking of the first track 110 and the third rail 611, the first carrier 120 can smoothly transition from the first track 110 to the third rail 611. When the second moving member 610 is in the second docking state, the second track 410 and the third guide rail 611 are docked. At this time, the second driving assembly can continue to drive the second carrier 420 to move on the second track 410. Due to the docking of the second track 410 and the third guide rail 611, the second carrier 420 can smoothly transition from the second track 410 to the third guide rail 611. In addition, the first driving assembly 300 is also used to drive the first carrier 120 to move from the third guide rail 611 to the first track 110; and / or, the second driving assembly is also used to drive the second carrier 420 to move from the third guide rail 611 to the second track 410, which only requires changing the driving direction of the first driving assembly 300 and the second driving assembly.
[0050] Further, in some embodiments, the movement direction of the first carrier 120 is opposite to the movement direction of the second carrier 420. The movement direction of the first carrier 120 may be from the first track 110 to the third guide rail 611, and the movement direction of the second carrier 420 may be from the third guide rail 611 to the second track 410. It is conceivable that after the movement direction of the first carrier 120 is opposite to the movement direction of the second carrier 420, the first carrier 120 may first move on the first track 110, and then the first carrier 120 may move to the second track 410 under the action of the docking assembly 600 to continue moving. In this case, the first conveying assembly 100 and the second conveying assembly 400 are arranged side by side, which can save space and prevent the first conveying assembly 100 and the second conveying assembly 400 from occupying too long a space in the same straight line. At the same time, the first carrier 120 and the second carrier 420 can both move on the first track 110 and the second track 410, which can make full use of the first carrier 120 and the second carrier 420, save costs, and maximize the efficiency of the conveying device 10.
[0051] Furthermore, in order to recycle the first carrier 120 and the second carrier 420, the first carrier 120 can be moved on the first track 110 and the second track 410, and the second carrier 420 can be moved on the first track 110 and the second track 410. Therefore, two docking assemblies 600 can be set so that the two docking assemblies 600, the first conveying assembly 100 and the second conveying assembly 400 are arranged in a "U" shape. In this way, the first carrier 120 or the second carrier 420 can move clockwise or counterclockwise between the first track 110, the second track 410 and the two third guide rails 611. For details, please refer to Figure 1 In some embodiments, two docking assemblies 600 are provided, and the two docking assemblies 600 are respectively located at the two ends of the first track 110. That is, the movement trajectory of the first carrier 120 can be the first track 110→the third guide rail 611→the second track 410→the third guide rail 611→the first track 110. Similarly, the movement trajectory of the second carrier 420 can also be the second track 410→the third guide rail 611→the first track 110→the third guide rail 611→the second track 410.
[0052] Further, the following describes how the first connecting member 220 is connected to the first connecting portion 121. Figure 4 In some embodiments, the first connection portion 121 is configured as a slot, and when the first connection member 220 is in the first state, the first connection member 220 is engaged with the slot wall of the slot. The slot may be semicircular in shape, and the first connection member 220 may be spherical in shape. After the spherical first connection member 220 is engaged with the slot wall of the slot, the first connection member 220 may drive the first carrier 120 to move. Similarly, please refer to Figure 5 , describes how the second connecting member 520 is connected to the second connecting portion 421. The second connecting portion 421 is configured as a slot, and when the second connecting member 520 is in the third state, the second connecting member 520 is engaged with the slot wall of the slot. The slot may be semicircular in shape, and the second connecting member 520 may be spherical in shape. After the spherical second connecting member 520 is engaged with the slot wall of the slot, the second connecting member 520 may drive the second carrier 420 to move.
[0053] It should be noted that the first connecting member 220 may also be provided with a slot, and when the first connecting member 220 is in the first state, the first connecting portion 121 is engaged with the slot wall of the slot. Similarly, the second connecting member 520 may also be provided with a slot, and when the second connecting member 520 is in the third state, the second connecting portion 421 is engaged with the slot wall of the slot.
[0054] In some embodiments, the production line includes the conveying device 10 of any one of the above embodiments. After the first driving member 210 drives the first connecting member 220 to move, the first connecting member 220 is in the first state, that is, the first connecting member 220 is connected to the first connecting portion 121, specifically, each first connecting member 220 is connected to a first connecting portion 121, that is, each first connecting component 200 is connected to a first carrier 120, and after the first driving component 300 drives multiple first connecting components 200 to move simultaneously in the length direction of the first track 110, multiple first carriers 120 can be driven by the first driving component 300 to move simultaneously, specifically, the conveying device 10 can convey multiple carriers at the same time. Further, the production efficiency of the production line with the conveying device 10 is higher.
[0055] The embodiments of the utility model are described in detail above in conjunction with the accompanying drawings, but the utility model is not limited to the above embodiments. Various changes can be made within the knowledge of ordinary technicians in the relevant technical field without departing from the purpose of the utility model. In addition, the embodiments of the utility model and the features in the embodiments can be combined with each other without conflict.
Claims
1. A conveying device, characterized in that: include: A first conveying assembly, the first conveying assembly comprising: Track 1; A plurality of first carriers, wherein the first carriers are used to place workpieces, and the first carriers are movably connected to the first rails, and the first carriers are provided with first connecting parts; A plurality of first connection components, including a first driving member and a first connection member, wherein the first connection member is fixedly connected to the first driving member, and the first driving member can drive the first connection member to move so that the first connection member switches between a first state and a second state, and when the first connection member is in the first state, the first connection member is connected to the first connection portion, and when the first connection member is in the second state, the first connection member is separated from the first connection portion; The first driving component is connected to the first connecting component, and the first driving component is used to simultaneously drive a plurality of the first connecting components to move along the length direction of the first track.
2. The conveying device according to claim 1, characterized in that The first driving component includes a first moving member, a first guide rail and a second driving member. The first moving member is movably connected to the first guide rail. The first connecting component and the second driving member are both connected to the first moving member. The second driving member is used to drive the first moving member to move on the first guide rail. The first moving member drives the first connecting component to move, and the first connecting component drives the first carrier to move.
3. The conveying device according to claim 1, characterized in that: The conveying device further includes a second conveying assembly, wherein the second conveying assembly includes: a second track; A plurality of second carriers, wherein the second carriers are used to place workpieces, and the second carriers are movably connected to the second track, and the second carriers are provided with second connecting parts; A plurality of second connection components, including a third driving member and a second connection member, wherein the second connection member is fixedly connected to the third driving member, and the third driving member can drive the second connection member to move so that the second connection member switches between a third state and a fourth state, when the second connection member is in the third state, the second connection member is connected to the second connection portion, and when the second connection member is in the fourth state, the second connection member is separated from the second connection portion; The second driving component is connected to the second connecting component, and the second driving component is used to simultaneously drive a plurality of the second connecting components to move along the length direction of the second track.
4. The conveying device according to claim 3, characterized in that: The conveying device further comprises a docking assembly, wherein the docking assembly is used to transfer the first carrier on the first track to the second track; and / or, The docking assembly is used to transfer the second carrier on the second track to the first track.
5. The conveying device according to claim 4, characterized in that: The docking assembly includes a second moving member, a second guide rail and a fourth driving member, the second moving member has a third guide rail, the third guide rail is used for the first carrier to move or the second carrier to move, the second moving member is movably connected to the second guide rail, the second moving member is connected to the fourth driving member, the fourth driving member is used to drive the second moving member to move on the second guide rail so that the second moving member switches between a first docking state and a second docking state, when the second moving member is in the first docking state, the third guide rail docks with the first rail, when the second moving member is in the second docking state, the third guide rail docks with the second rail.
6. The conveying device according to claim 5, characterized in that The first driving assembly is further used to drive the first carrier to move from the first track to the third guide rail; and / or, The second driving assembly is further used to drive the second carrier to move from the second track to the third guide rail.
7. The conveying device according to claim 4, characterized in that The moving direction of the first carrier is opposite to the moving direction of the second carrier.
8. The conveying device according to claim 4, characterized in that The two docking assemblies are provided, and the two docking assemblies are respectively located at two ends of the first track.
9. The conveying device according to claim 1, characterized in that: The first connecting portion is configured as a slot, and when the first connecting member is in the first state, the first connecting member is engaged with a slot wall of the slot.
10. A production line, characterized in that Comprising the delivery device as claimed in any one of claims 1 to 9.