Lifting appliance

By designing a spreader for boom, using the pin shaft and support plate structure, the problem of boom tilting and swaying during lifting is solved, and the safety and efficiency of the lifting process are improved.

CN222082262UActive Publication Date: 2024-11-29LIUGONG CHANGZHOU MACHINERY +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420939005.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-11-29
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

In the prior art, due to the lack of reliable fixation during lifting, the boom is prone to tilt and swaying, resulting in unbalanced stress, which poses a major safety hazard. Manual adjustment and regularization consume manpower, affecting the lifting efficiency.

Method used

Design a sling, including a sling body and a pin shaft. By setting up a lifting hole and a pin hole on the boom, the sling body and the boom are connected by a pin shaft, and the boom arm is supported by a support plate to ensure lifting and transportation. The center of the hole is connected to the center of gravity of the boom, avoiding tilt and shaking.

Benefits of technology

Effectively avoid the tilt and swaying of the boom during the lifting process, ensure the safety and reliability of the lifting process, reduce manual adjustment and straightening, and improve lifting efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222082262U_ABST
    Figure CN222082262U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of engineering machinery, and discloses a lifting appliance. The lifting appliance comprises a lifting appliance main body and a pin shaft, the lifting appliance main body is sequentially provided with an abutting supporting plate, a pin hole and a lifting hole from the first end to the second end of the lifting appliance main body, the pin shaft can penetrate through the pin hole and a lifting hole formed in the movable arm so as to connect the lifting appliance main body and the movable arm, and the lifting appliance main body can rotate around the pin shaft relative to the movable arm so that the abutting supporting plate can abut against the movable arm; and when the propping plate is propped against the movable arm, the circle center of the hoisting hole is vertical to the gravity center connecting line of the movable arm. The lifting appliance provided by the utility model is simple in structure and convenient to operate, can effectively prevent the movable arm from inclining and swinging when being connected with external lifting equipment, and ensures the safety and reliability in the lifting process of the movable arm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering machinery, in particular to a lifting device. Background Art

[0002] Excavators are a type of engineering machinery that is widely used in the fields of roads, mining, infrastructure, etc. Among them, the boom is an important component of the excavator's working device. After the boom is manufactured, the subsequent transportation and assembly stages will involve the lifting of the boom.

[0003] In the prior art, a double-legged steel wire rope is generally used to connect the double-legged steel wire rope to the boom, and the double-legged steel wire rope is hooked and lifted by a hook of an external lifting device to achieve the lifting of the boom. However, in the process of lifting the boom by the above method, due to the lack of reliable fixation of the boom, if the boom is affected by its own center of gravity or inertia during the lifting process, it will tend to tilt and swing, and then the force on the boom will be unbalanced, which poses a great safety hazard. In addition, the manual adjustment and straightening operations by the operator will consume additional manpower, affecting the lifting efficiency. Utility Model Content

[0004] The utility model aims to provide a lifting device with a simple structure and convenient operation, which can effectively prevent the boom from tilting and swinging when connected to external lifting equipment, thereby ensuring the safety and reliability of the boom lifting process.

[0005] To achieve this purpose, the utility model adopts the following technical solutions:

[0006] A sling is used for slinging a moving arm, wherein a sling hole is provided on the moving arm, and the sling comprises a sling body and a pin shaft; wherein:

[0007] The main body of the sling is provided with a support plate, a pin hole and a lifting hole in sequence from the first end to the second end thereof;

[0008] The pin shaft can pass through the pin hole and the lifting hole to connect the lifting device body and the movable arm;

[0009] The lifting device body can rotate around the pin shaft relative to the movable arm so that the supporting plate is supported against the movable arm, and when the supporting plate is supported against the movable arm, the center of the lifting hole is perpendicular to the line connecting the center of gravity of the movable arm.

[0010] Preferably, the support plate is welded to the hanger body.

[0011] Preferably, a pin sleeve is fixedly provided on the sling body, the axial dimension of the pin sleeve is larger than the thickness dimension of the sling body, and the pin hole is opened on the pin sleeve.

[0012] Preferably, the supporting plate is supported against the movable arm via a supporting end surface, and a buffer pad is provided on the supporting end surface.

[0013] Preferably, the support plate is rotatably disposed at the first end of the hanger body, and the support plate can be fixed relative to the hanger body after being rotated into place.

[0014] Preferably, the support plate is connected to the sling body through the bolt assembly; wherein,

[0015] The bolt assembly comprises a bolt and a nut;

[0016] A connecting head is fixedly provided on the supporting plate, and a first connecting hole is provided on the connecting head. A second connecting hole is correspondingly provided on the first end of the sling body. The bolt passes through the first connecting hole and the second connecting hole and is threadedly connected with the nut.

[0017] Preferably, the first connecting hole is configured as an arc-shaped long hole, and a plurality of the second connecting holes are configured in a one-to-one correspondence with the number of the bolt assemblies.

[0018] Preferably, the connecting head is welded on the supporting plate.

[0019] Preferably, a plurality of the lifting holes are arranged at intervals.

[0020] Preferably, the hanger body, the support plate and the pin shaft surface are all coated with an anti-rust layer.

[0021] Beneficial effects:

[0022] The sling provided by the utility model has a simple structure and is easy to operate. When performing lifting work, the sling body is placed on the upper side of the boom, so that the pin hole of the sling body and the lifting hole on the boom are in a coaxially connected position, and then the pin shaft is penetrated through the pin hole and the lifting hole to connect the sling body and the boom. And the hook of the external lifting equipment is hooked on the lifting hole. Then the hook of the external lifting equipment rises, and the sling body is pulled to rotate upward around the pin shaft relative to the boom. During the process, the support plate on the sling body rotates downward synchronously and finally supports the upper end surface of the boom, so that the boom can be reliably locked in the subsequent lifting process to prevent the boom from swinging. In addition, when the support plate is supported against the boom, the center of the lifting hole is vertically arranged to the center of gravity of the boom, thereby effectively ensuring the balance of the force of the boom during the lifting process, and effectively preventing the boom from tilting and swinging, thereby ensuring the safety and reliability of the boom lifting process. Reduce or avoid the situation where the operator manually adjusts and straightens, reduce manpower consumption, and improve lifting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1It is a structural schematic diagram of the sling provided by the utility model;

[0024] Figure 2 It is a structural schematic diagram of the main body of the sling provided by the utility model;

[0025] Figure 3 It is a structural schematic diagram of a movable arm corresponding to the lifting device provided by the utility model;

[0026] Figure 4 It is a structural schematic diagram of the connection between the sling and the boom provided by the utility model;

[0027] Figure 5 It is a structural schematic diagram of a sling provided by another embodiment of the utility model;

[0028] Figure 6 It is a structural schematic diagram of a sling main body provided by another embodiment of the utility model.

[0029] In the figure:

[0030] 1. Lifting device body; 11. Support plate; 111. Buffer pad; 112. Connector; 1121. First connecting hole; 12. Pin hole; 13. Lifting hole; 14. Pin sleeve; 15. Second connecting hole;

[0031] 2. Pin shaft; 21. Limit end;

[0032] 3. Bolt assembly; 31. Bolt; 32. Nut;

[0033] 4. Boom; 41. Lifting hole; 42. End plate; 421. Support contact surface. DETAILED DESCRIPTION

[0034] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0035] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0036] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0037] In the description of this embodiment, the terms "upper", "lower", "right", etc., are based on the directions or positions shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0038] This embodiment provides a lifting device. Figures 1 to 4 As shown, the sling includes a sling body 1 and a pin shaft 2, wherein the sling body 1 is provided with a support plate 11, a pin hole 12 and a lifting hole 13 in sequence from the first end to the second end thereof, the pin shaft 2 can penetrate the pin hole 12 and the lifting hole 41 on the boom 4 to connect the sling body 1 and the boom 4, the sling body 1 can rotate around the pin shaft 2 relative to the boom 4 so that the support plate 11 is supported against the boom 4, and when the support plate 11 is supported against the boom 4, the center of the lifting hole 13 is perpendicular to the line connecting the center of gravity of the boom 4.

[0039] The lifting device provided in this embodiment has a simple structure and is easy to operate. Figure 4 As shown, the sling body 1 is placed on the upper side of the boom 4 so that the pin hole 12 of the sling body 1 and the lifting hole 41 on the boom 4 are in a coaxially connected position, and then the pin shaft 2 is penetrated with the pin hole 12 and the lifting hole 41 to connect the sling body 1 and the boom 4. And the hook of the external lifting equipment is hooked into the lifting hole 13. Then the hook of the external lifting equipment rises, and the sling body 1 is pulled to rotate upward around the pin shaft 2 relative to the boom 4. During the process, the supporting plate 11 on the sling body 1 is synchronously rotated downward and finally supported against the upper end surface of the boom 4, so that the boom 4 can be reliably locked during the subsequent lifting process to prevent the boom 4 from swinging. In addition, refer to Figure 4 , Figure 4The point O is the center of gravity of the boom 4, and the point P is the center of the lifting hole 13. When the supporting plate 11 is supported against the boom 4, the center of gravity of the lifting hole 13 is perpendicular to the line connecting the center of gravity O of the boom 4, thereby effectively ensuring the balance of the lifting force of the boom 4 during the lifting process, effectively preventing the boom 4 from tilting and swinging, thereby ensuring the safety and reliability of the lifting process of the boom 4. In addition, it can also reduce or avoid the situation where the operator manually adjusts and straightens, reduce manpower consumption, and improve lifting efficiency.

[0040] In this embodiment, the supporting plate 11 is supported against the movable arm 4 through the supporting end surface. Figure 3 to Figure 4 As shown, the boom 4 includes two spaced end plates 42, each of which is provided with a hoisting hole 41. The two end plates 42 are provided with abutment contact surfaces on their end faces facing each other, and the abutment end faces of the abutment plates can abut against the abutment contact surfaces.

[0041] Specifically, the sling body 1 is placed between the two end plates 42 so that the pin hole 12 and the two lifting holes 41 are in a coaxially connected position, and then the pin shaft 2 is sequentially passed through one of the lifting holes 41, the pin hole 12 and the other lifting hole 41, thereby realizing the connection between the sling body 1 and the boom 4.

[0042] Specifically, the matching relationship between the pin shaft 2 and the hanging hole 41 is preferably set to a transition fit or an interference fit, which can ensure the effective insertion of the pin shaft 2 and avoid the pin shaft 2 from falling accidentally.

[0043] Optionally, a limiting end 21 may be provided at the end of the pin shaft 2, and the diameter of the limiting end 21 is larger than the aperture of the lifting hole 41. Such a setting can also play a certain limiting role on the pin shaft 2 to prevent the pin shaft 2 from accidentally falling.

[0044] In this embodiment, the support plate 11 is welded to the sling body 1. The welding method has high operation efficiency and strong connection strength and reliability.

[0045] In some other optional embodiments, the support plate 11 may be integrally formed with the sling body 1 .

[0046] In this embodiment, continue to refer to Figure 1 As shown, a pin sleeve 14 is fixedly arranged on the sling body 1, the axial dimension of the pin sleeve 14 is larger than the thickness dimension of the sling body 1, and the pin hole 12 is opened on the pin sleeve 14. Specifically, the circumferential direction of the pin sleeve 14 is the thickness direction of the sling body 1. Figure 1The dimension a in the middle is the thickness dimension of the sling body 1, and the dimension b is the axial dimension of the pin sleeve 14. By designing the axial dimension of the pin sleeve 14 to be larger than the thickness dimension of the sling body 1, the thickness of the sling body 1 does not need to be designed too large, and the effective length of the pin hole 12 can be ensured, thereby ensuring that the pin hole 12 has enough inner wall area to cooperate with the pin shaft 2, avoiding the sling body 1 from shaking relative to the pin shaft 2.

[0047] As an optional implementation, a buffer pad 111 is provided on the supporting end surface of the supporting plate 11 .

[0048] The buffer pad 111 can provide buffering when the supporting end surface contacts the movable arm 4 , thereby preventing the supporting end surface from contacting the movable arm 4 and causing surface damage to the movable arm 4 .

[0049] Optionally, the material of the buffer pad 111 may be rubber.

[0050] In some other optional embodiments, the support plate 11 can be rotatably arranged at the first end of the sling body 1, and the support plate 11 can be fixed relative to the sling body 1 after being rotated into place. For booms 4 of different external specifications, their own support contact surface 421 may also have different design inclinations. Such a setting can make the support plate 11 adjust the inclination of the support plate 11 according to the different external specifications of the booms 4, thereby adjusting the support end surface adapted to the inclination of the booms 4 of different specifications, further improving the compatibility of use.

[0051] As an optional implementation, refer to Figures 5 and 6 As shown, the support plate 11 is connected to the sling body 1 through a bolt assembly 3. The bolt assembly 3 includes a bolt 31 and a nut 32. A connecting head 112 is fixedly provided on the support plate 11, and a first connecting hole 1121 is provided on the connecting head 112. A second connecting hole 15 is correspondingly provided on the first end of the sling body 1. The bolt 31 passes through the first connecting hole 1121 and the second connecting hole 15 and is threadedly connected with the nut 32. Specifically, when it is necessary to adjust the inclination of the support plate 11, the bolt assembly 3 can be loosened, so that the bolt 31 and the nut 32 are temporarily released from the tight contact with the sling body 1 and the connecting head 112, and then the angle of the support plate 11 is adjusted. When the adjustment is in place, the bolt assembly 3 is tightened again, so that the bolt 31 and the nut 32 are tightly contacted with the sling body 1 and the connecting head 112 again.

[0052] Specifically, two connecting heads 112 are arranged on the support plate 11 at intervals, and each connecting head 112 is provided with a first connecting hole 1121. The first end of the sling body 1 can be placed between the two connecting heads 112, and the second connecting hole 15 is in a coaxially connected position with the two first connecting holes 1121. Then, the bolt assembly 3 is installed, and the bolt 31 passes through one of the first connecting holes 1121, the second connecting hole 15 and the other first connecting hole 1121 and is threadedly connected with the nut 32, so that the two connecting heads 112 are tightly abutted against the sling body 1 at the same time.

[0053] Further optionally, the first connection hole 1121 is set as an arc-shaped long hole, and the second connection hole 15 is set in a plurality corresponding to the number of bolt assemblies 3. Such a setting can effectively ensure the angle of the support plate 11, and can appropriately increase the number of bolt assemblies 3, further ensuring the effect of close contact between the sling body 1 and the connecting head 112.

[0054] As an optional embodiment, a driving motor can be installed between the support plate 11 and the sling body 1, the housing of the driving motor is fixed to the sling body 1, and the output shaft of the driving motor is connected to the support plate 11. By rotating the output shaft of the driving motor relative to the housing, the angle of the support plate 11 relative to the sling body 1 can also be adjusted.

[0055] Optionally, the connector 112 is welded on the supporting plate 11 .

[0056] In some other optional embodiments, the support plate 11 may be integrally formed with the connecting head 112 .

[0057] Optionally, a plurality of lifting holes 13 are arranged at intervals. In this way, when lifting booms 4 of different sizes and models, lifting holes 13 at different positions can be selected in accordance with the inclination angle of the support plate 11, so that when applied to booms 4 of different sizes and models, the verticality of the lifting holes 13 and the line connecting the center of the circle and the center of gravity of the boom 4 can be ensured. Figures 5 and 6 The number of the middle lifting holes 13 is set to two. This embodiment is not limited to this, and the lifting holes 13 can also be other numbers.

[0058] Optionally, the surfaces of the sling body 1, the support plate 11 and the pin 2 are coated with an anti-rust layer. This arrangement can prevent the sling body 1, the support plate 11, the pin 2 and other components that are exposed to the external environment for a long time from rusting due to long-term use.

[0059] Optionally, the material of the hanger body 1, the supporting plate 11 and the pin 2 can be cast iron, which is low in cost and can effectively ensure its own strength.

[0060] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.

Claims

1. A lifting device for lifting a movable arm (4), wherein the movable arm (4) is provided with a lifting hole (41), It is characterized in that The sling comprises a sling body (1) and a pin (2); wherein: The sling body (1) is provided with a supporting plate (11), a pin hole (12) and a lifting hole (13) in sequence from the first end to the second end thereof; The pin shaft (2) can be penetrated by the pin hole (12) and the lifting hole (41) to connect the lifting device body (1) and the movable arm (4); The lifting device body (1) can rotate around the pin shaft (2) relative to the movable arm (4) so ​​that the support plate (11) is supported against the movable arm (4), and when the support plate (11) is supported against the movable arm (4), the center of the lifting hole (13) is vertically arranged to connect the center of gravity of the movable arm (4).

2. The sling according to claim 1, It is characterized in that The supporting plate (11) is welded onto the sling body (1).

3. The sling according to claim 1, It is characterized in that A pin sleeve (14) is fixedly arranged on the sling body (1), the axial dimension of the pin sleeve (14) is greater than the thickness dimension of the sling body (1), and the pin hole (12) is opened on the pin sleeve (14).

4. The sling according to claim 1, It is characterized in that The supporting plate (11) is supported against the movable arm (4) via a supporting end surface, and a buffer pad (111) is provided on the supporting end surface.

5. The sling according to claim 1, It is characterized in that The support plate (11) can be rotatably arranged at the first end of the hanger body (1), and the support plate (11) can be fixed relative to the hanger body (1) after being rotated into place.

6. The sling according to claim 5, It is characterized in that The support plate (11) is connected to the sling body (1) via a bolt assembly (3); wherein: The bolt assembly (3) comprises a bolt (31) and a nut (32); A connecting head (112) is fixedly provided on the supporting plate (11), and a first connecting hole (1121) is provided on the connecting head (112). A second connecting hole (15) is correspondingly provided on the first end of the sling body (1), and the bolt (31) passes through the first connecting hole (1121) and the second connecting hole (15) and is threadedly connected to the nut (32).

7. The sling according to claim 6, It is characterized in that The first connection hole (1121) is configured as an arc-shaped long hole, and a plurality of the second connection holes (15) are configured in a one-to-one correspondence with the number of the bolt assemblies (3).

8. The sling according to claim 6, It is characterized in that The connecting head (112) is welded on the supporting plate (11).

9. The sling according to claim 1, It is characterized in that The lifting holes (13) are arranged in a plurality at intervals.

10. The sling according to claim 1, It is characterized in that The surfaces of the hanger body (1), the support plate (11) and the pin shaft (2) are all coated with an anti-rust layer.