Aeolian sand roadbed filling construction device

By designing a sand-turning mechanism and a sufficient sprinkling system, the problem of uneven sprinkling of the wind-created sand roadbed under gravity and upper pressure is solved, and the full soaking and compaction of the wind-created sand is achieved, and the filling effect is improved.

CN222083280UActive Publication Date: 2024-11-29CHINA FIRST HIGHWAY ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323541693.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-11-29
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

During the use of the existing wind-accumulated sand subgrade filling construction device, the wind-accumulated sand subgrade is unevenly sprinkled under the action of gravity and upper pressure, and the wind-accumulated sand cannot be completely soaked, which leads to wind-accumulated during subsequent rolling. The problem of insufficient sand compaction.

Method used

A construction device for filling and filling of the roadbed of the wind-created sand is designed, including a base, sand storage bin, sand turning mechanism, water storage bin, sprayer and electric telescopic board. The wind-created sand is turned through the sand-created sand, reserved the soaking passage, and use water pump and spraying. The device is fully sprinkled with water, and the electric telescopic plate and roller are rolled to ensure that the water can be fully soaked and compacted.

Benefits of technology

Through this device, the wind-accumulated sand can improve its filling effect after full soaking and compacting, solve the problems of uneven sprinkling and insufficient compaction, and ensure the stability and construction quality of the wind-accumulated sand roadbed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083280U_ABST
    Figure CN222083280U_ABST
Patent Text Reader

Abstract

The utility model discloses an aeolian sand roadbed filling construction device, which relates to the technical field of building construction and comprises a base, and one end of the top of the base is fixedly connected with a first sand discharge pipe. The electric telescopic rod is arranged at the bottom of the base, the connecting plate is arranged at the output end of the electric telescopic rod, and the sand casting block is arranged at the bottom of the connecting plate, so that when equipment operates, the electric telescopic rod is started to enable the connecting plate of the electric telescopic rod to drive the sand casting block to perform sand casting treatment on spread aeolian sand, and the aeolian sand is separated by the sand casting block; the soaking shortcut is reserved, so that when the aeolian sand is watered subsequently, the aeolian sand can be soaked in the soaking shortcut more fully, and the problems that in the using process of a traditional filling device, due to the fact that the aeolian sand roadbed is under the action of gravity and upper layer pressure, watering is not uniform, the aeolian sand cannot be soaked thoroughly, and the construction efficiency is poor are further solved. Therefore, the compaction degree of the aeolian sand is insufficient in the subsequent rolling process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a wind-blown sand roadbed filling construction device. Background Art

[0002] Roadbed is an important structure of road engineering projects. When road engineering is being constructed in some areas, aeolian sand is the main material along the route, and the surface is composed of moving and semi-moving sand beams and sand dunes. It is easy for vehicles to get stuck during construction in aeolian sand areas, and it is difficult to obtain and transport commonly used roadbed fillers such as soil and sand. Therefore, aeolian sand can be used as the material for filling the roadbed in sandy areas, which can not only control sand damage, but also solve the problem of lack of roadbed fillers.

[0003] For example, the Chinese patent with publication number CN217758147U discloses a construction device for filling a roadbed with wet compaction method of aeolian sand, which includes a traveling mechanism traveling on both sides of the roadbed, a sand storage hopper and a water storage tank arranged on the traveling mechanism, the water storage tank is arranged adjacent to the sand storage hopper, the sand storage hopper is located on the side of the water storage tank close to the forward direction of the traveling mechanism, the sand outlet of the sand storage hopper is in a long strip shape, the length direction of the sand outlet of the sand storage hopper is extended radially along the roadbed, and the sand outlet of the sand storage hopper is provided with a valve for controlling the amount of sand discharged; the water storage tank is provided with a water inlet for connecting to a water pumping pipe of a water well beside the roadbed, and a plurality of spray heads are arranged on a side wall of the water storage tank facing the roadbed, the plurality of spray heads are arranged at intervals extending along the width direction of the roadbed, and the plurality of spray heads are arranged obliquely toward the sand outlet of the sand storage hopper, and the spray path of the spray head intersects with the sand outlet path of the sand storage hopper. The present application has the effect of compacting aeolian sand filler under the condition of relatively sufficient water content.

[0004] The existing technology has the following problems:

[0005] During use, the existing aeolian sand roadbed filling construction device causes uneven watering and inability to thoroughly soak the aeolian sand due to the gravity and upper pressure of the aeolian sand roadbed, which results in insufficient compaction of the aeolian sand during subsequent rolling. Utility Model Content

[0006] The utility model provides a wind-blown sand roadbed filling construction device to solve the problems raised in the above background technology.

[0007] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0008] A wind-blown sand roadbed filling construction device comprises a base, one end of the top of the base is fixedly connected to a first sand discharge pipe, the top of the first sand discharge pipe is fixedly connected to a sand storage bin, and one end of the bottom of the base is provided with a sand turning mechanism.

[0009] A further improvement of the technical solution of the utility model is that the sand-turning mechanism includes an electric telescopic rod fixedly connected to the bottom of the base, the output end of the electric telescopic rod is fixedly connected to a connecting plate, and the bottom of the connecting plate is fixedly connected to a sand-turning block.

[0010] A further improvement of the technical solution of the utility model is that a water storage bin is fixedly connected to the top of the base, a water inlet pipe is fixedly connected to one end of the top of the water storage bin, and a drain pipe is fixedly connected to one side of the outer wall of the water storage bin.

[0011] A further improvement of the technical solution of the utility model is that one end of the drainage pipe is fixedly connected to a water pump, and the output end of the water pump is fixedly connected to a sprayer.

[0012] A further improvement of the technical solution of the utility model is that: the other end of the bottom of the sand storage bin is fixedly connected with a second sand discharge pipe, and the outer wall of the second sand discharge pipe is fixedly connected with an electric valve.

[0013] A further improvement of the technical solution of the utility model is that: an electric telescopic plate is fixedly connected to one side of the bottom of the base, and a roller is rotatably connected to one end of the bottom of the base.

[0014] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:

[0015] 1. The utility model provides a construction device for filling aeolian sand roadbed, by arranging an electric telescopic rod at the bottom of a base, a connecting plate at the output end of the electric telescopic rod, and a sand-turning block at the bottom of the connecting plate, so that when the equipment is running, the electric telescopic rod is started to make its connecting plate drive the sand-turning block to perform sand-turning on the spread aeolian sand, so that the aeolian sand is separated by the sand-turning block, thereby reserving a soaking path, so that when the aeolian sand is subsequently sprinkled with water, the soaking path can be used to make water more fully soak the aeolian sand, further solving the problem that in the use of traditional filling devices, due to the aeolian sand roadbed under the action of gravity and upper pressure, the water sprinkling is uneven, the aeolian sand cannot be thoroughly soaked, thereby resulting in insufficient compaction of the aeolian sand in the subsequent rolling process. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 It is a bottom view schematic diagram of the utility model;

[0018] Figure 3 It is a side cross-sectional schematic diagram of the utility model;

[0019] Figure 4 It is an enlarged schematic diagram of point A of the present utility model.

[0020] In the figure: 1. base; 2. first sand discharge pipe; 3. sand storage bin; 4. electric telescopic rod; 5. connecting plate; 6. sand turning block; 7. water storage bin; 8. water inlet pipe; 9. drain pipe; 10. water pump; 11. sprayer; 12. second sand discharge pipe; 13. electric valve; 14. electric telescopic plate; 15. roller. DETAILED DESCRIPTION

[0021] The present invention is further described in detail below in conjunction with the embodiments:

[0022] Example 1

[0023] like Figure 1-4 As shown, the utility model provides a wind-blown sand roadbed filling construction device, including a base 1, one end of the top of the base 1 is fixedly connected to a first sand discharge pipe 2, the top of the first sand discharge pipe 2 is fixedly connected to a sand storage bin 3, and one end of the bottom of the base 1 is provided with a sand turning mechanism.

[0024] In this embodiment, aeolian sand is injected into the sand storage bin 3 for storage, which is moved by using a vehicle towing device, and a first sand discharge pipe 2 is provided at one end of the inner wall of the sand storage bin 3, so that the aeolian sand is discharged onto the ground through the first sand discharge pipe 2, and the sand turning mechanism provided at one end of the bottom of the base 1 is started to turn the aeolian sand, thereby preventing water from being unable to completely penetrate the aeolian sand due to the effects of gravity and upper pressure during the watering process, thereby causing the aeolian sand layer to collapse and affecting the subsequent rolling effect.

[0025] Example 2

[0026] like Figure 1-4 As shown, based on Example 1, the utility model provides a technical solution: preferably, the sand-casting mechanism includes an electric telescopic rod 4 fixedly connected to the bottom of the base 1, the output end of the electric telescopic rod 4 is fixedly connected to a connecting plate 5, and the bottom of the connecting plate 5 is fixedly connected to a sand-casting block 6.

[0027] In this embodiment, an electric telescopic rod 4 is arranged at the bottom of the base 1, a connecting plate 5 is arranged at the output end of the electric telescopic rod 4, and a sand-turning block 6 is arranged at the bottom of the connecting plate 5. When the equipment is running, the electric telescopic rod 4 is started so that its connecting plate 5 drives the sand-turning block 6 to turn the spread aeolian sand, so that the aeolian sand is separated by the sand-turning block 6, thereby reserving a soaking path, so that when the aeolian sand is subsequently sprinkled with water, the soaking path can be used to allow water to more fully soak the aeolian sand, further solving the problem that in the use of traditional filling devices, due to the action of gravity and upper pressure on the aeolian sand roadbed, the water sprinkling is uneven and the aeolian sand cannot be thoroughly soaked, thereby resulting in insufficient compaction of the aeolian sand in the subsequent rolling process.

[0028] Example 3

[0029] like Figure 1-4 As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, a water storage tank 7 is fixedly connected to the top of the base 1, one end of the top of the water storage tank 7 is fixedly connected to a water inlet pipe 8, one side of the outer wall of the water storage tank 7 is fixedly connected to a drain pipe 9, one end of the drain pipe 9 is fixedly connected to a water pump 10, and the output end of the water pump 10 is fixedly connected to a sprayer 11.

[0030] In this embodiment, water is injected into the water storage tank 7 through the water inlet pipe 8. When it is necessary to sprinkle water on the aeolian sand foundation, the water pump 10 is started through the drainage pipe 9 to inject the water stored in the water storage tank 7 into the sprinkler 11 by the water pump 10, thereby achieving the purpose of sprinkling water on the aeolian sand.

[0031] Example 4

[0032] like Figure 1-4 As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, the other end of the bottom of the sand storage bin 3 is fixedly connected to a second sand discharge pipe 12, the outer wall of the second sand discharge pipe 12 is fixedly connected to an electric valve 13, one side of the bottom of the base 1 is fixedly connected to an electric telescopic plate 14, and one end of the bottom of the base 1 is rotatably connected to a roller 15.

[0033] In this embodiment, a second sand discharge pipe 12 is provided at the other end of the bottom of the sand storage bin 3. When the aeolian sand foundation is fully watered, the electric valve 13 is started to discharge the aeolian sand through the second sand discharge pipe 12 and spread it on the aeolian sand foundation, thereby absorbing the remaining moisture in the aeolian sand foundation to avoid the collapse of the aeolian sand slope due to excessive moisture. An electric telescopic plate 14 is provided on one side of the bottom of the base 1, and the electric telescopic plate 14 is used to limit the aeolian sand foundation. At this time, the roller 15 provided at one end of the bottom of the base is used to roll the aeolian sand foundation, thereby achieving the purpose of compacting the aeolian sand foundation.

[0034] The working principle of this aeolian sand roadbed filling construction device is specifically described below.

[0035] like Figure 1-4As shown, aeolian sand is injected into a sand storage bin 3 for storage, and the device is moved by towing a vehicle, and a first sand discharge pipe 2 is arranged at one end of the inner wall of the sand storage bin 3 to discharge the aeolian sand onto the ground through the first sand discharge pipe 2, and an electric telescopic rod 4 is arranged at the bottom of the base 1, and a connecting plate 5 is arranged at the output end of the electric telescopic rod 4, and a sand turning block 6 is arranged at the bottom of the connecting plate 5, so that when the device is running, the electric telescopic rod 4 is started so that its connecting plate 5 drives the sand turning block 6 to turn the spread aeolian sand, so that the aeolian sand is separated by the sand turning block 6, thereby reserving a soaking path, so that when the aeolian sand is subsequently sprinkled with water, the soaking path can be used to allow water to more fully soak the aeolian sand, further solving the problem that in the use of traditional filling devices, due to the aeolian sand roadbed under the action of gravity and upper pressure, the water sprinkling is uneven and the aeolian sand cannot be thoroughly soaked, thereby resulting in the subsequent rolling process. , the purpose of insufficient compaction of aeolian sand is achieved by injecting water into the water storage bin 7 through the water inlet pipe 8. When the aeolian sand foundation needs to be watered, the water pump 10 is started to pass through the drainage pipe 9, and the water stored in the water storage bin 7 is injected into the sprinkler 11 by the water pump 10, so as to achieve the purpose of watering the aeolian sand. A second sand discharge pipe 12 is arranged at the other end of the bottom of the sand storage bin 3. When the aeolian sand foundation is fully watered, the electric valve 13 is started to discharge the aeolian sand through the second sand discharge pipe 12 and spread it on the aeolian sand foundation, thereby absorbing the residual moisture of the aeolian sand foundation, and avoiding the collapse of the aeolian sand slope due to excessive moisture. An electric telescopic plate 14 is arranged on one side of the bottom of the base 1, and the electric telescopic plate 14 is used to limit the aeolian sand foundation. At this time, the roller 15 arranged at one end of the bottom of the base is used to roll the aeolian sand foundation, so as to achieve the purpose of compacting the aeolian sand foundation.

[0036] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A construction device for filling a roadbed with aeolian sand, comprising a base (1), characterized in that: One end of the top of the base (1) is fixedly connected to a first sand discharge pipe (2), the top of the first sand discharge pipe (2) is fixedly connected to a sand storage bin (3), and one end of the bottom of the base (1) is provided with a sand turning mechanism.

2. A wind-blown sand roadbed filling construction device according to claim 1, characterized in that: The sand-turning mechanism comprises an electric telescopic rod (4) fixedly connected to the bottom of the base (1); the output end of the electric telescopic rod (4) is fixedly connected to a connecting plate (5); and the bottom of the connecting plate (5) is fixedly connected to a sand-turning block (6).

3. The aeolian sand roadbed filling construction device according to claim 1, characterized in that: The top of the base (1) is fixedly connected to a water storage bin (7), one end of the top of the water storage bin (7) is fixedly connected to a water inlet pipe (8), and one side of the outer wall of the water storage bin (7) is fixedly connected to a drain pipe (9).

4. A wind-blown sand roadbed filling construction device according to claim 3, characterized in that: One end of the drainage pipe (9) is fixedly connected to a water pump (10), and the output end of the water pump (10) is fixedly connected to a sprayer (11).

5. The aeolian sand roadbed filling construction device according to claim 1, characterized in that: The other end of the bottom of the sand storage bin (3) is fixedly connected to a second sand discharge pipe (12), and the outer wall of the second sand discharge pipe (12) is fixedly connected to an electric valve (13).

6. The aeolian sand roadbed filling construction device according to claim 1, characterized in that: An electric telescopic plate (14) is fixedly connected to one side of the bottom of the base (1), and a roller (15) is rotatably connected to one end of the bottom of the base (1).