Plasma pulse unblocking device
Through plasma pulse deblocking device and electromagnetic transient electromagnetic impact technology, the poor removal effect of wellbore blockage and pollution in the existing technology has been solved, efficient removal of wellbore blockage and increase the permeability of oil layer, and significantly improve the oil and gas wells Mining efficiency and safety.
Patent Information
- Application Number
- CN202420800018.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The existing pulse deblocking devices have problems such as untidy wire discharge, easy collapse, many equipment, complex processes, and pollutants may be squeezed into the deep strata, resulting in poor deblocking effect and secondary pollution.
The plasma pulse deblocking device is used to generate shock waves through the plasma generator, and combined with electromagnetic transient electromagnetic impact technology, micro cracks and new connecting throats are formed, fluid viscosity is reduced, dirt is removed, oil layer permeability is improved, and equipment design is simplified. Safe and environmentally friendly.
It has achieved effective removal of wellbore blockage, improved the mining efficiency of oil and gas wells, reduced construction costs and time, enhanced the effective permeability of the oil layer, avoided oil layer pollution, and significantly increased production capacity.
Smart Images

Figure CN222084475U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of oil and gas exploitation unblocking, in particular to an antibacterial, antimicrobial and antiviral plant essential oil composition, specifically a plasma pulse unblocking device. Background Art
[0002] Blockage removal technology refers to a technical means used to solve the problem of wellbore blockage during oil extraction; wellbore blockage refers to the formation of blockages inside the wellbore due to the deposition or crystallization of sediments, hydrates, calcium and magnesium salts and other substances, which affects the normal flow of oil and gas.
[0003] Ultrasonic waves are sound waves with a frequency higher than 20,000 Hz, with the characteristics of high frequency, small amplitude, and strong penetrating power of high-frequency waves. Sound waves are a mechanical phenomenon, which refers to the propagation process of mechanical vibration in a medium, and have the physical property of vibration energy transmission. The half-slot principle is that the layers are staggered by half a slot, and this cycle can make the cables neatly arranged.
[0004] The main purpose of the unblocking technology is to remove wellbore blockages, restore oil and gas production capacity, and improve the production efficiency of oil and gas wells; the existing pulse unblocking devices and related products have problems such as uneven arrangement of wire ropes, easy collapse, mutual squeezing of wire ropes, and failure to lower to the right position, insufficient energy of the transducer, and poor unblocking effect; and the conventional process of increasing oil and gas production capacity generally adopts fracturing, acidizing, squeezing and other processes, but this process will squeeze pollutants into the deep formation, the unblocking effect is not as good as the pulse technology, and it is easy to form secondary pollution, and it uses a lot of equipment, a lot of construction personnel, complex processes and high costs.
[0005] In summary, the utility model provides a plasma pulse unblocking device to solve the above problems. Utility Model Content
[0006] The construction process of this technology is simple, and it can effectively remove stratum pollution, create micro-cracks in the oil layer, increase the effective permeability of the oil layer, reduce fluid viscosity, remove dirt, and reduce the amount of wax precipitation in crude oil, thereby increasing production capacity. This technology will not pollute the oil layer, has a short construction time, is safe and environmentally friendly, has low cost, has obvious production increase effects, and has a relatively high input-output ratio. It is an effective measure to remove oil layer pollution or blockage and improve production capacity.
[0007] In order to achieve the above-mentioned purpose, the technical solution adopted by the present technology is: it includes an engineering vehicle head, a pulse control box and a cable, the pulse control box is installed in the trunk of the engineering vehicle head, a plasma generator is arranged at the bottom of the pulse control box, the connection terminal of the plasma generator is electrically connected with an electric wire, the end of the electric wire away from the plasma generator is connected to a winch end plate, there are two winch end plates in total, a winch drum is fixedly connected between the two winch end plates, the cable is wound around the winch drum, the end of the cable away from the winch drum is connected to a transducer, a car cover is installed on the trunk of the engineering vehicle head, and a rear door curtain is arranged at the end of the car cover away from the engineering vehicle head.
[0008] Furthermore, a brush is provided at the connection between the electric wire and the capstan end plate to introduce current into the armature winding, reduce resistance and increase wear resistance, and the total length of the cable is 3700 meters.
[0009] Furthermore, both ends of the capstan drum pass through the capstan end plates, and both ends of the capstan drum are connected with cover plates, which cover the capstan drum tightly.
[0010] Furthermore, the inner side surfaces of the two capstan end plates are provided with semicircular grooves, the diameter of the semicircular grooves is the same as that of the cables, and the spacing between each of the semicircular grooves is 13.86 mm, so that the steel wire cables can be neatly arranged.
[0011] Furthermore, a square hole is provided between the other end of the cable and the transducer head near the negative pole radiation end, so that the energy has directionality, thereby achieving the purpose of increasing the emission energy and removing blockage.
[0012] Furthermore, a calibrated wire is connected between the two electrodes of the plasma generator. After power is turned on, the wire is instantly vaporized to form plasma in the liquid. The generated shock wave enters the production layer through the perforation channel, causing compression and tensile stress. The blockage in the near-well area is separated from the wall under the action of shear force and sinks to the bottom of the well, promoting the development of an abnormal microcrack network in the production layer matrix.
[0013] The method for using the plasma pulse unblocking device comprises the following steps:
[0014] S1. The unblocking equipment enters the well site, connects to the power supply, installs and debugs to ensure the equipment is normal;
[0015] S2. After the preparation work is completed, the natural gamma instrument is first lowered to measure the short casing distance and perforation section of the well, and the pressure of the perforation section in the well and the position of the intended treatment production layer section, i.e., the perforation section;
[0016] S3. After the measurement is completed, the plasma pulse plugging removal operation is divided into 15 working sections according to the production layer arrangement according to the measured data;
[0017] S4. Start the operation. First, lower the cable and move the transducer to the oil layer. Start the machine for preheating for 15-20 minutes, input the operation data, and start the operation. The operation time is 14-16 hours.
[0018] S5. After all unblocking operations are completed, shut down the well for 4-8 hours.
[0019] Compared with the prior art, the utility model has the following beneficial effects:
[0020] 1. The utility model provides semicircular grooves on the inner side surfaces of the two disk end plates, wherein the semicircular grooves have the same diameter as that of the cable and the spacing between each of the semicircular grooves is 13.86 mm, so that the steel wire cables are neatly arranged, and the plasma pulse signal energy converted by the transducer connected to the cable is emitted from the cable with four square windows, so that the energy has directionality, thereby achieving the purpose of increasing the emission energy and removing the blockage; and only one winch and four or five operators are required, and the use process is simple; after the plasma generator is energized, the wire connected between the two motors is instantly vaporized, forming plasma in the liquid, and the generated shock wave enters the production layer through the perforation channel, causing compression and tensile stress, and the blockage in the near-well area is separated from the wall under the action of shear force and sinks to the bottom of the well, promoting the development of abnormal microcrack network in the production layer matrix.
[0021] 2. The utility model adds electromagnetic (high-power transient electromagnetic impact) unblocking on the basis of the original ultrasonic unblocking, which effectively removes formation pollution. Under the accelerated impact of the strong transient electromagnetic field, the reservoir can cause certain physical deformation of the rock cement, thereby forming tiny cracks and new connecting throats, which is conducive to the output of more fluids in the pores and improves the effective permeability of the oil layer.
[0022] 3. The utility model forms a strong transient magnetic field and electric field in the formation through a strong transient process excited in the wellbore. When penetrating the wellbore, it polarizes and acts on the charged particles in the formation. The difference in acceleration between the charged and non-charged particles causes mutual friction and heating, which increases the temperature of the formation around the wellbore and reduces the viscosity of the fluid. The external impact electric field changes the electric field distribution on the formation surface, reduces resistance, reduces the tension at the oil-water interface, removes dirt, and reduces the amount of wax precipitation in crude oil, thereby increasing production capacity. This technology will not pollute the oil layer, has a short construction time, is safe and environmentally friendly, has low cost, has obvious production-increasing effects, and has a high input-output ratio. It is an effective measure to remove oil layer pollution or blockage and improve production capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a stereogram of the device of the utility model;
[0024] Figure 2It is a front view and a cross-sectional view of a capstan end plate of the utility model.
[0025] In the figure:
[0026] 1. Engineering vehicle head; 2. Pulse control box; 3. Plasma generator; 4. Wires; 5. Brushes; 6. Winch end plate; 7. Winch drum; 8. Cables; 9. Cover plate; 10. Carriage cover; 11. Transducer; 12. Rear door curtain. DETAILED DESCRIPTION
[0027] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0028] The utility model provides a new technical solution. Firstly, data of plugging wells are collected and sorted, dynamic and static data before operation are recorded, and electromagnetic ultrasonic plugging removal construction design is compiled; when the plugging removal equipment enters the well site, the power is turned on, the equipment is installed and debugged to ensure the normal operation of the equipment; when the preparation work is completed, a natural gamma instrument is first lowered to measure the short sleeve distance and the perforation section of the well, and the perforation section pressure in the well and the position of the intended treatment production layer section, i.e., the perforation section, are measured; after the measurement is completed, according to the measured data, the plasma pulse plugging removal operation content is divided into 15 working sections according to the production layer arrangement, so as to avoid cross contamination or mixing between different production layers, which affects the plugging removal effect, and improve the work efficiency.
[0029] Then, if Figure 1-2 As shown, the operation is started. The cable is lowered first. It should be noted that: the inner side of the two capstan end plates 6 is provided with a semicircular groove, the semicircular groove has the same diameter as the cable 8, and the spacing between each semicircular groove is 13.86 mm, so that the steel wire rope 8 is neatly arranged; the plasma pulse signal energy converted by the transducer 11 connected to the cable 8 is emitted from the square window, and the energy has directionality, so as to achieve the purpose of increasing the emission energy and unblocking; and only one engineering vehicle head and four or five operators are needed, and the use process is simple; after the plasma generator 3 is powered on, the wire connected between the two motors is instantly Gasification forms plasma in the liquid, and the generated shock wave enters the production layer through the perforation channel, causing compression and tensile stress. The blockage in the near-well area is separated from the wall under the action of shear force and sinks to the bottom of the well, promoting the development of abnormal micro-crack network in the matrix of the production layer; then the transducer is lowered to the oil layer position, turned on and preheated for 15-20 minutes, the operation data is input, and the operation starts. The operation time is about 15 hours; after the unblocking operation is completed, the well is shut down for 4-8 hours, which is conducive to the separation of oil and water and allows the formation pressure to reach a balanced state again, avoiding drastic changes in formation pressure due to rapid well opening, which affects the subsequent production capacity and well stability.
[0030] In view of the cause of formation pollution, in order to effectively remove the pollution, electromagnetic (high-power transient electromagnetic impact) unblocking has been newly added on the basis of the original ultrasonic unblocking, which effectively removes the formation pollution. Under the accelerated impact of the strong transient electromagnetic field, the reservoir can cause a certain physical deformation of the rock cement, thereby forming tiny cracks and new connecting throats, which is conducive to the output of more fluids in the pores and improves the effective permeability of the oil layer; the strong transient process excited in the wellbore forms a strong transient magnetic field and electric field in the formation, which polarizes and acts in the penetrating wellbore. It is used for charged particles in the formation, the acceleration difference between charged and non-charged particles, mutual friction, and heating, so that the temperature of the formation around the wellbore increases and the viscosity of the fluid is reduced; an external impact electric field is applied to change the electric field distribution on the formation surface, reduce resistance, reduce the tension at the oil-water interface, remove dirt, and reduce the amount of wax precipitation in crude oil, thereby increasing production capacity; this technology will not pollute the oil layer, has a short construction time, is safe and environmentally friendly, has low cost, has obvious production-increasing effects, and has a relatively high input-output ratio. It is an effective measure to remove oil layer pollution or blockage and improve production capacity.
[0031] The implementation modes of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A plasma pulse unblocking device, comprising an engineering vehicle head (1), a pulse control box (2) and a cable (8), characterized in that: The pulse control box (2) is installed in the trunk of the engineering vehicle head (1). A plasma generator (3) is arranged at the bottom of the pulse control box (2). The connection terminal of the plasma generator (3) is electrically connected to an electric wire (4). The end of the electric wire (4) away from the plasma generator (3) is connected to a winch end plate (6). There are two winch end plates (6) in total. A winch drum (7) is fixedly connected between the two winch end plates (6). The cable (8) is wound around the winch drum (7). The end of the cable (8) away from the winch drum (7) is connected to a transducer (11). A car cover (10) is installed on the trunk of the engineering vehicle head (1). The end of the car cover (10) away from the engineering vehicle head (1) is provided with a rear door curtain (12).
2. The plasma pulse unblocking device according to claim 1, characterized in that: A brush (5) is provided at the connection between the electric wire (4) and the capstan end plate (6).
3. The plasma pulse unblocking device according to claim 1, characterized in that: Both ends of the capstan drum (7) pass through the capstan end plates (6), and both ends of the capstan drum (7) are connected to cover plates (9).
4. The plasma pulse unblocking device according to claim 1, characterized in that: The inner side surfaces of the two capstan end plates (6) are provided with semicircular grooves, the diameter of the semicircular grooves is the same as that of the cables (8), and the spacing between each of the semicircular grooves is 13.86 mm.
5. The plasma pulse unblocking device according to claim 1, characterized in that: A square hole is provided between the other end of the cable (8) and the head of the transducer (11) near the negative electrode radiation end.
6. The plasma pulse unblocking device according to claim 1, characterized in that: A calibration wire is connected between the two electrodes of the plasma generator (3).
Citation Information
Cited By
Plasma pulse plug removal and permeation enhancement device for deep oil-gas well
CN223330547U
