Structure for prolonging service life of silicon carbide tee joint

By using silicon carbide intermediate layer and steel outer sheath in the tee structure, combined with arcuate connections and arch reinforcement blocks, the wear and leakage problems of existing tee structures are solved, extending service life and improving safety.

CN222085440UActive Publication Date: 2024-11-29ZHEJIANG FEIDA TONGQIU ENVIRONMENTAL PROTECTION PIPE IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420820427.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-11-29
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

The incident angle of the existing tee structure at the connection of the main pipe and branch pipe causes a high wear rate of medium, short service life, prone to deformation and leakage, and requires regular maintenance or replacement.

Method used

The silicon carbide intermediate layer and steel outer protective layer structure are adopted, combined with arcuate connections and arch reinforcement blocks, annular grooves and rubber seals, and visual protection barriers are provided to enhance structural stability and leakage detection.

Benefits of technology

It significantly increases the service life of the tee structure, avoids wear and deformation, detects leakage early, and ensures safety and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222085440U_ABST
    Figure CN222085440U_ABST
Patent Text Reader

Abstract

The structure for prolonging the service life of the silicon carbide tee joint comprises a first tee joint structure main body, one end of the first tee joint structure main body is communicated with a second tee joint structure main body, and the outer wall of the first tee joint structure main body and the outer wall of the second tee joint structure main body are both coated with silicon carbide middle layers. And the outer wall of the silicon carbide middle layer is coated with a steel shaping coating layer. According to the utility model, the outer wall of the first three-way structure main body and the outer wall of the second three-way structure main body are coated with the silicon carbide middle layers, so that the thickness of a lining of a scoured part is greatly increased; therefore, the overall shape of the first three-way structure body, the second three-way structure body and the silicon carbide middle layer is further stabilized, the situation that deformation and leakage are prone to occurring due to the fact that a lining part is excessively eroded and abraded can be avoided, and the overall service life of the structure is greatly prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of three-way pipes, in particular to a structure for improving the service life of a silicon carbide three-way pipe. Background Art

[0002] Pipeline is one of the common components of various equipment. In order to further meet the complex medium transmission tasks, pipelines will use a variety of styles of joints in actual application. Tee is a typical one of them, which has three openings to meet the specific transmission tasks of the medium.

[0003] When the existing tee structure is in use, there is an incident angle at the connection between the main pipe and the branch pipe, which causes the wear rate of the medium at this point to be higher than other parts during the transmission process, and the service life is lower than other parts. It is prone to deformation and leakage, which requires regular maintenance. This not only increases the workload of the staff, but sometimes the maintenance cannot be solved and the tee needs to be replaced as a whole, which greatly reduces the actual service life of the tee. Utility Model Content

[0004] The utility model aims to provide a structure for improving the service life of a silicon carbide tee. The structure for improving the service life of a silicon carbide tee solves the above-mentioned background problems by adding a silicon carbide intermediate layer and a steel outer protective layer.

[0005] The purpose of the utility model can be achieved through the following technical solutions:

[0006] A structure for improving the service life of a silicon carbide tee, comprising a first tee structure body,

[0007] One end of the first three-way structure body is connected to the second three-way structure body, and the outer walls of the first three-way structure body and the second three-way structure body are both coated with a silicon carbide intermediate layer, the outer wall of the silicon carbide intermediate layer is coated with a steel shaped coating layer, an annular groove is provided at the edge of the opening of the silicon carbide intermediate layer, and a window is reserved below the opening of the steel shaped coating layer;

[0008] The silicon carbide intermediate layer is provided with an elastic mechanism for sealing the connection between the openings of the first three-way structure body and the second three-way structure body.

[0009] As a further solution of the utility model: the connection between the first three-way structural body and the second three-way structural body is arc-shaped, and the first three-way structural body, the second three-way structural body and the silicon carbide intermediate layer are made in one piece.

[0010] As a further solution of the utility model: an arched reinforcement block is installed on a side of the inner wall of the second three-way structural body away from the first three-way structural body, and the arched reinforcement block and the second three-way structural body are made in one piece.

[0011] As a further solution of the utility model: a mounting ring is installed at the edge of the opening of the steel shaped coating layer, and mounting holes are evenly opened at one end of the mounting ring.

[0012] As a further solution of the utility model: the elastic mechanism includes three groups of rubber sealing pads, the rubber sealing pads are located at the openings of the steel forming coating layer, and through holes are evenly reserved at one end of the rubber sealing pads.

[0013] As a further solution of the utility model: a visual protection barrier is installed inside the window, and the visual protection barrier is fixedly connected to the steel shaped covering layer by gluing.

[0014] Beneficial effects of the utility model:

[0015] (1) The outer walls of the first three-way structure body and the second three-way structure body are coated with a silicon carbide intermediate layer, so that the thickness of the lining of the washed part is greatly increased. At the same time, the outer wall of the silicon carbide intermediate layer is coated with a steel shaped coating layer, thereby further stabilizing the overall shape of the first three-way structure body, the second three-way structure body and the silicon carbide intermediate layer, thereby preventing the lining part from being excessively washed and worn and prone to deformation and leakage, thereby greatly increasing the overall service life of the structure;

[0016] (2) An arched reinforcement block is arranged inside the second three-way structure body, so that when the medium enters the scouring process through the first three-way structure body, the arch of the arched reinforcement block can transmit the scouring force to the whole body, thereby further avoiding excessive wear or deformation at this part;

[0017] (3) An annular groove is provided on the silicon carbide intermediate layer, a window is provided on the steel shaped coating layer, and a visual protective barrier is provided in the window. When a slight leakage occurs at the connection of the structure, part of the medium will begin to remain inside the annular groove. The staff can observe it through the visual protective barrier during the maintenance process, and thus the leakage and other situations can be discovered and resolved early to avoid greater safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The utility model is further described below in conjunction with the accompanying drawings.

[0019] Figure 1 It is a main structural schematic diagram of the utility model;

[0020] Figure 2It is a schematic diagram of the main cross-sectional structure of the utility model;

[0021] Figure 3 This utility model Figure 2 A schematic diagram of the enlarged structure at point A;

[0022] Figure 4 It is a schematic diagram of the top structure of the utility model.

[0023] In the figure: 1. the main body of the first three-way structure; 2. the main body of the second three-way structure; 3. the silicon carbide intermediate layer; 4. the steel shaped covering layer; 5. the arch reinforcement block; 6. the annular groove; 7. the rubber sealing gasket; 8. the through hole; 9. the mounting ring; 10. the mounting hole; 11. the window; 12. the visual protective barrier. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Example 1

[0026] See also Figure 1-Figure 4 As shown, the utility model is a structure for improving the service life of a silicon carbide tee, comprising a first three-way structure body 1, one end of the first three-way structure body 1 is connected to a second three-way structure body 2, and the outer walls of the first three-way structure body 1 and the second three-way structure body 2 are both coated with a silicon carbide intermediate layer 3, the outer wall of the silicon carbide intermediate layer 3 is coated with a steel shaped coating layer 4, an annular groove 6 is provided at the edge of the opening of the silicon carbide intermediate layer 3, and a window 11 is reserved below the opening of the steel shaped coating layer 4, the connection between the first three-way structure body 1 and the second three-way structure body 2 is arc-shaped, and the first three-way structure body 1, the second three-way structure body 2 and the silicon carbide intermediate layer 3 are made in an integrated manner to ensure the connection strength of each part during use;

[0027] like Figure 2 and Figure 4As shown, an arched reinforcement block 5 is installed on the side of the inner wall of the second three-way structure body 2 away from the first three-way structure body 1, and the arched reinforcement block 5 and the second three-way structure body 2 are made in one piece, so that when the medium flows in through the first three-way structure body 1, the arched reinforcement block 5 can transmit the flushing force to the whole body, thereby avoiding excessive wear and deformation of the part, and at the same time, because the connection between the first three-way structure body 1 and the second three-way structure body 2 is arc-shaped, the space size at the corner of the first three-way structure body 1 and the second three-way structure body 2 will not be reduced, ensuring the normal transportation of the medium;

[0028] like Figure 2 As shown, a mounting ring 9 is installed at the edge of the opening of the steel shaped coating layer 4, and a mounting hole 10 is evenly opened at one end of the mounting ring 9. The staff can connect the structure with the pipeline system through the mounting ring 9 and the mounting hole 10 and use it;

[0029] Example 2

[0030] like Figure 2 and Figure 3 As shown, the elastic mechanism includes three groups of rubber sealing pads 7, the rubber sealing pads 7 are located at the openings of the steel forming coating 4, and one end of the rubber sealing pad 7 is evenly reserved with through holes 8, and a visual protective blocking member 12 is installed inside the window 11, and the visual protective blocking member 12 is fixedly connected to the steel forming coating 4 by pasting, so that when a slight leakage occurs at the connection between the structure and the pipeline system, part of the medium will flow into the interior of the annular groove 6 through the through holes 8 and remain, avoiding direct outflow to the outside to cause direct contamination or dripping, which makes it inconvenient for staff to notice during maintenance, so that staff can observe the annular groove 6 through the visual protective blocking member 12 during maintenance, so as to achieve early detection and early treatment.

[0031] The working principle of the utility model is as follows: the rubber sealing pads 7 are respectively placed at the edges of the openings of the steel shaped coating layer 4, and the structure is connected to the pipeline system through the mounting ring 9, the mounting hole 10 and the bolt assembly for use. During use, the silicon carbide intermediate layer 3 can cooperate with the first three-way structure body 1 and the second three-way structure body 2 to be washed by the scouring force, intersecting with the conventional tee, with a thicker thickness and a more stable structure, so that it is not easy to have insufficient remaining wear thickness or deformation, and at the same time, the steel shaped coating layer 4 can further stabilize the overall shape, further avoiding the deformation that is easy to cause leakage due to insufficient fit at the connection;

[0032] Furthermore, during use, when the pipeline system causes a slight leakage at the connection with the structure due to various reasons, the medium will flow into and remain inside the annular groove 6 through the through hole 8. Therefore, during daily maintenance, the staff can observe whether the transmitted medium remains inside the annular groove 6 through the visual protective barrier 12 to determine whether a slight leakage has occurred, so as to achieve early detection and early treatment.

[0033] The above is a detailed description of an embodiment of the utility model, but the content is only a preferred embodiment of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.

Claims

1. A structure for improving the service life of a silicon carbide tee, comprising a first tee structure body (1), characterized in that: One end of the first three-way structure body (1) is connected to the second three-way structure body (2), and the outer walls of the first three-way structure body (1) and the second three-way structure body (2) are both coated with a silicon carbide intermediate layer (3), the outer wall of the silicon carbide intermediate layer (3) is coated with a steel shaped coating layer (4), an annular groove (6) is provided at the edge of the opening of the silicon carbide intermediate layer (3), and a window (11) is reserved below the opening of the steel shaped coating layer (4); The silicon carbide intermediate layer (3) is provided with an elastic mechanism for sealing the opening connection between the first three-way structural body (1) and the second three-way structural body (2).

2. A structure for improving the service life of a silicon carbide tee according to claim 1, characterized in that: The connection between the first three-way structural body (1) and the second three-way structural body (2) is arc-shaped, and the first three-way structural body (1), the second three-way structural body (2) and the silicon carbide intermediate layer (3) are manufactured in an integrated manner.

3. A structure for improving the service life of a silicon carbide tee according to claim 1, characterized in that: An arched reinforcement block (5) is installed on the side of the inner wall of the second three-way structural body (2) away from the first three-way structural body (1), and the arched reinforcement block (5) and the second three-way structural body (2) are integrally manufactured.

4. A structure for improving the service life of a silicon carbide tee according to claim 1, characterized in that: A mounting ring (9) is installed at the edge of the opening of the steel shaped coating layer (4), and mounting holes (10) are evenly opened at one end of the mounting ring (9).

5. The structure for improving the service life of a silicon carbide tee according to claim 1, characterized in that: The elastic mechanism comprises three groups of rubber sealing pads (7), the rubber sealing pads (7) are located at the openings of the steel shaped coating layer (4), and through holes (8) are evenly reserved at one end of the rubber sealing pads (7).

6. The structure for improving the service life of a silicon carbide tee according to claim 1, characterized in that: A visual protection blocking member (12) is installed inside the window (11), and the visual protection blocking member (12) is fixedly connected to the steel shaped coating layer (4) by gluing.