Coal mill air pipe
The coal mill air duct with a pipeline and sedimentation device addresses high ash content by separating and settling flying sand, ensuring stable combustion and safety, and achieving economic benefits.
Patent Information
- Application Number
- CN202420694191.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-07
AI Technical Summary
The issue of high ash content in coal powder due to excessive hot air velocity entering the coal mill at the kiln head, causing flying sand to enter the mill through the air duct, which affects combustion characteristics and poses combustion hazards.
A coal mill air duct equipped with a pipeline assembly and sedimentation device, featuring a cyclone settling chamber with specific angles and diameters, to separate and settle flying sand, ensuring smooth transition and reducing ash content.
Prevents excessive hot air velocity and flying sand entry, stabilizing combustion and reducing ash content, enhancing safety and efficiency while saving energy and maintenance costs.
Smart Images

Figure CN222093607U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of coal mill pipelines, in particular to a coal mill air duct. Background Art
[0002] When the firing line is in normal production, the hot air velocity entering the coal mill at the kiln head is too fast, and flying sand enters the mill through the air duct, resulting in a high ash content in the coal powder, which affects the combustion characteristics of the coal powder.
[0003] The existing referenceable Chinese utility model patent with announcement number CN208751303U discloses a coal mill hot air duct structure. It includes a mill hot air duct, a hot air blower, and an air inlet duct connected to the mill. The air inlet and the air outlet of the hot air blower are respectively connected to the air inlet duct and the mill hot air duct. A bypass duct is arranged at the connection between the air inlet of the hot air blower and the air inlet duct, and the other end of the bypass duct is connected to the mill hot air duct. The utility model avoids the hot air blower from failing and thus affecting normal production. When the hot air blower fails, the hot air blower can be stopped and the bypass duct can be used alone, which does not affect normal production, reduces the number of kiln stoppages, and can improve the rotary kiln operation rate. At the same time, the hot air blower can be stopped regularly, and the hot air volume generated by the rotation of the hot air blower is directly supplied through the bypass duct, thereby greatly reducing the failure rate of the blower, ensuring the coal mill operation rate, and reducing the power consumption of the hot air blower, saving the maintenance cost of the hot air blower, and extending the service life of the equipment.
[0004] Based on the search of the above patents and in combination with the equipment in the prior art, it was found that when the firing line is in normal production, the hot air speed entering the coal mill at the kiln head is too fast, and the flying sand enters the mill through the air duct, resulting in a high ash content in the coal powder, affecting the combustion characteristics of the coal powder; the flying sand material has a high temperature and can easily enter the coal mill system, chute, and dust collector through the air duct, causing combustion hazards to the dust collecting bags and chute canvas, making the system flammable and explosive. The existence of these problems affects the use of the device. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the utility model provides a coal mill air duct, which has the advantages of effectively preventing the hot air velocity entering the coal mill at the kiln head from being too fast, and flying sand from entering the mill through the air duct, resulting in high ash content in coal powder and affecting the combustion characteristics of coal powder, thereby solving the above-mentioned technical problems.
[0007] Technical Solution
[0008] To achieve the above object, the utility model provides the following technical solutions: a coal mill air duct, comprising a device structure assembly, a pipeline assembly for conveying flying sand material is installed on the right side of the device structure assembly, and a settling device assembly for settling flying sand material is installed on the right side of the pipeline assembly;
[0009] The upper end of the pipeline assembly is equipped with a grate cooler air duct, the upper end of the grate cooler air duct is equipped with a second elbow, and the upper right side of the second elbow is connected to the coal mill air duct, and the lower end of the coal mill air duct is equipped with a connection port, the coal mill air duct transports the flying sand material, and the connection port facilitates the connection of the assembly with the sedimentation device assembly;
[0010] A cylinder body is installed at the upper end of the sedimentation device assembly, and a cone cylinder is installed at the upper end of the cylinder body. The cylinder body and the cone cylinder separate and sediment the flying sand.
[0011] As a preferred technical solution of the utility model, a grate cooling structure is installed at the lower end of the device structure component, and a connecting pipe is installed at the upper end of the grate cooling structure, and the connecting pipe connects and installs the pipeline component.
[0012] As a preferred technical solution of the utility model, a first elbow is installed at the upper end of the pipeline assembly, and the first elbow and the second elbow adjust the elbow angle.
[0013] As a preferred technical solution of the utility model, a fixing port is installed at the upper end of the sedimentation device assembly, and the fixing port is convenient for connecting to the connecting port, so as to facilitate the subsequent transportation of the flying sand material into the device.
[0014] As a preferred technical solution of the utility model, the pipeline assembly is installed at the upper end of the connecting pipe in the device structure assembly, and the sedimentation device assembly is installed at the lower end of the connecting port in the pipeline assembly.
[0015] As the preferred technical solution of the utility model, the connection angle between the first elbow and the connecting pipe is 135°, the connection angle between the second elbow and the connecting pipe is 135°, the diameter expansion of the grate cooler air duct and the coal mill air duct is Φ2.2m, and the connecting port is connected to the fixed port.
[0016] As the preferred technical solution of the utility model, the cylinder body and the cone are combined into a cyclone settling chamber. The cyclone settling chamber has a total height of 6.65m and a diameter of 4.2m. The cylinder body is 4.2m and the cone is 2.45m.
[0017] Compared with the prior art, the utility model provides a coal mill air duct having the following beneficial effects:
[0018] 1. The utility model sets a pipeline component and a sedimentation device component, and uses the pipeline component and the sedimentation device component in combination. By installing a sedimentation chamber on the hot air duct entering the coal mill in the firing line, expanding the diameter of the air duct, and adjusting the angle, a smooth transition of the secondary hot air is achieved, and the problems of too high resistance of the hot air duct, separation and sedimentation of flying sand, and too high ash content of coal powder are solved, so as to achieve the effect of safe and stable production of the coal mill and improve the combustion characteristics of coal powder, realize an economic benefit of about 100,000 per year, save 100t / year of standard coal, comply with the guiding spirit of energy conservation and consumption reduction of the state, industry, and enterprises, and effectively prevent the hot air speed entering the coal mill from the kiln head from being too fast during normal production of the firing line, and flying sand from entering the mill through the air duct, resulting in high ash content of coal powder and affecting the combustion characteristics of coal powder; the flying sand has a high temperature and is easy to enter the coal mill system, chute, and dust collector through the air duct, causing combustion hazards to the dust collecting bag and chute canvas, and making the system have flammable and explosive risks. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 It is a schematic diagram of the structural components of the structural device of the utility model;
[0021] Figure 3 This is a schematic diagram of the structural pipeline assembly of the utility model;
[0022] Figure 4 It is a schematic diagram of the components of the structural settlement device of the utility model;
[0023] Among them: 1. Device structure components; 101. Grate cooling structure; 102. Connecting pipe; 2. Pipeline components; 201. First elbow; 202. Grate cooler air duct; 203. Second elbow; 204. Coal mill air duct; 205. Connecting port; 3. Sedimentation device components; 301. Cylinder body; 302. Cone cylinder; 303. Fixing port. DETAILED DESCRIPTION
[0024] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0025] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] See also Figure 1 - Figure 4 In this embodiment, a coal mill air duct includes: a device structure component 1, a pipeline component 2 is installed on the right side of the device structure component 1, a grate cooler air duct 202 is installed on the upper end of the pipeline component 2, a second elbow 203 is installed on the upper end of the grate cooler air duct 202, and the right side of the upper end of the second elbow 203 is connected to the coal mill air duct 204, and the lower end of the coal mill air duct 204 is installed with a connection port 205, a settling device component 3 is connected to the right side of the pipeline component 2, a cylinder body 301 is installed on the upper end of the settling device component 3, and a cone cylinder 302 is installed on the upper end of the cylinder body 301, the pipeline component 2 is installed at the upper end of the connecting pipe 102 in the device structure component 1, and the settling device component 3 is installed at the lower end of the connection port 205 in the pipeline component 2.
[0028] Through the above structure: the device structure component 1 is easy to use as a whole, and the pipeline component 2 is used in combination with the sedimentation device component 3, which is convenient to prevent flying sand from entering the mill through the air duct, resulting in high ash content of coal powder and affecting the combustion characteristics of coal powder.
[0029] See also Figure 1 - Figure 4 A grate cooling structure 101 is installed at the lower end of the device structure component 1, and a connecting pipe 102 is installed at the upper end of the grate cooling structure 101.
[0030] Through the above structure: the grate cooling structure 101 is installed to absorb and transport the wind force, and the connecting pipe 102 is connected and installed to the pipeline assembly 2.
[0031] See also Figure 1 - Figure 4 A first elbow 201 is installed at the upper end of the pipeline assembly 2. The connection angle between the first elbow 201 and the connecting pipe 102 is 135°. The connection angle between the second elbow 203 and the connecting pipe 102 is 135°. The diameter expansion of the grate cooler air duct 202 and the coal mill air duct 204 is Φ2.2m. The connecting port 205 is connected to the fixed port 303.
[0032] Through the above structure: by installing the first bend pipe 201 and the second bend pipe 203, the bend angle is adjusted to facilitate subsequent prevention of excessive wind and sand resistance, the installation of the grate cooler air duct 202 transmits wind power, and the coal mill air duct 204 transmits flying sand, and the connection port 205 facilitates the connection of the component with the sedimentation device component 3.
[0033] See also Figure 1 - Figure 4 A fixing port 303 is installed at the upper end of the sedimentation device assembly 3. The cylinder body 301 and the cone cylinder 302 are combined into a cyclone sedimentation chamber. The cyclone sedimentation chamber has a total height of 6.65m and a diameter of 4.2m. The cylinder body 301 is 4.2m and the cone cylinder 302 is 2.45m.
[0034] Through the above structure: the flying sand is separated and settled by installing the cylinder body 301 and the cone cylinder 302, and the fixing port 303 is convenient for connecting to the connecting port 205, so as to facilitate the subsequent transportation of the flying sand to the inside of the device.
[0035] During use, first, when the firing line is in normal production, the hot air velocity of the coal mill at the kiln head is too fast, and the flying sand enters the mill through the air duct, resulting in high ash content of the coal powder, affecting the combustion characteristics of the coal powder; the flying sand material has a high temperature and is easy to enter the coal mill system, chute, and dust collector through the air duct, causing combustion hazards to the dust collection bag and chute canvas, making the system flammable and explosive. The hot air duct entering the coal mill at the firing line is equipped with a settling chamber, the air duct is enlarged, and the angle is adjusted to prevent this effect. A cyclone settling chamber is newly added to the upper end of the device, and the outlet position remains unchanged. A cyclone is installed on the kiln head platform, with a total height of 6. 65m, cylinder height 4.2m, diameter 4.2m, cone height 2.45m; the original diameters of the grate cooler air duct 202 and the coal mill air duct 204 are expanded to Φ2.2m; the angles of the grate cooler air duct 202 and the coal mill air duct 204 are optimized and adjusted, and the angle of the bends is changed from the original 100° to 135°. When used in conjunction with the cyclone, the flying sand mixed wind is transported through the connecting pipe 102, and the flying sand is transported to the sedimentation device assembly 3 through the coal mill air duct 204, and the flying sand is settled in the sedimentation chamber formed by the connection of the cylinder body 301 and the cone cylinder 302.
[0036] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A coal mill air duct, characterized in that: The invention comprises a device structure component (1), wherein a pipeline component (2) is installed on the right side of the device structure component (1), a grate cooler air duct (202) is installed on the upper end of the pipeline component (2), a second elbow (203) is installed on the upper end of the grate cooler air duct (202), and a coal mill air inlet duct (204) is connected to the right side of the upper end of the second elbow (203), and a connecting port (205) is installed at the lower end of the coal mill air inlet duct (204), a settling device component (3) is connected to the right side of the pipeline component (2), a cylinder body (301) is installed on the upper end of the settling device component (3), and a cone (302) is installed on the upper end of the cylinder body (301).
2. A coal mill air duct according to claim 1, characterized in that: A grate cooling structure (101) is installed at the lower end of the device structure component (1), and a connecting pipe (102) is installed at the upper end of the grate cooling structure (101).
3. The coal mill air duct according to claim 1, characterized in that: A first elbow (201) is installed at the upper end of the pipeline assembly (2).
4. The coal mill air duct according to claim 1, characterized in that: A fixing opening (303) is installed at the upper end of the sedimentation device assembly (3).
5. The coal mill air duct according to claim 1, characterized in that: The pipeline component (2) is installed at the upper end of the connecting pipe (102) in the device structure component (1), and the sedimentation device component (3) is installed at the lower end of the connecting port (205) in the pipeline component (2).
6. A coal mill air duct according to claim 3, characterized in that: The connection angle between the first elbow (201) and the connecting pipe (102) is 135°, the connection angle between the second elbow (203) and the connecting pipe (102) is 135°, the diameter expansion of the grate cooler outlet air duct (202) and the coal mill inlet air duct (204) is Φ2.2m, and the connecting port (205) is connected to the fixing port (303).
7. A coal mill air duct according to claim 4, characterized in that: The cylinder body (301) and the cone cylinder (302) are combined to form a cyclone settling chamber. The cyclone settling chamber has a total height of 6.65 m and a diameter of 4.2 m. The cylinder body (301) is 4.2 m, and the cone cylinder (302) is 2.45 m.