Prefabricated combined tundish cover
Through the design of prefabricated combined intermediate bag covers, the combination of welded steel structure and refractory prefabricated blocks and the post-pouring tape technology, the problems of insufficient baking and local damage of intermediate bag covers are solved, and a higher service life is achieved and lower maintenance costs.
Patent Information
- Application Number
- CN202420002600.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-02
AI Technical Summary
The existing intermediate bag cover is not baked sufficiently on site, resulting in a decrease in service life. It can only be replaced as a whole when locally damaged, and cannot be partially repaired, resulting in large consumption of steel and serious oxidation.
Prefabricated combined intermediate bag cover is used to combine welding steel structures and refractory prefabricated blocks, fixed connections are used with anchor nails, and gaps are filled with post-pouring tape technology to form prefabricated block areas, allowing partial replacement and reassembly to avoid kiln drying bake.
It improves the service life of the cover, reduces steel consumption, avoids steel oxidation, achieves local replacement and higher production operation rates, and reduces maintenance costs.
Smart Images

Figure CN222094714U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a steelmaking continuous casting tundish device, in particular to a prefabricated combined tundish cover. Background Art
[0002] The ladle cover is an important component of the tundish. Its main functions are: as a heat-insulating component during online baking and continuous casting of the tundish, it protects the molten steel in the ladle from secondary oxidation, protects the ladle slide mechanism and stopper mechanism from the heat radiation of the molten steel, improves the on-site operating environment, and plays a safety protection role for operators who take temperature measurements and samples. According to the needs of the continuous casting production process, the ladle cover needs to be reserved with casting holes, temperature measuring holes, vents, baking holes, stopper holes, etc. to meet the needs of on-site operations. At present, the tundish cover used on site is mainly composed of heat-resistant steel structure and refractory castables. The heat-resistant steel structure is welded by cover plates, side plates, tie bars, anchors, etc., and then refractory castables, such as high-aluminum castables or mullite castables, are used for casting and molding on site, and are directly applied to the site after baking.
[0003] However, the tundish cover after casting is often not effectively baked on site due to its large size, or even used directly without baking, which will cause the cover to burst. The existing cover consumes a lot of steel materials and has high requirements for steel structure. During use, the steel structure exposed on the hot side is prone to oxidation. The above problems will seriously affect the service life of the tundish cover and fail to meet the requirements of the continuous casting production process. Utility Model Content
[0004] The utility model provides a prefabricated combined tundish cover, which changes the current mode that the tundish cover is formed by integrally pouring refractory materials in a steel structure and must be fully baked before use, solves the problem that the service life of the cover is greatly reduced due to insufficient baking on site, and when damaged, the cover can only be replaced as a whole, but cannot be partially replaced according to the erosion conditions of different parts. The technical solution is as follows:
[0005] A prefabricated combined tundish cover comprises a cover welded steel structure and a plurality of refractory prefabricated blocks. The cover welded steel structure is a structural frame formed by welding steel materials, the interior of which is used to fill the refractory prefabricated blocks. Casting holes, temperature measuring holes, ventilation holes, baking holes and stopper holes are arranged on the corresponding refractory prefabricated blocks according to the cover structure, and the refractory prefabricated blocks are fixedly connected to the cover welded steel structure by anchoring nails.
[0006] The cover welded steel structure includes an outer frame and an inner frame. The outer frame is designed according to the size requirements of the middle cover to form the outermost frame structure; the inner frame is divided into different prefabricated block areas according to the middle cover, and steel materials are used to weld the corresponding filling frame inside the outer frame.
[0007] The prefabricated block area formed by the filling frame can be directly used as a casting hole or a stopper rod hole.
[0008] The interior of the cover welded steel structure is divided into 8 to 16 prefabricated block areas.
[0009] After the refractory prefabricated blocks are fixed to the covering welded steel structure, the gaps between adjacent refractory prefabricated blocks are poured using the post-casting strip technology.
[0010] The refractory prefabricated block is made of refractory castable material, and a groove structure for placing anchor nails is reserved on the side.
[0011] The refractory prefabricated blocks are placed into the frame corresponding to the prefabricated block area covering the welded steel structure, and the gap between the two ranges from 1 to 5 mm.
[0012] The height of the refractory prefabricated blocks is flush with the height of the covering welded steel structure.
[0013] The prefabricated combined tundish cover is divided into different areas, and prefabricated blocks are made for effective baking. The steel structure is used as the skeleton, and the corresponding prefabricated blocks are filled inside. The prefabricated blocks are fixedly connected to the steel structure through anchors. Finally, the gap between the frame and the prefabricated blocks is filled with refractory materials to form the whole cover.
[0014] The utility model enables the baling cover to get rid of the dependence on kiln baking, and through the replacement of partial prefabricated blocks, the undamaged part and the replaced part are recombined into a complete baling cover which can continue to be used, thereby reducing the amount of steel used and increasing the service life. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 is a structural schematic diagram of the prefabricated combined tundish cover;
[0016] Figure 2 It is a structural schematic diagram of the refractory prefabricated block. DETAILED DESCRIPTION
[0017] like Figure 1 As shown, the various parts of the prefabricated combined tundish cover are divided into a plurality of prefabricated block modes, which include a cover welded steel structure 1 and a plurality of refractory prefabricated blocks 2. The cover welded steel structure 1 is a structural frame welded with steel materials, and the interior is used to fill the refractory prefabricated blocks 2. According to the cover structure, a casting hole 3, a temperature measuring hole, a vent hole, a baking hole, and a stopper rod hole 4 are set in the corresponding refractory prefabricated blocks. The refractory prefabricated blocks 2 and the cover welded steel structure 1 are used as shown in FIG. Figure 2 The anchoring nail 5 shown provides a fixed connection.
[0018] The cover welded steel structure 1 includes an outer frame and an inner frame. The outer frame is designed according to the size requirements of the middle cover to form the outermost frame structure; the inner frame is divided into different prefabricated block areas according to the middle cover, and steel materials are used to weld the corresponding filling frame inside the outer frame.
[0019] The specific size of the refractory prefabricated block 2 can be adjusted according to the prefabricated block area of the tundish cover, and can be manufactured separately. After the refractory prefabricated block 2 is manufactured and baked in the factory, it can be directly put into use after being assembled at the continuous casting site without being baked again. The refractory prefabricated block 2 is made of refractory castables, and a groove structure for placing anchor nails is reserved on the side. After the manufacturing is completed, it is fully baked.
[0020] The corresponding refractory prefabricated blocks 2 are filled into the filling frame of the covering welded steel structure 1 according to the prefabricated block area, and the sides of the refractory prefabricated blocks 2 are fixedly connected to the covering welded steel structure 1 using anchor nails 5.
[0021] During anchoring, bolt holes need to be reserved on the side of the covered welded steel structure 1, corresponding to the bolt and nut fixing size of the anchor nail 5. Place the refractory prefabricated block 2 into the frame corresponding to the prefabricated block area of the covered welded steel structure 1, and the allowable gap between the two can be 1-5mm. If the gap is less than 1mm, it will not affect the original anchoring and fixing method, but it will affect the pouring between the gaps. If the gap is too small, the pouring between the gaps can be cancelled. The height of the refractory prefabricated block 2 should generally be flush with the height of the covered welded steel structure 1, and in rare cases it will be slightly higher than the covered welded steel structure 1 (depending on the on-site process environment of the continuous casting).
[0022] After the refractory prefabricated blocks 2 are fixed to the covered welded steel structure 1, the utility model adopts the post-casting strip technology to cast the gaps between adjacent refractory prefabricated blocks 2. The post-casting strip technology refers to the use of the same material castable to fill the gaps at the joints of adjacent prefabricated blocks after the prefabricated blocks are placed. After the assembly is completed, the whole can be put into use after online baking, without the need for separate baking.
[0023] When local structural damage occurs in the continuous casting on-site application, the damaged part can be replaced separately using the spare prefabricated blocks made in advance.
[0024] Local structural damage usually manifests as severe erosion and melting loss of steel structures and refractory materials in the modified parts, resulting in missing and incomplete structures, which will have a certain impact on the on-site production process. The specific damaged parts have different manifestations under different continuous casting machine process conditions, and are generally mostly in contact with molten steel and slag. When replacing a part, it is necessary to choose to remove and clean the damaged parts of the local structure after a period of application, after the cover is off the line and naturally cooled to room temperature, and then use the prepared accessories for replacement. Partial replacement requires consideration of post-casting strip processing and the corresponding removal, re-fixation and pouring of anchors.
[0025] Furthermore, the interior of the covered welded steel structure 1 can be divided into 8 to 16 prefabricated block areas, and a single prefabricated block area can also be directly used as a casting hole 3 or a stopper rod hole 4 without filling the refractory prefabricated block 2, and the prefabricated blocks 2 are used to fix the periphery of the hole.
[0026] The utility model comprises the following steps when assembling the refractory prefabricated block 2 and the cover welded steel structure 1:
[0027] S1: The cover welded steel structure is formed by welding steel materials into a structural frame to form a steel structure as a whole. During the forming process, the cover welded steel structure 1 is erected to a certain height so that its bottom is a certain distance from the ground.
[0028] S2: After fixing the refractory prefabricated block 2 to the corresponding filling frame, it is fixed with anchor nails. Finally, the gap between the steel structure and the prefabricated block is filled with castables, plastics, ramming materials, etc., and it can be put into use after the production is completed.
[0029] The utility model has the following advantages:
[0030] 1. The prefabricated combined tundish cover can change the current mode of the tundish cover being cast in one piece using welded steel structure and refractory castables and overly relying on kiln baking in the production factory, which can greatly improve the service life of the cover.
[0031] 2. After the pouring is completed, the prefabricated blocks can be baked separately. After baking, they can be directly installed and used on site. This not only avoids the problems caused by insufficient baking on site, but also improves the production operation rate.
[0032] 3. It can reduce the amount of steel used, reduce the contact area between steel and high-temperature areas, avoid steel leakage and excessive oxidation, and extend the service life of the cover.
[0033] 4. It can solve the problem that when the package cover is partially damaged, it can only be replaced as a whole and cannot be replaced locally according to the corrosion conditions of different parts. The undamaged part of the package cover and the replaced part can be recombined into a complete package cover and can continue to be used.
[0034] 5. If there are sufficient spare prefabricated blocks for easily damaged parts on site, the damaged parts can be replaced continuously. Such repeated operations can greatly increase the overall service life of the ladle cover, reduce the cost of ladle cover production and maintenance, and help reduce the consumption of refractory materials per ton of steel, which is beneficial to improving the production efficiency of continuous casting.
Claims
1. A prefabricated combined tundish cover, characterized in that: It includes a covering welded steel structure and multiple refractory prefabricated blocks. The covering welded steel structure is a structural frame welded with steel materials, and the interior is used to fill the refractory prefabricated blocks. Casting holes, temperature measuring holes, ventilation holes, baking holes, and plug rod holes are set on the corresponding refractory prefabricated blocks according to the covering structure. The refractory prefabricated blocks are fixedly connected to the covering welded steel structure by anchoring nails.
2. The prefabricated combined tundish cover according to claim 1, characterized in that: The cover welded steel structure includes an outer frame and an inner frame. The outer frame is designed according to the size requirements of the middle cover to form the outermost frame structure; the inner frame is divided into different prefabricated block areas according to the middle cover, and steel materials are used to weld the corresponding filling frame inside the outer frame.
3. The prefabricated combined tundish cover according to claim 2, characterized in that: The prefabricated block area formed by the filling frame can be directly used as a casting hole or a stopper rod hole.
4. The prefabricated combined tundish cover according to claim 2, characterized in that: The interior of the cover welded steel structure is divided into 8 to 16 prefabricated block areas.
5. The prefabricated combined tundish cover according to claim 1, characterized in that: After the refractory prefabricated blocks are fixed to the covering welded steel structure, the gaps between adjacent refractory prefabricated blocks are poured using the post-casting strip technology.
6. The prefabricated combined tundish cover according to claim 1, characterized in that: The refractory prefabricated block is made of refractory castable material, and a groove structure for placing anchor nails is reserved on the side.
7. The prefabricated combined tundish cover according to claim 1, characterized in that: The refractory prefabricated blocks are placed into the frame corresponding to the prefabricated block area covering the welded steel structure, and the gap between the two ranges from 1 to 5 mm.
8. The prefabricated combined tundish cover according to claim 1, characterized in that: The height of the refractory prefabricated blocks is flush with the height of the covering welded steel structure.