Automatic assembly conveying line for roots shaft sleeves

By designing an automated assembly conveyor line, and utilizing devices such as pneumatic lifting stoppers and elevators, the automated assembly of Roots bushings is achieved, solving the problems of inconvenient installation and unstable quality in existing technologies, and improving production efficiency and product stability.

CN222095313UActive Publication Date: 2024-12-03杭州兴鑫科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421267415.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-12-03
Estimated Expiration
2034-06-05

AI Technical Summary

Technical Problem

The existing Roots shaft assembly process suffers from problems such as inconvenient installation, unstable quality, high labor intensity for workers, and waste of materials during handling.

Method used

An automated assembly conveyor line was designed, comprising a lifting and circulating mechanism, a feeding station, a bushing pressing station, and a material unloading station. Automated assembly is achieved using mechanical devices such as a pneumatic lifting stopper, a backpack-type elevator, and a transverse pressing cylinder mechanism.

Benefits of technology

It improved production efficiency, reduced manual labor, enhanced product quality stability, and reduced the labor intensity of workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222095313U_ABST
    Figure CN222095313U_ABST
Patent Text Reader

Abstract

The utility model relates to an automatic assembly conveying line for Roots shaft sleeves. The shaft sleeve press-fitting device is characterized by comprising a lifting circulation mechanism, a feeding station, a shaft sleeve press-fitting station, a material taking station and a tool plate, the lifting circulation mechanism and the material taking station are located at the two ends of the feeding station respectively, and the lifting circulation mechanism comprises a first backpack type lifting machine, a first lifting platform, a first pneumatic jacking stopper and a lifting circulation mechanism body; the first backpack type elevator and the first lifting platform are both installed on the lifting circulation mechanism body. The feeding station comprises a second pneumatic jacking stopper, a double-speed chain conveying line, an integrated tool rack, a double-layer material rack, a feeding station body and a tool plate backflow conveying line. The double-speed chain conveying line and the tool plate backflow conveying line are both installed on the feeding station body. The shaft sleeve press-fitting station comprises a transverse press-fitting air cylinder mechanism and a third pneumatic jacking stopper. The production efficiency is high, the labor intensity is reduced, and the product stability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of Roots vacuum pump production machinery, in particular to an automatic assembly conveying line for Roots shaft sleeves. Background Art

[0002] At present, there is no automatic assembly conveyor line for Roots bushings. During the existing Roots assembly, the Roots are usually placed side by side on a pallet, and the workers squat to operate, inserting the O-ring and the bushing into the two shaft ends of the Roots in turn, and then hammering the bushings in turn through the copper rod and the tooling. After the hammering is completed, the pallet storing the Roots is moved to the assembly station by a forklift.

[0003] It can be seen that the installation of Roots is extremely inconvenient, and it is impossible to determine a fixed standard by knocking with a copper rod. The internal O-ring is often cracked during the knocking process, and the stability of quality cannot be guaranteed. In addition, long-term squatting operation will also put a burden on the workers' bodies, which is not ergonomic, and the materials need to be transported twice, which will also cause waste in site material flow, personnel allocation and time. Utility Model Content

[0004] The purpose of the utility model is to overcome the above-mentioned deficiencies in the prior art and to provide an automatic assembly conveyor line for Roots bushings which has reasonable structural design, high production efficiency, is conducive to reducing labor intensity and improving product stability.

[0005] The technical solution adopted by the utility model to solve the above problems is: the structural characteristics of the automatic assembly conveyor line for Roots bushings are: it includes a lifting circulation mechanism, a feeding station, a bushing press-fitting station, a material taking station and a tooling plate, the lifting circulation mechanism and the material taking station are respectively located at the two ends of the feeding station, the lifting circulation mechanism includes a No. 1 backpack hoist, a No. 1 lifting platform, a No. 1 pneumatic jacking blocker and a lifting circulation mechanism body, the No. 1 backpack hoist and the No. 1 lifting platform are both installed on the lifting circulation mechanism body, the The No. 1 backpack hoist cooperates with the No. 1 lifting platform, and the No. 1 pneumatic lifting blocker is installed on the No. 1 lifting platform; the loading station includes the No. 2 pneumatic lifting blocker, the double-speed chain conveyor line, the integrated tool rack, the double-layer material rack, the loading station body and the tooling board return conveyor line, the double-speed chain conveyor line and the tooling board return conveyor line are both installed on the loading station body, and the double-speed chain conveyor line is located directly above the tooling board return conveyor line, the No. 2 pneumatic lifting blocker is installed on the loading station body, the integrated tool rack and the double-layer The material racks are all located on the edge of the loading station body; the sleeve press-fitting station includes a transverse press-fitting cylinder mechanism and a No. 3 pneumatic lifting blocker, the transverse press-fitting cylinder mechanism is an arch bridge structure, the transverse press-fitting cylinder mechanism spans the loading station, the No. 3 pneumatic lifting blocker is installed on the loading station body, and the No. 3 pneumatic lifting blocker cooperates with the transverse press-fitting cylinder mechanism; the material picking station includes a No. 2 backpack hoist, a No. 2 lifting platform and the material picking station body, the No. 2 backpack hoist and the No. 2 lifting platform are both installed on the material picking station On the workstation body, the No. 2 backpack elevator cooperates with the No. 2 lifting platform; when the No. 1 lifting platform is to receive the tooling board, the No. 1 lifting platform descends to a height that cooperates with the tooling board return conveyor line, and when the No. 1 lifting platform is to send out the tooling board, the No. 1 lifting platform is lifted to a height that cooperates with the double-speed chain conveyor line; when the No. 2 lifting platform is to receive the tooling board, the No. 2 lifting platform is lifted to a height that cooperates with the double-speed chain conveyor line, and when the No. 2 lifting platform is to send out the tooling board, the No. 2 lifting platform is lowered to a height that cooperates with the tooling board return conveyor line.

[0006] Preferably, the lifting circulation mechanism of the utility model further comprises a No. 1 proximity switch, which is mounted on the lifting circulation mechanism body and cooperates with a No. 1 lifting platform.

[0007] Preferably, the shaft sleeve press-fitting station of the utility model further comprises a No. 2 proximity switch, which is mounted on the feeding station body and cooperates with the lateral press-fitting cylinder mechanism.

[0008] Preferably, the material retrieving station of the utility model further comprises a No. 3 proximity switch, which is installed on the material retrieving station body and cooperates with the No. 2 backpack-type hoist.

[0009] Preferably, the integrated tool rack of the utility model is provided with a release button box, which cooperates with the No. 2 pneumatic lifting blocker.

[0010] Preferably, the tooling plate of the utility model includes a right-angle block, a steel tooling plate body and a guide wheel, wherein the right-angle block is fixed on the top surface of the steel tooling plate body, and the right-angle block is distributed on the four corners of the steel tooling plate body; the guide wheel is rotatably installed on both sides of the steel tooling plate body.

[0011] Compared with the prior art, the utility model has the following advantages and effects: it reduces manual operation, reduces the operator's work intensity, improves work efficiency, and the content of the same workstation assembly is consistent, which improves the stability of product quality. The utility model completes the up and down reflux of the tooling plate through the lifting circulation mechanism, lifts the Roots to the tooling plate of the assembly conveyor line through the loading station, presses the sleeve through the horizontal press cylinder mechanism of the sleeve press station, and then moves to the material taking station, and directly delivers the finished Roots to the side of the assembly line by the crane, and is hoisted off the line by the workers of the assembly line. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the utility model and / or the technical solutions in the prior art, the drawings required for use in the embodiments and / or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0013] Figure 1 It is a three-dimensional structural schematic diagram of an automatic assembly conveyor line for Roots bushings in an embodiment of the utility model.

[0014] Figure 2 It is a schematic diagram of the main structure of an automatic assembly conveyor line for Roots bushings in an embodiment of the utility model.

[0015] Figure 3 It is a structural schematic diagram of the lifting circulation mechanism in the embodiment of the utility model.

[0016] Figure 4 It is a structural schematic diagram of a loading station in an embodiment of the utility model.

[0017] Figure 5 It is a structural schematic diagram of a shaft sleeve press-fitting station in an embodiment of the utility model.

[0018] Figure 6 It is a structural schematic diagram of a material taking station in an embodiment of the utility model.

[0019] Figure 7 It is a structural schematic diagram of a tooling plate in an embodiment of the utility model.

[0020] In the figure: 1-lifting circulation mechanism; 2-loading station; 3-sleeve pressing station; 4-retrieving station; 5-tooling plate;

[0021] 10-No. 1 proximity switch; 11-No. 1 backpack hoist; 12-No. 1 lifting platform; 13-No. 1 pneumatic lifting blocker; 14-Lifting circulation mechanism body;

[0022] 20-No. 2 pneumatic lifting blocker; 21-speed chain conveyor line; 22-integrated tool rack; 23-double-layer material rack; 24-loading station body;

[0023] 30- lateral press-fitting cylinder mechanism; 31- No. 3 pneumatic lifting blocker;

[0024] 40-No. 2 backpack hoist; 41-No. 2 lifting platform; 42-Material reclaiming station body;

[0025] 120-right angle block; 121-steel tooling plate body; 122-guide wheel. DETAILED DESCRIPTION

[0026] The present invention will be further described in detail below with reference to the accompanying drawings and through examples. The following examples are provided to explain the present invention, but the present invention is not limited to the following examples.

[0027] Example

[0028] See also Figures 1 to 7 The automatic assembly conveyor line for Roots bushings in this embodiment includes a lifting circulation mechanism 1, a loading station 2, a bushing pressing station 3, a material taking station 4 and a tooling plate 5.

[0029] The lifting circulation mechanism 1 and the material taking station 4 in this embodiment are respectively located at the two ends of the loading station 2. The lifting circulation mechanism 1 includes a No. 1 proximity switch 10, a No. 1 backpack hoist 11, a No. 1 lifting platform 12, a No. 1 pneumatic jacking blocker 13 and a lifting circulation mechanism body 14. The No. 1 backpack hoist 11 and the No. 1 lifting platform 12 are both installed on the lifting circulation mechanism body 14, and the No. 1 backpack hoist 11 and the No. 1 lifting platform 12 cooperate with each other. The No. 1 pneumatic jacking blocker 13 is installed on the No. 1 lifting platform 12; the No. 1 proximity switch 10 is installed on the lifting circulation mechanism body 14, and the No. 1 proximity switch 10 and the No. 1 lifting platform 12 cooperate with each other.

[0030] The loading station 2 in this embodiment includes a No. 2 pneumatic lifting blocker 20, a double-speed chain conveyor line 21, an integrated tool rack 22, a double-layer material rack 23, a loading station body 24 and a tooling board return conveyor line. The double-speed chain conveyor line 21 and the tooling board return conveyor line are both installed on the loading station body 24, and the double-speed chain conveyor line 21 is located directly above the tooling board return conveyor line. The No. 2 pneumatic lifting blocker 20 is installed on the loading station body 24, and the integrated tool rack 22 and the double-layer material rack 23 are both located on the side of the loading station body 24. A release button is usually provided on the integrated tool rack 22 in this embodiment, and the release button box cooperates with the No. 2 pneumatic lifting blocker 20.

[0031] When the No. 1 proximity switch 10 detects that there is no tooling board 5 on the No. 1 lifting platform 12, it will send a signal, and then the No. 1 backpack elevator 11 will drive the No. 1 lifting platform 12 to descend to the position of the tooling board return conveyor line on the lower layer of the loading station 2, and receive the tooling board 5 conveyed by the tooling board return conveyor line, and then the No. 1 backpack elevator 11 will drive the No. 1 lifting platform 12 carrying the tooling board 5 to the position of the upper double-speed chain conveyor line 21. At this time, if there is no tooling board 5 on the loading station 2, the No. 1 pneumatic jacking blocker 13 will descend to release the tooling board 5 on the No. 1 lifting platform 12 to the loading station 2.

[0032] The worker uses a crane to lift the Roots to the tooling plate 5 of the loading station 2, and manually installs the O-rings and sleeves on both ends of the Roots in turn; after the sleeves are installed, the release button on the integrated tool rack 22 is pressed, the No. 2 pneumatic jacking blocker 20 descends, and the tooling plate 5 is released through the double-speed chain conveyor line 21. The loading station 2 is equipped with an integrated tool rack 22 for placing tools, and a double-layer material rack 23 for storing sleeves and O-rings.

[0033] The sleeve pressing station 3 in this embodiment includes a transverse pressing cylinder mechanism 30, a No. 3 pneumatic lifting stopper 31 and a No. 2 proximity switch. The transverse pressing cylinder mechanism 30 is an arch bridge structure. The transverse pressing cylinder mechanism 30 spans across the loading station 2. The No. 3 pneumatic lifting stopper 31 is installed on the loading station body 24, and the No. 3 pneumatic lifting stopper 31 cooperates with the transverse pressing cylinder mechanism 30; the No. 2 proximity switch is installed on the loading station body 24, and the No. 2 proximity switch cooperates with the transverse pressing cylinder mechanism 30. The tooling plate 5 moves to the press station 3 and is positioned by the No. 3 pneumatic lifting stopper 31. After the No. 2 proximity switch detects that the tooling plate 5 is in place, the transverse pressing cylinder mechanism 30 presses the sleeve into place. After the pressing is completed, the No. 3 pneumatic lifting stopper 31 releases the tooling plate 5, and the tooling plate 5 is transported to the material picking station 4 along the double-speed chain conveyor line 21 to complete the work of the sleeve pressing station 3.

[0034] The retrieving station 4 in this embodiment includes a No. 2 backpack hoist 40, a No. 2 lifting platform 41, a retrieving station body 42 and a No. 3 proximity switch. The No. 2 backpack hoist 40 and the No. 2 lifting platform 41 are both installed on the retrieving station body 42, and the No. 2 backpack hoist 40 cooperates with the No. 2 lifting platform 41; the No. 3 proximity switch is installed on the retrieving station body 42, and the No. 3 proximity switch cooperates with the No. 2 backpack hoist 40. When the tooling board 5 is transported to the retrieving station 4 with the double-speed chain conveyor line 21, the worker hoists the Roots finished product on the tooling board 5 off the line by the crane. After the No. 3 proximity switch detects that the Roots finished product has been hoisted, the No. 2 backpack hoist 40 drives the No. 2 lifting platform 41 carrying the tooling board 5 to descend to the position of the tooling board return conveyor line of the loading station 2, and sends the tooling board 5 on the No. 2 lifting platform 41 to the tooling board return conveyor line to complete the return of the tooling board 5.

[0035] The tooling plate 5 in this embodiment includes a right-angle block 120, a steel tooling plate body 121 and a guide wheel 122. The right-angle block 120 is fixed to the top surface of the steel tooling plate body 121, and the right-angle block 120 is distributed at the four corners of the steel tooling plate body 121; the guide wheels 122 are rotatably mounted on both sides of the steel tooling plate body 121. The roots are positioned on the tooling plate 5 by the four right-angle blocks 120, and the bottom surface of the steel tooling plate body 121 is directly in contact with the double-speed chain conveyor line 21, and the tooling plate 5 is driven forward by the double-speed chain conveyor line 21. To avoid collision with the lifting circulation mechanism 1, the tooling plate 5 is equipped with guide wheels 122 around it.

[0036] When the No. 1 lifting platform 12 is to receive the tooling board 5, the No. 1 lifting platform 12 descends to a height that matches the tooling board return conveyor line. When the No. 1 lifting platform 12 is to send out the tooling board 5, the No. 1 lifting platform 12 is lifted to a height that matches the double-speed chain conveyor line 21. When the No. 2 lifting platform 41 is to receive the tooling board 5, the No. 2 lifting platform 41 is lifted to a height that matches the double-speed chain conveyor line 21. When the No. 2 lifting platform 41 is to send out the tooling board 5, the No. 2 lifting platform 41 descends to a height that matches the tooling board return conveyor line.

[0037] The automatic assembly conveyor line for Roots bushings in this embodiment uses a mechanical method to transport and assemble workpieces, thereby improving production efficiency, reducing the labor intensity of workers, and improving product quality.

[0038] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the utility model. All equivalent changes or simple changes made based on the structure, features and principles described in the patent concept of the utility model are included in the protection scope of the utility model patent. Technicians in the technical field of the utility model can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, as long as they do not deviate from the structure of the utility model or exceed the scope defined by the claims, they should all fall within the protection scope of the utility model.

Claims

1. An automatic assembly conveyor line for Roots bushings, characterized in that: The invention comprises a lifting circulation mechanism (1), a material loading station (2), a sleeve pressing station (3), a material taking station (4) and a tooling plate (5), wherein the lifting circulation mechanism (1) and the material taking station (4) are respectively located at two ends of the material loading station (2), and the lifting circulation mechanism (1) comprises a No. 1 backpack-type hoist (11), a No. 1 lifting platform (12), a No. 1 pneumatic lifting blocker (13) and a lifting circulation mechanism body (14), wherein the No. 1 backpack-type hoist (11) and the No. 1 lifting platform (12) are both installed on the lifting circulation mechanism body (14), the No. 1 backpack-type hoist (11) and the No. 1 lifting platform (12) cooperate, and the No. 1 pneumatic lifting blocker (13) Installed on the No. 1 lifting platform (12); the loading station (2) includes a No. 2 pneumatic lifting blocker (20), a double-speed chain conveyor line (21), an integrated tool rack (22), a double-layer material rack (23), a loading station body (24) and a tooling plate return conveyor line, the double-speed chain conveyor line (21) and the tooling plate return conveyor line are both installed on the loading station body (24), and the double-speed chain conveyor line (21) is located directly above the tooling plate return conveyor line, the No. 2 pneumatic lifting blocker (20) is installed on the loading station body (24), and the integrated tool rack (22) and the double-layer material rack (23) are both located on the side of the loading station body (24); the sleeve pressing tool The loading station (3) comprises a transverse pressing cylinder mechanism (30) and a No. 3 pneumatic lifting blocker (31), wherein the transverse pressing cylinder mechanism (30) is an arch bridge structure, and the transverse pressing cylinder mechanism (30) spans across the loading station (2), and the No. 3 pneumatic lifting blocker (31) is installed on the loading station body (24), and the No. 3 pneumatic lifting blocker (31) cooperates with the transverse pressing cylinder mechanism (30); the retrieving station (4) comprises a No. 2 backpack hoist (40), a No. 2 lifting platform (41) and a retrieving station body (42), wherein the No. 2 backpack hoist (40) and the No. 2 lifting platform (41) are both installed on the retrieving station body (42), and the No. 2 backpack hoist (40) and the No. 2 lifting platform (41) are both installed on the retrieving station body (42). The backpack lift (40) cooperates with the second lifting platform (41); when the first lifting platform (12) is to receive the tooling board (5), the first lifting platform (12) is lowered to a height that cooperates with the tooling board return conveyor line, and when the first lifting platform (12) is to deliver the tooling board (5), the first lifting platform (12) is lifted to a height that cooperates with the double-speed chain conveyor line (21); when the second lifting platform (41) is to receive the tooling board (5), the second lifting platform (41) is lifted to a height that cooperates with the double-speed chain conveyor line (21), and when the second lifting platform (41) is to deliver the tooling board (5), the second lifting platform (41) is lowered to a height that cooperates with the tooling board return conveyor line.

2. The automatic assembly conveyor line for Roots bushings according to claim 1, characterized in that: The lifting circulation mechanism (1) further comprises a No. 1 proximity switch (10), wherein the No. 1 proximity switch (10) is mounted on a lifting circulation mechanism body (14), and the No. 1 proximity switch (10) cooperates with a No. 1 lifting platform (12).

3. The automatic assembly conveyor line for Roots bushings according to claim 1 is characterized in that: The shaft sleeve press-fitting station (3) further comprises a No. 2 proximity switch, which is mounted on the loading station body (24) and cooperates with the lateral press-fitting cylinder mechanism (30).

4. The automatic assembly conveyor line for Roots bushings according to claim 1, characterized in that: The material taking station (4) further comprises a No. 3 proximity switch, which is mounted on the material taking station body (42) and cooperates with the No. 2 backpack hoist (40).

5. The automatic assembly conveyor line for Roots bushings according to claim 1, characterized in that: The integrated tool rack (22) is provided with a release button box, which cooperates with the second pneumatic lifting blocker (20).

6. The automatic assembly conveyor line for Roots bushings according to claim 1, characterized in that: The tooling plate (5) comprises a right-angle stopper (120), a steel tooling plate body (121) and guide wheels (122); the right-angle stopper (120) is fixed to the top surface of the steel tooling plate body (121), and the right-angle stopper (120) is distributed on the four corners of the steel tooling plate body (121); and the guide wheels (122) are rotatably mounted on both sides of the steel tooling plate body (121).