Offshore wind power system
By using the tension tendon between the gravity base and the floating platform in the offshore wind power system, combined with the design of the sinking ballast tank and the in-place ballast tank, the complex and high cost of the offshore wind power system is solved, and the problem of overhead wind power system is achieved. Simple and low-cost installation without underwater construction and large-scale equipment.
Patent Information
- Application Number
- CN202420201017.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-26
AI Technical Summary
During the construction and installation of existing offshore wind power systems, the operation of submarine anchoring foundation fixing and tension tendon connection is difficult, costly, and requires large equipment, resulting in complex and expensive construction.
Using multiple tension tendons between the gravity base and the floating platform, the sinking and floating platform are controlled by the design of sinking ballast tank and in-place ballast tank, using water injection and exhaust gas to control the position of the sinking and floating platform of the gravity base. Achieve slow tensioning of tension tendons to avoid large equipment and underwater construction.
There is no need for underwater construction, simple operation, low cost and high construction efficiency, avoiding the sudden stress problem of the platform caused by instant tension tendon tension, and improving the safety and stability of the overall installation.
Smart Images

Figure CN222097881U_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to offshore wind power technology, and in particular, to an offshore wind power system. Background Art
[0002] An offshore wind power system refers to a wind power platform installed at sea for power generation, which usually includes an anchor foundation fixed to the seabed and a floating platform floating on the sea surface. A wind turbine is installed on the floating platform, and tension tendons need to be connected between the anchor foundation and the floating platform. However, during the construction and installation of this conventional wind power system, underwater operations are required to fix the anchor foundation to the seabed, connect the tension tendons between the anchor foundation and the floating platform, and then tighten the tension tendons to a pre-tensioned state through tensioning equipment. Among them, the construction of the anchor foundation on the seabed is difficult and requires large-scale installation equipment. It is also difficult to connect the tension tendons on the seabed. At the same time, large-scale tensioning equipment needs to be arranged to tighten the tension tendons. The entire installation process has high construction costs and is difficult. Utility Model Content
[0003] An object of the present disclosure is to provide an offshore wind power system to at least partially solve the problems existing in the related art.
[0004] In order to achieve the above-mentioned objectives, the present disclosure provides an offshore wind power system, comprising: a floating platform for floating on the sea surface; a gravity foundation for installation on the surface of the seabed; a wind turbine installed on the floating platform and with the upper end extending out of the sea surface; and a plurality of tension tendons connected between the floating platform and the gravity foundation, wherein the gravity foundation has a sinking ballast tank and an in-situ ballast tank, and the sinking ballast tank is configured so that after being filled with water, the gravity foundation can sink until the plurality of tension tendons are in a tensioned state and the gravity foundation is spaced apart from the seabed; the in-situ ballast tank is configured so that after being filled with water at the same time as the sinking ballast tank, the gravity foundation can drive the floating platform to sink to the surface of the seabed where the gravity foundation is located through the plurality of tension tendons.
[0005] Optionally, a plurality of anti-skid columns are provided on the lower side of the gravity foundation.
[0006] Optionally, the gravity foundation is provided with a plurality of first connection points for connecting the tension tendons.
[0007] Optionally, a plurality of the first connection points are evenly arranged around the outer edge of the gravity foundation.
[0008] Optionally, the sunken ballast tank is located at a central position of the gravity foundation, and the in-situ ballast tanks are arranged around the sunken ballast tank.
[0009] Optionally, the sunken ballast tank is provided with a switchable first water inlet hole and a switchable first exhaust hole; the in-situ ballast tank is provided with a switchable second water inlet hole and a switchable second exhaust hole.
[0010] Optionally, it also includes a first water injection device for injecting water toward the sunken ballast tank through the first water inlet hole and a second water injection device for injecting water toward the in-situ ballast tank through the second water inlet hole.
[0011] Optionally, the floating platform comprises: a frame portion and a plurality of buoys disposed near a lower side of the frame portion, wherein the buoys are used to provide buoyancy for the floating platform.
[0012] Optionally, the frame portion is constructed in a tower shape with a cross-section that gradually decreases from bottom to top, and the fan is centrally installed on the frame portion.
[0013] Optionally, the fan is detachably mounted on the frame portion.
[0014] Through the above technical solution, when installing the gravity foundation, water can be first poured into the sinking ballast tank, and the gravity foundation can be steadily lowered until the tension tendons are tightened. At this time, the gravity foundation is completely immersed in the water, and the floating platform is partially immersed in the water. Under the dual buoyancy of the gravity foundation and the floating platform, the gravity foundation no longer sinks; then water is poured into the ballast tank in place, so that the gravity foundation can pull the floating platform down to the surface of the seabed where the gravity foundation is located, and the installation is completed. This offshore wind power system does not require underwater construction, and does not require large equipment to tighten the tension tendons. It is easy to operate, has low construction costs, and high construction efficiency. In addition, the purpose of designing the sinking ballast tank and the in-situ ballast tank is to allow water to be filled twice during installation, so that after the sinking ballast tank is filled with water (one time of water filling), the gravity foundation can be stabilized and slowly descend (achieved by designing the relationship between gravity and buoyancy) and the tension tendons can be slowly tightened to avoid filling the sinking ballast tank and the in-situ ballast tank with water at one time, causing the gravity of the gravity foundation to be too large and causing the entire wind power platform to sink rapidly, thereby instantly tightening the tension tendons, causing the floating platform to suddenly be subjected to a large tensile force and overturn.
[0015] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:
[0017] Figure 1 is a schematic diagram of an offshore wind power system exemplarily shown according to the present disclosure, wherein a gravity foundation is installed on the seabed;
[0018] Figure 2 yes Figure 1 A schematic diagram of an offshore wind power system shown in , wherein the gravity foundation is spaced apart from the seabed and the tension tendons are in a tensioned state;
[0019] Figure 3 yes Figure 1 A schematic diagram of an offshore wind power system shown in FIG. 1 , wherein the gravity foundation is in a non-water-filled state;
[0020] Figure 4 is a top view of a floating platform exemplarily shown according to the present disclosure;
[0021] Figure 5 is a side view of a floating platform exemplarily shown according to the present disclosure;
[0022] Figure 6 is a top view of a gravity foundation exemplarily shown according to the present disclosure;
[0023] Figure 7 A side view of a gravity foundation exemplarily shown in accordance with the present disclosure;
[0024] Figure 8 yes Figure 6 A partial enlarged view of the top view of the gravity foundation shown in FIG.
[0025] Description of Reference Numerals
[0026] 100- gravity foundation; 101- first connection point; 102- second connection point; 110- sinking ballast tank; 111- first water inlet; 112- first exhaust hole; 120- in-place ballast tank; 121- second water inlet; 122- second exhaust hole; 123- second exhaust pipe; 200- floating platform; 210- frame part; 220- buoy; 300- wind turbine; 400- tension tendon; 510- sea surface; 520- seabed; 600- anti-skid column. DETAILED DESCRIPTION
[0027] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.
[0028] In the present disclosure, unless otherwise stated, directional words such as "upper" and "lower" may be based on the structure of the relevant components themselves, or may be based on the orientation of the relevant components when used in combination. For example, a wind turbine installed on a floating platform with its "upper end" extending out of the sea surface refers to the end of the wind turbine away from the sea surface, that is, "upper" and "lower" are based on the height direction only; a plurality of anti-slip columns are provided on the "lower side" of the gravity foundation, which refers to the side of the gravity foundation facing the seabed when it is installed in place.
[0029] In the present disclosure, the terms "first", "second", etc. are used to distinguish one element from another element, and do not have order and importance. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements.
[0030] Reference Figure 1-Figure 8 , the present disclosure exemplarily shows an offshore wind power system, comprising a floating platform 200 for floating on the sea surface 510, a gravity foundation 100 for installation on the surface of the seabed 520, a wind turbine 300 installed on the floating platform 200 and with the upper end extending out of the sea surface 510, and a plurality of tension tendons 400 connected between the floating platform 200 and the gravity foundation 100. The gravity foundation 100 has a sinking ballast tank 110 and an in-place ballast tank 120. The sinking ballast tank 110 is configured such that after water is filled, the gravity foundation 100 can sink until the plurality of tension tendons 400 are in a tensioned state and the gravity foundation 100 is spaced from the seabed 520; the in-place ballast tank 120 is configured such that after water is filled simultaneously with the sinking ballast tank 110, the gravity foundation 100 can drive the floating platform 200 to sink to the surface of the gravity foundation 100 located on the seabed 520 through the plurality of tension tendons 400. Here, the tension tendon 400 refers to a connector connected between the gravity foundation 100 and the floating platform 200 so that the gravity foundation 100 and the floating platform 200 form a stable whole under tension. Specifically, it can be an anchor rope, a steel cable, etc. The number of the tension tendons 400 can be multiple and evenly distributed around the gravity foundation 100 and the floating platform 200. Since the structure and principle of the tension tendons 400 are well known to those skilled in the art, they will not be introduced in detail here.
[0031] In the embodiments of the present disclosure, the number of the sinking ballast tank 110 and the in-situ ballast tank 120 may be one or more, and the present disclosure does not impose any limitation on this.
[0032] The floating platform 200 may be a TLP (Tension Leg Platform) platform, etc., and may specifically include a buoy and a frame part mentioned below, wherein the buoy is used to provide buoyancy for the frame part so that the floating platform 200 can float on the sea surface 510. It should be explained that floating on the sea surface 510 here may refer to the floating platform 200 being completely immersed in water and close to the sea surface 510, or may also refer to the floating platform 200 being partially immersed in water, and the present disclosure does not limit this.
[0033] The present disclosure does not limit the specific structure of the gravity foundation 100, as long as it has a sinking ballast tank 110 and an in-place ballast tank 120, and after the sinking ballast tank 110 is filled with water, the gravity foundation 100 can sink until the multiple tension tendons 400 are in a tensioned state, and the gravity foundation 100 is spaced from the seabed 520; after the in-place ballast tank 120 is filled with water at the same time as the sinking ballast tank 110, the gravity foundation 100 can drive the floating platform 200 to sink to the surface of the gravity foundation 100 located on the seabed 520 through the multiple tension tendons 400. It should be noted that the above-mentioned sinking effect can be achieved by designing the spatial dimensions of the sinking ballast tank 110 and the in-place ballast tank 120 according to the volume, gravity and other factors of the gravity foundation 100 and the floating platform 200. Since the design process is well known to those skilled in the art, it will not be introduced too much here.
[0034] By using the above technical solution, when installing the gravity foundation 100, water can be first injected into the sinking ballast tank 110, and the gravity foundation 100 can be steadily lowered until the tension tendons 400 are tightened. At this time, the gravity foundation 100 is completely immersed in the water, and the floating platform 200 is partially immersed in the water. Under the dual buoyancy of the gravity foundation 100 and the floating platform 200, the gravity foundation 100 no longer sinks; and then water is injected into the in-place ballast tank 120, so that the gravity foundation 100 can pull the floating platform 200 to sink to the surface of the gravity foundation 100 located on the seabed 520, and the installation is completed. The offshore wind power system does not require underwater construction, and does not require large equipment to tighten the tension tendons 400. It is easy to operate, has low construction costs, and high construction efficiency. In addition, the purpose of designing the sinking ballast tank 110 and the in-situ ballast tank 120 is to allow water to be injected twice during installation, so that after the sinking ballast tank 110 is injected with water (injection of water once), the gravity foundation 100 can be stably and slowly lowered (achieved by designing the relationship between gravity and buoyancy), and the tension tendons 400 can be slowly tightened to avoid directly injecting water into the gravity foundation 100 to a weight that can sink to the seabed 520 (the weight of the gravity foundation 100 is too large, causing the entire wind power platform to sink rapidly, and then the tension tendons 400 are instantly tightened, causing the floating platform 200 to be suddenly subjected to a large pulling force and overturned).
[0035] Reference Figure 1-Figure 3 , Figure 7 In the embodiment of the present disclosure, a plurality of anti-skid columns 600 may be provided on the lower side of the gravity foundation 100. When the offshore wind power system is installed, the gravity foundation 100 is installed on the surface of the seabed 520, and the anti-skid columns 600 may be inserted into the silt of the seabed 520 to prevent the gravity foundation 100 from deflecting or shifting when it is subjected to external forces such as the impact of waves.
[0036] The present disclosure does not limit the number and structure of the anti-skid posts 600, and specifically, there may be four, six, etc. Preferably, the plurality of anti-skid posts 600 may be evenly distributed near the edge of the lower side of the gravity-type foundation 100. In some embodiments, the anti-skid posts 600 may be configured as steel posts with sharp lower ends so that the anti-skid posts 600 may be more easily extended into the mud.
[0037] In order to connect the tension tendon 400 to the gravity foundation 100, refer to Figure 8 In the embodiment of the present disclosure, the gravity foundation 100 may be provided with a plurality of first connection points 101 for connecting the tension tendons 400. The present disclosure does not limit the specific structure of the first connection point 101, which may be a hanging ring or a hanging hole for connecting the tension tendons 400.
[0038] Furthermore, a plurality of first connection points 101 can be evenly arranged around the outer edge of the gravity foundation 100. With such a design, when the tension tendons 400 are tightened, the gravity foundation 100 can be subjected to a balanced force, thereby preventing the gravity foundation 100 from tipping over.
[0039] In some other embodiments, the gravity foundation 100 may also be provided with a plurality of second connection points 102 for connecting auxiliary sinking cables. Here, it should be explained that the auxiliary sinking cable is used to be connected between the gravity foundation 100 and the floating platform 200 and is in a tensioned state before the sinking ballast tank 110 is filled with water, and when the sinking ballast tank 110 is filled with water and sinks, the auxiliary sinking cable is slowly released (stretched) to keep it in a tensioned state until the tension tendon 400 is tightened, at which time the auxiliary sinking cable can be disassembled and recovered. The auxiliary sinking cable can ensure that the gravity foundation 100 and the floating platform 200 remain as a stable whole during the sinking process, thereby ensuring the stability of the floating platform 200.
[0040] Reference Figure 6 In the embodiment of the present disclosure, the sinking ballast tank 110 can be located at the center of the gravity foundation 100, and the in-place ballast tank 120 can be arranged around the sinking ballast tank 110. With such a design, after the sinking ballast tank 110 or the in-place ballast tank 120 is filled with water, this "centering" design can ensure that the center of gravity of the gravity foundation 100 is in the center position, and avoid the center of gravity shifting from the center position and causing the gravity foundation 100 to overturn.
[0041] In order to facilitate the filling of water into the sinking ballast tank 110 and the in-place ballast tank 120, refer to Figure 8 In the embodiment of the present disclosure, the sinking ballast tank 110 may be provided with a switchable first water inlet 111 and a switchable first exhaust hole 112. The in-situ ballast tank 120 may be provided with a switchable second water inlet 121 and a switchable second exhaust hole 122. With such a design, when water injection is required, the corresponding water inlet and exhaust holes are opened, and water is injected toward the corresponding sinking ballast tank 110 or the in-situ ballast tank 120 through the water inlet, and the exhaust hole can discharge the gas in the sinking ballast tank 110 or the in-situ ballast tank 120 to facilitate water injection. After the water injection is completed, the corresponding water inlet and exhaust holes can be controlled to be closed. Among them, the switching of the water inlet and exhaust holes can be realized by valves.
[0042] Further, in an embodiment of the present disclosure, the offshore wind power system may further include a first water injection device for injecting water toward the sinking ballast tank 110 through the first water inlet hole 111 and a second water injection device for injecting water toward the in-situ ballast tank 120 through the second water inlet hole 121. The first water injection device may inject seawater into the sinking ballast tank 110 through the first water inlet hole 111, and the second water injection device may inject seawater into the in-situ ballast tank 120 through the second water inlet hole 121. The first water injection device and the second water injection device may be water pumps or the like.
[0043] In order to avoid the reduction of the strength of the gravity foundation 100 due to the opening of a large number of exhaust holes on the sinking ballast tank 110 and the in-place ballast tank 120, refer to Figure 8 In an embodiment of the present disclosure, the offshore wind power system may further include a first exhaust pipe (not shown in the figure) connected to the sunken ballast tank 110 and a second exhaust pipe 123 connected to the in-situ ballast tank 120. The first exhaust pipe may be provided with a plurality of first exhaust holes 112, and the second exhaust pipe 123 may be provided with a plurality of second exhaust holes 122.
[0044] The present disclosure does not limit the specific structure of the floating platform 200. Figure 4-Figure 5 In the illustrated embodiment, the floating platform 200 may include: a frame portion 210 and a plurality of buoys 220 disposed near the lower side of the frame portion 210, and the buoys 220 are used to provide buoyancy for the floating platform 200. Designing the main part of the floating platform 200 in the form of a frame can reduce weight on the one hand, and on the other hand, reduce the force on the floating platform 200 when it is blown by the wind, thereby preventing displacement or overturning after being blown by the wind.
[0045] In the embodiment of the present disclosure, the number of the buoys 220 may be four, and they are distributed at the four corners of the frame portion 210. In addition, in some other embodiments, the number of the buoys 220 may also be six, eight, etc. In addition to the buoys 220, in some other embodiments, foam, air bags, etc. may also be used instead of the buoys 220.
[0046] In order to improve the stability of the floating platform 200 and prevent it from tipping over due to force (such as wind and waves), refer to Figure 4 and Figure 5 In an embodiment of the present disclosure, the frame portion 210 may be constructed in a tower shape with a cross section gradually decreasing from bottom to top, and the wind turbine 300 may be centrally disposed on the frame portion 210. The tower structure may bring the center of gravity of the floating platform 200 closer to the lower side, thereby improving overall stability.
[0047] In order to avoid disassembling the entire offshore wind power system when the wind turbine 300 needs to be replaced or repaired, in the embodiment of the present disclosure, the wind turbine 300 can be detachably installed on the floating platform 200. With such a design, when the wind turbine 300 fails, the wind turbine 300 can be disassembled separately, reducing maintenance costs and maintenance difficulties.
[0048] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.
[0049] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.
[0050] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.
Claims
1. An offshore wind power system, characterized in that: include: Floating platform, used to float on the sea surface; Gravity foundations, for surface installation on the seabed; A wind turbine, installed on the floating platform and with its upper end extending out of the sea surface; as well as A plurality of tension tendons are connected between the floating platform and the gravity foundation, Wherein, the gravity foundation has a sinking ballast tank and an in-situ ballast tank. The sinking ballast tank is configured so that after being filled with water, the gravity foundation can sink until the multiple tension tendons are in a tensioned state, and the gravity foundation is spaced apart from the seabed; the in-situ ballast tank is configured so that after being filled with water at the same time as the sinking ballast tank, the gravity foundation can drive the floating platform to sink to the surface of the seabed where the gravity foundation is located through the multiple tension tendons.
2. The offshore wind power system according to claim 1, characterized in that: A plurality of anti-skid columns are arranged on the lower side of the gravity foundation.
3. The offshore wind power system according to claim 1, characterized in that: The gravity foundation is provided with a plurality of first connection points for connecting the tension tendons.
4. The offshore wind power system according to claim 3, characterized in that: A plurality of the first connection points are evenly arranged around the outer edge of the gravity foundation.
5. The offshore wind power system according to claim 1, characterized in that: The sunken ballast tank is located at the center of the gravity foundation, and the in-situ ballast tanks are arranged around the sunken ballast tank.
6. The offshore wind power system according to claim 5, characterized in that: The sunken ballast tank is provided with a switchable first water inlet and a switchable first exhaust hole; the in-situ ballast tank is provided with a switchable second water inlet and a switchable second exhaust hole.
7. The offshore wind power system according to claim 6, characterized in that: It also includes a first water injection device for injecting water into the sinking ballast tank through the first water inlet hole and a second water injection device for injecting water into the in-situ ballast tank through the second water inlet hole.
8. The offshore wind power system according to claim 1, characterized in that: The floating platform comprises a frame part and a plurality of buoys arranged near the lower side of the frame part, wherein the buoys are used to provide buoyancy for the floating platform.
9. The offshore wind power system according to claim 8, characterized in that: The frame part is constructed in a tower shape with a cross section gradually decreasing from bottom to top, and the fan is centrally installed on the frame part.
10. The offshore wind power system according to claim 9, characterized in that: The fan is detachably mounted on the frame portion.