Building engineering board lifting box
The construction engineering plate lifting box addresses size adjustment challenges by using clamping and T-block mechanisms for easy size adaptation and horizontal rope maintenance, enhancing operational efficiency and reducing complexity.
Patent Information
- Application Number
- CN202420541613.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-20
AI Technical Summary
Existing plate lifting boxes face challenges with adjusting to different plate sizes, leading to increased complexity and cost due to the need for repeated disassembly and reconfiguration of lifting mechanisms.
A construction engineering plate lifting box design featuring a carrier box with adjustable components such as clamping rods, sliding rods, and a T-block mechanism that allows for easy size adjustment and horizontal rope maintenance without repeated disassembly.
Enables efficient accommodation of plates of varying sizes with reduced operational complexity and cost by allowing easy adjustment and fixing components.
Smart Images

Figure CN222099331U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of plate lifting machines, in particular to a plate lifting box for construction engineering. Background Art
[0002] The construction engineering board lifting box is a special equipment used to lift large construction boards from the ground or low place to high place. It usually adopts chain or rope transmission principle for rising and falling.
[0003] After searching, Chinese patent announcement number: CN215905754 U discloses a hoist for construction engineering, including a retractable support rod, a cross beam, a mounting plate, a winding wheel, a guide wheel, a motor, a transmission assembly, a hanging rope, a lifting box, a pull rod and a pull rope, the top and bottom ends of the support rod are provided with cross plates, two support rods are provided, and are erected parallel to each other between the lower floor slab and the lower floor slab, and the cross plates are against the bottom surface of the lower floor slab and the top surface of the lower floor slab; the lifting box of the utility model is made of plate material, and tools will not fall off. At the same time, a pull rod and a pull rope arranged on the side of the lifting box are provided.
[0004] In the above technology, although a lifting box is used to lift the plates, the different sizes of the plates during use make it difficult to remove the twist rope, and then replace different lifting boxes according to the size, which increases the complexity and cost of the operation, and it is difficult to cause the lifting box to be inconsistent. Therefore, a construction engineering plate lifting box is proposed to solve the above problem. Utility Model Content
[0005] In order to make up for the above shortcomings, the utility model provides a lifting box for building engineering panels, aiming to improve the problem of low practicality of the lifting box in the prior art.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a construction engineering board lifting box, including a carrier box one, a card block is elastically connected to the inside of the lower right end of the carrier box one through a spring one, the front of the card block is fixedly connected to a sliding rod, the front ends of the carrier box one and the carrier box two are provided with grooves, the right end of multiple groups of the card blocks are respectively slidably connected to the carrier box two and the baffle, the middle of the left part of the carrier box two and the baffle is fixedly connected with a connecting rod, the upper part of the carrier box one and the carrier box two is slidably connected with a fixing assembly, the upper part of the fixing assembly is fixedly connected with a hinge block, and a twisted rope is wound around the middle of the hinge block.
[0007] As a further description of the above technical solution:
[0008] The fixing assembly includes a T-block, the outside of which is in contact with a stop block, the rear parts of multiple groups of the stop blocks are elastically connected to the side ends of the first and second carrier boxes respectively through springs, and the rear ends of the stop blocks are slidably connected to the inside of positioning columns.
[0009] As a further description of the above technical solution:
[0010] One end of the spring one is fixedly connected to the inside of the right lower end of the carrier box one and the carrier box two, the other end of the spring one is fixedly connected to the outside of the left end of the block, and the outside of the sliding rod is slidably connected to the inside of the lower end of the carrier box one and the carrier box two.
[0011] As a further description of the above technical solution:
[0012] The two ends of the second carrier box are in contact with the right part of the first carrier box and the left outer wall of the baffle respectively.
[0013] As a further description of the above technical solution:
[0014] The outer parts of the clamping rods are respectively slidably connected to the inner parts of the right ends of the first and second carrying boxes.
[0015] As a further description of the above technical solution:
[0016] The outside of the T-block is slidably connected to the inside of the side ends of the first and second carrier boxes, and the upper end of the T-block is fixedly connected to the lower part of the hinge block.
[0017] As a further description of the above technical solution:
[0018] One end of the second spring is fixedly connected to the inside of the side ends of the first and second carrier boxes, and the other end of the second spring is fixedly connected to the outside of the side end of the stop block.
[0019] As a further description of the above technical solution:
[0020] The two ends of the positioning column are fixedly connected inside the side ends of the first and second carrying boxes.
[0021] The utility model has the following beneficial effects:
[0022] 1. In the utility model, the clamping rod is used for clamping, and then the clamping block is used to prevent the support box 1 and the support box 2 from sliding up and down and keep them fixed. Finally, the baffle plate is used for clamping, so that the baffle plate can be modified according to the size of the plate, which makes it unnecessary to repeatedly disassemble and install the rope, and increases the practicality of the overall device.
[0023] 2. In the utility model, the T-block can be slid out by sliding the stop block so that the hinge block can drive the twist rope to move to the middle position of the whole device, so that the twist rope can be quickly adjusted to maintain a horizontal state during lifting. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is an overall schematic diagram of a construction engineering plate lifting box proposed by the utility model;
[0025] Figure 2 This is a schematic diagram of a fixing assembly of a construction engineering plate lifting box proposed by the utility model;
[0026] Figure 3 This is a schematic diagram of a clamping rod of a construction engineering plate lifting box proposed by the utility model;
[0027] Figure 4 The utility model is a schematic diagram of a clamping block of a construction engineering plate lifting box.
[0028] Legend:
[0029] 1. Carrying box 1; 2. Stop block; 3. Carrying box 2; 4. Baffle; 5. Articulated block; 6. Twisted rope; 7. Positioning column; 8. Spring 2; 9. T-block; 10. Clamping rod; 11. Spring 1; 12. Clamping block; 13. Sliding rod; 14. Groove. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0031] Reference Figure 1 , Figure 3 and Figure 4The utility model provides an embodiment of a construction engineering plate lifting box, comprising a carrying box 1, the right end of the carrying box 1 is an opening, which can be clamped with the carrying box 2 3 and the baffle 4 to adjust the size of the space that can carry the plate. The lower right end of the carrying box 1 is elastically connected with a clamping block 12 through a spring 11. The clamping block 12 is T-shaped, and the clamping block 12 can slide into the inside of the carrying box 2 3 and the baffle 4 so that it cannot slide out relative to the carrying box 1, and the clamping rod 10 cannot slide out. One end of the spring 11 is fixedly connected to the inside of the lower right end of the carrying box 1 and the carrying box 2 3, and the spring 11 is squeezed to keep the clamping block 12 in a state of sliding out. The other end of the spring 11 is fixedly connected to the outside of the left end of the clamping block 12, and the upper end of the clamping block 12 is an inclined surface that can be squeezed to slide into the inside of the carrying box 1 and the carrying box 2 3, so that the clamping rod 10 can slide in and be clamped conveniently.
[0032] Reference Figure 1 , Figure 2 and Figure 4 The front part of the card block 12 is fixedly connected with a sliding rod 13, and the sliding rod 13 is L-shaped, which can conveniently manually release the card block 12 so that the card rod 10 can slide out, which can facilitate the disassembly of the carrier box 2 3 and the baffle 4. The outside of the sliding rod 13 is slidably connected to the lower end of the carrier box 1 and the carrier box 2 3. The carrier box 1 and the carrier box 2 3 can keep the card block 12 and the sliding rod 13 only able to slide horizontally within a fixed distance. The front end of the carrier box 1 and the carrier box 2 3 is provided with a groove 14, and the groove 14 can facilitate manual driving of the sliding rod 13 to slide. The right end of the plurality of groups of card blocks 12 is respectively slidably connected with the carrier box 2 3 and the baffle 4. The two ends of the carrier box 2 3 are respectively in contact with the right part of the carrier box 1 and the left outer wall of the baffle 4, and the carrier box 2 3 is convenient to carry. Multiple groups of supporting boxes 2 3 and supporting boxes 1 can be snapped together to change the size of the supporting space to accommodate plates of different sizes. A snap-in rod 10 is fixedly connected between the supporting box 2 3 and the middle of the left part of the baffle 4. The snap-in rod 10 is L-shaped, which can prevent the baffle 4 and the supporting box 2 3 from sliding horizontally relative to the supporting box 1. The outer parts of the snap-in rod 10 are respectively slidably connected to the inside of the right ends of the supporting box 1 and the supporting box 2 3. The upper parts of the supporting boxes 1 and 2 are slidably connected with a fixing component, which can keep the position of the hinge block 5 relatively fixed. The upper part of the fixing component is fixedly connected with a hinge block 5, which can drive the entire device to be lifted along with the twisted rope 6. A twisted rope 6 is wound around the middle of the hinge block 5, and the twisted rope 6 can be connected to the lifting device so that the entire device can move up and down accordingly.
[0033] Reference Figure 1-Figure 2The fixing assembly includes a T-block 9, which can be snapped into different positions of the overall device, so that the rope 6 can be kept in the middle position when lifting, and can be kept horizontal when lifting, without repeatedly disassembling and installing the rope 6. The outside of the T-block 9 is slidably connected to the inside of the side ends of the carrier box 1 and the carrier box 2 3, and the T-block 9 is restricted to relatively horizontal sliding. The upper end of the T-block 9 is fixedly connected to the lower part of the hinge block 5, and the T-block 9 can drive the overall device to move with the hinge block 5. The outside of the T-block 9 is in contact with a stop block 2, and the stop block 2 is L-shaped, and the front portion can limit the T-block 9 from sliding out of the carrier box 1 and the carrier box 2 3 The rear parts of the multiple groups of shift blocks 2 are elastically connected to the side ends of the carrier box 1 and the carrier box 2 3 through the spring 28. The spring 28 squeezes the shift block 2 to keep it blocking the T-block 9 and unable to slide and keep it fixed. One end of the spring 28 is fixedly connected to the side ends of the carrier box 1 and the carrier box 2 3, and the other end of the spring 28 is fixedly connected to the outside of the side end of the shift block 2. The spring 28 can be squeezed to keep squeezing the shift block 2. A positioning column 7 is slidably connected to the rear end of the shift block 2. The positioning column 7 limits the shift block 2 to only slide relatively horizontally. The two ends of the positioning column 7 are fixedly connected to the side ends of the carrier box 1 and the carrier box 2 3.
[0034] Working principle: select different numbers of carrier boxes 2 3 as needed, slide the left end clamping rod 10 of carrier box 2 3 into the right end of carrier box 1 and left end carrier box 2 3 in turn, then slide the clamping rod 10 and carrier box 2 3 vertically downward, so that the lower end of carrier box 2 3 squeezes the clamping block 12 into carrier box 1 and the inside of carrier box 2 3 to squeeze the spring 11, when the clamping rod 10 is restricted and cannot slide down, the clamping block 12 slides into the inside of carrier box 2 3 under the pressure of spring 1 11 to keep carrier box 2 3 from sliding up vertically and keep it relatively fixed, then clamp the baffle 4 and the rightmost carrier box 2 3 according to the above steps to keep them fixed, put the plate inside, then slide the stop block 2 to squeeze the spring 2 8 makes the stop block 2 no longer squeeze the T-block 9, and the T-block 9 slides out, and then the T-block 9 drives the hinge block 5 and the twisted rope 6 to move to the middle position of the overall device, and then the T-block 9 slides into the two ends of the overall device. At this time, the stop block 2 in the middle position slides to the left under the squeezing of the spring 2 8 to restrict the T-block 9 from sliding out, and then the plate is placed inside the device and the hinge block 5 is driven up by the twisted rope 6, and the hinge block 5 drives the T-block 9 to rise, so that the overall device rises. When disassembly is required, the sliding rod 13 can be slid to the left to drive the card block 12 to slide into the carrier box 1 or the carrier box 2 3 to squeeze the spring 11, and then slide up the carrier box 2 3 or the baffle 4 and then slide to the right to slide the card rod 10 out.
[0035] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction engineering board lifting box, comprising a carrying box (1), characterized in that: The lower right end of the carrier box 1 (1) is elastically connected to a card block (12) through a spring 1 (11), and the front part of the card block (12) is fixedly connected to a sliding rod (13). The front ends of the carrier box 1 (1) and the carrier box 2 (3) are provided with grooves (14). The right ends of multiple groups of the card blocks (12) are slidably connected to the carrier box 2 (3) and the baffle (4) respectively. The left middle of the carrier box 2 (3) and the baffle (4) is fixedly connected to a card connecting rod (10). The upper part of the carrier box 1 (1) and the carrier box 2 (3) is slidably connected to a fixing assembly, and the upper part of the fixing assembly is fixedly connected to a hinge block (5), and a twisted rope (6) is wound around the middle of the hinge block (5).
2. A construction engineering board lifting box according to claim 1, characterized in that: The fixing assembly comprises a T-shaped block (9), the outside of the T-shaped block (9) is in contact with a stop block (2), the rear parts of the plurality of groups of the stop blocks (2) are elastically connected to the inside of the side ends of the carrier box one (1) and the carrier box two (3) respectively through spring two (8), and the rear end of the stop block (2) is slidably connected to a positioning column (7).
3. A construction engineering board lifting box according to claim 1, characterized in that: One end of the spring one (11) is fixedly connected to the inside of the right lower end of the carrier box one (1) and the carrier box two (3), the other end of the spring one (11) is fixedly connected to the outside of the left end of the block (12), and the outside of the sliding rod (13) is slidably connected to the inside of the lower end of the carrier box one (1) and the carrier box two (3).
4. A construction engineering board lifting box according to claim 1, characterized in that: The two ends of the second carrier box (3) are in contact with the right part of the first carrier box (1) and the left outer wall of the baffle (4) respectively.
5. A construction engineering board lifting box according to claim 1, characterized in that: The outside of the clamping rod (10) is slidably connected to the inside of the right side ends of the first carrier box (1) and the second carrier box (3).
6. A construction engineering board lifting box according to claim 2, characterized in that: The outside of the T-shaped block (9) is slidably connected to the inside of the side ends of the first carrier box (1) and the second carrier box (3), and the upper end of the T-shaped block (9) is fixedly connected to the lower part of the hinge block (5).
7. A construction engineering board lifting box according to claim 2, characterized in that: One end of the second spring (8) is fixedly connected to the inside of the side ends of the first carrier box (1) and the second carrier box (3), and the other end of the second spring (8) is fixedly connected to the outside of the side end of the stop block (2).
8. A construction engineering board lifting box according to claim 2, characterized in that: The two ends of the positioning column (7) are fixedly connected inside the side ends of the first carrier box (1) and the second carrier box (3).
