Road system
By setting up pile foundations and support plates in the road system in soft soil areas, dispersing loads and monitoring and adjusting the position of support plates, the problems of uneven settlement of the subgrade and overloading of pile foundations between the tunnel and the elevated bridge foundation are solved, and the overall road is improved Structural strength and safety.
Patent Information
- Application Number
- CN202420755058.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-12
AI Technical Summary
In soft soil areas, the roadbed between the tunnel and the overpass foundation is unevenly supported, resulting in uneven settlement in local driving lanes, which affects driving comfort and safety, and overloading of pile foundations may lead to through cracks.
Design a road system by setting up pile foundations between the support structure and the overpass bridge foundation, and laying support plates on the top surface of the pile foundation, supporting them below the roadbed, one end of the support plate overlaps with the support structure, and the other end is connected to the overpass The beam foundation overlaps in the vertical projection part to disperse loads and prevent overload damage of pile foundations. At the same time, a lifting mechanism and settlement monitoring module are set up to monitor and adjust the position of the support plate to ensure the balance of the roadbed.
Effectively prevent uneven settlement of the roadbed within the pile foundation, improve the overall structural strength and safety of the road, avoid the creation of through cracks in the transition section, and ensure the safety and comfort of road driving.
Smart Images

Figure CN222100520U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of traffic construction, in particular to a road system. Background Art
[0002] At present, in some areas, the same transportation corridor needs to take into account both road traffic and rail traffic. If tunnel traffic, road traffic and elevated bridge traffic are taken into account at the same time, the underground, ground and air space can be fully utilized to form a three-dimensional transportation corridor to facilitate transportation.
[0003] When tunnel traffic, highway traffic and viaduct traffic are constructed in soft soil areas, and there are tunnels and viaduct foundations under the roadbed of the highway, the roadbed above the tunnel and viaduct foundation will not sink due to sufficient support, while the roadbed between the tunnel and viaduct foundation will sink, which will cause uneven settlement between the local lanes and the lanes directly above the tunnel and viaduct foundation, seriously affecting the comfort and safety of driving. In the prior art, pile foundations are often set in the soil layer below the area where the highway roadbed is prone to sink, so as to support the roadbed in this area and prevent uneven settlement of the roadbed.
[0004] However, if pile foundations are only set up in the soil layer between the tunnel and the elevated bridge foundation for reinforcement, the support for the roadbed is not uniform enough, and uneven settlement will still occur in the local roadbed within the pile foundation range. Moreover, the load above the roadbed is entirely borne by the pile foundation. When the load on the pile foundation is large, the transition section between the pile foundation and the tunnel and elevated bridge foundation may produce through cracks due to overload, and the safety and comfort of road driving cannot be guaranteed. Summary of the invention
[0005] The purpose of the utility model is to provide a road system which can effectively solve the problem of uneven settlement of local roadbed within the range of pile foundation, avoid the generation of through cracks due to overload in the transition section between the pile foundation and the foundation of the tunnel and elevated bridge, keep the overall structure of the roadbed balanced, and improve the safety and comfort of the road.
[0006] To achieve this purpose, the utility model adopts the following technical solutions:
[0007] A road system, comprising:
[0008] Roadbed;
[0009] a tunnel located in the soil layer below the roadbed;
[0010] A supporting structure, wherein the supporting structure is arranged on a side of the tunnel close to the viaduct foundation;
[0011] an elevated bridge foundation, located in the soil layer below the roadbed and spaced apart from the tunnel;
[0012] A pile foundation is arranged between the supporting structure and the viaduct foundation, and the lower end of the pile foundation is inserted into the soil layer;
[0013] A support plate is arranged on the top surface of the pile foundation and supported below the roadbed; one end of the support plate overlaps the supporting structure, and the other end at least partially overlaps with the viaduct foundation along the vertical projection.
[0014] Optionally, the pile foundation is flush with the top surface of the supporting structure, and the side of the supporting structure close to the tunnel is flush with one end of the support plate.
[0015] Optionally, the top surface of the viaduct foundation is lower than the top surface of the pile foundation, so that there is a fill gap between the plane where the support plate is located and the viaduct foundation.
[0016] Optionally, a plurality of pile foundations are evenly distributed along the width direction of the roadbed.
[0017] Optionally, the pile foundation includes a prestressed pipe pile and a pile cap, the lower end of the prestressed pipe pile is inserted into the soil layer, the pile cap is connected to the top of the prestressed pipe pile and supported under the supporting plate, and the cross-sectional area of the pile cap is larger than the cross-sectional area of the prestressed pipe pile.
[0018] Optionally, the center distance between two adjacent prestressed pipe piles is 2.3m-3.0m.
[0019] Optionally, the support plate includes a steel mesh and a concrete structure, and the steel mesh is centrally arranged in the concrete structure along the thickness direction of the concrete structure.
[0020] Optionally, a limiting protrusion is provided on one of the top surface of the pile foundation and the bottom surface of the support plate, and a limiting groove is provided on the other, and the limiting protrusion is clamped in the limiting groove.
[0021] Optionally, a jacking mechanism, a settlement monitoring module and a control module are provided between the support plate and the supporting structure, and between the support plate and the pile foundation. The settlement monitoring module is used to monitor the settlement of the roadbed above the support plate. The control module is communicatively connected with the jacking mechanism. The control module controls the jacking mechanism to lift the support plate when the settlement exceeds a set range.
[0022] Optionally, the road system further comprises a grid reinforcement plate, wherein the grid reinforcement plate is laid on the top surface of the support plate and buried in the soil layer below the roadbed.
[0023] Beneficial effects of the utility model:
[0024] The road system proposed by the utility model can transfer the upper load to the soil layer with strong bearing capacity below the roadbed by setting pile foundations in the soil layer between the supporting structure and the elevated bridge foundation, so as to meet the bearing capacity and settlement requirements and prevent the settlement of the roadbed in this part from being greatly different from the settlement of the roadbed above the tunnel and the elevated bridge foundation; laying a support plate on the upper end of the pile foundation can disperse the upper load, make the pile foundation more evenly support the roadbed above, better exert the bearing capacity of the pile foundation, and ensure that the roadbed in the area above the support plate will not suffer from uneven settlement. Moreover, one end of the support plate overlaps with the support structure, and the support structure is combined with the pile foundation to form a pile-supported roadbed, further improving the overall strength of the roadbed structure. The other end of the support plate overlaps with the elevated bridge foundation at least partially along the vertical projection, and the elevated bridge foundation can provide vertical support for the support plate, that is, the two ends of the support plate are supported by the support structure and the elevated bridge foundation respectively, and the middle part is supported by the pile foundation, which can disperse the load on the support plate and the load above it, prevent the pile foundation from being damaged due to overload, and coordinate the uneven settlement of the roadbed, improve the safety and comfort of road driving, and ensure the stability and reliability of the support. In addition, the two ends of the support plate overlap with the support structure and the elevated bridge foundation respectively, which can avoid the generation of through cracks in the transition section. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of a road system provided by an embodiment of the utility model;
[0026] Figure 2 It is a cross-sectional schematic diagram of a support plate provided by an embodiment of the utility model;
[0027] Figure 3 It is a schematic diagram of the steel mesh structure provided by an embodiment of the utility model.
[0028] in:
[0029] 1. Roadbed;
[0030] 2. Tunnel;
[0031] 3. Support structure;
[0032] 4. Elevated bridge foundation; 41. Elevated bridge piles; 42. Elevated bridge pile cap;
[0033] 5. Pile foundation; 51. Prestressed pipe pile; 52. Pile cap;
[0034] 6. Support plate; 61. Steel mesh; 611. Steel bars; 62. Concrete structure. DETAILED DESCRIPTION
[0035] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0036] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0038] In the description of this embodiment, the terms "upper", "lower", "left", "right" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0039] This embodiment provides a road system, such as Figure 1As shown, it includes a roadbed 1, a tunnel 2, a supporting structure 3, an elevated bridge foundation 4, a pile foundation 5 and a supporting plate 6, wherein the tunnel 2 is located in the soil layer below the roadbed 1; the elevated bridge foundation 4 and the tunnel 2 are arranged in the soil layer below the roadbed 1 at intervals; the supporting structure 3 is arranged on one side of the tunnel 2 close to the elevated bridge foundation 4; the pile foundation 5 is located in the soil layer below the roadbed 1 between the supporting structure 3 and the elevated bridge foundation 4, and the lower end of the pile foundation 5 is inserted in the soil layer with strong bearing capacity, which can transfer the upper load to the soil layer to meet the bearing capacity and settlement requirements, and prevent the part from being damaged. The settlement of the inner roadbed 1 is quite different from the settlement of the roadbed 1 above the tunnel 2 and the elevated bridge foundation 4; the support plate 6 is arranged on the top surface of the pile foundation 5 and supported under the roadbed 1, which can disperse the upper load and make the pile foundation 5 support the roadbed 1 above more evenly, better exert the bearing capacity of the pile foundation 5, and ensure that the roadbed 1 in the area above the support plate 6 will not experience uneven settlement; one end of the support plate 6 overlaps the supporting structure 3, and the supporting structure 3 is combined with the pile foundation 5 to form a pile-supported roadbed, which can further improve the overall strength of the roadbed 1 structure and reduce the settlement deformation of the roadbed 1. The other end of the support plate 6 at least partially overlaps with the viaduct foundation 4 along the vertical projection, and the viaduct foundation 4 can provide vertical support force for the support plate 6, that is, the two ends of the support plate 6 are supported by the support structure 3 and the viaduct foundation 4 respectively, and the middle part is supported by the pile foundation 5, which can disperse the load on the support plate 6 and the load above it, prevent the pile foundation 5 from being damaged due to overload, and coordinate the uneven settlement of the roadbed 1, improve the safety and comfort of road driving, and ensure the stability and reliability of the support. In addition, the support plate 6 overlaps with the support structure 3 and the viaduct foundation 4 to avoid the generation of through cracks in the transition section.
[0040] The supporting structure 3 can be the initial support of the tunnel 2 and will not be demolished in subsequent construction. The types of initial support commonly used in tunnels include slope reduction, soil nail walls, underground continuous walls, gravity cement soil walls and steel frames. In this embodiment, the initial support selected is an underground continuous wall. In other embodiments, a suitable structural form can be selected according to actual needs. In addition, the initial support of the tunnel 2 can be demolished and a suitable supporting structure 3 can be re-set according to actual needs.
[0041] In this embodiment, Figure 1As shown, the pile foundation 5 in the soil layer is flush with the top surface of the support structure 3, and the support plate 6 can be set as a flat plate, the bottom surface of which overlaps the upper end of the pile foundation 5 and the upper end of the support structure 3, so that the manufacturing process of the support plate can be simplified and it is also more convenient to transport. The side of the support structure 3 close to the tunnel 2 is flush with the end surface of the support plate 6. On the one hand, without wasting the engineering materials required for the support plate 6, it can ensure that there is enough contact area between the support plate 6 and the support structure 3, improve the support stability of the support structure 3 to the support plate 6, meet the bearing capacity requirements of the roadbed 1, and be economical and practical; on the other hand, because one end of the support plate 6 does not protrude from the support structure 3, when the backfill construction is carried out above the tunnel 2, the existence of the support plate 6 will not affect the compactness of the backfill below it, and the backfill in the entire upper area of the tunnel 2 can be compacted at a later stage.
[0042] In other embodiments, the support structure 3 may also be lower than the pile foundation 5. In this case, a protruding block may be provided on the bottom surface of one end of the support plate 6 overlapping the support structure 3, and the block is supported on the top surface of the support structure 3. Alternatively, the support structure 3 may also be higher than the pile foundation 5. In this case, the support plate 6 may be provided in a Z-shape, and the overlap with the support structure 3 and the pile foundation 5 can also be achieved.
[0043] In other embodiments, under the premise of ensuring sufficient supporting force, one end of the support plate 6 may only overlap a partial area of the supporting structure 3, or may be cantilevered relative to the supporting structure 3.
[0044] like Figure 1 As shown, the elevated bridge foundation 4 includes an elevated bridge foundation pile 41 and an elevated bridge pile cap 42. The lower end of the elevated bridge foundation pile 41 is inserted into the soil layer, and the elevated bridge pile cap 42 is arranged on the top of the elevated bridge foundation pile 41. The top surface of the elevated bridge pile cap 42 is lower than the top surface of the pile foundation 5. Therefore, there will be a fill gap between the plane where the support plate 6 is located and the elevated bridge pile cap 42. After the construction of the pile foundation 5, the tunnel 2 and the elevated bridge foundation 4 is completed, the fill gap is filled and leveled, and the subsequent support plate 6 can be directly erected on the leveled fill structure to ensure the stability of the support plate 6.
[0045] In other embodiments, the viaduct foundation 4 may also be higher than the pile foundation 5 or flush with the pile foundation 5. If the viaduct foundation 4 is higher than the pile foundation 5, the end of the support plate 6 overlapping the viaduct foundation 4 is set to be Z-shaped; if the viaduct foundation 4 is flush with the pile foundation 5, the support plate 6 is set to be a flat plate, and one end of the support plate 6 is directly overlapped with the viaduct foundation 4.
[0046] like Figure 1 As shown, a plurality of pile foundations 5 are evenly distributed along the width direction of the roadbed 1, which can provide uniform bearing capacity for the upper roadbed 1, prevent the occurrence of a phenomenon in which the local bearing capacity is strong or weak, and avoid uneven settlement of the roadbed 1.
[0047] In some other embodiments, if the bearing capacity of a single pile meets the requirements, a pile foundation 5 may also be provided.
[0048] Optionally, the pile foundation 5 includes a pile cap 52 and a prestressed pipe pile 51. The lower end of the prestressed pipe pile 51 is inserted into a soil layer with a strong bearing capacity. The pile cap 52 is set at the top of the prestressed pipe pile 51 and supported below the support plate 6. The cross-sectional area of the pile cap 52 is larger than the cross-sectional area of the prestressed pipe pile 51. The pile cap 52 can evenly distribute the upper layer load to the lower prestressed pipe pile 51, and can increase the contact area between the support plate 6 and the pile foundation 5, avoid stress concentration and damage to the support plate 6, improve the reliability of the road system, and extend the service life of the road system. Furthermore, the upper end of the prestressed pipe pile 51 is embedded in the pile cap 52 by 50mm-100mm, which can improve the connection strength between the prestressed pipe pile 51 and the pile cap 52, and prevent the pile foundation 5 from being broken and damaged and reducing the bearing capacity of the roadbed 1.
[0049] Exemplarily, along the extension direction of the roadbed 1, the distribution form of the prestressed pipe piles 51 can be a plum blossom distribution or a rectangular array distribution. Prestressed pipe piles 51 with a diameter of 0.4m can be selected to ensure the bearing capacity of a single pile. The center distance between two adjacent prestressed pipe piles 51 is 2.3m-3.0m, for example, 2.5m, 2.8m, etc. This spacing can provide sufficient bearing capacity for the roadbed 1 without wasting pile foundation, which is economical and reliable.
[0050] Of course, in other embodiments, the size of the prestressed pipe piles 51 and the center distance between two adjacent prestressed pipe piles 51 can be adaptively adjusted according to design requirements and are not limited to the above-mentioned size limitations.
[0051] Alternatively, if Figure 2 and Figure 3 As shown, the support plate 6 is a reinforced concrete plate, which includes a steel mesh 61 and a concrete structure 62. The steel mesh 61 is formed by overlapping a plurality of transverse steel bars 611 and longitudinal steel bars 611 in a mesh shape (in this embodiment, the selected steel bar 611 model is HRB400, with a diameter of 12mm, and the spacing between two adjacent steel bars 611 is 100mm), and the steel mesh 61 is centrally arranged in the concrete structure 62 along the thickness direction of the concrete structure 62 (in this embodiment, the selected concrete strength grade is C30, and the total thickness of the concrete structure 62 is 150mm). The reinforced concrete plate has a stable structure and good durability, and can better disperse the upper load, which is conducive to exerting the bearing capacity of the pile foundation 5; the steel mesh 61 is centrally arranged in the concrete structure 62, which can ensure that the bearing capacity of the support plate is balanced in the thickness direction, and can also effectively prevent the steel mesh 61 from contacting with groundwater to avoid its corrosion, and the addition of the steel mesh 61 in the concrete structure 62 can improve the bending resistance of the concrete material.
[0052] In other embodiments, suitable steel bars 611 of suitable size and strength grade and concrete of suitable strength grade can be selected according to actual needs. The spacing between the transverse steel bars 611 and the longitudinal steel bars 611 is also selected according to design requirements to ensure the bearing capacity of the support plate 6.
[0053] Optionally, a limiting protrusion is provided on the top surface of the pile foundation 5, and a limiting groove is provided on the bottom surface of the supporting plate 6 in contact with the top surface of the pile foundation 5. The limiting protrusion can be just stuck in the limiting groove, and the supporting plate 6 can be limited and fixed to prevent the supporting plate 6 from shifting, thereby ensuring the supporting stability of the supporting plate 6 and ensuring that it still has a better bearing capacity after long-term use.
[0054] Exemplarily, the top wall of the inner cavity of the first casting mold of the pile cap 52 is provided with an upward depression, so that the above-mentioned limiting protrusion of the pile foundation 5 is formed at the depression. The inner cavity wall of the second casting mold of the support plate 6 is provided with a structural form that protrudes inward, so that the above-mentioned limiting groove of the support plate 6 is formed at the protrusion, or a steel part can be pre-provided, and then the support plate 6 is cast and manufactured. After casting, the steel part is bonded to the concrete, and the steel part is embedded in the concrete structure 62 of the support plate 6, and the above-mentioned limiting groove is defined by the steel part.
[0055] In other embodiments, the limiting protrusions may be arranged on the bottom surface of the supporting plate 6, and the limiting grooves may be arranged on the top surface of the pile foundation 5. In this case, the manufacturing method of the pile foundation 5 and the supporting plate 6 is similar to the above method.
[0056] Optionally, the road system further includes a lifting mechanism, a settlement monitoring module and a control module. A lifting mechanism is provided between the support plate 6 and the supporting structure 3, and between the support plate 6 and the pile foundation 5. The lifting mechanism and the settlement monitoring module are both connected to the control module in communication, and the control module can control the lifting mechanism to rise or fall vertically. The settlement monitoring module is used to monitor the settlement of the roadbed 1 above the support plate 6, and send a signal to the control module; the control module receives the signal transmitted by the settlement monitoring module to obtain the monitored settlement information, and when the settlement exceeds the set range, the control module sends an instruction to enable the lifting mechanism to lift the support plate 6. Exemplarily, the setting range is less than or equal to 10 cm. When the settlement monitored by the settlement monitoring module is higher than 10 cm, the control module controls the lifting mechanism to lift the support plate 6 to support the roadbed 1 and prevent the roadbed 1 from settling. In other embodiments, the above setting range is selected according to the design requirements of the actual construction section, and is not specifically limited here.
[0057] For example, in this embodiment, a hydraulic jack is selected as a lifting mechanism, which can provide a sufficiently large lifting force and is easy to realize intelligent control, and a PLC controller is selected as a control module. The settlement monitoring module includes a displacement sensor, and a monitoring point is set on the road surface. The displacement sensor is set at the monitoring point to monitor the vertical displacement of the road surface, that is, the settlement of the roadbed 1; the PLC controller is connected to the displacement sensor in communication, and can receive the signal of the displacement sensor to collect the settlement of the roadbed 1 at the observation point; when the settlement of the roadbed 1 collected by the PLC controller is higher than 10cm, it will send a command to control the hydraulic jack to lift the support plate 6 to provide support force for the roadbed 1 to prevent the roadbed 1 from settling.
[0058] Optionally, a grid reinforcement plate is laid on the top surface of the support plate 6, and the grid reinforcement plate is buried in the soil layer of the roadbed 1. The grid reinforcement plate can effectively restrain the lateral displacement of the soil, enhance the stability of the soil layer, further play a supporting role, evenly distribute the upper layer load, improve stability, and greatly enhance the bearing capacity of the foundation.
[0059] Optionally, in the construction of roads, railways, etc., geogrids are usually selected as grid reinforcement plates to enhance the strength of the roadbed 1. Commonly used geogrids include plastic geogrids, steel-plastic geogrids, glass fiber geogrids, and polyester warp-knitted polyester geogrids. For example, in this embodiment, the grid reinforcement plate selected is steel-plastic geogrids. Steel-plastic geogrids are square or rectangular mesh materials made of high-strength reinforced geotextiles formed by extrusion and compounding of specially treated high-strength steel wires (or other fibers) and polyethylene (or polypropylene).
[0060] In other embodiments, other types of grille reinforcement plates may be selected according to specific needs.
[0061] The construction process of the road system provided in this embodiment is as follows:
[0062] S1. Level the construction site before construction;
[0063] S2, excavating the foundation pit of tunnel 2, and constructing the supporting structure 3 according to the design elevation of the supporting structure 3;
[0064] S3, after the support structure 3 is completed, the main structure of the tunnel 2 is constructed, and after the construction is completed and inspected to be qualified, the lime soil is filled to the first elevation; the first elevation is the ground elevation before excavation;
[0065] S4, construct the prestressed pipe pile 51 and the pile cap 52 at the top, so that the upper end of the prestressed pipe pile 51 is embedded in the pile cap 52 by 50mm-100mm, and the prestressed pipe pile 51 is pre-pressed as required;
[0066] After the construction of S5 and pile foundation 5 is completed, the viaduct bridge foundation 4 is constructed;
[0067] S6. After the construction of the viaduct foundation 4 is completed and passed the inspection, fill the soil and level it to the first elevation; the first elevation is flush with the supporting structure 3 and the pile foundation 5;
[0068] S7, laying a support plate 6 on the top surface of the pile foundation 5, with one end of the support plate 6 overlapping the supporting structure 3, and the other end overlapping the leveled gray soil above the viaduct foundation 4;
[0069] S8. Fill the soil to the second elevation; the second elevation is the design elevation of roadbed 1.
[0070] It should be noted that the initial support of the foundation pit of the tunnel 2 may not be removed in the later construction and may be used as the support structure 3. Alternatively, the initial support of the tunnel 2 may be removed and then a suitable support structure 3 may be re-set according to actual needs. In this embodiment, lime soil is selected as the filler of the roadbed 1. The lime soil has a small bulk density and can reduce the additional load, thereby reducing the load borne by the roadbed 1, which is beneficial to preventing the roadbed 1 from producing uneven settlement.
[0071] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A road system, characterized in that: include: Roadbed (1); A tunnel (2) located in the soil layer below the roadbed (1); An elevated bridge foundation (4) is located in the soil layer below the roadbed (1) and is spaced apart from the tunnel (2); A supporting structure (3), the supporting structure (3) being arranged on a side of the tunnel (2) close to the viaduct foundation (4); A pile foundation (5) is located between the supporting structure (3) and the viaduct foundation (4), and the lower end of the pile foundation (5) is inserted into the soil layer; A support plate (6) is arranged on the top surface of the pile foundation (5) and supported below the roadbed (1); one end of the support plate (6) overlaps the support structure (3), and the other end at least partially overlaps with the viaduct foundation (4) along the vertical projection.
2. The road system according to claim 1, characterized in that: The pile foundation (5) is flush with the top surface of the supporting structure (3), and the side surface of the supporting structure (3) close to the tunnel (2) is flush with one end of the supporting plate (6).
3. The road system according to claim 1, characterized in that: The top surface of the viaduct foundation (4) is lower than the top surface of the pile foundation (5), so that a fill gap is formed between the plane where the support plate (6) is located and the viaduct foundation (4).
4. The road system according to claim 1, characterized in that: A plurality of pile foundations (5) are evenly distributed along the width direction of the roadbed (1).
5. The road system according to claim 4, characterized in that: The pile foundation (5) comprises a prestressed pipe pile (51) and a pile cap (52), wherein the lower end of the prestressed pipe pile (51) is inserted into the soil layer, the pile cap (52) is connected to the top of the prestressed pipe pile (51) and supported below the support plate (6), and the cross-sectional area of the pile cap (52) is greater than the cross-sectional area of the prestressed pipe pile (51).
6. The road system according to claim 5, characterized in that: The center distance between two adjacent prestressed pipe piles (51) is 2.3m-3.0m.
7. The road system according to any one of claims 1 to 6, characterized in that: The support plate (6) comprises a steel mesh (61) and a concrete structure (62), wherein the steel mesh (61) is centrally arranged in the concrete structure (62) along the thickness direction of the concrete structure (62).
8. The road system according to any one of claims 1 to 6, characterized in that: A limiting protrusion is provided on one of the top surface of the pile foundation (5) and the bottom surface of the support plate (6), and a limiting groove is provided on the other, and the limiting protrusion is clamped in the limiting groove.
9. The road system according to any one of claims 1 to 6, characterized in that: The road system comprises a lifting mechanism, a settlement monitoring module and a control module. The lifting mechanism is arranged between the support plate (6) and the supporting structure (3), and between the support plate (6) and the pile foundation (5). The lifting mechanism and the settlement monitoring module are both in communication connection with the control module. The settlement monitoring module is used to monitor the settlement of the roadbed (1) above the support plate (6). When the settlement exceeds a set range, the control module controls the lifting mechanism to lift the support plate (6).
10. The road system according to any one of claims 1 to 6, characterized in that: The road system further comprises a grid reinforcement plate, which is laid on the top surface of the support plate (6) and buried in the roadbed (1).