Temporary arch bridge support splicing and positioning device

By designing the temporary bracket splicing positioning device of the arch bridge, welded connections and bolt fixing of the fixing plate, waist plate and positioning plate, the problem of difficulty in controlling the splicing spacing of the column is solved, and efficient and low-cost bracket installation is achieved.

CN222100627UActive Publication Date: 2024-12-03THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420496277.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-12-03
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

During the installation of steel structure arch bridges, the column height is high and the body shape and weight are different, which makes it difficult to accurately control the splicing spacing. The existing methods require a lot of labor and materials, which increases construction costs and construction periods.

Method used

A temporary bracket splicing positioning device for arch bridges is designed, including fixing plates, waist plates and positioning plates. The precise control and flexible fixing of bracket spacing are achieved through welding connection and bolt holes are set.

Benefits of technology

It effectively improves the accuracy of bracket spacing during welding, reduces control time, reduces construction costs, and improves construction efficiency and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100627U_ABST
    Figure CN222100627U_ABST
Patent Text Reader

Abstract

The utility model provides an arch bridge temporary support splicing positioning device, which relates to the technical field of arch bridge temporary support splicing and comprises a fixing plate, waist plates are arranged at the lower ends of the two sides of the fixing plate, a positioning plate is arranged at the upper end of the fixing plate, and the positioning plate is arranged to be an equilateral right triangle. The positioning device is simple in structure, low in cost and very convenient to manufacture and dismantle, and a plurality of positioning devices can be manufactured at the same time for modular construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of temporary bridge support splicing, in particular to a temporary arch bridge support splicing positioning device. Background Art

[0002] In recent years, steel structure bridges have been widely used, especially steel structure arch bridges. When installing steel box arch bridges, temporary brackets need to be assembled and welded at the construction site. Due to the high height of the columns, they are often pre-welded and assembled on the ground, and then fixed to the foundation by segmented hoisting. Due to the different shapes and weights of the columns, it takes a long time to control the splicing spacing of the columns and it is difficult to ensure the accuracy. Level rulers and laser levels are usually used to control the accuracy, but this method requires a lot of labor and materials, and also has a great impact on the construction period, increasing the construction cost. Summary of the invention

[0003] In view of the above-mentioned prior art, the utility model proposes a temporary support splicing and positioning device for an arch bridge.

[0004] The utility model provides a temporary support splicing and positioning device for an arch bridge, comprising a fixing plate, waist plates are arranged at the lower ends of both sides of the fixing plate, a positioning plate is arranged at the upper end of the fixing plate, and the positioning plate is arranged in an equilateral right triangle.

[0005] Preferably, a plurality of bolt holes are provided on the waist plate.

[0006] Preferably, the fixing plate and the waist plate have the same length.

[0007] Preferably, the fixing plate, waist plate and positioning plate are all made of Q235 steel plates, and the thickness is 1 cm.

[0008] Preferably, the fixing plate and the waist plate are both configured to be rectangular.

[0009] Preferably, the fixing plate, waist plate and positioning plate are all connected by welding.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] 1. The utility model provides a temporary support splicing and positioning device for an arch bridge, which effectively controls the spacing accuracy of the supports during welding, effectively reduces the time for controlling the support spacing during welding, can be fixed at any time by tightening or loosening the bolts, has high flexibility, and can be moved and fixed according to different support spacings.

[0012] 2. The utility model has a simple structure, low cost, and is easy to manufacture and dismantle. Multiple positioning devices can be manufactured at the same time for modular construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a front view of the temporary support splicing and positioning device for an arch bridge in an embodiment of the utility model.

[0014] Figure 2 It is a side view of the temporary support splicing and positioning device for an arch bridge in an embodiment of the utility model.

[0015] Figure 3 It is an application schematic diagram of the temporary support splicing and positioning device for an arch bridge in an embodiment of the utility model.

[0016] In the figure: 1. fixing plate; 2. waist plate; 3. positioning plate; 4. hexagonal bolt; 5. steel pipe bracket. DETAILED DESCRIPTION

[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.

[0018] Example: Figure 1 , 2 The temporary support splicing and positioning device for an arch bridge shown in the figure comprises a fixing plate 1, the lower ends of both sides of the fixing plate 1 are welded with waist plates 2 in the vertical direction, the middle part of the upper end of the fixing plate 1 is welded with a positioning plate 3 in the vertical direction, the positioning plate 3 is arranged in an equilateral right triangle, and the waist plate 2 is provided with two symmetrical bolt holes.

[0019] Among them, the materials of the fixed plate 1, waist plate 2 and positioning plate 3 are all Q235 steel plates with a thickness of 1 cm. The side length of the positioning plate 3 is 30 cm, the length of the waist plate 2 is 30 cm, the width is 8 cm, and the length of the fixed plate 1 is 30 cm, and the width is 12 cm.

[0020] like Figure 3 As shown, in the specific application of this embodiment, three rectangular steel plates are welded to form a channel steel shape, and then the triangular steel plate is fixed to the middle position of the upper end of the fixing plate 1 by welding, and holes are opened on the waist plates 2 on both sides according to the size of the bolts, and the nuts of the hexagonal bolts 4 are welded to the holes, and then placed in the square wood laying position, and the device is fixed by tightening the hexagonal bolts 4; after fixing one side, the steel pipe bracket 5 is placed against the right-angled side of the positioning plate 3, and then the other side is fixed, and then the spacing distance is released on the square wood according to the spacing of the steel pipe bracket 5, the positioning device is fixed, and then the steps are repeated to fix the steel pipe bracket 5 on the other side.

[0021] The above are only implementation methods of the present utility model, and are not intended to limit the patent scope of the present utility model. Any equivalent structure made using the contents of the specification and drawings of the present utility model, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present utility model.

Claims

1. A temporary support splicing and positioning device for an arch bridge, characterized in that: It comprises a fixing plate, the lower ends of both sides of the fixing plate are provided with waist plates, the upper end of the fixing plate is provided with a positioning plate, and the positioning plate is arranged in an equilateral right triangle.

2. The temporary support splicing and positioning device for an arch bridge as claimed in claim 1, characterized in that: The waist plate is provided with a plurality of bolt holes.

3. The temporary support splicing and positioning device for an arch bridge as claimed in claim 1 or 2, characterized in that: The fixing plate and the waist plate have the same length.

4. The temporary support splicing and positioning device for an arch bridge as claimed in claim 1 or 2, characterized in that: The fixing plate, waist plate and positioning plate are all made of Q235 steel plates with a thickness of 1 cm.

5. The temporary support splicing and positioning device for an arch bridge as claimed in claim 1 or 2, characterized in that: The fixing plate and the waist plate are both configured in a rectangular shape.

6. The temporary support splicing and positioning device for an arch bridge as claimed in claim 1 or 2, characterized in that: The fixing plate, waist plate and positioning plate are all connected by welding.