High-safety formwork-removal-free construction device for high pier partition plate construction
By using a mold-free construction device with a combination of foam plates and steel bar main beams in the construction of large bridges, the problems of long construction cycles and safety risks in traditional construction methods are solved, and efficient and safe cross-dividing plate construction is achieved.
Patent Information
- Application Number
- CN202420711035.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional cross-dividing plate construction technology has problems such as long construction cycle, waste of materials, safety risks of high-altitude operations and confined space operations, and is especially difficult to effectively solve in the construction of large-span bridges.
Use foam board as the base mold, and combine the steel bar main beam and PVC pipe to form a removable steel bar main beam bracket, erect a high-density foam core mold, and combine it with the main beam removal tool of the partition board to achieve the construction of formwork without removal, reducing material waste and Construction risk.
It effectively shortens the construction cycle of cross-dividing plates, reduces the risks of high-altitude operations and confined space operations for construction personnel, and improves construction safety and efficiency.
Smart Images

Figure CN222100637U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of hollow pier partitions, and in particular relates to a high-safety mold removal-free construction device for high pier partition construction. Background Art
[0002] With the rapid development of domestic highway construction, hollow thin-walled high piers are increasingly used in the design of large-span bridges in complex terrain. The main function of the diaphragm is to limit the lateral deformation of the high hollow pier wall and enhance the stability of the pier body. The traditional diaphragm construction process mostly uses the steel bracket method, which requires stopping at the position of the armpit chamfer under the diaphragm to construct the diaphragm separately. The construction period of each diaphragm is about 5 to 6 days, which is a long construction period. In addition, it is difficult to remove the diaphragm formwork bracket due to limited space, high-altitude operations, welding operations and other conditions. The construction difficulty and safety risks are relatively large.
[0003] Tongmu River Bridge is located on the Congjiang-Rong'an-Lipu Highway (Rong'an via Yongfu to Yangshuo), with pile numbers of ZK34+427~ZK35+476 / K34+445~K35+496m, a total length of 1050m, the highest pier of the main pier is 96m, and the bridge deck height is 108m. One of the difficulties in the construction of this bridge is the construction of the rectangular hollow pier partition formwork, which poses safety risks in high-altitude operations and confined space operations. The current traditional methods are mainly steel support method and prefabricated plate bottom formwork method.
[0004] (1) Steel support method
[0005] This method uses 90cm 14# I-beams in pier construction, which are placed and fixed on the pier as the main beam, and a 60cm steel pipe rack and partition are set up on the steel. This method has a stable structure and a construction period of about 7 to 8 days. It is extremely difficult to dismantle in the later stage and wastes materials.
[0006] (2) Prefabricated slab bottom formwork method
[0007] During construction, part of the lower arm chamfer is cast in advance, and a 12cm reinforced concrete precast slab is prefabricated. The precast slab is placed on the lower arm chamfer cast in advance, and the steel bars are tied and the partition concrete is cast. The construction period is about 6 to 7 days. The arm chamfer cannot be cast in one time, and the size of the reinforced concrete slab needs to be strictly controlled, which wastes materials.
[0008] Therefore, it is necessary to provide a new high-pier diaphragm construction device with high safety and free formwork removal to solve the above technical problems. Utility Model Content
[0009] The technical problem solved by the utility model is to provide a high-safety formwork-free construction device for high pier partition construction that uses a foam board as a bottom formwork to save materials and can achieve the purpose of not needing to remove the formwork simply by pulling out steel bars, thereby reducing the risks of construction workers working at heights and in confined spaces.
[0010] In order to solve the above technical problems, the utility model provides a high-safety formwork-free construction device for high-pier diaphragm construction, which includes: a device body and a diaphragm main beam removal tool, wherein the device body includes:
[0011] Rectangular hollow pier;
[0012] A plurality of PVC pipes, wherein the plurality of PVC pipes are arranged in a rectangular hollow pier;
[0013] A steel bar main beam, wherein a plurality of steel bars are arranged in a through-and-through manner in a PVC pipe to form a steel bar main beam, and a plurality of steel bar main beams form a steel bar main beam bracket, and a high-density foam core mold is laid on the steel bar main beam bracket;
[0014] The partition main beam removal tool includes: a steel bar main beam, one end of which is provided with a rolled rib-stripping straight thread sleeve, and a straight thread sleeve is reserved at the threaded end of the steel bar main beam; a short steel bar is correspondingly provided at the other end of the straight thread sleeve, one end of the short steel bar is provided with a steel bar handle, and the other end is provided with a corresponding straight thread sleeve corresponding to the straight thread sleeve. A high-density foam core mold, the high-density foam core mold is arranged in a rectangular hollow pier, and the bottom of the high-density foam core mold contacts the outer walls of multiple PVC pipes.
[0015] As a further solution of the utility model, a concrete casting body is provided on the top of the high-density foam core mold.
[0016] As a further solution of the present invention, the diameter of the steel bars is 32 mm, and the spacing between the steel bars is 20 cm.
[0017] As a further solution of the utility model, the diameter of the PVC pipe is 50 mm, and the height of the high-density foam core mold is 60 centimeters.
[0018] As a further solution of the utility model, the foam core comprises module one and module two, and the joint between module one and module two is a tongue-and-groove joint.
[0019] Compared with the related art, the high-safety formwork-free construction device for high-pier partition construction provided by the utility model has the following beneficial effects:
[0020] 1. The utility model adopts the foam core mold construction technology in the construction of high piers of bridges, effectively shortens the construction period of diaphragms, and solves the problems of difficulty and slow construction speed of hollow thin-walled high pier diaphragms.
[0021] 2. The partition main beam removal tool can effectively remove the steel main beam to ensure the stability of the bridge pier during removal. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings.
[0023] Figure 1 This is a large-scale drawing of the installation of the foam core mold of the hollow pier diaphragm of the utility model;
[0024] Figure 2 It is a schematic diagram of a hollow pier diaphragm main beam removal tool of the utility model;
[0025] Figure 3 This is the foam core mold module sample of the hollow pier diaphragm of the utility model Figure 1 ;
[0026] Figure 4 This is the foam core mold module sample of the hollow pier diaphragm of the utility model Figure 2 .
[0027] In the figure: 1. Rectangular hollow pier; 11. Module one; 12. Module two; 2. Foam core mold; 3. Steel bar main beam; 31. Straight thread sleeve; 32. Straight thread sleeve; 33. Short steel bar; 34. Steel bar handle; 4. PVC pipe. DETAILED DESCRIPTION
[0028] Please refer to Figure 1 , Figure 2 and Figure 3 ,in, Figure 1 This is a large-scale drawing of the installation of the foam core mold of the hollow pier diaphragm of the utility model; this is a schematic diagram of the removal tool of the main beam of the hollow pier diaphragm of the utility model; Figure 3 This is the foam core mold module sample of the hollow pier diaphragm of the utility model Figure 1 ; Figure 4 This is the foam core mold module sample of the hollow pier diaphragm of the utility model Figure 2 A high-safety, formwork-free construction device for high-pier partition construction comprises: a rectangular hollow pier 1;
[0029] A plurality of PVC pipes 4, wherein the plurality of PVC pipes 4 are all arranged in the rectangular hollow pier 1;
[0030] A steel bar main beam 3, wherein a plurality of steel bars are arranged in a through-through manner in a PVC pipe 4 to form a steel bar main beam 3, and a plurality of steel bar main beams 3 form a steel bar main beam 3 bracket, and a high-density foam core mold 2 is laid on the steel bar main beam 3 bracket;
[0031] The partition main beam removal tool comprises: a steel bar main beam 3, one end of which is provided with a rolled rib-stripping straight thread sleeve 32, and a straight thread sleeve 31 is reserved at the threaded end of the steel bar main beam 3; a short steel bar 33 is correspondingly provided at the other end of the straight thread sleeve 31, one end of the short steel bar 33 is provided with a steel bar handle 34, and the other end is provided with a corresponding straight thread sleeve 32 corresponding to the straight thread sleeve 31. A high-density foam core mold 2, which is arranged in a rectangular hollow pier 1, and the bottom of the high-density foam core mold 2 contacts the outer wall of a plurality of PVC pipes 4.
[0032] A concrete casting body is arranged on the top of the high-density foam core mold 2 .
[0033] The diameter of the steel bar main beam 3 is 32 mm, and the spacing between the steel bars is 20 cm.
[0034] The diameter of the PVC tube 4 is 40 mm, and the height of the high-density foam core mold 2 is 60 cm.
[0035] The specific implementation method of this utility model:
[0036] When pouring the pier body concrete in the mold in front of the diaphragm, control the pier body surface elevation, which should not exceed the bottom of the chamfer under the diaphragm, and install the diaphragm chamfer steel bars in advance according to the design drawings.
[0037] 4cm below the transverse partition in the long side direction of the pier, four φ50PVC pipes are reserved with a spacing of 30cm for passing through three holes for the reinforced main beam.
[0038] The steel bar main beam 3 uses φ30 steel bars, one end of which is rolled and stripped with a straight thread 32. The thread length is 3.5 cm, and the steel bar cutting length is the short side size of the pier body minus 2 cm to avoid affecting the climbing formwork. At the same time, a straight thread sleeve 31 is reserved at the threaded end of the steel bar main beam 3 so that it can be rotated out of the PVC pipe 4 after the formwork is removed.
[0039] The steel main beam 3 is penetrated into the pier body at a spacing of 20 cm, and the end of the steel main beam 3 does not exceed the concrete surface of the pier body to ensure that it does not affect the template reinforcement.
[0040] After the reinforcement main beam 3 bracket is laid, a customized 60cm thick foam core mold 2 is laid on the main beam bracket. The foam core mold 2 is divided into two types, module 1 11 and module 2 12. The width of a single foam core mold 2 is 2.2m. During installation, first install module 1 1 at both ends. After module 1 11 is installed, install module 2 12 and fix it on the reinforcement main beam 3 with wire to ensure that it does not move.
[0041] After the bottom formwork is laid and accepted, all steel bars are processed and formed in the processing yard according to the design drawings, transported to the site by flatbed trucks, moved into the partitions by tower cranes for installation, and the steel bars are tied strictly in accordance with the requirements of the design drawings.
[0042] After the reinforcement is tied and accepted by the supervisor, the climbing formwork is raised as required to reinforce the inner and outer formwork of the pier.
[0043] After the template is accepted by the supervision engineer, the concrete is poured. 3 The concrete mixer truck is transported to the bottom of the pier column, and then transported vertically into the warehouse by a tower crane, and manually vibrated to compact. To avoid displacement of the foam core board, the pouring sequence should be symmetrical from the middle to both sides, and the slump should be strictly controlled between 90 and 120 mm.
[0044] After the concrete pouring is completed, it shall be watered and cured together with the pier body, and the curing time shall not be less than 7 days.
[0045] After the construction of the diaphragm is completed and the concrete strength reaches 75% of the design strength, the climbing formwork climbs to the upper section to remove the steel beam 3. The upper main beam removal tool is rotated on the steel beam 3 to rotate the steel beam 3 out of the reserved PCV pipe hole. In order to ensure construction safety, the foam core formwork 2 will not be removed.
[0046] After the steel beam 3 is removed, the reserved opening of the pier body when installing the steel beam 3 at the lower part of the diaphragm is sealed with micro-expansion mortar with the same strength as the pier body. Before construction, the reserved hole is roughened with a small electric hammer, the PVC pipe 4 in the hole is removed, water is poured to moisten it, and the reserved hole is sealed.
[0047] Furthermore, the high-density foam core mold 2 is fixed with wire, and the slump of the concrete is strictly controlled when pouring the diaphragm concrete. After the pouring of the diaphragm concrete is completed, the pier body concrete is poured. When the pier body concrete is vibrated, the pouring time and the vibration position are strictly controlled.
[0048] Furthermore, the foam core mold 2 used for the diaphragm is a 60 cm customized high-density foam core mold 2 to ensure sufficient strength and flatness. At the same time, the foam core mold 2 is made into a tongue-and-groove joint to prevent construction workers from stepping on empty space at the joint and concrete leakage during pouring. The foam core mold 2 needs to be tied to the steel main beam 3 with iron wire to prevent the core mold from floating upward during concrete pouring and affecting the quality of concrete pouring.
[0049] Furthermore, during concrete pouring, the layer thickness is strictly controlled to be no more than 30 cm, and the discharge height is no more than 0.5 m, so as to reduce the impact force of the concrete discharge on the foam core mold 2. The concrete pouring sequence is symmetrical pouring from the center of the partition to both sides of the long side to ensure the stability of the partition during the concrete pouring process.
[0050] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;
[0051] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.
[0052] Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations or direct or indirect applications may be made to these embodiments without departing from the principles and spirit of the present invention. In other related technical fields, the scope of the present invention is defined by the attached claims and their equivalents, which are equally included in the scope of patent protection of the present invention.
Claims
1. A highly safe, mold-free construction device for high pier partition construction. It is characterized in that It includes: a device body and a partition main beam removal tool, and the device body includes: Rectangular hollow pier; A plurality of PVC pipes, wherein the plurality of PVC pipes are arranged in a rectangular hollow pier; A steel bar main beam, wherein a plurality of steel bars are arranged in a through-and-through manner in a PVC pipe to form a steel bar main beam, and a plurality of steel bar main beams form a steel bar main beam bracket, and a high-density foam core mold is laid on the steel bar main beam bracket; The partition main beam removal tool includes: a steel bar main beam, one end of which is provided with a rolled and stripped straight thread sleeve, and a straight thread sleeve is reserved at the threaded end of the steel bar main beam; a short steel bar is correspondingly provided at the other end of the straight thread sleeve, and a steel bar handle is provided at one end of the short steel bar, and a corresponding straight thread sleeve is provided at the other end corresponding to the straight thread sleeve.
2. The high-safety, formwork-free construction device for high-pier diaphragm construction according to claim 1 is characterized in that: A concrete casting body is arranged on the top of the high-density foam core mold.
3. The high-safety formwork-free construction device for high-pier diaphragm construction according to claim 1 is characterized in that: The diameter of the steel bars is 32 mm, and the spacing between the steel bars is 20 cm.
4. The high-safety formwork-free construction device for high-pier diaphragm construction according to claim 1 is characterized in that: The diameter of the PVC pipe is 50 mm, and the height of the high-density foam core mold is 60 cm.
5. The high-safety formwork-free construction device for high-pier diaphragm construction according to claim 1 is characterized in that: The foam core mold comprises module one and module two, and the joint between module one and module two is a tongue-and-groove joint.