Modularized prefabricated micro pile

Through the design of modular prefabricated micro piles, the combined structure of prefabricated bearings and pipe piles is used to achieve rapid and environmentally friendly construction of the pile foundation of the transmission tower, solving the problems of ground damage and environmental pollution in traditional construction methods, and improving construction efficiency and security.

CN222100815UInactive Publication Date: 2024-12-03SUIZHOU POWER SUPPLY COMPANY STATE GRID HUBEI ELECTRIC POWER +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420658431.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The construction of traditional transmission tower pile foundations requires large drilling equipment, resulting in serious ground damage, long construction period, high labor intensity for workers and large environmental pollution, and it is difficult to implement in complex terrain and remote areas.

Method used

A modular prefabricated micro pile, including prefabricated support and prefabricated pipe piles, was designed, prefabricated and transported to the site through the factory, and was installed in holes and fixed, and finally the pile bottom grouting fills the gap, avoiding large drilling Use of hole equipment.

Benefits of technology

It has achieved rapid construction, reduced surface damage, reduced environmental pollution and labor intensity for workers, shortened construction cycle and cost, and is suitable for transmission towers of different specifications and sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100815U_ABST
    Figure CN222100815U_ABST
Patent Text Reader

Abstract

The modularized prefabricated miniature pile comprises a prefabricated bearing platform and prefabricated pipe piles, the bottom ends of the prefabricated pipe piles perpendicularly penetrate through the prefabricated bearing platform, the top ends of the prefabricated pipe piles are fixed to the prefabricated bearing platform, a plurality of foundation bolts used for fixing a power transmission tower foundation are embedded in the middle of the prefabricated bearing platform, and the prefabricated pipe piles are arranged around the foundation bolts in the middle of the prefabricated bearing platform at intervals; the top end of the prefabricated pipe pile is detachably fixed to the prefabricated bearing platform through a pipe pile fixing structure, a grouting hole communicating with an axial pipe hole of the prefabricated pipe pile is formed in the pipe pile fixing structure, and a grouting head communicating with the axial pipe hole of the prefabricated pipe pile and used for grouting the pile side of the prefabricated pipe pile is fixed to the bottom end of the prefabricated pipe pile. A plurality of pipe pile positioning holes corresponding to the prefabricated pipe piles are formed in the prefabricated bearing platform, steel jackets are coaxially prefabricated and fixed to the inner walls of the pipe pile positioning holes, and protrusions fixed to the hole walls of the pipe pile positioning holes are arranged on the surfaces of the outer walls of the steel jackets. The miniature pile does not need to be operated by a large drilling machine tool, and damage to the earth surface is small.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of transmission and transformation engineering, in particular to a modular prefabricated micro pile. Background Art

[0002] The transmission network is an important part of the power system. It is mainly responsible for transmitting the electricity produced by large power plants to various cities, regions and substations through high-voltage transmission lines over long distances. Transmission towers are the basis for the long-distance layout of high-voltage transmission lines in the transmission network. In order to ensure the stable installation of transmission towers, pile foundation construction of transmission towers is required in advance. Traditional pile foundation construction requires drilling with a drilling machine, on-site binding and welding of steel bars and pouring of concrete.

[0003] With the development of my country's economy, the scope of the power transmission network is also expanding. However, due to the complex and changeable terrain of my country, limited transportation conditions in remote areas and high road construction costs, on-site drilling construction with huge large-scale drilling equipment is difficult to achieve. In addition, on-site poured concrete is prone to quality defects, large amounts of earth and stone excavation on site, serious surface damage, long construction period, high labor intensity of workers and severe environmental pollution.

[0004] Therefore, there is an urgent need for a modular prefabricated micro pile that is fast to construct, does not require large-scale drilling equipment, causes little damage to the ground surface, has a short construction period, has low labor intensity for workers, and has little environmental pollution. Utility Model Content

[0005] The purpose of the utility model is to solve the shortcomings of the above-mentioned background technology and provide a modular prefabricated micro pile which has fast construction, does not require large-scale drilling equipment, has little damage to the ground surface, has a short construction period, has low labor intensity for workers and has little environmental pollution.

[0006] To achieve this purpose, the modular prefabricated micro pile designed by the utility model comprises a prefabricated cap and a prefabricated pipe pile whose bottom end vertically passes through the prefabricated cap and whose top end is fixed to the prefabricated cap, wherein a plurality of anchor bolts for fixing the foundation of the transmission tower are pre-buried in the middle of the prefabricated cap, and the prefabricated pipe piles are arranged at intervals around the plurality of anchor bolts in the middle of the prefabricated cap; the top of the prefabricated pipe pile is detachably fixed to the prefabricated cap by a pipe pile fixing structure, a grouting hole connected to the axial pipe hole of the prefabricated pipe pile is provided on the pipe pile fixing structure, a grouting head connected to the axial pipe hole of the prefabricated pipe pile and used for grouting the pile side of the prefabricated pipe pile is fixed at the bottom end of the prefabricated pipe pile, a plurality of pipe pile positioning holes corresponding to the prefabricated pipe piles are provided in the prefabricated cap, a steel sheath is coaxially prefabricated and fixed on the inner wall of the pipe pile positioning hole, and a protrusion fixed to the hole wall of the pipe pile positioning hole is provided on the outer wall surface of the steel sheath.

[0007] Preferably, the number of the prefabricated pipe piles is two, four or eight.

[0008] Furthermore, the prefabricated foundation is a single-layer structure or a multi-layer structure.

[0009] Furthermore, the single-layer structure includes a prefabricated pedestal seat with a flat top surface, and a plurality of the anchor bolts are pre-embedded in the middle of the prefabricated pedestal seat.

[0010] Furthermore, the multi-layer structure includes at least two layers of prefabricated pedestal columns and prefabricated pedestal bases arranged up and down, the prefabricated pedestal columns are fixedly connected to the center of the top surface of the prefabricated pedestal base, the prefabricated pedestal columns and the prefabricated pedestal base are an integrated structure, and a plurality of the anchor bolts are embedded in the prefabricated pedestal columns.

[0011] Furthermore, the pipe pile fixing structure includes a fixing plate which is arranged perpendicular to the axial direction of the prefabricated pipe pile and fixed to the top of the prefabricated pipe pile, the grouting hole is opened in the middle of the fixing plate, the top of the prefabricated pipe pile is coaxially arranged in the steel jacket, and there is a gap for grouting between the inner surface of the steel jacket and the outer surface of the top of the prefabricated pipe pile.

[0012] Furthermore, a plurality of stiffening plates vertically connected to each other are provided on the top surface of the fixing plate, and the stiffening plates are arranged along the length direction or the width direction of the fixing plate.

[0013] Furthermore, a plurality of threaded sleeves having internal threads and having top surfaces flush with the top surfaces of the pipe pile positioning holes are prefabricated and fixed at intervals on the top circumferential outer surface of the steel jacket, and the fixing plate is fixed to the prefabricated foundation by bolts and the threaded sleeves.

[0014] Furthermore, the pipe pile fixing structure also includes a plurality of embedded steel bars which are arranged between the prefabricated pipe pile and the steel sheath and are evenly spaced along the circumferential direction of the prefabricated pipe pile, the top ends of the embedded steel bars vertically passing through and being fixed on the fixing plate, and the bottom ends of the embedded steel bars extend to below the steel sheath.

[0015] Furthermore, the inner wall surface of the steel sheath is provided with protrusions.

[0016] The beneficial effects of the utility model are as follows: the micro piles designed by the utility model are prefabricated in the factory, and the micro piles can be constructed by transporting the prefabricated cap to the construction area, first drilling and installing the prefabricated cap, then hoisting the prefabricated pipe pile to the prefabricated cap for fixing, and finally grouting the pile bottom to fill the gap between the prefabricated pipe pile and the soil around the pile. No large-scale drilling equipment is required, less damage to the surface, less pollution to the environment, and less labor intensity for workers. Modular micro piles of different specifications, sizes and structures can be prefabricated for different transmission towers, which greatly shortens the construction period and construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a top view of a prefabricated cap of a micro pile with two prefabricated pipe piles in the utility model;

[0018] Figure 2 It is a vertical cross-sectional view of a micropile with two prefabricated pipe piles in the utility model;

[0019] Figure 3 It is a top view of the fixing structure of the fixing plate and the prefabricated pipe pile in the utility model;

[0020] Figure 4 It is a top view of a fixing plate with a stiffening plate arranged on the surface in the utility model;

[0021] Figure 5 A top view of a prefabricated cap of a micro pile having four prefabricated pipe piles in the utility model;

[0022] Figure 6 A top view of a micro pile with four prefabricated pipe piles in the utility model;

[0023] Figure 7 A vertical cross-sectional view of a micropile having four prefabricated pipe piles in the utility model;

[0024] Figure 8 A top view of a prefabricated cap of a micro-pile having eight prefabricated pipe piles in the utility model;

[0025] Fig. 9 A top view of a micro pile with eight prefabricated pipe piles in the utility model;

[0026] Fig.10 A vertical cross-sectional view of a micropile having eight prefabricated pipe piles in the utility model;

[0027] Fig.11 It is a top view of the fixing structure of the middle channel steel and the embedded steel bars of the utility model;

[0028] Fig.12 It is a front view of the fixed connection between the embedded steel bars and the steel bar connecting plate in the utility model;

[0029] Fig.13 It is a top view of the fixed connection between the embedded steel bars, prefabricated pipe piles and channel steels in the utility model;

[0030] Fig.14 It is a vertical cross-sectional view of the fixed connection between the embedded steel bars, the prefabricated pipe piles and the channel steel in the utility model;

[0031] Among them, 1—prefabricated cap (1.1—prefabricated cap seat, 1.2—prefabricated cap base, 1.3—prefabricated cap column), 2—prefabricated pipe pile, 3—anchor bolt, 4—grouting hole, 5—grouting head, 6—fixing plate, 7—steel sheath, 8—stiffening plate, 9—embedded bolt, 10—threaded sleeve, 11—embedded steel bar, 12—embedded steel plate, 13—grouting joint (13.1—flange, 13.2—grouting joint pipe), 14—gasket, 15—connecting nut, 16—bolt hole, 17—slurry outlet hole, 18—channel steel, 19—steel connecting plate, 20—stirrup, 21—pile positioning hole. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than all the embodiments. In the description of the utility model, it should be understood that the orientation or position relationship indicated by the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.

[0033] like Figure 1 As shown in FIG. 14 , the modular prefabricated micro pile designed by the utility model comprises a prefabricated cap 1 and a prefabricated pipe pile 2 whose bottom end vertically passes through the prefabricated cap 1 and whose top end is fixed to the prefabricated cap 1. A plurality of anchor bolts 3 for fixing the foundation of the transmission tower are pre-buried in the middle of the prefabricated cap 1, and the prefabricated pipe piles 2 are arranged at intervals around the plurality of anchor bolts 3 in the middle of the prefabricated cap 1; the top of the prefabricated pipe pile 2 is detachably fixed to the prefabricated cap 1 by a pipe pile fixing structure, a grouting hole 4 connected to the axial pipe hole of the prefabricated pipe pile 2 is opened on the pipe pile fixing structure, and a grouting head 5 connected to the axial pipe hole of the prefabricated pipe pile 2 and used for grouting the pile side of the prefabricated pipe pile 2 is fixed at the bottom of the prefabricated pipe pile 2.

[0034] Example 1: Figure 1As shown in FIG. 4 , the prefabricated cap 1 is used in conjunction with two prefabricated pipe piles 2 to form a micro pile. The prefabricated cap 1 is a single-layer structure, consisting of a prefabricated cap seat 1.1. A pipe pile positioning hole 21 is respectively provided on the left and right sides of the prefabricated cap seat 1.1. A prefabricated pipe pile 2 is coaxially arranged in each pipe pile positioning hole 21. A grouting hole 4 is provided in the center of the fixing plate 6, and bolt holes are provided around it. A flange 13.1 is welded and fixed to the top surface of the prefabricated pipe pile 2. A grouting joint pipe 13.2 is welded and fixed to the flange 13.1. The grouting joint pipe 13.2 can be made of bolts: the bolts are tapped inside to form threaded holes, and the bolt surfaces are threadedly connected with the connecting nuts 15, and the bolts are fixed to the fixing plate 6. The grouting joint pipe 13.2 passes through the grouting holes 4 of the fixing plate 6. The fixing plate 6 is fixed to the prefabricated cap seat 1.1 by nuts and embedded bolts 9 provided in the prefabricated cap seat 1.1. The grouting pipe can be inserted into the inner hole of the grouting joint pipe 13.2 and threadedly connected with the grouting joint pipe 13.2, so as to ensure the grouting stability of the grouting pipe. The flange 13.1 and the grouting joint pipe 13.2 form a grouting joint 13. A steel jacket 7 is coaxially prefabricated and fixed on the inner wall of the pipe pile positioning hole 21. A protrusion fixed to the hole wall of the pipe pile positioning hole 21 is provided on the outer wall surface of the steel jacket 7 to enhance the structural strength of the connection between the steel jacket 7 and the pipe pile positioning hole 21. There is a gap for grouting between the inner surface of the steel jacket 7 and the top outer surface of the prefabricated pipe pile 2. At the same time, the inner wall surface of the steel jacket 7 is also provided with a protrusion. When the grouting gap between the inner surface of the cast-in-place steel jacket 7 and the top outer surface of the prefabricated pipe pile 2 is formed, the protrusion on the inner wall of the steel jacket 7 is tightly combined with the cast-in-place concrete, further improving the structural connection strength of the steel casing 7, and also improving the overall structural strength of the micropile, and strengthening the pull-out resistance of the micropile. The bottom end of the prefabricated pipe pile 2 is fixed with a grouting head 5 connected with the axial pipe hole of the prefabricated pipe pile 2, and the side of the grouting head 5 is provided with a grouting outlet 17. The middle part of the prefabricated pedestal seat 1.1 is pre-embedded with an embedded steel plate 12 and an anchor bolt 3, and the top of the anchor bolt 3 vertically passes through the embedded steel plate 12.

[0035] To further strengthen the structure, the fixing plate 6 in this embodiment can be made of channel steel structure or Figure 4 The reinforcement structure shown, that is, the top surface of the fixing plate 6 is provided with a plurality of stiffening plates 8 vertically connected to each other, and the stiffening plates 8 are arranged along the length direction or the width direction of the fixing plate 6.

[0036] Example 2: Figure 5As shown in FIG. 7 , the prefabricated cap 1 is used in conjunction with four prefabricated pipe piles 2 to form a micro pile. The prefabricated cap 1 is a double-layer structure, consisting of a prefabricated cap base 1.2 and a prefabricated cap column 1.3. The prefabricated cap base 1.2 is provided with four pipe pile positioning holes 21 at intervals in the circumference, and a prefabricated pipe pile 2 is coaxially arranged in each pipe pile positioning hole 21. A grouting hole 4 is provided in the center of the channel steel 18, and a bolt through hole is provided on the left and right sides respectively. A steel sheath 7 is coaxially prefabricated and fixed on the inner wall of the pipe pile positioning hole 21, and a protrusion fixed to the hole wall of the pipe pile positioning hole 21 is provided on the outer wall surface of the steel sheath 7 to enhance the strength of the connection structure between the steel sheath 7 and the pipe pile positioning hole 21. The top of the prefabricated pipe pile 2 is coaxially arranged in the steel jacket 7. There is a gap for grouting between the inner surface of the steel jacket 7 and the outer surface of the top of the prefabricated pipe pile 2. At the same time, the inner wall surface of the steel jacket 7 is also provided with a protrusion. When the grouting gap between the inner surface of the cast-in-place steel jacket 7 and the outer surface of the top of the prefabricated pipe pile 2 is formed, the protrusion of the inner wall of the steel jacket 7 is tightly combined with the cast-in-place concrete, further improving the structural connection strength of the steel jacket 7, and also improving the overall structural strength of the micropile, and strengthening the pull-out resistance of the micropile. A threaded sleeve 10 with an internal thread and a top surface flush with the top surface of the pipe pile positioning hole 21 and capable of fitting with the bottom surface of the channel steel 18 is respectively fixed on the outer surface of the left and right sides of the top of the steel jacket 7. The channel steel 18 is fixed to the prefabricated cap base 1.2 by bolts and the threaded sleeve 10. A grouting head 5 connected to the axial pipe hole of the prefabricated pipe pile 2 is fixed at the bottom end of the prefabricated pipe pile 2, and a grouting outlet 17 is opened on the side of the grouting head 5. A plurality of anchor bolts 3 are embedded in the middle of the prefabricated cap 1. The top of the anchor bolt 3 vertically passes through the prefabricated cap column 1.3, and the bottom is embedded in the prefabricated cap base 1.2.

[0037] Example 3: Figure 8As shown in FIG. 14 , the prefabricated cap 1 is used in conjunction with eight prefabricated pipe piles 2 to form a micro pile. The prefabricated cap 1 is a double-layer structure, consisting of a prefabricated cap base 1.2 and a prefabricated cap column 1.3. The prefabricated cap base 1.2 is provided with eight pipe pile positioning holes 21 at intervals in the circumference, and a prefabricated pipe pile 2 is coaxially arranged in each pipe pile positioning hole 21. A grouting hole 4 is provided in the center of the channel steel 18, and a bolt through hole is provided on the left and right sides respectively. A steel sheath 7 is coaxially prefabricated and fixed on the inner wall of the pipe pile positioning hole 21, and a protrusion fixed to the hole wall of the pipe pile positioning hole 21 is provided on the outer wall surface of the steel sheath 7 to enhance the structural strength of the connection between the steel sheath 7 and the pipe pile positioning hole 21. The top of the prefabricated pipe pile 2 is coaxially arranged in the steel jacket 7. There is a gap for grouting between the inner surface of the steel jacket 7 and the outer surface of the top of the prefabricated pipe pile 2. At the same time, the inner wall surface of the steel jacket 7 is also provided with a protrusion. When the grouting gap between the inner surface of the cast-in-place steel jacket 7 and the outer surface of the top of the prefabricated pipe pile 2 is formed, the protrusion of the inner wall of the steel jacket 7 is tightly combined with the cast-in-place concrete, further improving the structural connection strength of the steel jacket 7, and also improving the overall structural strength of the micropile, and strengthening the pull-out resistance of the micropile. A threaded sleeve 10 with an internal thread and a top surface flush with the top surface of the pipe pile positioning hole 21 and capable of fitting with the bottom surface of the channel steel 18 is respectively fixed on the outer surface of the left and right sides of the top of the steel jacket 7. The channel steel 18 is fixed to the prefabricated cap base 1.2 by bolts and the threaded sleeve 10. A grouting head 5 connected to the axial pipe hole of the prefabricated pipe pile 2 is fixed at the bottom end of the prefabricated pipe pile 2, and a grouting outlet 17 is opened on the side of the grouting head 5. A plurality of anchor bolts 3 are embedded in the middle of the prefabricated cap 1. The top of the anchor bolt 3 vertically passes through the prefabricated cap column 1.3, and the bottom is embedded in the prefabricated cap base 1.2.

[0038] like Fig.11 As shown in FIG. 14 , in order to further enhance the structural strength of the micro pile, the channel steel 18 is also fixedly connected with a plurality of embedded steel bars 11. The top ends of the embedded steel bars 11 vertically pass through and are fixed in the channel steel 18 through the steel bar connecting plate 19. The embedded steel bars 11 are fixed to the prefabricated pipe piles 2 by means of stirrups 20. The bottom ends of the embedded steel bars 11 extend to the bottom of the steel sheath 7.

[0039] The above-mentioned prefabricated micro piles all include a prefabricated cap 1 and a prefabricated pipe pile 2. The prefabricated cap 1 has the above-mentioned single-layer and double-layer structures. The fixation of the prefabricated pipe pile 2 and the prefabricated cap 1 can be achieved by a fixing plate 6, a channel steel 18 (the middle plate of the channel steel 18 can be regarded as a fixing plate 6) and a plate structure with a stiffening plate 8. The grouting joint 13 can be selectively fixed on the top of the prefabricated pipe pile 2, and the structure of the embedded steel bar 11 can also be selectively increased to improve the structural strength of the micro pile. In summary, the micro pile designed by the utility model can selectively customize the number of prefabricated pipe piles 2, the structural form of the prefabricated cap 1, and the fixing structural form of the prefabricated pipe pile 2 and the prefabricated cap 1 according to demand, forming a combination with multiple modules, and each module can be combined with each other to form different micro pile structures.

[0040] The micro pile designed by the utility model is prefabricated in the factory. The micro pile can be constructed by transporting the prefabricated cap 1 to the construction area, first drilling and installing the prefabricated cap 1, then hoisting the prefabricated pipe pile 2 to fix it in the prefabricated cap 1, and finally grouting the pile bottom to fill the gap between the prefabricated pipe pile 2 and the soil around the pile. No large-scale drilling equipment is required, less damage to the surface, less pollution to the environment, and less labor intensity for workers. Modular micro piles of different specifications, sizes and structures can be prefabricated for different transmission towers, which greatly shortens the construction period and construction cost.

[0041] Finally, it should be pointed out that the above embodiments are only representative examples of the present utility model. Obviously, the present utility model is not limited to the above embodiments, and there are many variations. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present utility model shall be considered to belong to the protection scope of the present utility model.

Claims

1. A modular prefabricated micro pile, comprising a prefabricated cap (1) and a prefabricated pipe pile (2) with a bottom end vertically passing through the prefabricated cap (1) and a top end fixed to the prefabricated cap (1), characterized in that: A plurality of anchor bolts (3) for fixing the foundation of the transmission tower are pre-buried in the middle of the prefabricated cap (1); the prefabricated pipe piles (2) are arranged at intervals around the plurality of anchor bolts (3) in the middle of the prefabricated cap (1); the top of the prefabricated pipe pile (2) is detachably fixed to the prefabricated cap (1) via a pipe pile fixing structure; the pipe pile fixing structure is provided with a grouting hole (4) connected to the axial pipe hole of the prefabricated pipe pile (2); the prefabricated pipe pile ( A grouting head (5) is fixed at the bottom end of the prefabricated pipe pile (2) and is connected to the axial pipe hole of the prefabricated pipe pile (2) and is used for grouting the pile side of the prefabricated pipe pile (2). A plurality of pipe pile positioning holes (21) corresponding to the prefabricated pipe piles (2) are opened in the prefabricated foundation (1). A steel sheath (7) is coaxially prefabricated and fixed on the inner wall of the pipe pile positioning hole (21). A protrusion fixed to the hole wall of the pipe pile positioning hole (21) is provided on the outer wall surface of the steel sheath (7).

2. The modular prefabricated micropile according to claim 1, characterized in that: The number of the prefabricated pipe piles (2) is two, four or eight.

3. The modular prefabricated micropile according to claim 1, characterized in that: The prefabricated support platform (1) is a single-layer structure or a multi-layer structure.

4. The modular prefabricated micropile according to claim 3, characterized in that: The single-layer structure comprises a prefabricated foundation seat (1.1) with a flat top surface, and a plurality of anchor bolts (3) are pre-buried in the middle of the prefabricated foundation seat (1.1).

5. The modular prefabricated micropile according to claim 3, characterized in that: The multi-layer structure comprises at least two layers of prefabricated cap columns (1.3) and prefabricated cap bases (1.2) arranged in an upper and lower manner, wherein the prefabricated cap columns (1.3) are fixedly connected to the center of the top surface of the prefabricated cap base (1.2), the prefabricated cap columns (1.3) and the prefabricated cap base (1.2) are an integrated structure, and a plurality of the anchor bolts (3) are pre-embedded in the prefabricated cap columns (1.3).

6. The modular prefabricated micropile according to claim 1, characterized in that: The pipe pile fixing structure comprises a fixing plate (6) arranged perpendicularly to the axial direction of the prefabricated pipe pile (2) and fixed to the top of the prefabricated pipe pile (2); the grouting hole (4) is opened in the middle of the fixing plate (6); the top of the prefabricated pipe pile (2) is coaxially arranged in the steel jacket (7); and a gap for grouting exists between the inner surface of the steel jacket (7) and the outer surface of the top of the prefabricated pipe pile (2).

7. The modular prefabricated micropile according to claim 6, characterized in that: The top surface of the fixing plate (6) is provided with a plurality of stiffening plates (8) vertically connected to each other, and the stiffening plates (8) are arranged along the length direction or the width direction of the fixing plate (6).

8. The modular prefabricated micropile according to claim 6 or 7, characterized in that: A plurality of threaded sleeves (10) having internal threads and having top surfaces flush with the top surfaces of the pipe pile positioning holes (21) are prefabricated and fixed at intervals on the top circumferential outer surface of the steel jacket (7), and the fixing plate (6) is fixed to the prefabricated foundation (1) by means of bolts and the threaded sleeves (10).

9. The modular prefabricated micropile according to claim 8, characterized in that: The pipe pile fixing structure also includes a plurality of embedded steel bars (11) arranged between the prefabricated pipe pile (2) and the steel sheath (7) and evenly spaced along the circumferential direction of the prefabricated pipe pile (2), the top ends of the embedded steel bars (11) vertically passing through and being fixed on the fixing plate (6), and the bottom ends of the embedded steel bars (11) extending to below the steel sheath (7).

10. The modular prefabricated micropile according to claim 1, characterized in that: The inner wall surface of the steel jacket (7) is provided with protrusions.