Power plant water taking device for seaside mountain fracture development

By using the connecting wells and multiple water intake risers in the power plant water in the mountain crack area by the sea, the tunnel elevation is reduced and the seabed silt is adapted to the seabed silt, the problems of tunnel seepage collapse and shoreline damage are solved, and safe and economical water intake is achieved Effect.

CN222101030UActive Publication Date: 2024-12-03ZHEJIANG ELECTRIC POWER DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420711765.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-12-03
Estimated Expiration
2034-04-08

AI Technical Summary

Technical Problem

The water intake device of coastal thermal power plants in mountain crack areas is prone to collapse of tunnel seepage due to water pressure, and the existing water intake method causes damage to the natural coastline, which cannot meet the safety and economical water intake requirements.

Method used

The connecting well is used to connect the culvert water diversion pipe to the water intake tunnel to reduce the tunnel elevation. By adjusting the height of the water intake vertical pipe and the water intake tank, the lower edge is higher than the silt surface of the seabed, combining multiple water intake vertical pipes and side water intake channels Designed to adapt to complex seabed siltation situations.

Benefits of technology

It realizes safe and reliable tunnel drilling and explosion, avoids the risk of collapse, reduces damage to the natural coastline, improves water intake efficiency and economy, and adapts to complex submarine silt environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101030U_ABST
    Figure CN222101030U_ABST
Patent Text Reader

Abstract

The utility model provides a power plant water taking device for seaside mountain fracture development. The power plant water taking device comprises a water taking tunnel, a box culvert water diversion pipe and a water taking vertical pipe. The water taking tunnel is formed below a seaside mountain fracture. The horizontal level of the box culvert water diversion pipe is higher than that of the water intake tunnel, one end of the box culvert water diversion pipe is communicated with the water intake tunnel through a connecting well, and the other end of the box culvert water diversion pipe is connected with a water intake vertical pipe; the lower edge of the water taking opening is higher than the deposited seabed surface, and the lower portion of the water taking vertical pipe is connected with the box culvert water diversion pipe. The box culvert water diversion pipe is connected with the water intake tunnel through the connecting well, the elevation of the water intake tunnel is reduced, and the requirement of a top covering layer of the tunnel is met; meanwhile, due to the fact that the tunnel blasting depth is large, rock exposed out of the low tide level of the sea surface is not involved, and the natural shoreline is not damaged; in addition, by adjusting the height of the water intake, the water inlet cabin is higher than the deposited seabed surface, the requirement for the water intake amount is met, and the device adapts to complex seabed deposition conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water intake in power plants, in particular to a water intake device for power plants with developed seaside mountain fissures. Background Art

[0002] For most coastal thermal power plant projects, circulating water intake and drainage projects play an important role in the construction process, and the cost of the intake and drainage projects accounts for a relatively high proportion of the total project cost. As one of the most important auxiliary systems of thermal power plants, circulating water intake buildings (structures) need to ensure that the water consumption of the power plant meets the requirements, which is related to the safe and economical operation of the power plant. Therefore, how to choose a safe, reliable and economical water intake method has become a key task in the construction process of power plants.

[0003] The main function of the water intake buildings of coastal thermal power plants is to provide the required cooling water to the power plants. These buildings are usually designed to be able to take water from the ocean or nearby bays, estuaries and other water sources, and transport it to the cooling system of the power plant. Conventional methods of taking water from the seaside include shield tunnel excavation, mountain tunnel drilling and blasting, and open-cut box culverts. Among them, the mountain tunnel drilling and blasting method has a significant price advantage over the other two methods in terms of cost. Therefore, for power plant sites with mountain distribution, the mountain drilling and blasting method should be reasonably adopted to reduce the cost of water intake projects.

[0004] For the method of extracting water by drilling and blasting in mountain tunnels, a water intake needs to be set up at the end of the tunnel. The water intake generally adopts the following two methods: first, trumpet-mouth water extraction; second, rock plug blasting water extraction. For the former, the water intake adopts a trumpet-mouth shape, which is wide in front and narrow in the back. The elevation of the bottom of the water intake is determined according to the evolution of the seabed and the hydrodynamic mathematical model; the water intake is constructed by underwater blasting or underwater excavation. For the latter, it is mainly through reserving a certain thickness of rock mass (i.e. rock plug) in the tunnel, and after the tunnel is completed, the reserved rock plug is blasted away at one time by blasting, so that the tunnel is connected to the water source. Which method to choose depends on the distribution of the mountain at the water intake.

[0005] However, for the mountains below sea level in the seaside, under the long-term erosion of seawater and waves, some fracture zones are often produced. When the tunnel passes through these fracture zones, due to the insufficient upper cover layer of the tunnel, it is very easy to cause water seepage and collapse under the action of water pressure, thus causing major casualties and economic losses. Therefore, in order to prevent the collapse of the tunnel during drilling and blasting, the thickness of the top cover layer of the tunnel needs to meet certain requirements, that is, the elevation of the water intake tunnel needs to be lowered to a certain depth. When the water intake adopts the "bell-mouth water intake method", due to the reduction of the water intake tunnel elevation, the bottom elevation of the bell mouth will also be reduced accordingly, resulting in the elevation of the seabed mud surface near the water intake head being higher than the bottom elevation of the bell mouth, resulting in siltation at the bell mouth, which cannot meet the requirements of safe water intake. When the water intake adopts the "rock plug blasting water intake method", the water inlet is arranged above the seabed surface, which is generally only applicable to special geological conditions where the mountain below sea level drops sharply and the seabed mud surface is buried deep, and the scope of application is limited.

[0006] In addition, the above-mentioned "bell-mouth water extraction" and "rock plug blasting water extraction" are likely to cause a certain degree of damage to the natural coastline in order to meet water extraction requirements.

[0007] Therefore, for geological conditions with developed mountain fissures and water extraction from mountain tunnels that require protection of coastal beaches, both "bell-mouth water extraction" and "rock plug blasting water extraction" have certain limitations and cannot meet the water extraction requirements of power plants. Utility Model Content

[0008] The technical problem to be solved by the utility model is to provide a water intake device for power plants with developed fissures in seaside mountains. The device connects the box culvert water diversion pipe with the water intake tunnel through a connecting well to lower the elevation of the water intake tunnel, thereby meeting the requirements for the covering layer on the top of the tunnel. At the same time, by adjusting the height of the water diversion riser and the water intake tank, the lower edge of the water intake tank is made higher than the seabed surface after siltation, thereby meeting the water intake requirements and adapting to complex seabed siltation conditions.

[0009] The utility model adopts the following technical solutions to solve the above technical problems:

[0010] A water intake device for a power plant with developed seaside mountain fissures comprises a water intake tunnel, a box culvert water diversion pipe and a water intake riser: the water intake tunnel is opened below the seabed mountain fissure; the box culvert water diversion pipe is at a higher level than the water intake tunnel, and at the same time, one end of the box culvert water diversion pipe is connected to the water intake tunnel via a connecting well, and the other end is connected to the water intake riser; a water intake port is installed at the upper part of the water intake riser, the lower edge of the water intake port is higher than the seabed surface after siltation, and the lower part of the water intake riser is connected to the box culvert water diversion pipe.

[0011] As one of the preferred embodiments of the utility model, the box culvert water diversion pipe is a horizontally arranged and extended pipe body; one end of the box culvert water diversion pipe close to the seabed mountain is located in the seabed rock layer, and the other end opposite is located in the seabed mud layer.

[0012] As one of the preferred embodiments of the present invention, rock-embedded cast-in-place piles are supported below the box culvert water diversion pipe located in the seabed mud layer.

[0013] As one of the preferred embodiments of the present invention, a plurality of water intake risers are provided, each of which has a water intake port installed at its upper portion and is connected to a box culvert water diversion pipe at its lower portion.

[0014] As one of the preferred embodiments of the present invention, the water intake port on the water intake riser adopts a water intake tank with a side water inlet channel.

[0015] As one of the preferred embodiments of the present invention, the water intake tunnel, the box culvert water diversion pipe and the water intake riser are all located below the sea level.

[0016] The advantages of the utility model compared with the prior art are:

[0017] (1) The utility model connects the box culvert water pipe with the water intake tunnel through a connecting well, which can lower the elevation of the water intake tunnel, thereby meeting the requirements of the tunnel top cover layer and ensuring the safety and reliability of the tunnel drilling and blasting work; at the same time, since the elevation of the water intake tunnel is lowered, the tunnel blasting depth is deeper, and does not involve the rocks exposed at low tide level on the sea surface, which is not easy to cause damage to the natural coastline;

[0018] (2) The utility model adjusts the height of the water intake riser and the water intake so that the lower edge of the water intake tank (i.e., the water intake) is higher than the seabed surface after silting, thereby meeting the water intake requirements and being able to adapt to complex seabed siltation conditions;

[0019] (3) The utility model realizes multi-point water intake by setting multiple water intake risers, which can not only improve the water intake efficiency, but also avoid silting and blockage of the water intake when the seabed silt layer is thick, and further adapt to the complex seabed siltation environment;

[0020] (4) The water intake of the utility model adopts a water inlet chamber with a side water inlet channel to achieve side water inlet; compared with the traditional top water inlet method, the side water inlet has a smoother water flow and reduces the entry of garbage;

[0021] (5) The water intake method based on the device of the utility model is not costly and has certain economical efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the overall structure of the water intake device for a power plant with developed seaside mountain fissures in Example 1.

[0023] In the figure: 100 is a submarine mountain, 101 is an original surface, 102 is a submarine rock layer, 103 is a submarine silt layer, 1 is a water intake tunnel, 2 is a box culvert water diversion pipe, 3 is a water intake riser, 31 is a water intake tank, 4 is a connecting well, and 5 is a rock-embedded cast-in-place pile. DETAILED DESCRIPTION

[0024] The following is a detailed description of an embodiment of the utility model. This embodiment is implemented on the premise of the technical solution of the utility model, and a detailed implementation method and a specific operation process are given, but the protection scope of the utility model is not limited to the following embodiment.

[0025] Example 1

[0026] like Figure 1 As shown, a water intake device for a power plant with developed fissures in a seaside mountain in this embodiment is specifically suitable for a mountain below sea level, and includes a water intake tunnel 1, a culvert water diversion pipe 2, and a water intake riser 3 (all located below sea level). The water intake tunnel 1 is opened in the fissure development area of ​​the submarine mountain 100; the horizontal height of the culvert water diversion pipe 2 is higher than the water intake tunnel 1, and at the same time, one end of the culvert water diversion pipe 2 is connected to the water intake tunnel 1 below through a connecting well 4, and the other end is connected to the water intake riser 3; the upper part of the water intake riser 3 is installed with a water intake tank 31, the lower edge of the water intake tank 31 is higher than the seabed surface after siltation, and the lower part of the water intake riser 3 is connected to the culvert water diversion pipe 2. Among them, the seabed surface after siltation refers to the "original surface 101 + seabed surface after silt accumulation" at the corresponding position. The height of the original surface 101 is determined by exploration based on the construction site conditions, and the silt accumulation height is estimated at 10 cm / year based on the construction situation. For example, if the construction project needs to last for 30 years, the height of the seabed after siltation is "the height of the original surface 101 + 3 meters".

[0027] In this embodiment, the box culvert water pipe 2 is connected to the water intake tunnel 1 through the connecting well 4, so that the elevation of the water intake tunnel 1 can be lowered, thereby meeting the requirements of the tunnel top cover layer and ensuring the safety and reliability of the tunnel drilling and blasting work; at the same time, since the elevation of the water intake tunnel 1 is lowered, the tunnel blasting depth is deeper, and does not involve the rocks exposed at the low tide level of the sea surface, and is not easy to cause damage to the natural coastline; and by adjusting the height of the water intake tank 31, the lower edge of the water intake tank 31 is higher than the seabed surface after siltation, which can meet the water intake requirements and adapt to complex seabed siltation conditions.

[0028] Furthermore, in this embodiment, the box culvert water diversion pipe 2 is a horizontally arranged and extended pipe body; one end of the box culvert water diversion pipe 2 close to the seabed mountain 100 is located in the seabed rock layer 102, and the other end is located in the seabed mud layer 103. Among them, the box culvert water diversion pipe 2 located in the seabed mud layer 103 is supported by rock-embedded cast-in-place piles 5 below to improve the stability of the pipe body.

[0029] Furthermore, in this embodiment, a plurality of water intake risers 3 are provided, and a water intake tank 31 is installed at the upper part of each water intake riser 3, and the lower part is connected to the box culvert water diversion pipe 2. By providing a plurality of water intake risers 3 to achieve multi-point water intake, the water intake efficiency can be improved, and when the seabed silt layer is thick, the water intake port can be prevented from silting up and blocking, and the complex seabed siltation environment can be further adapted.

[0030] Furthermore, in the present embodiment, the water inlet chamber 31 is provided with a side water inlet channel to realize side water inlet; compared with the traditional top water inlet method, the side water inlet has a smoother water flow and reduces the entry of garbage at the same time.

[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A water intake device for a power plant with developed fissures in a seaside mountain, characterized in that: It includes a water intake tunnel, a box culvert water diversion pipe and a water intake riser: the water intake tunnel is opened below the fissure of the seabed mountain; the horizontal height of the box culvert water diversion pipe is higher than the water intake tunnel, and at the same time, one end of the box culvert water diversion pipe is connected with the water intake tunnel through a connecting well, and the other end is connected with the water intake riser; a water intake port is installed on the upper part of the water intake riser, the lower edge of the water intake port is higher than the seabed surface after siltation, and the lower part of the water intake riser is connected with the box culvert water diversion pipe.

2. The water intake device for a power plant with developed fissures in a seaside mountain according to claim 1, characterized in that: The box culvert water diversion pipe is a horizontally arranged and extended pipe body; one end of the box culvert water diversion pipe close to the seabed mountain is located in the seabed rock layer, and the other end opposite is located in the seabed mud layer.

3. The water intake device for a power plant with developed fissures in a seaside mountain according to claim 2, characterized in that: Rock-embedded cast-in-place piles are supported below the box culvert water diversion pipe located in the seabed mud layer.

4. The water intake device for a power plant with developed fissures in a seaside mountain according to claim 1, characterized in that: The water intake riser is provided with a plurality of pipes, the upper part of each water intake riser is respectively provided with a water intake port, and the lower part is respectively connected with the box culvert water diversion pipe.

5. The water intake device for a power plant with developed fissures in a seaside mountain according to claim 1, characterized in that: The water intake port on the water intake riser adopts a water intake cabin with a side water intake channel.

6. The water intake device for a power plant with developed fissures in a seaside mountain according to any one of claims 1 to 5, characterized in that: The water intake tunnel, box culvert water diversion pipe and water intake riser are all located below sea level.