Slope crest intercepting ditch

By designing reinforcement grooves and flange structures in slope top gutters, combining greening means and C25 concrete materials, the problem of concrete being easily eroded in the prior art is solved, and the impact resistance and service life of the gutters are improved , achieving structural stability and simplicity of construction.

CN222101079UActive Publication Date: 2024-12-03ZHEJIANG COMM CONSTR GRP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420240689.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-12-03
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

The concrete is easily eroded when the slope is steep, with a short service life and poor structural stability, making it difficult to effectively resist water flow erosion.

Method used

A slope top water trench was designed, using reinforcement grooves embedded on the foundation groove, bent outwardly near the top of the slope top to form flange, and guide water flow through the water facing surface and guide surface to enhance impact resistance and combine greening. Means to reduce the water flow pressure and use C25 concrete material to simplify the construction process.

Benefits of technology

It improves the impact resistance and service life of the interceptor groove, enhances structural stability, reduces the damage caused by water flow to the interceptor groove, simplifies the construction process, reduces costs, and is suitable for a variety of terrain and soil conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101079U_ABST
    Figure CN222101079U_ABST
Patent Text Reader

Abstract

The utility model relates to a slope crest intercepting ditch which comprises a base ditch formed in the position, close to the slope crest, of the surface of a side slope and a reinforcing groove fixed to the base ditch in an embedded mode, the top end, close to the slope crest, of the reinforcing groove bends and extends outwards to form a turnup, the end, close to the slope crest, of the turnup is connected to the side slope in an inserted mode, and the end, away from the slope crest, of the turnup is provided with an upstream face. The upstream face and the surface of the side slope are approximately located on the same plane, a guide face is arranged on the inner wall, close to the slope top, of the reinforcing groove, and the top face, away from the slope top, of the reinforcing groove extends out of the base ditch and passes through the surface of the side slope. The slope crest intercepting ditch has the advantages of being good in structural stability and long in service life.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of deep cutting and high slope protection, in particular to a slope top intercepting ditch. Background Art

[0002] The intercepting ditch is a ditch set outside the top of the road cut to intercept the water flowing from the hillside to the roadbed (the specification stipulates that it should be greater than or equal to 5m from the outer edge of the top of the road cut and greater than or equal to 2m from the outer edge of the embankment slope foot). It is usually in the form of mortar-laid stone, mortar-laid block stone or cement concrete prefabricated block. The intercepting ditch on the top of the cut roadbed should be set 5m away from the slope mouth and should be laid out in combination with the terrain. The distance between the embankment intercepting ditch on the upper side of the fill roadbed and the fill slope foot should not be less than 2m. In rainy areas, one or more intercepting ditches can be set up according to actual conditions. Its function is to intercept the surface water flowing from the top of the roadbed to the roadbed and protect the cut slope and fill slope foot from being eroded by water flow. Before excavating the earth road cut in the rainy season, the intercepting ditch should be excavated 2m away from the top of the road cut slope and connected to the outlet.

[0003] The Chinese patent with the authorization announcement number CN213204160U discloses a slope-top intercepting ditch, including a base ditch opened on the surface of the slope near the top of the slope, and a reinforcement body arranged in the base ditch and fixedly connected to the base ditch, the reinforcement body is integrally formed by concrete pouring, the reinforcement body includes a bottom plate fitted with the bottom surface of the base ditch, a first side wall connected to one end of the bottom plate near the top of the slope, and a second side wall connected to one end of the bottom plate away from the top of the slope, the first side wall and the second side wall are respectively fitted with the corresponding side wall surfaces of the base ditch, the bottom plate, the first side wall and the second side wall are integrally formed by concrete pouring; the upper end of the first side wall is provided with a lining wall for blocking the water from the slope. The above-mentioned intercepting ditch forms a "dike" structure with a lining wall higher than the ground line. While assisting in water blocking and drainage, the lining wall also bears the water flow pressure for a long time. Especially in the case of a steep slope, the water flow speed is fast, and the concrete will be eroded quickly, thereby affecting the service life of the above-mentioned intercepting ditch, which needs to be improved. Utility Model Content

[0004] The problem to be solved by the utility model is to provide a slope top intercepting ditch in view of the above-mentioned deficiencies existing in the prior art, which has the advantages of good structural stability and long service life.

[0005] The above utility model object of the utility model is achieved through the following technical solutions:

[0006] A slope top intercepting ditch comprises a base ditch opened on the surface of a slope near the top of the slope, and a reinforcement groove embedded and fixed on the base ditch, wherein the top end of the reinforcement groove near the top of the slope is bent outward and extends to form a flange, one end of the flange near the top of the slope is plugged into the slope, and the end away from the top of the slope is provided with a water-facing surface, the water-facing surface and the surface of the slope are approximately in the same plane, the inner wall of the reinforcement groove near the top of the slope is provided with a guide surface, and the top surface of the reinforcement groove away from the top of the slope extends to the outside of the base ditch and passes through the surface of the slope.

[0007] By adopting the above technical scheme, when the top of the slope has a large catchment area, an intercepting ditch is set on the surface of the slope near the top of the slope and shielded by greening. The surface water is discharged smoothly through the water-facing surface flush with the surface of the slope, and is collected in the reinforcement groove under the guidance of the guide surface on the inner side of the reinforcement groove. The collected water in the intercepting ditch should generally be introduced into the drainage ditch through the rapids groove at both ends. When the continuous length of the intercepting ditch exceeds 400m, the rapids groove should be set at a suitable position to discharge the collected water to the excavated ditch. This design enhances the impact resistance of the intercepting ditch, reduces the damage to the intercepting ditch caused by the water flow pressure, and thus increases its service life; at the same time, the flange design enables the side of the reinforcement groove impacted by the water flow at the top of the slope to be firmly fixed on the slope, and the top surface of the reinforcement groove away from the top of the slope intersects with the surface of the slope, which not only makes the structure of the intercepting ditch stable and not easy to deform or slide, but also reduces the damage to the intercepting ditch caused by the water flow pressure flowing from the top of the slope.

[0008] The utility model is further configured as follows: the reinforcement groove includes an inner wall, a bottom plate and an outer wall connected in sequence along a direction away from the top of the slope, the inner wall, the bottom plate and the outer wall are respectively fitted with one inner wall, the bottom wall and the other inner wall of the base ditch, the flange is arranged at the top of the inner wall, the guide surface is arranged on the surface of the inner wall, the top surface of the outer wall extends to the outside of the base ditch, and the side close to the top of the slope passes through the slope surface.

[0009] By adopting the above technical scheme, the impact resistance of the slope top intercepting ditch is further enhanced and the service life is further extended. Due to the setting of the inner wall, bottom plate and outer wall, the structure of the reinforced ditch is more stable and not easy to deform or slide; at the same time, the flange design enables the reinforced ditch to be firmly fixed on the slope when subjected to water flow impact, reducing the damage of water flow pressure to the intercepting ditch.

[0010] The utility model is further configured as follows: the reinforcement groove is composed of C25 concrete.

[0011] By adopting the above technical solution, the reinforcement trough is cast with C25 concrete. There is no need to use a large number of prefabricated blocks or stone slabs during the construction process, which reduces the construction difficulty and cost. It can be applied to various terrains and soil conditions and has strong adaptability.

[0012] The utility model is further configured as follows: the width of the flange is 20 cm and the thickness is 20 cm.

[0013] The utility model is further configured as follows: the horizontal width of the water-facing surface is 20 cm, and the vertical height is 5-10 cm.

[0014] The utility model is further configured as follows: the top width of the inner wall is 20 cm and the bottom width is 35 cm.

[0015] The utility model is further configured as follows: the width of the bottom plate is 105 cm and the thickness is 20 cm.

[0016] The utility model is further configured as follows: the width of the outer wall is 20 cm and the height is 60 cm.

[0017] By adopting the above technical solution and under the above size design, the intercepting ditch on the top of the slope can effectively intercept and guide the water flow while ensuring the structural stability, thereby reducing the scouring effect of the water flow on the slope and improving the stability of the slope; in addition, the intercepting ditch is simple in design and easy to construct, and can be widely used in various slope protection projects.

[0018] To sum up, the beneficial technical effects of the utility model are as follows: the slope top intercepting ditch provided by the utility model can not only solve the problems in the prior art, but also has high economic and social benefits. Through the innovative design of the reinforcement groove, the stability and service life of the intercepting ditch are improved, and the maintenance cost is reduced. At the same time, the simplified construction process helps to improve construction efficiency and reduce engineering costs. It has broad application prospects in the fields of deep road cuttings and high slope protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the slope top intercepting ditch of the utility model.

[0020] In the figure, 1, foundation ditch; 2, reinforcement groove; 21, inner wall; 22, bottom plate; 23, outer wall; 3, flange; 4, water-facing surface; 5, guide surface. DETAILED DESCRIPTION

[0021] In order to make the technical means, creative features, objectives and functions achieved by the present invention clearer and easier to understand, the present invention is further described below in conjunction with the accompanying drawings and specific implementation methods.

[0022] Reference Figure 1, is a slope top intercepting ditch disclosed by the utility model, comprising a base ditch 1 opened on the surface of the slope near the top of the slope, and a reinforcement groove 2 embedded and fixed on the base ditch 1 and composed of C25 concrete. Among them, the reinforcement groove 2 is inserted into the slope at the end near the top of the slope, guides the water flow to converge at the inner wall near the top of the slope, and intersects with the slope at the end away from the top of the slope. The impact resistance of the intercepting ditch is enhanced, and the damage to the intercepting ditch caused by the water flow pressure is reduced. Not only does it make the intercepting ditch have good structural stability and is not easy to deform or slide, but it can also reduce the damage to the intercepting ditch caused by the water flow pressure flowing down from the top of the slope.

[0023] The reinforcement groove 2 includes an inner wall 21, a bottom plate 22 and an outer wall 23 connected in sequence in a direction away from the top of the slope. The inner wall 21, the bottom plate 22 and the outer wall 23 are respectively fitted with the inner wall of the side close to the top of the slope, the bottom wall and the inner wall of the side away from the top of the slope of the foundation trench 1. In addition, the top of the inner wall 21 is bent outward and extends to form a flange 3. The end of the flange 3 close to the top of the slope is inserted into the slope, and the end away from the top of the slope is provided with a water-facing surface 4. The water-facing surface 4 and the surface of the slope are approximately in the same plane. The inner wall of the inner wall 21 is provided with a guide surface 5. The top surface of the outer wall 23 extends to the outside of the foundation trench 1, and the side close to the top of the slope passes through the surface of the slope.

[0024] When the top of the slope has a large catchment area, a drainage ditch is set near the top of the slope surface and shielded by greening. Surface water is discharged smoothly through the water-facing surface 4 flush with the slope surface, and is collected in the reinforcement groove 2 under the guidance of the guide surface 5 inside the reinforcement groove 2. The collected water in the drainage ditch should generally be introduced into the drainage ditch through the rapids groove at both ends. When the continuous length of the drainage ditch exceeds 400m, a rapids groove should be set at a suitable position to discharge the collected water to the excavated ditch. This design enhances the impact resistance of the drainage ditch, reduces the damage to the drainage ditch caused by the water flow pressure, and thus increases its service life. At the same time, the design of the flange 3 enables the side of the reinforcement groove 2 impacted by the water flow at the top of the slope to be firmly fixed on the slope, and the top surface of the reinforcement groove 2 away from the top of the slope intersects with the slope surface, which not only makes the drainage ditch have good structural stability and is not easy to deform or slide, but also reduces the damage to the drainage ditch caused by the water flow pressure flowing from the top of the slope.

[0025] The impact resistance of the slope top intercepting ditch is further enhanced, and the service life is further extended. Due to the setting of the inner wall 21, the bottom plate 22 and the outer wall 23, the structure of the reinforcement groove 2 is more stable and not easy to deform or slide; at the same time, the design of the flange 3 enables the reinforcement groove 2 to be firmly fixed on the slope when subjected to the impact of water flow, reducing the damage to the intercepting ditch caused by the water flow pressure. In order to further improve the structural strength of the reinforcement groove 2, the flange 3 has a width of 20 cm and a thickness of 20 cm; the horizontal width of the water-facing surface 4 is 20 cm and the vertical height is 10 cm; the top width of the inner wall 21 is 20 cm and the bottom width is 35 cm; the width of the bottom plate 22 is 105 cm and the thickness is 20 cm; the width of the outer wall 23 is 20 cm and the height is 60 cm.

[0026] The implementation principle of this embodiment is:

[0027] (1) Construction layout

[0028] The surveying engineer uses the ruler method to measure and design the intercepting ditch line according to the design drawings, and calibrates the excavation line of the base ditch 1 in combination with the actual terrain and drainage needs, and makes appropriate adjustments to the intercepting ditch line to ensure the straightness of the intercepting ditch line;

[0029] (2) Cleaning the rock surface

[0030] Before excavating the foundation trench 1, the surrounding floating stones should be cleared along the direction of the intercepting trench to prevent the hand pneumatic drill from working and the floating stones from sliding, which may cause unnecessary safety accidents;

[0031] (3) Excavation of foundation trench 1

[0032] According to the on-site construction measurement and layout position, a hand-held pneumatic drill is used to drill the rock to excavate the foundation trench 1, and the stone is excavated. The plane excavation size and depth are controlled to avoid over-excavation and under-excavation of the foundation trench 1; the excavation of the intercepting ditch is carried out from top to bottom in sections using a hand-held pneumatic drill; the excavated stone of the intercepting ditch is discarded along the slag ditch, and a special person is assigned to guard when the slag is discarded; when the hand-held pneumatic drill is used to excavate the foundation trench 1, the working edge on each side should not be less than 10cm, and the elevation of the bottom of the intercepting ditch should be strictly controlled to ensure smooth water flow and prevent damage to the base and the two sides; a circular curve with a radius of not less than 5m should be set at the horizontal and vertical corners of the intercepting ditch; concrete pouring can be carried out only after the supervisor inspects the process;

[0033] (4) Template installation

[0034] When installing the formwork, the formwork surface must be smooth, accurate in size, tight in joints, without misalignment, and have sufficient strength and stability. The inner formwork should be carefully coated with a release agent, which should be applied evenly, neither gathered in clumps nor flowing down in strands, to ensure that the appearance color is consistent after pouring concrete. After the formwork is installed, its plane position, top elevation, formwork joints, support reinforcement, formwork line type, etc. must be fully inspected, and the next process can only be carried out after the supervision engineer has signed a visa to pass the inspection.

[0035] (5) Concrete mixing

[0036] Materials can only be used after passing inspection upon arrival. Concrete must be prepared strictly according to the construction mix ratio, sufficient mixing time must be ensured, and various indicators such as the slump and workability of the concrete must meet the requirements of the specifications;

[0037] (6) Concrete transportation and pouring

[0038] Concrete is transported by dump tricycles and poured into the formwork manually; vibrating is done by insert vibrators, and the vibration points are required to be even during the vibration process. The vibration time is suitable when the concrete surface is covered with slurry and no longer sinks, and no bubbles emerge from the side of the formwork;

[0039] (7) Concrete curing

[0040] Within 7 to 10 days after concrete pouring, the surface of concrete must always be kept moist; wrap it with plastic film for curing, and water it more than twice a day. When the weather is hot, increase the number of watering appropriately to keep the surface of concrete moist.

[0041] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A slope top intercepting ditch, characterized in that: The invention comprises a base ditch (1) provided on the surface of a slope near the top of the slope, and a reinforcement groove (2) embedded and fixed on the base ditch (1); the top of the reinforcement groove (2) near the top of the slope is bent outward and extends to form a flange (3); one end of the flange (3) near the top of the slope is plugged into the slope, and the end away from the top of the slope is provided with a water-facing surface (4); the water-facing surface (4) and the surface of the slope are approximately in the same plane; the inner wall of the reinforcement groove (2) near the top of the slope is provided with a guide surface (5); the top surface of the reinforcement groove (2) away from the top of the slope extends to the outside of the base ditch (1) and passes through the surface of the slope.

2. A slope top intercepting ditch according to claim 1, characterized in that: The reinforcement groove (2) comprises an inner wall (21), a bottom plate (22) and an outer wall (23) which are connected in sequence along a direction away from the top of the slope; the inner wall (21), the bottom plate (22) and the outer wall (23) are respectively fitted with one inner wall, the bottom wall and the other inner wall of the base trench (1); the flange (3) is arranged at the top of the inner wall (21); the guide surface (5) is arranged on the surface of the inner wall (21); the top surface of the outer wall (23) extends to the outside of the base trench (1) and passes through the slope surface on the side close to the top of the slope.

3. A slope top intercepting ditch according to claim 2, characterized in that: The reinforcement groove (2) is made of C25 concrete.

4. A slope top intercepting ditch according to claim 2, characterized in that: The flange (3) has a width of 20 cm and a thickness of 20 cm.

5. The slope top intercepting ditch according to claim 2, characterized in that: The water-facing surface (4) has a horizontal width of 20 cm and a vertical height of 5 to 10 cm.

6. A slope top intercepting ditch according to claim 2, characterized in that: The top width of the inner wall (21) is 20 cm, and the bottom width is 35 cm.

7. The slope top intercepting ditch according to claim 2, characterized in that: The bottom plate (22) has a width of 105 cm and a thickness of 20 cm.

8. The slope top intercepting ditch according to claim 2, characterized in that: The outer wall (23) has a width of 20 cm and a height of 60 cm.