Protective net for super high-rise building

The integration of an anti-falling and buffer net system with a rod assembly and elastic pull ropes enhances the protective net's ability to absorb impact forces, addressing the penetration issue in traditional nets and improving structural stability.

CN222101563UActive Publication Date: 2024-12-03CHINA AEROSPACE CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420658460.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-12-03
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

Traditional building protection nets for super high-rise buildings are prone to penetration by large falling objects, compromising their protective performance.

Method used

A protective net system comprising an anti-falling net and a buffer net, supported by a rod assembly with clamps and elastic pull ropes, where the buffer net is positioned above the anti-falling net and connected via pulleys, enhancing the net's ability to absorb impact through elastic stretching.

Benefits of technology

The system improves protective performance by allowing the buffer net to absorb impact forces and ensuring the anti-falling net supports the buffer net, thereby preventing large objects from penetrating, while maintaining structural stability and ease of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101563U_ABST
    Figure CN222101563U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of buildings, and particularly relates to a protective net for a super high-rise building, which comprises an anti-falling net and a support rod assembly, a binding rope for positioning the anti-falling net is bound on the support rod assembly, a pulley is mounted at the upper end of the support rod assembly, an elastic pull rope is wound on the pulley, and the elastic pull rope is connected with the anti-falling net. One end of the elastic pull rope is fixed to the lower portion of the supporting rod assembly, a buffer net is fixed to the other end of the elastic pull rope, and the buffer net is located over the anti-falling net. The anti-falling net and the buffering net are arranged, the two ends of the buffering net are hoisted through the elastic pull ropes and the pulleys, then buffering is conveniently conducted through stretching of the elastic pull ropes when the buffering net is stressed, and the anti-falling net is arranged under the buffering net, so that the buffering net is borne by the anti-falling net when the buffering net descends; the pulleys are installed at the upper ends of the supporting rod assemblies, meanwhile, the elastic pull ropes are wound around the pulleys, and the length of the elastic pull ropes can be conveniently increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction, and in particular relates to a protective net for super high-rise buildings. Background Art

[0002] Building protection net is a kind of facility used to protect workers and the surrounding environment at construction sites. It is usually made of high-strength mesh material and is used to cover the outer wall or suspended part of the building to prevent objects from falling, people from falling, or construction materials from splashing.

[0003] Traditional building protection nets often use a fixed method to prevent objects from falling. However, when the mass of the falling object is too large, it is easy for the large mass object to penetrate the protection net, which reduces the protective performance of the building protection net.

[0004] Based on this, a protective net for super high-rise buildings that combines a buffer net and an anti-fall net is designed. Utility Model Content

[0005] In order to solve the problems raised in the above background technology, the utility model provides a protective net for super high-rise buildings.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a protective net for super high-rise buildings, comprising an anti-falling net and a support rod assembly, the support rod assembly is also tied with a binding rope for positioning the anti-falling net, a pulley is installed at the upper end of the support rod assembly, an elastic pull rope is wound around the pulley, one end of the elastic pull rope is fixed to the lower part of the support rod assembly, and a buffer net is fixed to the other end of the elastic pull rope, and the buffer net is located directly above the anti-falling net.

[0007] As a preferred technical solution for a protective net for a super high-rise building of the utility model, the support rod assembly includes a first cross bar, a second cross bar and a third cross bar arranged in parallel, and a vertical bar arranged perpendicular to the first cross bar, and the first cross bar, the second cross bar and the third cross bar are all fixed to the vertical bar by clamps, the binding rope is fixed to the bottom of the first cross bar by the clamp, and a pulling wire rope for pulling is also fixed between the first cross bar, the second cross bar and the third cross bar.

[0008] As a preferred technical solution for a protective net for super high-rise buildings of the utility model, the clamp includes a first clamp plate and a second clamp plate, one end of the first clamp plate is integrally formed with a clamping plate, one end of the second clamp plate is integrally formed with a clamping column, and the clamping column is movably installed inside the clamping plate, and the other ends of the first clamp plate and the second clamp plate are fixed by positioning bolts.

[0009] As a preferred technical solution for a protective net for super high-rise buildings of the utility model, the first clamping plate and the second clamping plate are both C-shaped metal plate structures.

[0010] As a preferred technical solution of a protective net for super high-rise buildings of the utility model, both ends of the anti-falling net are fixed to the third cross bar by binding ropes.

[0011] As a preferred technical solution for a protective net for super high-rise buildings of the utility model, the first cross bar and the third cross bar are of equal length, and the length of the second cross bar is half of the length of the first cross bar.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. By setting up an anti-fall net and a buffer net, the two ends of the buffer net are hoisted by elastic ropes and pulleys, so that when the buffer net is subjected to force, it is convenient to buffer by stretching the elastic ropes. The anti-fall net arranged directly below the buffer net makes the anti-fall net take over when the buffer net descends, thereby improving the protective performance of the protection net for high-rise buildings. The pulley is installed at the upper end of the support rod assembly, and the elastic rope is bypassed around the pulley, which is convenient for extending the length of the elastic rope.

[0014] 2. The support rod assembly consists of a parallel first cross bar, a second cross bar, a third cross bar, and a vertical bar perpendicular to the first cross bar. The first cross bar, the second cross bar and the third cross bar are fixed to the vertical bar by clamps. The first cross bar, the second cross bar and the third cross bar are also pulled by pulling wire ropes, thereby increasing the stability of the support rod assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0016] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0017] Figure 2 This is a schematic diagram of the main structure of the utility model;

[0018] Figure 3 It is a schematic diagram of the support structure in the utility model;

[0019] Figure 4 It is a schematic diagram of the clamp structure in the utility model;

[0020] Figure 5 for Figure 1 A schematic diagram of the enlarged structure at A in the middle;

[0021] Figure 6 for Figure 1 Schematic diagram of the enlarged structure at point B in the middle.

[0022] In the figure: 1. vertical rod; 2. first horizontal rod; 3. second horizontal rod; 4. third horizontal rod; 5. pulling wire rope; 6. clamp; 61. first clamp plate; 62. second clamp plate; 63. positioning bolt; 64. clamp plate; 65. clamp column; 7. anti-fall net; 8. binding rope; 9. pulley; 10. elastic pull rope; 11. buffer net. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Example

[0025] See also Figure 1-6 The utility model provides a technical solution: a protective net for a super high-rise building, comprising an anti-falling net 7 and a strut assembly, the strut assembly is also tied with a binding rope 8 for positioning the anti-falling net 7, a pulley 9 is installed at the upper end of the strut assembly, an elastic pull rope 10 is wound around the pulley 9, one end of the elastic pull rope 10 is fixed to the lower part of the strut assembly, and the other end of the elastic pull rope 10 is fixed with a buffer net 11, and the buffer net 11 is located directly above the anti-falling net 7.

[0026] In the present embodiment, an anti-falling net 7 and a buffer net 11 are provided, and both ends of the buffer net 11 are hoisted by elastic pull ropes 10 and pulleys 9, so that when the buffer net 11 is subjected to force, the stretching of the elastic pull ropes 10 can be used for buffering. The anti-falling net 7 provided directly below the buffer net 11 allows the anti-falling net 7 to support the buffer net 11 when it descends, thereby improving the protective performance of the protection net against high-rise buildings. The pulley 9 is installed at the upper end of the support rod assembly, and the elastic pull rope 10 bypasses the pulley 9, so as to extend the length of the elastic pull rope 10.

[0027] Specifically, the support rod assembly includes a first cross bar 2, a second cross bar 3 and a third cross bar 4 arranged in parallel, and a vertical bar 1 arranged perpendicular to the first cross bar 2, and the first cross bar 2, the second cross bar 3 and the third cross bar 4 are all fixed to the vertical bar 1 by a clamp 6, and a binding rope 8 is fixed to the bottom of the first cross bar 2 by the clamp 6, and a pulling wire rope 5 for pulling is also fixed between the first cross bar 2, the second cross bar 3 and the third cross bar 4.

[0028] In this embodiment, the support rod assembly is composed of a parallel first cross bar 2, a second cross bar 3, a third cross bar 4, and a vertical bar 1 perpendicular to the first cross bar 2. The first cross bar 2, the second cross bar 3 and the third cross bar 4 are fixed to the vertical bar 1 by a clamp 6. The first cross bar 2, the second cross bar 3 and the third cross bar 4 are also pulled by a pulling wire rope 5, thereby increasing the stability of the support rod assembly.

[0029] Specifically, the clamp 6 includes a first clamp plate 61 and a second clamp plate 62. A clamp plate 64 is integrally formed at one end of the first clamp plate 61, and a clamp column 65 is integrally formed at one end of the second clamp plate 62. The clamp column 65 is movably installed inside the clamp plate 64. The other ends of the first clamp plate 61 and the second clamp plate 62 are fixed by positioning bolts 63. Both the first clamp plate 61 and the second clamp plate 62 are C-shaped metal plate structures. Both ends of the anti-fall net 7 are fixed to the third cross bar 4 by binding ropes 8.

[0030] In this embodiment, the clamp 6 is composed of a first clamp plate 61, a second clamp plate 62, a positioning bolt 63, a clamp plate 64 and a clamp column 65, and the clamp plate 64 integrally formed at one end of the first clamp plate 61 is movably installed inside the clamp column 65, and the other ends of the first clamp plate 61 and the second clamp plate 62 are fixed by a positioning bolt 63, thereby facilitating the installation and disassembly of the clamp 6.

[0031] Specifically, the first crossbar 2 and the third crossbar 4 are of equal length, and the length of the second crossbar 3 is half of the length of the first crossbar 2 .

[0032] In this embodiment, the first cross bar 2, the second cross bar 3, and the third cross bar 4 cooperate with each other to provide support.

[0033] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A protective net for a super high-rise building, comprising an anti-falling net (7) and a support rod assembly, characterized in that: The support rod assembly is also tied with a binding rope (8) for positioning the anti-falling net (7); a pulley (9) is installed at the upper end of the support rod assembly, an elastic pull rope (10) is wound around the pulley (9), one end of the elastic pull rope (10) is fixed to the lower part of the support rod assembly, and the other end of the elastic pull rope (10) is fixed with a buffer net (11), and the buffer net (11) is located directly above the anti-falling net (7).

2. A super high-rise building protection net according to claim 1, characterized in that: The support rod assembly comprises a first cross bar (2), a second cross bar (3) and a third cross bar (4) arranged in parallel, and a vertical bar (1) arranged perpendicular to the first cross bar (2), and the first cross bar (2), the second cross bar (3) and the third cross bar (4) are all fixed to the vertical bar (1) through a clamp (6), the binding rope (8) is fixed below the first cross bar (2) through the clamp (6), and a pulling wire rope (5) for pulling is also fixed between the first cross bar (2), the second cross bar (3) and the third cross bar (4).

3. A super high-rise building protection net according to claim 2, characterized in that: The clamp (6) comprises a first clamping plate (61) and a second clamping plate (62); one end of the first clamping plate (61) is integrally formed with a clamping plate (64); one end of the second clamping plate (62) is integrally formed with a clamping column (65), and the clamping column (65) is movably mounted inside the clamping plate (64); the other ends of the first clamping plate (61) and the second clamping plate (62) are fixed by positioning bolts (63).

4. A super high-rise building protection net according to claim 3, characterized in that: The first clamping plate (61) and the second clamping plate (62) are both C-shaped metal plate structures.

5. The protective net for super high-rise buildings according to claim 2, characterized in that: Both ends of the anti-falling net (7) are fixed to the third crossbar (4) via binding ropes (8).

6. A super high-rise building protection net according to claim 5, characterized in that: The first crossbar (2) and the third crossbar (4) are of equal length, and the length of the second crossbar (3) is half of the length of the first crossbar (2).