Combined movable reinforcing steel bar processing shed capable of walking
By designing a combined walking movable steel bar processing shed, the problem of low lifting efficiency in the existing technology is solved, efficient lifting and processing of steel bars and I-steel is realized, construction costs are reduced, and the stability of the processing environment is ensured. and dryness.
Patent Information
- Application Number
- CN202420733820.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-10
AI Technical Summary
In the construction of hydropower tunnel projects, the existing fixed steel bar processing sheds have low steel bar lifting efficiency due to immobility and space limitations, which increases construction cost and time.
A combined walking movable steel bar processing shed is designed, including a fixed outer processing shed and a movable inner processing shed. The outer processing shed is fixed on the foundation. The inner processing shed can move freely on the inside and outside the outer processing shed, through the steel rails and The sliding bearings are moved to ensure efficient lifting and processing of steel bars and I-steel.
It improves the lifting efficiency of steel bars and I-steel, reduces material transportation and handling, reduces construction costs, and provides a stable and dry processing environment after the lifting is completed, protects the construction site, and ensures processing quality.
Smart Images

Figure CN222101616U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hydropower engineering construction, in particular to a combined walkable and movable steel bar processing shed. Background Art
[0002] In the construction of hydropower tunnel projects, under soft surrounding rock geological conditions, it is often necessary to process I-beams and steel bars to strengthen the support of the tunnel. Using a steel bar processing shed to process steel bars can provide a relatively stable and dry processing environment, avoid the influence of external factors such as rain and dust, and ensure processing quality.
[0003] Existing standard steel bar processing sheds are all placed in fixed positions. When the construction site is small and limited, due to the immobility and limited space of the existing steel bar processing sheds, the hoisted steel bars and I-beams cannot be directly placed in the processing area, and need to be manually transported a distance. Therefore, this conventional fixed steel bar processing shed is not only time-consuming and labor-intensive, but also increases the processing cost and has relatively low construction efficiency. Therefore, a modular walkable and movable steel bar processing shed is proposed to solve the above defects. Summary of the invention
[0004] The utility model overcomes the shortcomings of the prior art and provides a combined walkable and movable steel bar processing shed.
[0005] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a combined walkable and movable steel bar processing shed, comprising: an inner processing shed and an outer processing shed of the same structure and different sizes, the outer processing shed is fixedly arranged on the foundation, the inner processing shed is movably arranged on the inner side of the outer processing shed, a steel track is arranged on the surface of the foundation, a steel rail sliding support is arranged at the bottom of the inner processing shed, and the steel rail sliding support cooperates with the steel track; the outer processing shed comprises: two rows of steel columns symmetrically arranged on the foundation, a connecting support is arranged on the top of the steel column, a number of the connecting supports are connected to a supporting truss, and a colored steel tile ceiling is arranged on the upper part of the supporting truss.
[0006] In a preferred embodiment of the utility model, two steel diagonal braces are staggered between two adjacent steel columns, the upper end of the steel diagonal brace is connected to the upper end of one of the steel columns, and the lower end of the steel diagonal brace is connected to the lower end of the other steel column.
[0007] In a preferred embodiment of the utility model, the steel diagonal brace is made of square steel.
[0008] In a preferred embodiment of the utility model, the upper parts of two adjacent steel columns are connected by a steel cross bar, and the steel cross bar is made of square steel.
[0009] In a preferred embodiment of the utility model, the steel column and the rail sliding support are both fixed to the foundation by expansion bolts.
[0010] In a preferred embodiment of the utility model, the support truss is assembled by splicing DN50 steel pipes and DN12 steel pipes.
[0011] The utility model solves the defects existing in the background technology, and has the following beneficial effects:
[0012] (1) The utility model transforms and divides the existing steel bar processing shed, designs an outer processing shed and an inner processing shed according to the site conditions. The outer processing shed is fixed and is used for the steel bar and I-beam processing area. The inner processing shed is movable and can move freely inside and outside the outer processing shed. It is used for the steel bar and I-beam preparation processing area. When it is necessary to hoist the incoming steel bars and I-beams, the inner processing shed can leave the upper part of the steel bar and I-beam preparation processing area, which is convenient for direct hoisting of the incoming steel bars and I-beams, thereby improving construction efficiency, reducing the transportation and handling of materials, and improving construction efficiency, thereby reducing construction costs.
[0013] (2) After the lifting is completed, the utility model covers the processing site and the storage site through the internal processing shed, reduces the interference of debris, ensures the safety and cleanliness of the construction, provides a relatively stable and dry processing environment for the processing of steel bars, facilitates the processing of steel bars, avoids the influence of external factors such as rain and dust, ensures the processing quality, and protects the construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The utility model is further described below in conjunction with the accompanying drawings and embodiments;
[0015] Figure 1 It is a side view of a preferred embodiment of the utility model;
[0016] Figure 2 It is a front view of a preferred embodiment of the utility model.
[0017] Specifically, 1. Foundation; 2. Steel track; 3. Rail sliding support; 4. Steel column; 5. Connecting support; 6. Support truss; 7. Color steel tile ceiling; 8. Steel diagonal brace; 9. Steel cross bar; 10. Track support. DETAILED DESCRIPTION
[0018] The present invention will now be further described in detail in conjunction with the accompanying drawings and embodiments. These drawings are simplified schematic diagrams that only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0019] like Figure 1 and Figure 2As shown, a combined walkable and movable steel bar processing shed includes: two inner processing sheds and outer processing sheds of the same structure and different sizes, the outer processing shed is fixedly arranged on the foundation 1, and the inner processing shed is movably arranged inside the outer processing shed, a steel track 2 is arranged on the surface of the foundation 1, and a steel rail sliding support 3 is arranged at the bottom of the inner processing shed, and the steel rail sliding support 3 cooperates with the steel track 2. By transforming and dividing the existing steel bar processing shed, the outer processing shed and the inner processing shed are designed according to the site conditions. The outer processing shed adopts a fixed type and is used for the steel bar and I-beam processing area, and the inner processing shed adopts a movable type and can move freely inside and outside the outer processing shed and is used for the steel bar and I-beam preparation processing area. When it is necessary to hoist the incoming steel bars and I-beams, the inner processing shed can leave the upper part of the steel bar and I-beam preparation processing area, which is convenient for the direct hoisting of the incoming steel bars and I-beams, which can improve the construction efficiency, reduce the transportation and handling of materials, improve the construction efficiency, and thus reduce the construction cost.
[0020] like Figure 1 As shown, the left side is the external processing shed, and the right side is the internal processing shed. After the lifting is completed, the internal processing shed will cover the processing site and the storage site to reduce the interference of debris, ensure the safety and cleanliness of the construction, and provide a relatively stable and dry processing environment for the processing of steel bars, which is convenient for steel bar processing, avoids the influence of external factors such as rain and dust, ensures processing quality, and protects the construction site.
[0021] The external processing shed includes: two rows of steel columns 4 symmetrically arranged on the foundation 1, connecting supports 5 are arranged on the top of the steel columns 4, and several connecting supports 5 are connected to the supporting trusses 6. A color steel tile ceiling 7 is arranged on the upper part of the supporting trusses 6. The supporting trusses 6 are assembled by splicing DN50 steel pipes and DN12 steel pipes. Two steel diagonal braces 8 are staggered between two adjacent steel columns 4. The upper end of the steel diagonal brace 8 is connected to the upper end of one of the steel columns 4, and the lower end of the steel diagonal brace 8 is connected to the lower end of the other steel column 4. The upper parts of the two adjacent steel columns 4 are connected by steel cross bars 9. The steel diagonal braces 8 and the steel cross bars are made of square steel. The arrangement of the steel diagonal braces 8 and the steel cross bars 9 can enhance the stability of the steel columns 4, thereby making the connection between the steel columns 4 and the color steel tile ceiling 7 more stable.
[0022] In a preferred embodiment of the utility model, the steel column 4 and the rail sliding support 3 are fixed to the foundation 1 by expansion bolts to ensure that the steel column 4 is firmly connected to the foundation 1, and at the same time ensure that the steel rail 2 is firmly connected to the rail support 10 and the foundation 1, and at the same time a braking device is provided at the end of the steel rail 2 to prevent the rail sliding support 3 from sliding out of the steel rail 2.
[0023] When the utility model is in use, an outer processing shed and an inner processing shed are designed according to site conditions. The outer processing shed is fixed and the inner processing shed is movable. When it is necessary to hoist incoming steel bars and I-beams, the inner processing shed leaves the upper part of the steel bars and I-beams preparation processing area, and the incoming steel bars and I-beams are directly hoisted by a crane. After the hoisting is completed, the processing site and the storage site are covered by the inner processing shed to protect the construction site.
[0024] It should be noted that when installing the external processing shed and the internal processing shed, the site is first leveled, and after the leveling is completed, the site is rolled to ensure that the ground bearing capacity is not less than 150kpa, and then the earth and stone filling is carried out. Use 20cm thick C25 concrete to harden the foundation 1, first install the external processing shed, and install the steel column 4 on the foundation 1 through expansion bolts with one steel column 4 per 3m at the center point of the steel column 4. The height of the steel column 4 in the external processing shed is preferably 4.5m, and the height of the steel column 4 in the internal processing shed is preferably 3.5m. The specifications of the steel column 4 are 150mmx200mm and the thickness is 5mm. Before installing the columns of the movable steel bar processing shed, the steel track 2 is installed in advance. The specifications of the steel track 2 are 120mmx100mm and are fixed on the top of the track support 10 by welding. The track support 10 is made of 20 I-beams and fixed to the ground with expansion bolts to ensure that the steel track 2 is firmly connected to the track support 10 and the foundation 1. The steel diagonal brace 8 of the steel processing shed is made of 50mmx100mm square steel with a thickness of 2mm, and the cross bar is made of 40mmx80mm square steel with a thickness of 2mm, which is fixed to the column by welding. The steel beams of the steel processing shed are made of DN50 steel pipes and DN12 steel pipes. After pre-assembly and welding on the ground, they are welded and fixed by overall hoisting. The roof of the steel processing shed is made of 11mx1m color steel tiles. The color steel tiles are hoisted to the roof of the shed by a crane in a block hoisting method, and then the color steel tiles are placed in place with manual assistance and fixed with self-tapping screws.
[0025] The above is based on the ideal embodiment of the utility model. Through the above description, relevant personnel can make various changes and modifications without deviating from the technical concept of the utility model. The technical scope of this utility model is not limited to the content in the specification, and the technical scope must be determined according to the scope of the claims.
Claims
1. A combined walkable and movable steel bar processing shed, comprising: Two inner processing sheds and outer processing sheds of the same structure and different sizes are provided, characterized in that the outer processing shed is fixedly arranged on a foundation (1), the inner processing shed is movably arranged inside the outer processing shed, a steel track (2) is arranged on the surface of the foundation (1), a steel track sliding support (3) is arranged at the bottom of the inner processing shed, and the steel track sliding support (3) cooperates with the steel track (2); the outer processing shed comprises: two rows of steel columns (4) symmetrically arranged on the foundation (1), a connecting support (5) is arranged on the top of the steel column (4), a plurality of the connecting supports (5) are connected to a supporting truss (6), and a colored steel tile ceiling (7) is arranged on the upper part of the supporting truss (6).
2. The combined walkable and movable steel bar processing shed according to claim 1 is characterized in that: Two steel diagonal braces (8) are arranged alternately between two adjacent steel columns (4), wherein the upper end of the steel diagonal brace (8) is connected to the upper end of one of the steel columns (4), and the lower end of the steel diagonal brace (8) is connected to the lower end of the other steel column (4).
3. The combined walkable and movable steel bar processing shed according to claim 2 is characterized in that: The steel diagonal brace (8) is made of square steel.
4. The combined walkable and movable steel bar processing shed according to claim 1 is characterized in that: The upper parts of two adjacent steel columns (4) are connected via a steel cross bar (9), and the steel cross bar (9) is made of square steel.
5. The combined walkable and movable steel bar processing shed according to claim 1 is characterized in that: The steel column (4) and the steel rail sliding support (3) are both fixed to the foundation (1) by means of expansion bolts.
6. The combined walkable and movable steel bar processing shed according to claim 1 is characterized in that: The support truss (6) is assembled by splicing DN50 steel pipes and DN12 steel pipes.