Fluorosilicone waste gas treatment system
By adopting multi-stage treatment technology and waste heat recovery in fluorosilic waste gas treatment system, combining acid and alkali neutralization and wet electrostatic dust removal, the problems of high energy consumption of the equipment, easy to block, corrosion and secondary pollution are solved, and efficient treatment of waste gas is achieved and long-term safe operation of the equipment.
Patent Information
- Application Number
- CN202323570003.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-26
AI Technical Summary
The existing fluorosilic fluorine-silica waste gas treatment system has problems such as high energy consumption in equipment, easy to block and corrosion, and secondary pollution, and a single treatment technology is difficult to effectively solve these problems.
Using a multi-stage treatment system based on TO direct combustion furnace, soda heat exchanger, air preheater, whitening heat exchanger, quench tower, alkaline washing tower and water washing tower, through waste heat recovery and acid-base neutralization reaction, combined with automatic Dosing system and wet electrostatic dust collector realize comprehensive management of waste gas.
It effectively reduces heat waste, reduces equipment energy consumption, prevents equipment blockage and corrosion, reduces dust particles emissions, ensures the long-term safe operation of the equipment and the effective removal of pollutants.
Smart Images

Figure CN222103635U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a fluorine silicon waste gas treatment system, in particular to a fluorine silicon waste gas comprehensive treatment system based on direct combustion and waste heat utilization, belonging to the technical field of organic waste gas treatment. Background Art
[0002] Fluorosilicon materials are widely used in industrial fields and high-tech fields such as military industry, aerospace, petrochemical industry, machinery, construction, electronic information, electric power and electrical appliances, automobiles, light industry, medicine, agriculture, environmental protection, food, new energy and strategic emerging industries, and are important new chemical materials.
[0003] The waste gas produced by fluorine silicon production has complex components, including organic waste gas and inorganic waste gas. In the existing technology, a single treatment technology is usually used to treat the waste gas, which is not only difficult to achieve the treatment effect, but also has high treatment costs and is very uneconomical. It has the following problems:
[0004] (1) The waste gas combustion process releases a large amount of heat and increases the temperature. The existing treatment system causes a large amount of heat waste and the equipment operation energy consumption is also high;
[0005] (2) Silane combustion generates a large amount of dust particles, and direct emission will cause secondary pollution;
[0006] (3) After the exhaust gas is burned, acidic substances are generated, which can easily clog the equipment and are corrosive, making it difficult for the equipment to operate for a long time. Summary of the invention
[0007] The technical problem to be solved by the utility model is to provide a fluorine silicon waste gas treatment system which can solve the problems of high energy consumption of equipment operation, easy clogging and corrosion, etc. through waste heat recovery and multi-stage post-processing.
[0008] In order to solve the above technical problems, the fluorine silicon waste gas treatment system of the utility model includes a TO direct-fired furnace, a steam-water heat exchanger, an air preheater, a descaling heat exchanger, a quenching tower, an alkali washing tower and a water washing tower. The outlet of the TO direct-fired furnace is connected to the heat source inlet of the steam-water heat exchanger, the steam-water heat exchanger heat source outlet of the steam-water heat exchanger is connected to the air preheater heat source inlet of the air preheater, the air preheater heat source outlet of the air preheater is connected to the descaling heat source inlet of the descaling heat exchanger, the descaling heat exchanger heat source outlet of the descaling heat exchanger passes through the quenching tower, the alkali washing tower and the water washing tower in sequence and is connected to a wet electrostatic precipitator, the wet electrostatic precipitator is connected to the descaling heat exchanger cold source inlet of the descaling heat exchanger, and the descaling heat exchanger cold source outlet of the descaling heat exchanger is connected to a chimney after passing through an exhaust fan.
[0009] The inlet of the TO direct-fired furnace is also connected to a flame arrester, the inlet of the flame arrester is connected to an inlet switch valve, the front end of the inlet switch valve is also provided with an inlet bypass valve, and the outlet of the inlet bypass valve is connected to the emergency torch.
[0010] A hot water inlet pipe is connected to a cold source inlet of the steam-water heat exchanger of the steam-water heat exchanger, and a hot water outlet pipe is connected to a cold source outlet of the steam-water heat exchanger of the steam-water heat exchanger.
[0011] The cold source inlet of the air preheater is connected to a blower, and the cold source outlet of the air preheater is connected to the TO direct-fired furnace.
[0012] The alkali washing tower is connected with an automatic dosing system.
[0013] The TO direct-fired furnace is equipped with explosion-proof plates, fire-penetrating ports and slag discharge inspection doors.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] (1) By setting up a steam-water heat exchanger and an air preheater, the high-temperature hot gas at the outlet of the TO direct-fired furnace is used to heat the circulating water and preheat the combustion air in the furnace, thereby realizing the recovery and utilization of waste heat, reducing heat waste and saving equipment energy consumption.
[0016] (2) The exhaust gas is preheated and heated by using the waste heat after passing through the steam-water heat exchanger and the air preheater, thereby reducing the relative humidity of the exhaust gas and eliminating the wet smoke plume.
[0017] (3) An alkali washing tower is installed between the quenching tower and the water washing tower. The acidic corrosive components generated after high-temperature combustion are removed through acid-base neutralization reaction, ensuring the long-term operation of the equipment. At the same time, the alkali solution can be automatically replenished through the automatic dosing system to achieve automatic operation.
[0018] (4) The inlet bypass valve and inlet switch valve can be set to cut off the exhaust gas source in an emergency state of the equipment, ensuring the safety of the exhaust gas device.
[0019] (5) A wet electrostatic precipitator is installed after the water scrubber, which uses the electric field to capture particulate matter on the collector, effectively reducing the particulate matter content in the exhaust gas and effectively solving the problem of secondary pollution. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is the principle diagram of the fluorine silicon waste gas treatment system of the utility model. Implementation
[0021] The fluorine silicon waste gas treatment system of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0022] As shown in the figure, the fluorine silicon waste gas treatment system of the utility model includes a TO direct-fired furnace 4, a steam-water heat exchanger 5, an air preheater 6, a descaling heat exchanger 10, a quenching tower 11, an alkali washing tower 12 and a water washing tower 14, wherein the steam-water heat exchanger 5 has a steam-water heat exchanger heat source inlet 501, a steam-water heat exchanger heat source outlet 502, a steam-water heat exchanger cold source outlet 503 and a steam-water heat exchanger cold source inlet 504, the air preheater 6 has an air preheater heat source inlet 601, an air preheater heat source outlet 602, an air preheater cold source outlet 603 and an air preheater cold source inlet 604, and the descaling heat exchanger 10 has a descaling heat exchanger heat source inlet 1001, a descaling heat exchanger heat source outlet 1002, a descaling heat exchanger cold source inlet 1003 and a descaling heat exchanger cold source outlet 10 04, the outlet of the TO direct-fired furnace 4 is connected to the heat source inlet 501 of the steam-water heat exchanger, the heat source outlet 502 of the steam-water heat exchanger is connected to the heat source inlet 601 of the air preheater, the heat source outlet 602 of the air preheater is connected to the heat source inlet 1001 of the de-whitening heat exchanger, the heat source outlet 1002 of the de-whitening heat exchanger is connected to the wet electrostatic precipitator 15 after passing through the quenching tower 11, the alkali washing tower 12 and the water washing tower 14 in sequence, the wet electrostatic precipitator 16 is connected to the de-whitening heat exchanger cold source inlet 1003 of the de-whitening heat exchanger, the cold source outlet 1004 of the de-whitening heat exchanger is connected to the chimney 8 after passing through the exhaust fan 9, the inlet of the TO direct-fired furnace 4 is also connected to the flame arrester 1, the inlet of the flame arrester 1 is connected to the inlet switch valve 2, and the front end of the inlet switch valve 2 is also provided with an inlet bypass valve 3, and the outlet of the inlet bypass valve 3 is connected to the emergency torch.
[0023] Furthermore, the cold source inlet 504 of the steam-water heat exchanger is connected to a hot water inlet pipe, and the cold source outlet 503 of the steam-water heat exchanger is connected to a hot water outlet pipe, and the waste heat of the TO direct-fired furnace can be used to heat circulating water for daily use.
[0024] Furthermore, the air preheater cold source inlet 604 is connected to the blower 7, and the air preheater cold source outlet 603 is connected to the TO direct-fired furnace 4. The waste heat after the steam-water heat exchanger can be used to preheat the furnace combustion air, thereby reducing the energy consumption of equipment operation.
[0025] Furthermore, the alkali washing tower 12 is connected to an automatic dosing system 13, which can automatically replenish alkali solution by detecting the pH value in the water tank of the alkali washing tower, thereby realizing automatic operation of the equipment.
[0026] Furthermore, the TO direct-fired furnace 4 is equipped with explosion-proof plates 16, fire peeks 17 and slag discharge inspection doors 18, which ensure the safe operation of the TO direct-fired furnace.
[0027] The normal operation mode of the equipment is: the exhaust gas enters the TO direct-fired furnace 4 from the inlet switch valve 2 through the flame arrester 1 for high-temperature combustion. The high-temperature gas after combustion passes through the steam-water heat exchanger 5, the air preheater 6 and the deoxidation heat exchanger 10 in turn, and then enters the quenching tower 11 for cooling and removing some particulate matter. After cooling, it enters the alkali washing tower 12 for acid-base neutralization to remove acidic substances, and then enters the water washing tower 14 to remove particulate matter and water-soluble components again. Finally, it is discharged into the atmosphere through the chimney 8 after the wet electrostatic precipitator 16 captures the remaining particulate matter and the deoxidation heat exchanger 10 removes the wet smoke plume.
[0028] The emergency operation mode of the equipment is: the inlet switch valve 2 is closed, and the exhaust gas is directly discharged into the emergency flare for combustion through the inlet bypass valve 3.
[0029] The waste heat utilization method of the equipment is as follows: the high-temperature gas after combustion in the TO direct-fired furnace 4 first recovers heat through the steam-water heat exchanger 5 for circulating water heating, then preheats the furnace combustion air through the air preheater 6, and finally preheats the gas after the wet electrostatic precipitator 16 through the deoxidizing heat exchanger 10 to remove the wet smoke plume.
[0030] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. A fluorine silicon waste gas treatment system, Features: The invention comprises a TO direct-fired furnace (4), a steam-water heat exchanger (5), an air preheater (6), a descaling heat exchanger (10), a quenching tower (11), an alkali washing tower (12) and a water washing tower (14), wherein the outlet of the TO direct-fired furnace (4) is connected to the steam-water heat exchanger heat source inlet (501) of the steam-water heat exchanger (5), the steam-water heat exchanger heat source outlet (502) of the steam-water heat exchanger (5) is connected to the air preheater heat source inlet (601) of the air preheater (6), and the air preheater heat source outlet (602) of the air preheater (6) is connected to the steam-water heat exchanger heat source inlet (502) of the air preheater (6). The descaling heat exchanger (10) is connected to a heat source inlet (1001) of the descaling heat exchanger, and the heat source outlet (1002) of the descaling heat exchanger (10) passes through the quenching tower (11), the alkali washing tower (12) and the water washing tower (14) in sequence and is then connected to a wet electrostatic precipitator (15). The wet electrostatic precipitator (15) is connected to a cold source inlet (1003) of the descaling heat exchanger (10), and the cold source outlet (1004) of the descaling heat exchanger (10) passes through an exhaust fan (9) and is then connected to a chimney (8).
2. According to the fluorine silicon waste gas treatment system of claim 1, Features: The inlet of the TO direct-fired furnace (4) is also connected to a flame arrester (1), the inlet of the flame arrester (1) is connected to an inlet switch valve (2), the front end of the inlet switch valve (2) is also provided with an inlet bypass valve (3), and the outlet of the inlet bypass valve (3) is connected to an emergency torch.
3. The fluorine silicon waste gas treatment system according to claim 1 or 2, Features: The steam-water heat exchanger cold source inlet (504) of the steam-water heat exchanger (5) is connected to a hot water inlet pipe, and the steam-water heat exchanger cold source outlet (503) of the steam-water heat exchanger (5) is connected to a hot water outlet pipe.
4. According to the fluorine silicon waste gas treatment system of claim 3, Features: The air preheater cold source inlet (604) of the air preheater (6) is connected to a blower (7), and the air preheater cold source outlet (603) of the air preheater (6) is connected to the TO direct-fired furnace (4).
5. The fluorine-silicon waste gas treatment system according to claim 1, Features: The alkali washing tower (12) is connected to an automatic dosing system (13).
6. The fluorine silicon waste gas treatment system according to claim 1, Features: The TO direct-fired furnace (4) is equipped with explosion-proof plates (16), fire peeks (17) and slag discharge inspection doors (18).
