System for blowing soot on heat exchange tube bundle in dry quenching boiler by using dry quenching inert cycle gas
By pressurized soot blowing and filter cleaning of inert circulation gas inside the dry coke quenching system, the corrosion and operating resistance problems caused by ash accumulation of heat exchange tube bundles in the dry coke quenching boiler are solved, extending the equipment life and reducing costs, and achieving environmentally friendly results .
Patent Information
- Application Number
- CN202420259490.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-02-02
AI Technical Summary
The heat exchange tube bundle in the dry-quenching coke boiler is corroded, bursts the pipe, reduces heat exchange efficiency and increases operating resistance due to ash accumulation, and the coke powder contains sulfide to aggravate corrosion and thins strength, affecting the boiler output.
The inert circulation gas inside the dry coke quenching system is used for pressurization and blowing soot, and the radial heat pipe water feed preheating device, filter, presser, controller and other components can be used to blow soot of the heat exchange tube bundle and clean the filter. Ash to avoid exhaust gas discharge.
It effectively solves the corrosion and operating resistance problems caused by ash accumulation in heat exchange tube bundles, extends the life of the filtration equipment, ensures the filtration efficiency of circulating gas, reduces costs and is friendly to the environment.
Smart Images

Figure CN222103646U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of dry coke quenching waste heat boilers, in particular to a soot blowing system for a heat exchange tube bundle inside a dry coke quenching boiler by utilizing dry coke quenching inert circulating gas. Background Art
[0002] The main function of the CDQ system is to recover the heat of red-hot coke through inert circulating gas for utilization, and generate steam for power generation or heating. The main process of inert circulating gas is as follows: under the action of the circulating fan, the inert circulating gas cools the red-hot coke at about 1050°C in the CDQ furnace, and the inert circulating gas that absorbs the sensible heat of the coke is heated to 900°C to 980°C; the high-temperature inert circulating gas is dedusted by the primary dust collector and enters the CDQ boiler, and after heat exchange with the steam-water system, the temperature drops to 160 to 170°C; the inert circulating gas passes through the secondary dust collector, circulating fan and radial heat pipe feed water preheating device, and the temperature drops to about 130°C, and enters the CDQ furnace again to cool the red-hot coke.
[0003] Affected by the dry coke quenching process, coke powder dust will be brought into the dry coke quenching boiler from the dry quenching furnace with the flow of circulating gas. Although a part of the coke powder is removed by a dust collector before entering the dry coke quenching boiler, some coke powder still enters the dry coke quenching boiler and is deposited on the heat exchange tube bundle inside the boiler. Usually, coke powder contains sulfides. The deposition of coke powder on the heat exchange tube bundle will enhance the corrosion of the heat exchange tube bundle and reduce the strength of the heat exchange tube bundle, resulting in a thinning of the wall thickness of the heat exchange tube bundle. Boiler tube bursts often occur during operation. At the same time, the deposition of coke powder on the heat exchange tube bundle will also reduce the heat transfer efficiency and affect the boiler output. In addition, due to the influence of ash accumulation, the flow area of the inert circulating gas is reduced, which increases the operating resistance. Summary of the invention
[0004] The utility model provides a soot blowing system for a heat exchange tube bundle inside a dry quenching boiler by using an inert circulating gas of a dry quenching system. The utility model uses the inert circulating gas inside the dry quenching system to soot blow the heat exchange tube bundle inside the dry quenching boiler, thereby solving the problems of corrosion and bursting of the heat exchange tube bundle, affecting the heat exchange efficiency, and increasing the operation resistance during the operation of the dry quenching boiler due to dust accumulation in the heat exchange tube bundle. At the same time, because the inert circulating gas inside the dry quenching system is used for pressurized soot blowing, the composition of the inert circulating gas of the dry quenching is not changed, and waste gas is not discharged externally, so the investment cost is low and the system is environmentally friendly.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A sootblowing system for a heat exchange tube bundle inside a dry quenching boiler using dry quenching inert circulating gas comprises a radial heat pipe feedwater preheating device and a dry quenching furnace, wherein an outlet pipe of the radial heat pipe feedwater preheating device is connected to the dry quenching furnace; an inlet pipe, a filter, an outlet pipe, a sootblowing device, a pressurizer, a pressure gauge and a controller; one end of the inlet pipe is connected to the outlet pipe of the radial heat pipe feedwater preheating device, and the other end is connected to the filter; one end of the outlet pipe is connected to the filter, and the other end is connected to the sootblowing device, and a pressurizer and a pressure gauge are sequentially arranged on the outlet pipe; and the controller is electrically and mechanically connected to the sootblowing device and the pressurizer, respectively.
[0007] A soot blowing system for a heat exchange tube bundle inside a dry quenching boiler using dry quenching inert circulating gas also includes a back-blowing inlet pipe, a back-blowing outlet pipe and a valve; one end of the back-blowing inlet pipe is connected to the outlet pipe, and the other end is connected to a filter; one end of the back-blowing outlet pipe is connected to the filter, and the other end is connected to the outlet pipe of a radial heat pipe feedwater preheating device; the valve is arranged on the back-blowing inlet pipe; and a controller is connected to the valve by electrical signals.
[0008] The controller is a PLC controller.
[0009] The valve is a regulating valve.
[0010] Compared with the prior art, the beneficial effects of the utility model are:
[0011] 1) The utility model uses the inert circulating gas inside the dry coke quenching system to blow soot on the heat exchange tube bundle inside the dry coke quenching boiler, thereby solving the problem of corrosion and tube bursting caused by soot accumulation in the heat exchange tube bundle during the operation of the dry coke quenching boiler, affecting the heat exchange efficiency and increasing the operation resistance; at the same time, because the inert circulating gas inside the dry coke quenching system is used for pressurized soot blowing, the composition of the inert circulating gas of the dry coke quenching is not changed, and waste gas is not discharged, so the investment cost is low and it is environmentally friendly.
[0012] 2) The utility model arranges a filter in front of the compressor of the inert circulating gas to extend the service life of the filtering equipment.
[0013] 3) The utility model can ensure the filtering efficiency of the inert circulating gas by regularly cleaning the filter. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the accompanying drawings:
[0015] Figure 1 It is a schematic diagram of the principle of the utility model system.
[0016] Description of reference numerals:
[0017] In the figure:
[0018] 1. CDQ furnace 2. Primary dust collector 3. CDQ boiler 4. Secondary dust collector 5. Circulating fan 6. Radial heat pipe feed water preheating device 7. Outlet pipe of radial heat pipe feed water preheating device 8. Inlet pipe 9. Filter 10. Outlet pipe 11. Soot blowing device 12. Pressurizer 13. Pressure gauge 14. Controller 15. Backflush inlet pipe 16. Backflush outlet pipe 17. Valve 18. Heat exchange tube bundle inside CDQ boiler DETAILED DESCRIPTION
[0019] The specific implementation of the utility model is further described below in conjunction with the accompanying drawings:
[0020] See Figure 1 As shown, the utility model relates to a sootblowing system for the internal heat exchange tube bundle of a dry quenching boiler using the inert circulating gas of dry quenching, comprising a radial heat pipe feed water preheating device 6 and a dry quenching furnace 1, wherein the outlet pipe 7 of the radial heat pipe feed water preheating device is connected to the dry quenching furnace 1. It also comprises an inlet pipe 8, a filter 9, an outlet pipe 10, a sootblowing device 11, a pressurizing machine 12, a pressure gauge 13 and a controller 14. One end of the inlet pipe 8 is connected to the outlet pipe 7 of the radial heat pipe feed water preheating device, and the other end is connected to the filter 9. One end of the outlet pipe 10 is connected to the filter 9, and the other end is connected to the sootblowing device 11, and a pressurizing machine 12 and a pressure gauge 13 are sequentially arranged on the outlet pipe 10. The controller 14 is electrically connected to the sootblowing device 11 and the pressurizing machine 12, respectively.
[0021] A soot blowing system for the internal heat exchange tube bundle of a dry quenching boiler using inert circulating gas of dry quenching includes a back-blowing inlet pipe 15, a back-blowing outlet pipe 16 and a valve 17. One end of the back-blowing inlet pipe 15 is connected to the outlet pipe 10, and the other end is connected to the filter 9. One end of the back-blowing outlet pipe 15 is connected to the filter 9, and the other end is connected to the outlet pipe 7 of the radial heat pipe type feed water preheating device. The connection end of the back-blowing outlet pipe 16 and the outlet pipe 7 of the radial heat pipe type feed water preheating device should be arranged between the connection end of the inlet pipe 8 and the outlet pipe 7 of the radial heat pipe type feed water preheating device and the dry quenching furnace 1, so as to prevent the gas with high dust content in the back-blowing outlet pipe 15 from entering the filter 9 through the inlet pipe, thereby increasing its workload.
[0022] The valve 17 is arranged on the back-blowing introduction pipeline 15. The controller 14 is connected to the valve 17 by electrical signals. The controller 14 is a PLC controller. The valve 17 is a regulating valve.
[0023] A soot blowing principle of a soot blowing system for a heat exchange tube bundle inside a dry coke quenching boiler using a dry coke quenching inert circulating gas, the specific method is as follows:
[0024] (1) A portion of the inert circulating gas from the outlet pipe 7 of the radial heat pipe feedwater preheating device enters the filter 9 through the inlet pipe 8 for filtration;
[0025] (2) The filtered inert circulating gas is pressurized by a compressor 12, and the pressurized inert circulating gas enters a sootblowing device 11 to blow soot on the heat exchange tube bundle 18 inside the dry coke quenching boiler; the pressure of the pressurized inert gas is above 0.6 MPa;
[0026] (3) The pressurized inert circulating gas can enter the filter 9 through the back-blowing inlet pipe 15 to clean the filter 9, and the gas passing through the filter 9 enters the outlet pipe 7 of the radial heat pipe type feed water preheating device through the back-blowing outlet pipe 16;
[0027] (4) The controller 14 can control the opening and closing of the sootblowing device 11, the compressor 12 and the valve 17 to achieve regular sootblowing of the heat exchange tube bundle 18 inside the CDQ boiler and cleaning of the filter 9.
[0028] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, and these simple modifications all belong to the protection scope of the present invention. It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations. In addition, the various different embodiments of the present invention can also be arbitrarily combined, as long as they do not violate the idea of the present invention, they should also be regarded as the contents disclosed by the present invention.
Claims
1. A soot blowing system for the heat exchange tube bundle inside the dry coke quenching boiler using the dry coke quenching inert circulating gas. It is characterized in that It comprises a radial heat pipe type feed water preheating device and a dry quenching furnace, wherein the outlet pipe of the radial heat pipe type feed water preheating device is connected to the dry quenching furnace; it also comprises an inlet pipe, a filter, an outlet pipe, a sootblower, a pressurizer, a pressure gauge and a controller; one end of the inlet pipe is connected to the outlet pipe of the radial heat pipe type feed water preheating device, and the other end is connected to the filter; one end of the outlet pipe is connected to the filter, and the other end is connected to the sootblower, and a pressurizer and a pressure gauge are sequentially arranged on the outlet pipe; the controller is respectively connected to the sootblower and the pressurizer by electrical signals.
2. A soot blowing system for the internal heat exchange tube bundle of a dry coke quenching boiler using the dry coke quenching inert circulating gas according to claim 1, It is characterized in that It also includes a back-blowing inlet pipe, a back-blowing outlet pipe and a valve; one end of the back-blowing inlet pipe is connected to the outlet pipe, and the other end is connected to the filter; one end of the back-blowing outlet pipe is connected to the filter, and the other end is connected to the outlet pipe of the radial heat pipe type water preheating device; the valve is arranged on the back-blowing inlet pipe; the controller is connected to the valve electrical signal.
3. A soot blowing system for the internal heat exchange tube bundle of a dry coke quenching boiler using the dry coke quenching inert circulating gas according to claim 1, It is characterized in that The controller is a PLC controller.
4. A soot blowing system for the internal heat exchange tube bundle of a dry coke quenching boiler using the dry coke quenching inert circulating gas according to claim 2, It is characterized in that The valve is a regulating valve.
Citation Information
Cited By
System and method for blowing soot on heat exchange tube bundle in dry quenching boiler by using dry quenching inert cycle gas
CN117847555A
