Asphalt amount detection device in asphalt pavement construction process

By using the heat-conducting oil furnace waste gas waste heat to heat and insulation in the asphalt usage detection device, the problems of asphalt heat loss and energy waste are solved, the measurement accuracy of the flowmeter is improved, and the accurate detection of asphalt usage is achieved.

CN222104794UActive Publication Date: 2024-12-03HENAN TIANPING ENG QUALITY INSPECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420930512.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-12-03
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

During the construction of asphalt pavement, heat loss in the discharge pipe leads to an increase in viscosity, affecting the measurement accuracy of the flowmeter, and the waste heat of the exhaust gas of the thermally conductive oil furnace is not effectively utilized, resulting in waste of energy.

Method used

Design a bitumen detection device, by connecting a spiral heating pipe to the outside of the discharge pipe, heating and insulation using the waste heat of the heat conducting oil furnace, including a circulation heating component and a heat exchange component, and using the waste heat of the waste gas of the heat conducting oil furnace to be spiral The heating pipe provides heat to ensure the temperature of the asphalt is stable as it flows through the discharge pipe.

Benefits of technology

It effectively reduces resource waste, improves the detection accuracy of the asphalt flowmeter, and ensures accurate control of the amount of asphalt.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222104794U_ABST
    Figure CN222104794U_ABST
Patent Text Reader

Abstract

The utility model discloses an asphalt pavement construction process asphalt consumption detection device, which comprises an asphalt tank body, a discharge pipe is arranged on the asphalt tank body, a flow meter for detecting the asphalt consumption is arranged on the discharge pipe, a spiral heating pipe is sleeved on the part of the discharge pipe between the asphalt tank body and the flow meter, and the spiral heating pipe is connected with the asphalt tank body. The two ends of the spiral heating pipe communicate with a heating mechanism, the heating mechanism comprises a circulation heating assembly used for providing heat for a first organic working medium circulation assembly and a heat exchange assembly used for providing heat for the circulation heating assembly, and the first organic working medium circulation assembly is used for providing heat for the spiral heating pipe. The heat exchange assembly is arranged in the heat conduction oil furnace waste gas waste heat discharging pipeline. The spiral heating pipe is connected to the outer side of the discharging pipe in a sleeving mode and used for heating and heat preservation of asphalt flowing through the discharging pipe, heat needed by the spiral heating pipe comes from waste heat of waste gas of the heat conduction oil furnace, and the problems that heat is lost when the asphalt flows through the discharging pipe and the waste heat of the waste gas of the heat conduction oil furnace is not effectively utilized are comprehensively considered; the purposes of reducing resource waste and improving the detection precision of the asphalt flowmeter are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of asphalt production equipment, and in particular relates to an asphalt dosage detection device in an asphalt pavement construction process. Background Art

[0002] During the asphalt pavement construction process, since the asphalt production equipment assembly occupies a large area, the asphalt for paving generally needs to be produced simultaneously in the asphalt production plant and transported to the construction site in a timely manner by asphalt mixer trucks. It needs to be produced and used in a timely manner.

[0003] Before the asphalt is delivered to the foaming device by the asphalt delivery pump for asphalt foaming, the asphalt delivered to the construction site needs to be stored in the asphalt tank. During this period, the asphalt tank needs to be heated and insulated to maintain the viscosity of the asphalt in the tank. After the asphalt reaches the required temperature, the asphalt is delivered to the foaming device through the discharge pipe on the asphalt tank. Among them, an asphalt flowmeter needs to be set on the discharge pipe to detect the amount of asphalt used. In order to improve the accuracy of detecting the amount of asphalt used, the asphalt flowmeter is generally set at one end of the discharge pipe close to the foaming device to reduce the impact of the unused asphalt inside the discharge pipe on the measurement of the asphalt flowmeter. However, it is found in practice that the discharge pipe generally has a certain length. After heating, the asphalt that meets the temperature requirements will lose heat when flowing through the discharge pipe, resulting in an increase in the viscosity of the asphalt, which is easy to have a certain impact on the detection of the asphalt flowmeter, affecting its measurement accuracy, and is not conducive to the control of the asphalt amount.

[0004] At present, the heating of asphalt in asphalt tanks is mostly done by indirect heating with heat transfer oil, which is a common method for medium-temperature heating, that is, the organic heat carrier is used as the heat transfer medium to indirectly heat the asphalt. The temperature of the heat transfer oil is controlled at about 180°C, which can effectively prevent the asphalt from aging and deteriorating due to excessive temperature. The heating of the heat transfer oil is carried out in a heat transfer oil furnace, and the heat transfer oil furnace usually burns coal or gas when working, which will produce waste gas discharged from the waste heat exhaust pipe. In the existing asphalt production, the waste heat in the waste gas is mostly not effectively utilized, which also causes a certain amount of energy waste. Utility Model Content

[0005] In view of the shortcomings of the prior art, the purpose of the utility model is to provide an asphalt dosage detection device for an asphalt pavement construction process, so as to solve the technical problems raised in the background technology.

[0006] The utility model provides the following technical solutions:

[0007] A device for detecting asphalt usage during asphalt pavement construction comprises an asphalt tank body, a discharge pipe is provided on the asphalt tank body, a flow meter for detecting asphalt usage is provided on the discharge pipe, a spiral heating pipe is partially sleeved on the discharge pipe located between the asphalt tank body and the flow meter, a heating mechanism is connected to both ends of the spiral heating pipe, the heating mechanism comprises a circulating heating component for providing heat to a first organic working fluid circulation component and a heat exchange component for providing heat to the circulating heating component, the first organic working fluid circulation component is used to provide heat to the spiral heating pipe, and the heat exchange component is arranged inside a waste heat discharge pipe of a thermal oil furnace.

[0008] Preferably, the portion of the discharge pipe located between the asphalt tank body and the flow meter is also sleeved with an insulation sleeve, and the spiral heating pipe is located between the discharge pipe and the insulation sleeve.

[0009] Preferably, a heating filling layer is also filled between the discharge pipe and the insulation sleeve.

[0010] Preferably, the flow meter is an asphalt flow meter.

[0011] Preferably, the circulating heating component comprises an evaporator, a compressor, a condenser, and an expansion valve, and the evaporator, the compressor, the condenser, and the expansion valve are connected end to end in sequence through a first pipeline, and the first pipeline is filled with a second organic working fluid.

[0012] Preferably, the heat exchange assembly includes a U-shaped heat exchange tube, which is arranged inside the exhaust heat discharge pipe of the thermal oil furnace, and a heat exchange medium is arranged inside the U-shaped heat exchange tube. The input end of the U-shaped heat exchange tube is provided with a first liquid inlet pipe, and the output end of the U-shaped heat exchange tube is provided with a first liquid outlet pipe. A disc-shaped heat exchange tube is arranged on the side of the evaporator, and the other end of the first liquid outlet pipe is connected to the input end of the disc-shaped heat exchange tube, and the other end of the first liquid inlet pipe is connected to the output end of the disc-shaped heat exchange tube through a second pump body.

[0013] Preferably, a heat collecting fin is provided on the outside of the U-shaped heat exchange tube, and the heat collecting fin is an annular heat collecting fin, and the annular heat collecting fin is coaxially arranged on the outside of the U-shaped heat exchange tube. There are a plurality of heat collecting fins, and the plurality of heat collecting fins are evenly arranged at equal intervals along the extension direction of the U-shaped heat exchange tube.

[0014] Preferably, the spiral heating tube is coaxially arranged with the discharge tube, and one end of the spiral heating tube close to the asphalt tank body is a liquid outlet port, and one end of the spiral heating tube close to the flowmeter is a liquid inlet port.

[0015] Preferably, the first organic working fluid circulation component includes a circulation pipe, a first pump body and a first organic working fluid box, the liquid outlet port is connected to the liquid inlet of the first organic working fluid box through the circulation pipe, the liquid outlet of the first organic working fluid box is connected to the input end of the first pump body through the circulation pipe, the output end of the first pump body is connected to the cold water inlet end of the condenser through the circulation pipe, and the hot water outlet end of the condenser is connected to the liquid inlet port through the circulation pipe.

[0016] Compared with the prior art, the utility model has the following beneficial effects:

[0017] The utility model discloses a device for detecting asphalt consumption in an asphalt pavement construction process. The device heats and insulates asphalt flowing through the discharge pipe by sleeve-connecting a spiral heating pipe on the outer side of the discharge pipe. The heat required by the spiral heating pipe comes from the waste heat of exhaust gas from a heat transfer oil furnace. The device comprehensively considers the problem of heat loss when the asphalt flows through the discharge pipe and the problem that the waste heat of exhaust gas from the heat transfer oil furnace is not effectively utilized, thereby achieving the purpose of reducing resource waste and improving the detection accuracy of the asphalt flow meter. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a structural schematic diagram of the utility model.

[0020] Figure 2 It is a schematic diagram of the heating mechanism structure of the utility model.

[0021] Figure 3 This is a schematic diagram of the discharge pipe structure of the utility model. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is only a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] See also Figure 1-3 As shown, a device for detecting asphalt consumption in an asphalt pavement construction process comprises an asphalt tank body 1, on which a discharge pipe 2 is provided, on which a flow meter 3 for detecting asphalt consumption is provided, and a spiral heating pipe 5 is partially sleeved on the discharge pipe 2 located between the asphalt tank body 1 and the flow meter 3, and both ends of the spiral heating pipe 5 are connected to a heating mechanism, and the heating mechanism comprises a circulating heating component 7 for providing heat to a first organic working fluid circulation component 6 and a heat exchange component 8 for providing heat to the circulating heating component 7, wherein the first organic working fluid circulation component 6 is used to provide heat to the spiral heating pipe 5, and the heat exchange component 8 is arranged inside a waste heat discharge pipe 9 of a thermal oil furnace. A spiral heating tube is sleeved on the outside of the discharge pipe to heat and insulate the asphalt flowing through the discharge pipe. The heat required by the spiral heating tube comes from the first organic working fluid circulation component 6, the heat required by the first organic working fluid circulation component 6 comes from the circulation heating component 7, the heat required by the circulation heating component 7 comes from the heat exchange component 8, and the heat of the heat exchange component 8 comes from the waste heat of the thermal oil furnace exhaust gas. This comprehensively considers the heat loss when the asphalt flows through the discharge pipe and the problem that the waste heat of the thermal oil furnace exhaust gas is not effectively utilized, thereby achieving the purpose of reducing resource waste and improving the detection accuracy of the asphalt flowmeter.

[0025] The discharge pipe 2 is located between the asphalt tank body 1 and the flow meter 3 and is also sleeved with a heat preservation sleeve 4, and the spiral heating pipe 5 is located between the discharge pipe 2 and the heat preservation sleeve 4. A heating filling layer is also filled between the discharge pipe 2 and the heat preservation sleeve 4. The material of the heating filling layer is one of alumina ceramics and heat-conducting insulating rubber.

[0026] The flow meter 3 is an asphalt flow meter.

[0027] The circulating heating component 7 includes an evaporator 71, a compressor 72, a condenser 73, and an expansion valve 74. The evaporator 71, the compressor 72, the condenser 73, and the expansion valve 74 are connected end to end in sequence through a first pipeline, and the first pipeline is filled with a second organic working medium. The second organic working medium has the characteristics of heat release during condensation and liquefaction, and heat absorption during evaporation and gasification. When the thermal oil furnace is working, the compressor will pressurize the gaseous second organic working medium to make it a high-temperature and high-pressure gas, which will be condensed and liquefied by the condenser 73, releasing a large amount of heat to exchange heat with the first organic working medium inside the circulation pipe 61. The expansion valve will decompress the liquid second organic working medium, and the liquid second organic working medium will be vaporized by the evaporator to absorb the heat of the heat exchange medium inside the heat exchange component and become a gas to start the next cycle.

[0028] The heat exchange assembly 8 includes a U-shaped heat exchange tube, which is arranged inside the exhaust heat exhaust pipe 9 of the thermal oil furnace. A heat exchange medium is arranged inside the U-shaped heat exchange tube. A first liquid inlet pipe is arranged at the input end of the U-shaped heat exchange tube, and a first liquid outlet pipe is arranged at the output end of the U-shaped heat exchange tube. A disc-shaped heat exchange tube 75 is arranged on the side of the evaporator. The other end of the first liquid outlet pipe is connected to the input end of the disc-shaped heat exchange tube, and the other end of the first liquid inlet pipe is connected to the output end of the disc-shaped heat exchange tube through a second pump body. A heat collecting fin is arranged on the outside of the U-shaped heat exchange tube. The heat collecting fin is an annular heat collecting fin, and the annular heat collecting fin is coaxially arranged on the outside of the U-shaped heat exchange tube. There are a plurality of heat collecting fins, and the plurality of heat collecting fins are evenly arranged at equal intervals along the extension direction of the U-shaped heat exchange tube. When the heat exchange medium inside the U-shaped heat exchange tube flows, it can absorb the heat in the exhaust heat of the thermal oil furnace.

[0029] The spiral heating tube 5 is coaxially arranged with the discharge tube 2, and the end of the spiral heating tube 5 close to the asphalt tank body 1 is a liquid outlet port 51, and the end of the spiral heating tube 5 close to the flowmeter 3 is a liquid inlet port. The first organic working medium circulation component includes a circulation pipe 61, a first pump body 62 and a first organic working medium box 63, the liquid outlet port 51 is connected with the liquid inlet of the first organic working medium box 63 through the circulation pipe 61, the liquid outlet of the first organic working medium box 63 is connected with the input end of the first pump body through the circulation pipe, the output end of the first pump body is connected with the cold water inlet end of the condenser 73 through the circulation pipe, and the hot water outlet end of the condenser is connected with the liquid inlet port through the circulation pipe. Through the operation of the first pump body, the first organic working medium in the first organic working medium box 63 can be returned to the first organic working medium box 63 again through the first pump body, the condenser 73, and the spiral heating tube 5 in sequence, wherein heat exchange is achieved when passing through the condenser 73, the temperature of the first organic working medium increases, and the asphalt inside the discharge pipe is heated and kept warm, and the cycle is carried out in sequence. The heated first organic working medium enters from the end close to the flow meter 3 because the internal asphalt at the end of the discharge pipe close to the flow meter 3 loses the most heat, and more heat is needed to reach the required temperature.

[0030] A second spiral heating tube 10 is also provided inside the asphalt tank body 1, and a heat transfer oil inlet 14 and a heat transfer oil outlet 15 are respectively provided at both ends of the second spiral heating tube 10. The heat transfer oil inlet 14 and the heat transfer oil outlet 15 are respectively connected to the oil outlet end and the oil inlet end of the heat transfer oil furnace.

[0031] A stirring shaft 11 is coaxially arranged inside the asphalt tank body 1 along its length direction, and the two ends of the stirring shaft are respectively connected to the two ends of the asphalt tank body 1 through bearings, and a plurality of stirring rods 12 are arranged on the stirring shaft. A motor 13 for driving the stirring shaft is also arranged at one end of the asphalt tank body 1. The heating and stirring of the asphalt inside the asphalt tank body are realized, and the uniformity of the viscosity of the asphalt is further improved, and the accuracy of the flow meter in detecting the asphalt is improved.

[0032] The above is only a preferred implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed by the present invention according to the technical solution and inventive concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A device for detecting asphalt consumption during asphalt pavement construction, comprising an asphalt tank body (1), wherein the asphalt tank body (1) is provided with a discharge pipe (2). Features: The discharge pipe (2) is provided with a flow meter (3) for detecting the amount of asphalt used. The discharge pipe (2) is partially sleeved with a spiral heating pipe (5) located between the asphalt tank (1) and the flow meter (3). Both ends of the spiral heating pipe (5) are connected to a heating mechanism. The heating mechanism comprises a circulating heating component (7) for providing heat to a first organic working fluid circulation component (6) and a heat exchange component (8) for providing heat to the circulating heating component (7). The first organic working fluid circulation component (6) is used to provide heat to the spiral heating pipe (5). The heat exchange component (8) is arranged inside a waste heat discharge pipe (9) for exhaust gas from a thermal oil furnace.

2. According to claim 1, a device for detecting asphalt usage in asphalt pavement construction process, It is characterized in that The circulating heating component (7) comprises an evaporator (71), a compressor (72), a condenser (73), and an expansion valve (74); the evaporator (71), the compressor (72), the condenser (73), and the expansion valve (74) are connected end to end in sequence via a first pipeline; the first pipeline is filled with a second organic working fluid.

3. According to claim 2, a device for detecting asphalt usage during asphalt pavement construction, It is characterized in that The heat exchange assembly (8) comprises a U-shaped heat exchange tube, the U-shaped heat exchange tube is arranged inside the waste heat discharge pipe (9) of the thermal oil furnace, a heat exchange medium is arranged inside the U-shaped heat exchange tube, a first liquid inlet pipe is arranged at the input end of the U-shaped heat exchange tube, and a first liquid outlet pipe is arranged at the output end of the U-shaped heat exchange tube, a disc-shaped heat exchange tube (75) is arranged on the side of the evaporator, the other end of the first liquid outlet pipe is connected to the input end of the disc-shaped heat exchange tube, and the other end of the first liquid inlet pipe is connected to the output end of the disc-shaped heat exchange tube through a second pump body.

4. According to claim 3, a device for detecting asphalt usage during asphalt pavement construction, It is characterized in that The spiral heating tube (5) is coaxially arranged with the discharge tube (2), and one end of the spiral heating tube (5) close to the asphalt tank body (1) is a liquid outlet port (51), and one end of the spiral heating tube (5) close to the flow meter (3) is a liquid inlet port.

5. According to claim 4, a device for detecting asphalt usage during asphalt pavement construction, It is characterized in that The first organic working fluid circulation component comprises a circulation pipe (61), a first pump body (62) and a first organic working fluid box (63); the liquid outlet port (51) is connected to a liquid inlet port of the first organic working fluid box (63) through the circulation pipe (61); the liquid outlet port of the first organic working fluid box (63) is connected to an input end of the first pump body through the circulation pipe; the output end of the first pump body is connected to a cold water inlet end of the condenser (73) through the circulation pipe; and the hot water outlet end of the condenser is connected to the liquid inlet port through the circulation pipe.

6. According to claim 1, a device for detecting asphalt usage during asphalt pavement construction, It is characterized in that The portion of the discharge pipe (2) located between the asphalt tank body (1) and the flow meter (3) is also sleeved with a heat-insulating sleeve (4), and the spiral heating pipe (5) is located between the discharge pipe (2) and the heat-insulating sleeve (4).

7. A device for detecting asphalt usage during asphalt pavement construction according to claim 6, It is characterized in that A heating filling layer is also filled between the discharge pipe (2) and the insulation sleeve (4).