Bridge prefabricated T-beam shared pedestal

By designing a movable concrete foundation and positioning mechanism in the prefabricated T-beam of the bridge, combined with guide wheels and tracks, the flexible splicing and growth of the bridge T-beam pedestal is achieved, solving the problem that the pedestal cannot be moved and shared in the existing technology, and improving the ease of use and production efficiency.

CN222115507UActive Publication Date: 2024-12-06CCCC SHEC FOURTH ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420570685.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-12-06
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

The steel pedestals of the existing bridge T-beam cannot be moved after installation and adjacent pedestals cannot be shared, which has problems such as inconvenience and waste.

Method used

A common pedestal for prefabricated T-beams of bridge is designed, using first and second pedestals that can be movably installed on concrete foundation, and the disassembly connection and fixation of the pedestal section is achieved through the first bolt and nut assembly and positioning mechanism, and combined with guide wheels and tracks to achieve Move to facilitate splicing and fixing of the pedestal section.

Benefits of technology

It realizes flexible splicing and growth of pedestals, meets the needs of different lengths, simplifies the use process, realizes the sharing of adjacent pedestals, and improves production efficiency and convenience of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222115507U_ABST
    Figure CN222115507U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge prefabricated T-beam shared pedestal which comprises a concrete foundation, a first pedestal and a second pedestal are movably installed on the concrete foundation, each of the first pedestal and the second pedestal is formed by sequentially connecting a plurality of pedestal sections, the adjacent pedestal sections are detachably connected through first bolt and nut assemblies, and the first bolt and nut assemblies and the second bolt and nut assemblies are detachably connected through second bolt and nut assemblies. A positioning mechanism for the pedestal section is mounted on the concrete foundation; first penetrating holes matched with the first bolt and nut assemblies are formed in the two ends of the base. According to the utility model, the first pedestal and the second pedestal can be independently used, when the length of the T-beam needing to be prefabricated exceeds the length of the first pedestal and the length of the second pedestal, a certain number of pedestal sections can be detached from the second pedestal and connected with the first pedestal, and then the pedestal sections and the concrete foundation are fixed through the positioning mechanism; therefore, the first pedestal can be lengthened to meet production requirements, sharing of adjacent pedestals is achieved, and use is easy and convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated beam production, in particular to a common pedestal for prefabricated T-beams of bridges. Background Art

[0002] At present, the prefabrication of bridge T-beams is mostly carried out on pedestals. Most of the current pedestals are divided into concrete pedestals and steel pedestals. Concrete pedestals have low investment costs, but cannot be used in a rotating manner. Although steel pedestals have high initial investment costs, they can be used in a rotating manner, and the total length of the pedestal can be spliced ​​according to design requirements, which is more convenient to use.

[0003] However, the steel pedestal cannot be moved after installation, and adjacent pedestals cannot be shared, which needs to be improved. Utility Model Content

[0004] The utility model aims to provide a common pedestal for prefabricated T-beams of bridges to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A common pedestal for prefabricated T-beams of a bridge comprises a concrete foundation, on which a first pedestal and a second pedestal are movably mounted, wherein the first pedestal and the second pedestal are each composed of a plurality of pedestal sections connected in sequence, and adjacent pedestal sections are detachably connected via a first bolt and nut assembly, and a positioning mechanism for the pedestal sections is mounted on the concrete foundation.

[0007] As a further solution of the utility model: the pedestal section includes two bases, both ends of the bases are provided with first through holes compatible with the first bolt and nut assembly, a plurality of guide wheels are fixedly installed on the bottom of the base, a plurality of beams are erected on the two bases, and both ends of the beams are detachably connected to the corresponding bases through the second bolt and nut assembly, the top of the beam is fixedly connected to a support, the top of the support is fixedly installed with a panel, and both sides of the support are fixedly connected with channel steel.

[0008] As a further solution of the utility model: two parallel tracks are fixedly connected to the top of the concrete foundation, and the guide wheels are located on the corresponding tracks.

[0009] As a further solution of the utility model: the positioning mechanism includes an internal threaded tube pre-buried in a concrete foundation, a third bolt is passed through the base, and the third bolt is matched with the internal threaded tube.

[0010] As a further solution of the utility model: a lifting lug is fixedly connected to the outer wall of the base.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] In the utility model, the first pedestal and the second pedestal can be used separately. When the length of the prefabricated T-beam exceeds the length of the first pedestal and the second pedestal, a certain number of pedestal sections can be removed from the second pedestal and connected to the first pedestal. The pedestal sections are then fixed to the concrete foundation through a positioning mechanism, and the first pedestal can be extended to meet production needs, thereby realizing the sharing of adjacent pedestals and being simple and convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of a common pedestal for prefabricated T-beams of a bridge.

[0014] Figure 2 It is a structural schematic diagram of a pedestal section in a common pedestal for prefabricated T-beams of a bridge.

[0015] Figure 3 This is a structural schematic diagram of the channel steel in a common pedestal for prefabricated T-beams of a bridge.

[0016] Among them, there are concrete foundation 1, track 2, internal threaded pipe 3, first pedestal 4, second pedestal 5, pedestal section 6, base 7, guide wheel 8, first through hole 9, first bolt and nut assembly 10, cross beam 11, second bolt and nut assembly 12, support 13, channel steel 14, panel 15, third bolt 16, and lifting ear 17. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0018] See also Figures 1 to 3 In an embodiment of the utility model, a common pedestal for prefabricated T-beams of a bridge includes a concrete foundation 1, on which a first pedestal 4 and a second pedestal 5 are movably installed, wherein the first pedestal 4 and the second pedestal 5 are each composed of a plurality of pedestal segments 6 connected in sequence, and adjacent pedestal segments 6 are detachably connected by a first bolt and nut assembly 10, and a positioning mechanism for the pedestal segments 6 is installed on the concrete foundation 1.

[0019] By adopting the above scheme, the utility model can use the first pedestal 4 and the second pedestal 5 separately. When the length of the prefabricated T-beam exceeds the length of the first pedestal 4 and the second pedestal 5, a certain number of pedestal sections 6 can be removed from the second pedestal 5 and connected to the first pedestal 4. The pedestal sections 6 are then fixed to the concrete foundation 1 through the positioning mechanism, and the growth of the first pedestal 4 can be completed to meet production needs, realize the sharing of adjacent pedestals, and be simple and convenient to use.

[0020] Specific combination Figure 1-3 In one embodiment of the utility model, the pedestal section 6 includes two bases 7, both ends of the bases 7 are provided with first through holes 9 adapted to the first bolt and nut assembly 10, a plurality of guide wheels 8 are fixedly installed at the bottom of the base 7, a plurality of beams 11 are erected on the two bases 7, and both ends of the beams 11 are detachably connected to the corresponding bases 7 through second bolt and nut assemblies 12, a support 13 is fixedly connected to the top of the support 13, a panel 15 is fixedly installed on the top of the support 13, and channel steels 14 are fixedly connected to both sides of the support 13.

[0021] The setting of the guide wheel 8 facilitates the movement of the pedestal segment 6 on the concrete foundation 1 , and the cooperation of the first bolt and nut assembly 10 and the first through-hole 9 facilitates the splicing and fixing of adjacent pedestal segments 6 .

[0022] Specific combination Figure 2 , Figure 3 Based on the previous embodiment, two parallel tracks 2 are fixedly connected to the top of the concrete foundation 1, and the guide wheel 8 is located on the corresponding track 2.

[0023] Through the cooperation between the guide wheel 8 and the track 2 , the movement of the pedestal segment 6 can be guided on the concrete foundation 1 , thereby aligning adjacent pedestal segments 6 .

[0024] Specific combination Figure 2 , Figure 3 On the basis of the previous embodiment, further, the positioning mechanism includes an internal threaded tube 3 embedded in the concrete foundation 1, and a third bolt 16 is penetrated on the base 7, and the third bolt 16 is adapted to the internal threaded tube 3.

[0025] Through the cooperation between the third bolt 16 and the internally threaded tube 3 , the pedestal section 6 can be locked on the concrete foundation, thereby ensuring the stability of the pedestal on the concrete foundation 1 .

[0026] In addition, a lifting lug 17 is fixedly connected to the outer wall of the base 7 , so as to facilitate lifting of the pedestal segment 6 , or to use a vehicle to tow the pedestal segment 6 so as to move the pedestal segment 6 along the track 2 .

[0027] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A common pedestal for prefabricated T-beams of bridges, Features: The invention comprises a concrete foundation (1), on which a first pedestal (4) and a second pedestal (5) are movably mounted, wherein the first pedestal (4) and the second pedestal (5) are each composed of a plurality of pedestal segments (6) connected in sequence, and adjacent pedestal segments (6) are detachably connected via a first bolt and nut assembly (10), and a positioning mechanism for the pedestal segments (6) is mounted on the concrete foundation (1).

2. A common pedestal for prefabricated T-beams of bridges according to claim 1, Features: The pedestal section (6) comprises two bases (7), both ends of the bases (7) are provided with first through holes (9) adapted to the first bolt and nut assembly (10), a plurality of guide wheels (8) are fixedly mounted on the bottom of the bases (7), a plurality of cross beams (11) are mounted on the two bases (7), and both ends of the cross beams (11) are detachably connected to the corresponding bases (7) via second bolt and nut assemblies (12), a support (13) is fixedly mounted on the top of the support (13), a panel (15) is fixedly mounted on the top of the support (13), and channel steels (14) are fixedly mounted on both sides of the support (13).

3. A common pedestal for prefabricated T-beams of bridges according to claim 2, Features: Two mutually parallel tracks (2) are fixedly connected to the top of the concrete foundation (1), and the guide wheels (8) are located on the corresponding tracks (2).

4. A common pedestal for prefabricated T-beams of bridges according to claim 2, Features: The positioning mechanism comprises an internally threaded tube (3) pre-buried in a concrete foundation (1), and a third bolt (16) is passed through the base (7), and the third bolt (16) is matched with the internally threaded tube (3).

5. The common pedestal for prefabricated T-beams of bridges according to claim 2, Features: A lifting lug (17) is fixedly connected to the outer wall of the base (7).