Auxiliary construction device for slope protection laying

By designing auxiliary construction devices for slope protection laying, and using mounting frames, slide rails and hoisting mechanisms, the problem of inconvenient laying of river embankment slope protection bricks is solved, and a more efficient and automated construction process is achieved, which is suitable for a variety of river embankment lengths.

CN222120106UActive Publication Date: 2024-12-06CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420799255.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-12-06
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

In the prior art, when laying river embankment slope protection bricks, manual handling is inconvenient and time-consuming, especially difficult to operate on inclined slopes.

Method used

An auxiliary construction device for slope protection laying is designed, including two mounting frames, slide rails and hoisting mechanisms. The slope protection bricks are connected through ropes and installation rollers to achieve automatic lifting and movement.

Benefits of technology

It improves the convenience and automation of slope protection brick laying, is suitable for river embankments of different lengths, simplifies the construction process and reduces manpower demand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120106U_ABST
    Figure CN222120106U_ABST
Patent Text Reader

Abstract

The auxiliary construction device comprises two first installation frames, two second installation frames and a plurality of sliding rails, first connecting plates are arranged on the side walls of the first installation frames and the side walls of the second installation frames, hoisting mechanisms used for hoisting slope protection bricks are arranged on the two first installation frames, and the sliding rails are arranged on the two second installation frames. And the hoisting mechanism comprises two rolling wheels arranged in the two first mounting frames, the side walls of the two rolling wheels are jointly and fixedly connected with a rotating rod, the side wall of the rotating rod is rotationally connected with a mounting roller and a mounting piece, and a pull rope is arranged on the side wall of the mounting piece. According to the slope protection brick laying device, the hoisting mechanism is arranged, workers can assist in laying slope protection bricks on the river bank along the river bank all the time, so that the slope protection bricks are laid more conveniently, the slope protection bricks can be laid through a simple structure, and the practicability of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of slope protection, in particular to an auxiliary construction device for laying slope protection. Background Art

[0002] Slope protection is a protective facility built to prevent the slope of an earth-rock dam or the side slope of a channel from being eroded by scouring. It can prevent destructive effects such as wave scouring, rain erosion, freezing, wind erosion, and cracking. The types of slope protection for earth-rock dams include: riprap, dry stone masonry, mortar stone masonry, precast concrete slabs, reinforced concrete slabs, asphalt concrete, willow frame stone fill, and turf.

[0003] In the prior art, when laying river bank slope protection bricks, the slope protection bricks are usually placed on the inclined river bank slope manually or laid by on-site pouring. Although on-site pouring saves manpower, it takes a long time. Manual transportation requires multiple people to use ropes to carry together, and people need to move on the inclined slope, which is very inconvenient compared to land laying. Therefore, it is necessary to design an auxiliary construction device for slope protection laying to solve the above problems. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes an auxiliary construction device for slope protection paving.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] An auxiliary construction device for slope protection laying includes two first mounting frames, two second mounting frames and a plurality of slide rails, the side walls of the first mounting frames and the second mounting frames are each provided with a first connecting plate, the two first mounting frames are provided with a lifting mechanism for lifting slope protection bricks, the lifting mechanism includes two rollers arranged in the two first mounting frames, the side walls of the two rollers are commonly fixedly connected with a rotating rod, the side walls of the rotating rod are rotatably connected with an installation roller and a mounting member, the side walls of the mounting member are provided with a pull rope, the side walls of the installation roller are fixedly connected with a plurality of mounting ears, and two adjacent slide rails are connected by a connecting mechanism.

[0007] Preferably, the connection mechanism comprises two third connection plates fixedly connected to the side walls of the two slide rails, and the two third connection plates are connected by bolts and nuts.

[0008] Preferably, two second connecting plates are fixedly connected to both side walls of the first connecting plate, and a plurality of screws are disposed on the side walls of the second connecting plates.

[0009] Preferably, a winch is installed on the upper end of one of the first connecting plates, and a through hole is provided on the upper end of the mounting member.

[0010] Preferably, two running wheels are provided at the lower end of the first mounting frame, and two running wheels are also provided at the lower end of the second mounting frame.

[0011] Preferably, two lifting ears are fixedly connected to the upper end of the first mounting bracket, and two fixing ears are fixedly connected to the upper end of the second mounting bracket.

[0012] The utility model has the following beneficial effects:

[0013] 1. The device is equipped with a hoisting mechanism. The slope protection bricks are connected to the installation rollers through ropes. Workers can continuously put down the slope protection bricks on the river bank and assist in laying the slope protection bricks along the river bank, making it more convenient to lay the slope protection bricks. The slope protection bricks can be laid with a simple structure, thereby improving the practicality of the device;

[0014] 2. The device is provided with a connection mechanism, and the first mounting frame and the second mounting frame can be connected by adding or reducing the number of slide rails, so that the device can assist in laying riverbanks of different lengths, thereby expanding the scope of application of the device;

[0015] 3. The device is provided with a winch, and the output end of the winch can be tied to the mounting part. By starting the winch to release the rope and pull back the rope, there is no need to manually pull the mounting part, thereby improving the degree of automation of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a structural schematic diagram of an auxiliary construction device for slope protection paving proposed by the utility model;

[0017] Figure 2 for Figure 1 A magnified view of the structure at A;

[0018] Figure 3 The utility model is a side view of an auxiliary construction device for slope protection paving.

[0019] In the figure: 1 first mounting frame, 2 second mounting frame, 3 first connecting plate, 4 second connecting plate, 5 slide rail, 6 third connecting plate, 7 rotating rod, 8 mounting roller, 9 mounting ear, 10 mounting member, 11 pull rope, 12 lifting ear, 13 roller, 14 winch, 15 fourth connecting plate. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0021] Reference Figure 1-3, an auxiliary construction device for slope protection laying, including two first mounting frames 1, two second mounting frames 2 and multiple slide rails 5, the side walls of the first mounting frames 1 and the second mounting frames 2 are both provided with first connecting plates 3, the two first mounting frames 1 are provided with a lifting mechanism for lifting slope protection bricks, the lifting mechanism includes two rollers 13 arranged in the two first mounting frames 1, the side walls of the two rollers 13 are commonly fixedly connected with a rotating rod 7, the side wall of the rotating rod 7 is rotatably connected with an installation roller 8 and a mounting member 10, the side wall of the mounting member 10 is provided with a pull rope 11 (a rope of sufficient length), and the side wall of the installation roller 8 is fixedly connected with multiple mounting ears 9.

[0022] Two adjacent slide rails 5 are connected by a connecting mechanism, which includes two third connecting plates 6 fixedly connected to the side walls of the two slide rails 5. The two third connecting plates 6 are connected by bolts and nuts. The side walls of the two first mounting frames 1 and the two second mounting frames 2 are also provided with third connecting plates 6. In practice, a third connecting plate 6 can also be set on the inner side of the slide rail 5.

[0023] In the utility model, two second connecting plates 4 are fixedly connected to both side walls of the first connecting plate 3, and a plurality of screws are arranged on the side walls of the second connecting plates 4, so that the two first mounting frames 1 and the two second mounting frames 2 can be disassembled for convenient transportation.

[0024] In the utility model, a winch 14 is installed on the upper end of one of the first connecting plates 3, and a through hole is provided on the upper end of the mounting member 10. The rope of the winch 14 can be connected to the mounting member 10 through the through hole, and the winch 14 can be used to lift and lower the mounting roller 8 without manual pulling.

[0025] In the utility model, two running wheels are provided at the lower end of the first mounting frame 1, and two running wheels are also provided at the lower end of the second mounting frame 2, so that the equipment can move along the river bank to complete the laying of a section of the river bank, thereby improving the practicability of the device.

[0026] In the utility model, two lifting ears 12 are fixedly connected to the upper end of the first mounting frame 1, and two fixing ears are fixedly connected to the upper end of the second mounting frame 2, so that the first mounting frame 1 and the second mounting frame 2 can be hoisted by an external crane and conveniently placed on the river bank.

[0027] When in use, ropes are tied to the four installation ears 9, and then tied to the four corners of the slope protection bricks. Workers pull the pull rope 11 on the river bank and slowly release the pull rope 11. The two rollers 13 move in the multiple slide rails 5 of the two first installation frames 1. Since the installation roller 8 is rotatably connected to the rotating rod 7, the slope protection bricks will not rotate with it. When the slope protection bricks move to the appropriate position, the ropes on the slope protection bricks can be untied, and the workers can install the slope protection bricks in place. The workers pull back the installation roller 8 and repeat the above operation to place the next slope protection brick under the installed slope protection bricks. In the process, the slope protection bricks can be hoisted with a simple structure, thereby improving the practicability of the device.

[0028] The above is only a preferred specific implementation method of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the utility model according to the technical solution and practical concept of the utility model, which should be covered by the protection scope of the utility model.

Claims

1. An auxiliary construction device for slope protection paving, comprising two first mounting frames (1), two second mounting frames (2) and a plurality of slide rails (5), characterized in that: The first mounting frame (1) and the second mounting frame (2) are both provided with a first connecting plate (3) on their side walls. The two first mounting frames (1) are provided with a lifting mechanism for lifting slope protection bricks. The lifting mechanism comprises two rollers (13) arranged in the two first mounting frames (1). The side walls of the two rollers (13) are commonly fixedly connected to a rotating rod (7). The side wall of the rotating rod (7) is rotatably connected to a mounting roller (8) and a mounting member (10). The side wall of the mounting member (10) is provided with a pull rope (11). The side wall of the mounting roller (8) is fixedly connected to a plurality of mounting ears (9). Two adjacent slide rails (5) are connected via a connecting mechanism.

2. The auxiliary construction device for slope protection paving according to claim 1 is characterized in that: The connection mechanism comprises two third connection plates (6) fixedly connected to the side walls of the two slide rails (5), and the two third connection plates (6) are connected by bolts and nuts.

3. The auxiliary construction device for slope protection paving according to claim 2 is characterized in that: Two second connecting plates (4) are fixedly connected to both side walls of the first connecting plate (3), and the side walls of the second connecting plates (4) are provided with a plurality of screws.

4. The auxiliary construction device for slope protection paving according to claim 3 is characterized in that: A winch (14) is mounted on the upper end of one of the first connecting plates (3), and a through hole is provided on the upper end of the mounting member (10).

5. The auxiliary construction device for slope protection paving according to claim 4 is characterized in that: The first mounting frame (1) has two running wheels at its lower end, and the second mounting frame (2) also has two running wheels at its lower end.

6. The auxiliary construction device for slope protection paving according to claim 5 is characterized in that: The upper end of the first mounting frame (1) is fixedly connected to two lifting ears (12), and the upper end of the second mounting frame (2) is fixedly connected to two fixing ears.

Citation Information

Cited By

  • A device for assisting in the construction of a revetment

    CN223593298U