Steel plate assembly and tunnel support

The steel plate assembly with hinges and rotatable blades addresses the challenge of aligning screw holes in tunnel construction, enabling rapid and precise installation of steel plates, thereby improving tunnel construction efficiency and stability.

CN222121541UActive Publication Date: 2024-12-06SICHUAN ROAD BRIDGE & BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420982448.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-08
Publication Date
2024-12-06
Estimated Expiration
2034-05-08

AI Technical Summary

Technical Problem

The alignment of screw holes between adjacent steel plates in tunnel construction is cumbersome and difficult, affecting the accuracy and speed of steel plate support installation, which compromises the stability and safety of tunnel construction in loose accumulation environments.

Method used

A steel plate assembly with hinges that allow pre-installation of screw holes before lifting, enabling accurate alignment and connection of adjacent steel plates using rotatable blades and screws, facilitated by a hinge structure with specific angle configurations and reinforcing ribs for enhanced stability.

Benefits of technology

Facilitates rapid and precise installation of steel plate supports, reducing deformation risks and accelerating tunnel construction by ensuring accurate screw hole alignment and enhancing structural integrity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222121541U_ABST
    Figure CN222121541U_ABST
Patent Text Reader

Abstract

The utility model relates to a steel plate assembly and a tunnel support, which are used for solving the problems that the screwing operation of steel plates in the existing support structure is complicated, and screw holes between adjacent steel plates are difficult to align accurately, and the steel plate assembly for the support structure comprises a steel plate main body and lap joint plates, the lap joint plates are arranged at the two ends of the steel plate main body, and the lap joint plates are arranged on the steel plate main body. A first screw hole is formed in the lapping plate, the steel plate assembly further comprises a hinge, the hinge comprises a first blade, and the first blade is provided with a second screw hole matched with the first screw hole; the first blade is rotationally connected with the blade shaft; one end of the second transition section is rotationally connected with the blade shaft; and the other end of the second transition section is connected with the second connecting section. Pre-installation of the steel plate is achieved through the hinge, due to the existence of pre-installation operation, after the steel plate is rotated, the screw hole of the steel plate is accurately aligned with the screw hole of the top steel plate, and the erecting speed of tunnel supports is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of supporting structures, in particular to a steel plate assembly for supporting structures and a tunnel support. Background Art

[0002] In tunnel construction, the construction work in the shallow loose accumulation environment is relatively difficult. The surrounding rock is a loose structure with a lack of regularity in internal composition. The mechanical properties and stability are relatively poor. It will be affected by excavation disturbance, resulting in large-scale arch collapse during construction, which affects the safety of tunnel construction. In order to avoid the settlement and collapse of the arch, steel plate support is often used to reinforce and load the surrounding rock.

[0003] Steel plate support is often made of multiple steel plates screwed together, but due to the limitations of the tunnel construction site and equipment, it is not easy to accurately align the screw holes of adjacent steel plates. For example, in the process of connecting adjacent steel plates, a whole row of screwing operations are required. Once a deviation occurs in one of them, it may cause the subsequent bolts to be unable to be installed. For another example, it is difficult to accurately position the steel plate to the top of the tunnel, which makes it impossible to align the screw holes with the adjacent steel plates. Regardless of the factors that affect the alignment of the screw holes of adjacent steel plates, they will seriously affect the progress of the project, and will also affect the timely support of the surrounding rock. In the loose accumulation layer environment, the deformation tendency of the surrounding rock before the support is erected increases. Utility Model Content

[0004] The utility model aims to provide a steel plate assembly and a supporting structure for a supporting structure, so as to solve the problem that the screw connection operation of the steel plates in the existing supporting structure is relatively cumbersome and the screw holes between adjacent steel plates are difficult to align accurately.

[0005] The embodiments of the present invention are implemented by the following technical solutions:

[0006] A steel plate assembly for a supporting structure comprises a steel plate main body and a lap plate, wherein the lap plates are provided at both ends of the steel plate main body, and the lap plates are provided with a first screw hole. The steel plate assembly also comprises: a hinge, wherein the hinge comprises: a first blade, wherein the first blade is provided with a second screw hole matching the first screw hole; a blade shaft, wherein the first blade is rotatably connected to the blade shaft; a second blade, wherein the second blade is rotatably connected to the blade shaft, and the second blade comprises: a second transition section, wherein one end of the second transition section is rotatably connected to the blade shaft; and a second connecting section, wherein the other end of the second transition section is connected to the second connecting section, and the angle between the axis of the second transition section in the length direction and the axis of the second connecting section in the length direction is less than 180 degrees.

[0007] Preferably, the axis of the second transition section in the length direction and the axis of the second connecting section in the length direction are perpendicular to each other.

[0008] Preferably, the angle between the axis of the second transition section in the length direction and the axis of the second connecting section in the length direction is greater than 90 degrees; the hinge also includes: reinforcing ribs, and the side wall of the second transition section away from the blade axis is connected to the second connecting section through the reinforcing ribs.

[0009] Preferably, the first blade includes: a first transition section, one end of which is rotatably connected to the blade shaft; a first connecting section, the other end of which is connected to the first connecting section, the angle between the axis of the first transition section in the length direction and the axis of the first connecting section in the length direction is less than 180 degrees, and the first connecting section is provided with the second screw hole.

[0010] A tunnel support comprises: a plurality of the steel plate assemblies, wherein the plurality of the steel plate assemblies are screwed in sequence to form an upper arch portion that can be laid on the inner wall of the tunnel.

[0011] Preferably, it comprises: an anchor rod, and the steel plate body is connected to the surrounding rock through the anchor rod.

[0012] Preferably, it comprises: a waterproof coiled material, wherein the waterproof coiled material is laid on the inner wall of the steel plate body and the inner wall of the lap plate.

[0013] Preferably, it comprises: a reinforcing plate, wherein the reinforcing plate is provided with a third screw hole and a fourth screw hole whose axes are perpendicular to each other, the reinforcing plate can be screwed to the lap plate through the third screw hole, and the reinforcing plate can be screwed to the first blade and the lap plate through the fourth screw hole.

[0014] Preferably, the difference in thickness between the steel plate main body and the lap plate is greater than the thickness of the reinforcing plate.

[0015] Preferably, it comprises: a lower arch portion, two ends of the lower arch portion are butted and enclosed with two ends of the upper arch portion to form a supporting body covering the inner wall of the tunnel.

[0016] The utility model has at least the following beneficial effects:

[0017] The utility model realizes the pre-installation of steel plates by hinges of specific structures, and through the pre-installation, the screw holes between adjacent steel plates are aligned before the steel plates are lifted. After the screw connection is released, the adjacent steel plates are still hinged by the hinges. The steel plate installed at the center of the tunnel top is then lifted to the corresponding position and fixed. The adjacent steel plate rotatably connected to it by the hinges can reach the predetermined position by rotation. Moreover, due to the existence of the pre-installation operation, after the steel plate is rotated, its screw holes are accurately aligned with the screw holes of the top steel plate, which speeds up the erection speed of the tunnel support and reduces the deformation possibility and degree of the surrounding rock before the support is erected in a loose accumulation layer environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 A schematic diagram of the structure of a steel plate assembly used in the supporting structure of the arch according to the utility model;

[0020] Figure 2 A is a schematic diagram of the structure of the hinge;

[0021] Figure 3 It is the structural schematic diagram b of hinge;

[0022] Figure 4 It is the structural schematic diagram of hinge c;

[0023] Figure 5 d is a structural diagram of a hinge;

[0024] Figure 6 It is a schematic diagram after the bolt connection of adjacent lap plates is released;

[0025] Figure 7 The structural diagram of the hinge in the embodiment

[0026] Figure 8 for Figure 7 Schematic diagram of adjacent lap plates after the bolt connection is released;

[0027] Fig. 9 A is a schematic diagram of the tunnel support structure;

[0028] Fig.10 b is a schematic diagram of the tunnel support structure;

[0029] Fig.11 is a structural schematic diagram of the tunnel support c;

[0030] Fig.12 A is a structural schematic diagram of a reinforcement plate;

[0031] Fig.13 b is a structural diagram of the reinforcement plate;

[0032] Icons: 1-steel plate main body, 2-lap plate, 21-first screw hole, 3-hinge, 31-first blade, 311-first transition section, 312-first connecting section, 3121-second screw hole, 32-blade shaft, 33-second blade, 331-second transition section, 332-second connecting section, 34-reinforcement rib, 4-upper arch, 5-anchor rod, 6-waterproof membrane, 7-reinforcement plate, 71-third screw hole, 72-fourth screw hole, 8-lower arch, 9-temporary invert arch. DETAILED DESCRIPTION

[0033] In order to make the purpose, method scheme and advantages of the embodiments of the utility model clearer, the method scheme in the embodiments of the utility model is clearly and completely described. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. The components of the embodiments of the utility model described and shown in the drawings herein can be arranged and designed in various different configurations.

[0034] Example 1

[0035] like Figure 1 As shown, a steel plate assembly for a supporting structure includes a steel plate body 1 and a lap plate 2. The lap plates 2 are provided at both ends of the steel plate body 1. Figure 1 As shown, the upper surface of the lap plate 2 is in the same plane as the upper surface of the steel plate body 1, and the lap plate 2 and the steel plate body 1 can be integrally formed. The specifications of the steel plate body 1 and the lap plate 2, such as length, width and curvature, are designed according to the tunnel. The lap plate 2 is provided with a first screw hole 21, and the steel plate assembly also includes: a hinge 3, the hinge 3 includes: a first blade 31, the first blade 31 is provided with a second screw hole 3121 that matches the first screw hole 21; a blade shaft 32, the first blade 31 is rotatably connected to the blade shaft 32; a second blade 33, the second blade 33 is rotatably connected to the blade shaft 32, and the second blade 33 includes: a second transition section 331, one end of the second transition section 331 is rotatably connected to the blade shaft 32; a second connecting section 332, the other end of the second transition section 331 is connected to the second connecting section 332, and the angle between the axis of the length direction of the second transition section 331 and the axis of the length direction of the second connecting section 332 is less than 180 degrees.

[0036] In the specific implementation process, the specifications of the steel plate body 1, such as length, width and curvature, are designed according to the tunnel conditions. Figure 2Pre-installation is performed as shown, and the specific operations include: connecting the lap plate 2 and the first blade 31 by bolts, and then connecting the second blade 33 to the lap plate 2. The second blade 33 and the lap plate 2 can be connected by welding or screwing. In order to ensure the stability of the connection between the two, welding is a preferred fixed connection method. Then, the first blade 31 is welded to the abutment plate, and the bolts are removed. At this time, the lap plates 2 of the adjacent steel plate bodies 1 are rotatably connected by hinges 3. The above operations can be performed on the ground, which is convenient to operate. Finally, the steel plate assembly is lifted to the top of the tunnel by a lifting device, and the steel plate assembly preset at the center of the top of the tunnel is first fixed to the surrounding rock at the top of the tunnel. At this time, Figure 6 As shown, the lap plate 2 of the adjacent steel plate assembly does not abut against the lap plate 2 of the central steel plate assembly under the action of gravity, and the adjacent steel plate assembly is rotated by the hinge so that its lap plate 2 is as shown in FIG. Figure 2 As shown, the lap plate 2 of the central steel plate assembly is abutted. Due to the previous pre-installation operation, after the rotation and abutment, the first screw holes 21 of the two adjacent abutment plates and the second screw holes 3121 on the hinge 3 can be accurately aligned. At this time, bolts are used to fix the two abutment plates and the first blade 31. The operation is simple and quick.

[0037] For example, Figure 3 As shown, the first blade 31 can also be directly fixedly connected to the lap plate 2, or even integrally formed.

[0038] It should be noted that since the second blade 33 needs to abut against the lap plate 2 through rotation, in order to avoid a gap between the second connecting section 332 and the lap plate 2 when the second transition section 331 and the lap plate 2 abut against each other during rotation, the end of the second transition section 331 away from the first blade 31 cannot extend in the direction of the first blade 31.

[0039] Example 2

[0040] In order to improve the strength of the loose-leaf, improvements were made on the basis of Example 1, such as Figure 4 As shown, in this embodiment, the axis of the second transition section 331 in the length direction and the axis of the second connection section 332 in the length direction are perpendicular to each other.

[0041] In the specific implementation process, Figure 6 As shown, if the included angle between the second transition section 331 and the second connecting section 332 is an obtuse angle, Figure 6 When a steel plate assembly has not yet been connected to the laid steel plate assembly, the black shaded portion in the figure, i.e., the second transition section 331, is easily damaged or even broken under the gravity of the steel plate assembly. Therefore, the utility model can adopt the following method: Figure 4 The structure of the hinge 3 shown is such that the included angle between the second transition section 331 and the second connection section 332 is 90 degrees.

[0042] Example 3

[0043] In order to improve the strength of the loose-leaf, improvements were made on the basis of Example 1, such as Figure 5 As shown, in this embodiment, the angle between the axis of the second transition section 331 in the length direction and the axis of the second connecting section 332 in the length direction is greater than 90 degrees; the hinge 3 also includes: a reinforcing rib 34, and the side wall of the second transition section 331 away from the blade shaft 32 is connected to the second connecting section 332 through the reinforcing rib 34.

[0044] In the specific implementation process, as described in Example 2, if the Figure 6 The hinge 3 structure shown in the figure has a second transition section 331 which is easily damaged. Figure 6 The structure of the middle hinge 3 is increased as follows Figure 5 The reinforcement ribs 34 shown are used to improve the strength of the second transition section 331 .

[0045] Example 4

[0046] In order to achieve the flatness of the inner and outer walls of the support after the steel plate components are connected, improvements are made on the basis of Examples 1-3, such as Figure 7-8 As shown, in this embodiment, the first blade 31 includes: a first transition section 311, one end of which is rotatably connected to the blade shaft 32; a first connecting section 312, the other end of which is connected to the first connecting section 312. In order to ensure the strength of the first transition section 311, a reinforcing rib 34 may be provided as in the case of the second transition section 331. The angle between the axis of the length direction of the first transition section 311 and the axis of the length direction of the first connecting section 312 is less than 180 degrees. Of course, in order to ensure the strength of the first transition section 311, the angle may be set to 90 degrees as in the case of the second transition section 331. The first connecting section 312 is provided with the second screw hole 3121.

[0047] In the specific implementation process, Figure 1 As shown, if the first blade 31 has only a horizontal section, in order to ensure that the inner and outer surfaces of the support structure formed by connecting the steel plates are flat, the positions of the lap plates 2 in adjacent steel plate assemblies are different, such as Figure 1 As shown in the figure, when the lap plate 2 of the middle steel plate assembly is arranged on the upper side, the lap plate 2 of the steel plate assembly on both sides is arranged in the middle of the end of the steel plate body 1, so that the structure of the steel plate assembly constituting the support is not completely the same, which increases the difficulty and cost investment in prefabricating the steel plate assembly. Figure 7After the hinge 3 structure is shown, the connection positions of the lap plates 2 of the adjacent steel plate assemblies and the steel plate body 1 are the same, and the two steel plate assemblies are only inverted, so the steel plate assembly structures that constitute the support structure are completely identical, and the upper and lower surfaces of the support structure finally formed can also maintain good flatness. Maintaining flatness can better perform subsequent processes, such as laying waterproof membrane 6 on the surface of the steel plate assembly.

[0048] Example 5

[0049] A tunnel support, comprising: a plurality of the steel plate assemblies, wherein the plurality of the steel plate assemblies are screwed in sequence to form an upper arch 4 that can be laid on the inner wall of the tunnel. A lower arch 8, wherein the two ends of the lower arch 8 are butted and enclosed with the two ends of the upper arch 4 to form a support body covering the inner wall of the tunnel. Anchor rods 5, wherein the steel plate body 1 is connected to the surrounding rock through the anchor rods 5. A waterproofing membrane 6, wherein the waterproofing membrane 6 is laid on the inner wall of the steel plate body 1 and the inner wall of the lap plate 2. The inner wall of the steel plate body 1 and the lap plate 2 refers to the wall surface thereof facing the inside of the tunnel.

[0050] In the specific implementation process, the step method can be used for excavation. First, the upper step face is excavated and the surrounding rock is supported. Fig. 9 As shown in the figure, after the steel plate assemblies are pre-connected, they are first fixed to the top and side walls of the tunnel. Since adjacent steel plate assemblies can rotate, the remaining steel plate assemblies can be connected to the bottom wall of the tunnel after rotation to form a temporary invert 9. Then, the lower step face is excavated and the surrounding rock is supported. During the support, the temporary invert 9 constructed on the upper step can be Fig.10 As shown, it is rotated to the side wall of the tunnel and then connected to the side wall. The temporary invert 9 is directly converted into the support body, which is convenient to operate and speeds up the construction progress. Fig.11 As shown, the lower arch 8 is applied so that the tunnel support forms a complete annular structure. The connection surface between the lower arch 8 and the upper arch 4 can be set as an inclined surface. When the upper arch 4 is under pressure, the upper arch 4 applies pressure toward the inside of the tunnel to the lower arch 8. Since the lower arch 8 is in an arc shape as a whole, the lower arch 8 will apply a reverse pressure upward and toward the outside of the tunnel to the upper arch 4, thereby improving the overall pressure bearing capacity of the support.

[0051] The steel plate assembly is mainly connected to the surrounding rock through the anchor rod 5. The anchor rod 5 can be a grouting anchor rod 5. The grouting anchor rod 5 is a tension member that penetrates into the stratum. One end of the grouting anchor rod 5 is connected to the engineering structure, and the other end penetrates into the stratum. The whole anchor rod 5 is divided into a free section and an anchoring section. The free section refers to the area where the tension at the head of the anchor rod 5 is transmitted to the anchoring section, and its function is to apply prestress to the anchor rod 5; the anchoring section refers to the area where the cement slurry bonds the prestressed tendons to the soil layer, and its function is to increase the bonding friction between the anchoring section and the soil layer, increase the pressure-bearing effect of the anchoring section, and transmit the tension of the free section to the deep soil.

[0052] Before laying the waterproofing membrane 6, the steel plate assembly needs to be cleaned and polished to ensure cleanliness and flatness. Then, accurate measurements are made according to the actual situation, the waterproofing membrane 6 is determined and cut, and finally the waterproofing membrane 6 is laid. The waterproofing membrane 6 can be laid with nails or without nails. During laying, a pressure roller can be used to ensure the flatness and stability of the laying.

[0053] Example 6

[0054] In order to prevent the hinge 3 at the connection between the temporary invert 9 and the side wall steel plate assembly from being damaged due to excessive force, an improvement is made on the basis of Example 5, such as Fig.12 As shown, in this embodiment, it includes: a reinforcing plate 7, the reinforcing plate 7 is provided with a third screw hole 71 and a fourth screw hole 72 whose axes are perpendicular to each other, the reinforcing plate 7 can be screwed to the lap plate 2 through the third screw hole 71, and the reinforcing plate 7 can be screwed to the first blade 31 and the lap plate 2 through the fourth screw hole 72.

[0055] In the specific implementation process, if the reinforcing plate 7 is not provided, the pressure of the upper arch 4 on the temporary invert 9 is directly transmitted by the hinge 3, and the hinge 3 is easily damaged. Therefore, the reinforcing plate 7 is provided in this embodiment, and its third screw hole 71 is connected to the lap plate 2 of the tunnel side wall steel plate assembly, and the fourth screw hole 72 is connected to the lap plate 2 of the temporary invert 9 and the first blade 31 of the hinge 3. The reinforcing plate 7 can also be used as a component for transmitting the pressure of the upper arch 4, reducing the force on the hinge 3. The connection mode of the reinforcing plate 7 is a detachable connection. After the reinforcing plate 7 is removed, it will not affect the temporary invert 9 from Figure 9 to Figure 10 conversion process.

[0056] Example 7

[0057] In order to simplify the construction process, improvements were made based on Example 6, such as Fig.13 As shown, in this embodiment, the thickness difference between the steel plate main body 1 and the overlapping plate 2 is greater than the thickness of the reinforcing plate 7 .

[0058] In the specific implementation process, Fig.12 As shown in FIG. 1 , if the thickness of the reinforcing plate 7 is too large, a space for accommodating the reinforcing plate 7 needs to be dug out of the bottom rock layer, otherwise there will be a gap between the temporary invert 9 and the bottom rock layer. In this embodiment, the thickness of the reinforcing plate 7 is set to be smaller than the difference in thickness between the steel plate body 1 and the lap plate 2. Fig.13 As shown, the temporary invert 9 is laid without digging the bottom rock layer. Optimally, the difference in thickness between the steel plate body 1 and the lap plate 2 is just equal to the sum of the thicknesses of the reinforcing plate 7 and the first blade 31 .

[0059] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.

Claims

1. A steel plate assembly, comprising a steel plate body and a lap plate, wherein the lap plates are provided at both ends of the steel plate body, and the lap plates are provided with a first screw hole, It is characterized in that The steel plate assembly also includes: Hinge, the hinge comprising: a first blade, wherein the first blade is provided with a second screw hole matching the first screw hole; a blade shaft, wherein the first blade is rotatably connected to the blade shaft; A second blade, the second blade is rotatably connected to the blade shaft, and the second blade comprises: a second transition section, one end of which is rotatably connected to the blade shaft; A second connecting section, the other end of the second transition section is connected to the second connecting section, and the angle between the axis of the second transition section in the length direction and the axis of the second connecting section in the length direction is less than 180 degrees.

2. The steel plate assembly according to claim 1, It is characterized in that An axis in the length direction of the second transition section and an axis in the length direction of the second connecting section are perpendicular to each other.

3. The steel plate assembly according to claim 1, It is characterized in that The angle between the axis of the second transition section in the length direction and the axis of the second connection section in the length direction is greater than 90 degrees; the hinge further comprises: A reinforcing rib, wherein the side wall of the second transition section away from the blade shaft is connected to the second connecting section through the reinforcing rib.

4. The steel plate assembly according to any one of claims 1 to 3, It is characterized in that The first blade comprises: a first transition section, one end of which is rotatably connected to the blade shaft; A first connecting section, the other end of the first transition section is connected to the first connecting section, the angle between the axis of the first transition section in the length direction and the axis of the first connecting section in the length direction is less than 180 degrees, and the first connecting section is provided with the second screw hole.

5. A tunnel support, It is characterized in that include: Several steel plate assemblies as described in any one of claims 1-4, several of which are screwed in sequence to form an upper arch portion that can be laid on the inner wall of a tunnel.

6. The tunnel support according to claim 5, It is characterized in that include: Anchor rods, the steel plate body is connected to the surrounding rock through the anchor rods.

7. The tunnel support according to claim 5, It is characterized in that include: A waterproof coiled material is laid on the inner wall of the steel plate body and the inner wall of the lap plate.

8. The tunnel support according to any one of claims 5 to 7, It is characterized in that include: A reinforcing plate, wherein the reinforcing plate is provided with a third screw hole and a fourth screw hole whose axes are perpendicular to each other, the reinforcing plate can be screwed to the lap plate through the third screw hole, and the reinforcing plate can be screwed to the first blade and the lap plate through the fourth screw hole.

9. The tunnel support according to claim 8, It is characterized in that The difference in thickness between the steel plate main body and the overlapping plate is greater than the thickness of the reinforcing plate.

10. The tunnel support according to claim 8, It is characterized in that include: The lower arch portion, the two ends of the lower arch portion are butted and enclosed with the two ends of the upper arch portion to form a supporting body covering the inner wall of the tunnel.