Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

67results about How to "Fast erection" patented technology

Tailing cemented and filled retaining wall device under mine

The invention relates to a tailing cemented and filled retaining wall device under a mine. The device comprises a roadway, a wall body and a plurality of dewatering pipes. The wall body divides the roadway into an internal part of a mining area and an external part of the mining area. The wall body comprises a filter fabric, a plurality of layers of stone cages and a plurality of retaining wall crosspieces. The stone cages are filled with mining waste rock. A concrete foundation is arranged below the lower layer of stone cages. The dewatering pipes are arranged in the concrete foundation. Water outlet ports of the dewatering pipes are arranged at the external part of the mining area and water inlet ports of the dewatering pipes are arranged at the internal part of the mining area. The filter fabric is laid on the outer surface of layers of stone cages at the internal part of the mining area. The retaining wall crosspieces are arranged at an upper layer and a lower layer and are fixedly arranged outside the layers of stone cages at the external part of the mining area. Gaps among the two sides and the top of the wall body and the walls of the roadway are blocked and sealed through concrete. The tailing cemented and filled retaining wall device under the mine has the characteristics of excellent wall body stress performance, good slurry retaining effect, good water filtering effect, high erection speed, simplicity and convenience in construction, low cost and the like. At an early filling stage, the dewatering capacity of the retaining wall device is 7-10 times of that of a concrete enclosure wall.
Owner:NORTHWEST RES INST OF MINING & METALLURGY INST

General construction method for partially ground-anchored cable-stayed suspension bridge

ActiveCN105274941AGuaranteed stabilityAvoid the problem of temporary consolidation to withstand large horizontal forcesBridge erection/assemblyHorizontal forceCable stayed
The invention discloses a general construction method for a partially ground-anchored cable-stayed suspension bridge, which belongs to the technical field of bridge construction. According to general construction method for the partially ground-anchored cable-stayed suspension bridge, a cable-stayed area girder section and a suspension area girder section of the cable-stayed suspension bridge are simultaneously erected and constructed; before the construction of the cable-stayed suspension bridge, a reasonable completed bridge state of the cable-stayed suspension bridge is determined by using a reasonable completed bridge state determining method which takes stiffness distribution into consideration; and during the construction of the cable-stayed suspension bridge, the closing of a cable-stayed area girder section girder and a suspension area girder section girder is finished by using a closing method for the cable-stayed suspension bridge. As the cable-stayed suspension bridge is erected by using the general construction method disclosed by the invention, the girder erecting speed can be effectively increased, a problem that solidified parts formed after a pylon and girder temporarily solidifies bears a greater horizontal force can be avoided, the construction period is greatly reduced and the construction strength is reduced.
Owner:CCCC SECOND HARBOR ENG

Construction method for splicing and erecting concrete precast beam sections

The invention discloses a construction method for splicing and erecting concrete precast beam sections, comprising the following steps of: 1) arranging a plurality of site splicing platforms beside a beam line to be erected; 2) arranging a plurality of precast beam sections on the site splicing platforms, and carrying out section splicing, glue joint, rope penetration, pre-stressed reinforcement tension and grouting on the plurality of precast beam sections so that the precast beam section are spliced into a beam to be erected; 3) hoisting a first spliced beam to be erected on a pier through a hoisting device and mounting the first spliced beam to be erected; 4) hoisting a beam transportation truck on the mounted first spliced beam to be erected through the hoisting device; 5) arranging a bridge girder erection machine on the beam line to be erected; 6) hoisting following mounted beams to be erected on the beam transportation truck through the hoisting device, and feeding the beams to the bridge girder erection machine through the beam transportation truck; and 7) mounting the beams to be erected through the bridge girder erection machine. By additionally arranging the site splicing platforms, the time for each process is reasonably distributed, so as to ensure the splicing quality and improve the mounting efficiency and the security.
Owner:JIANGYIN BRIDGE BEIJING ENG

Assembling highway steel bridge transporting and erecting vehicle

The invention discloses an assembling highway steel bridge transporting and erecting vehicle which comprises a goods shelf, a pedal, an oil cylinder base, an oil cylinder and a handle. A vertical plate is fixed on the goods shelf, a top plate is fixed on the vertical plate, and the vertical plate is connected with the oil cylinder base through a left A connection sheet and a right A connection sheet. The oil cylinder comprises a large plunger and a small plunger, wherein the large plunger is connected with the top plate, and the top end of the small plunger is contacted with the bottom end of the handle. A back wheel is arranged at the lower end of the oil cylinder base, and a universal wheel is arranged on each of two sides at the front end of the goods shelf. The universal wheels are connected with a front wheel cross plate, the front end of the front wheel cross plate is hinged to a front wheel front frame, the front wheel front frame is hinged to a front wheel support seat disposed at the bottom at the front end of the goods shelf, the back end of the front wheel cross plate is hinged to a front wheel back frame, and the front wheel back frame is hinged to the goods shelf. A pivot point of the pedal is hinged to the back end of the goods shelf, and the pedal is connected with the vertical plate or the top plate through an A spring. The assembling highway steel bridge transporting and erecting vehicle can solve problems of large labor intensity and long time wasted on member connection and transport due to pure manual operation, and buys time for emergent campaign of our military and rescue and relief.
Owner:NAT UNIV OF DEFENSE TECH

Multifunctional upright column base for scaffold and manufacturing process thereof

The invention discloses a multifunctional upright column base for a scaffold and a manufacturing process thereof. The invention adopts the technical scheme as follows: the multifunctional upright column base comprises a horizontal bed which is formed by perpendicularly connecting a plurality of U-shaped steel plates, and a plurality of anchoring rod stands and anchoring rods matched with the anchoring rod stands, which are arranged on the U-shaped steel plates, wherein locking devices are arranged in layers and columns inside the cylindrical walls of the anchoring rods; and a product is manufactured under the synchronous control of discharge equipment, sand-blast equipment, grinding equipment, auxiliary equipment, marking equipment, drilling equipment, milling equipment, turning equipment, working clamp equipment, welding equipment, sleeve-pressing equipment and stacking equipment. The multifunctional upright column base overcomes the problems in the prior art that the construction efficiency and construction safety are poor because standard members are unavailable for the horizontal bed and the base during scaffold construction; and is suitable for building construction, advertising and decoration and building repair and maintenance.
Owner:湖南省第三工程有限公司

Easy-to-transport electric power accident rush-repairing tower

The invention provides an easy-to-transport electric power accident rush-repairing tower which comprises a trussed left upright post, a trussed right upright post and a trussed crossarm, wherein the left upright post, the right upright post and the crossarm are all provided with a dragrope for structural reinforcement, and the crossarm comprises a side crossarm and a middle crossarm. The easy-to-transport electric power accident rush-repairing tower is characterized in that the left upright post and the right upright post both adopt the mode of sectional assembly, the sectional area of each section is decreased section by section from bottom to top, i.e. a stepped structure, and every two sections are connected through a flange. When the stepped sectional structure is transported or stored, an assembled section with smaller caliber can be placed inside the assembled section with larger caliber according to the mode of sleeving the larger section on the smaller section, thus, through the storage mode of sleeving one section on another section, the space utilization ratio can be greatly improved, the transportation difficulty can be greatly lowered, and the rush-repairing efficiency of a transmission line can be improved; moreover, after people arrive at the scene of an accident, all modules can be assembled into the required tower shape so as to be put into use according to actual conditions.
Owner:WUHAN NARI LIABILITY OF STATE GRID ELECTRIC POWER RES INST

Erecting method of cable-stayed bridge main beam and cable-stayed bridge main beam

The invention discloses an erecting method of a cable-stayed bridge main beam and the cable-stayed bridge main beam, and relates to the technical field of bridge construction. The method includes 1) prefabricating a plurality of steel beam assembly segments; 2) moving a bridge deck crane to the erected segmental beams; 3) sequentially hoisting the two steel beam assembly segments on cantilevers ofthe erected section beams by utilizing the bridge deck crane to form two connected section steel beams, after each section of steel beam is formed, connecting the section steel beams with a main tower of the cable-stayed bridge through stay cables, and tensioning the stay cables for the first time; 4) hoisting prefabricated concrete bridge deck slabs to the two section steel beams by using the bridge deck crane; 5) pouring a wet joint between the concrete bridge deck slabs, tensioning the stay cables on the two sections again, and when erection of the two section beams is completed, moving the bridge deck crane in the direction of the newly-erected section beams; and 6) repeating the steps 2-5 until all the segmental beams are erected. The erecting speed of the main beam of the cable-stayed bridge can be increased, and the beam erecting period is shortened.
Owner:中铁大桥局第七工程有限公司

Multi-section type cement telegraph pole

The invention discloses amulti-section type cement telegraph pole. The multi-section type cement telegraph pole comprises a telegraph pole body; two ends of the telegraph pole body are correspondinglyfixedly connected with a first connecting block and a second connecting block; the end face, far away from the telegraph pole body, of the first connecting block is fixedly connected with a pluralityof fixed poles; the end, far away from the first connecting block, of each pole is fixedly connected with a wedge-shaped block; first grooves matched with the wedge-shaped blocks are formed in the end face, far away from the telegraph pole, of the second connecting block; the end face, far away from the telegraph pole, of the second connecting block is fixedly connected with an annular limiting plate; an annular groove matched with the annular limiting plate is formed in the first connecting block; a second groove matched with the first groove is formed in the lateral wall of the second connecting block; a fixed plate is fixedly connected in the second groove; a sliding rod is arranged on the sliding plate in a penetrating mode; one end of the sliding rod penetrates through the second groove and extends into the first groove. The multi-section type cement telegraph pole is convenient to conveyand quick to assemble; and erecting efficiency of the telephone poles is greatly improved.
Owner:盐城市新驰工贸有限公司

Construction method for erecting and installing bridge pier top block by adopting floating crane

The invention discloses a construction method for erecting and installing a bridge pier top block by adopting a floating crane. The method comprises the steps that a permanent support is installed on the top of a pier body, a temporary support is erected on the side of the pier body, and a three-direction adjusting jack is arranged on the top face of the temporary support; the floating crane is adopted for lifting the pier top block to the portion above the top of the pier body, and the three-direction adjusting jack is controlled to complete positioning of the pier top block; a screw-type jack is arranged on the temporary support, and the floating crane instrument is disassembled; finally, pouring and tamping are performed on a leveling layer between the bottom of the pier top block and the permanent support; after the requirement for strength is met, the three-direction adjusting jack and the screw-type jack are disassembled. The pier top block is erected in a floating-crane mode, a distribution beam is anchored on the pier top block after construction is completed, a bridge machine is erected, and a via hole is formed, so that the trouble caused by installing a bracket reserved branch trestle is omitted, the cost input is reduced, the erection safety of the pier top block is further ensured, and the erection speed of the bridge machine is increased so as to improve the erection safety and stability of the pier top block.
Owner:CCCC SHEC FIRST HIGHWAY ENG

Simple plastic rescue pontoon

The invention discloses a simple plastic rescue pontoon, and relates to a pontoon. A floating barrel (1) on one side and a floating barrel (3) on the other side are of the same structure. The lower part of the floating barrel (1) on one side is provided with a flat barrel plate (13). An upper vertical extension barrel (6) is arranged on the outer side of the flat barrel plate (13). A horizontal extension plate (9) is arranged at the inner end part of the flat barrel plate (13). The horizontal extension plate (9) the floating barrel (1) on one side and the horizontal extension plate (9) of thefloating barrel (3) on the other side are oppositely arranged at intervals. The two ends of a pontoon panel (4) abut against the opposite surfaces of the horizontal extension plate (9) and the upper vertical extension barrel (6) of the floating barrel (3) on the other side correspondingly. Penetrating holes (11), close to the two edges, of the pontoon panel (4) and light holes (8) of the floatingbarrel (1) on one side and the floating barrel (3) on the other side are fixed through a plurality of bolts (2). According to the simple plastic rescue pontoon, the floating barrel on one side, the pontoon panel and the floating barrel on the other side are connected and formed into the pontoon through the bolts, and fast rescue during the rainy season is achieved.
Owner:吴丽平

Railway temporary-platform mobile-erection mechanism

The invention discloses a railway temporary-platform mobile-erection mechanism. The erection mechanism includes a chassis vehicle, a guide rail, a moving trolley assembly, a suspension arm assembly, ahydraulic control system and an electrical control system; the guide rail is welded above a cross beam of the chassis vehicle, the two sides of the front end of the guide rail are provided with frontlanding legs, and the two sides of the tail end of the guide rail are provided with rear landing legs; the suspension arm assembly is installed on the moving trolley assembly, and achieves extensionand contraction of the suspension arm length and pitching motion, and a temporary platform is installed on the suspension arm assembly; the moving trolley assembly is matched with the guide rail and does reciprocating motion in the direction from the locomotive to the caboose, mobile erection and withdrawing operation of the temporary platform are achieved, the hydraulic control system provides hydraulic power for power parts in the moving trolley assembly, the suspension arm assembly and the front and rear landing legs, and the electrical control system achieves protection of a control circuit in the hydraulic control system. The mechanism can achieve rapid erection of the railway temporary-platform, and the erection process is safe and reliable.
Owner:CHINA HARZONE IND CORP

Double rail supporting table type rail transit U-shaped beam

The invention discloses a double rail supporting table type rail transit U-shaped beam. The double rail supporting table type rail transit U-shaped beam comprises a beam body which is composed of a bottom plate, two side web plates and two flange plates at the tops of the web plates. The supper surface of the bottom plate is connected with rail supporting tables, power supply devices are fixedly connected along the length direction of the two flange plates, the inner sides of the web plates are provided with supports for supporting power supply cables, and the bottom plate is provided with cable grooves; the cross section of the beam body is in a U shape, and the number of the rail supporting table is at least two pairs. The double rail supporting table type rail transit U-shaped beam is in a large beam structure and accordingly solves the problem that a small U-shaped beam cannot be applied to a cable distribution interval, widens the application range of U-shaped beams, better improves the landscape effects of urban bridges, reduces the noise of rail transit, and meanwhile, avoids increase of inter-cable distance of small U-shaped beams and reduces occupation of land resources. The double rail supporting table type rail transit U-shaped beam achieves one beam for one double-cable hole, increases the construction speed of U-shaped beams, shortens the engineering period and is applicable to popularization and application.
Owner:CHINA RAILWAY ENG CONSULTING GRP CO LTD

Novel girder erection equipment and erection method

The invention discloses novel girder erection equipment and an erection method. The novel girder erection equipment comprises a via hole girder, an inner guide girder and a girder falling frame, wherein an inner guide hole is horizontally formed in the via hole girder in a penetrating mode, the inner guide girder is arranged in the inner guide hole in the via hole girder in a penetrating mode, anda power pulley mechanism for driving the via hole girder or the inner guide girder to do linear displacement is arranged between the via hole girder and the inner guide girder; a girder falling portal for lifting or descending a girder to be erected walks on the via hole girder; and the via hole girder is a specially-made steel box girder. According to the novel girder erecting equipment and theerecting method, the rule that a bridge girder erection machine must be used for traditional girder erection is broken; complicated and dangerous high-difficulty and high-risk operation of assembling,hoisting, load-bearing moving and hole passing during girder erection of the bridge girder erection machine is abandoned, the problems of construction safety and construction period in the construction process are effectively solved, and huge social benefits and economic benefits are brought to rapid development of high-speed rails, urban railways and high-grade highways.
Owner:中桥科建(德州)路桥工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products