Energy-saving gaseous suspension roasting furnace system for aluminum hydroxide

By using a parallel cyclone separator and U-shaped connecting pipe in the gaseous suspension roasting furnace system of aluminum hydroxide, combined with a series preheated cyclone separator and a high-temperature resistant central cylinder, the problems of low separation efficiency and high energy consumption are solved, and the problem of low separation efficiency and high energy consumption is achieved. Efficient heat utilization and energy consumption reduction.

CN222123954UActive Publication Date: 2024-12-06GUANGXI LONGZHOU XINXIANG ECOLOGICAL ALUMINUM LNDUSTRY CO LTD

Patent Information

Application Number
CN202420876377.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-12-06
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

The existing gaseous suspended roasting furnace of aluminum hydroxide is low in separation efficiency, resulting in high circulation rate and low production capacity in the system, which in turn increases the energy consumption of the roasting furnace system.

Method used

A new energy-saving gaseous suspended roasting furnace system of aluminum hydroxide was designed, using a parallel cyclone separator and a U-shaped connecting pipe, which improved the heat exchange efficiency and heat utilization rate of materials and system air, and was separated by series preheated cyclone. The device and high-temperature resistant central cylinder enhance material separation efficiency and reduce system resistance.

Benefits of technology

It significantly improves the heat utilization rate and separation efficiency of the roasting furnace system, reduces the material circulation and fuel usage, reduces the energy consumption of the roasting furnace, and increases production capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222123954U_ABST
    Figure CN222123954U_ABST
Patent Text Reader

Abstract

The utility model discloses an energy-saving gaseous suspension roasting furnace system for aluminum hydroxide, and solves the technical problems that the existing roasting furnace is low in separation efficiency, so that the circulation rate of materials in the system is high, the productivity is low, and the energy consumption of the roasting furnace system is high. According to the roasting furnace system disclosed by the utility model, the first-stage preheating cyclone separator, the first-stage cooling cyclone separator and the fourth-stage cooling cyclone separator are all arranged as parallel cyclone separators, so that the separation efficiency is improved, and the circulation amount of materials in the system is reduced; the secondary preheating cyclone separator comprises one preheating cyclone separator or two preheating cyclone separators which are connected in series, and the secondary preheating cyclone separator is connected with the tertiary cyclone separator through a U-shaped connecting pipe, so that the heat exchange time of materials and high-temperature hot air of the system is prolonged, the crystal water removal efficiency and the heat exchange efficiency and the heat utilization rate of the roasting system are improved, and the energy consumption is reduced. Compared with an existing roasting furnace, the gas energy consumption is greatly reduced, and the roasting furnace system is compact in structure, high in automation degree and large in single-machine yield.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of aluminum oxide production equipment, in particular to an aluminum hydroxide energy-saving gaseous suspension roasting furnace system. Background Art

[0002] The energy consumption of roasting furnace accounts for nearly one-third of the energy consumption of alumina enterprises. High energy consumption leads to higher roasting costs and lower profits. With the continuous oversupply of alumina, the competitive pressure of enterprises continues to increase. Only by fundamentally reducing production costs can enterprises win more profits and survival space.

[0003] In order to reduce the energy consumption of the roasting furnace, the Chinese utility model patent with the authorization announcement date of 2021.06.01 and the authorization announcement number CN 213335523 U discloses an energy-saving and environmentally friendly aluminum hydroxide suspension roasting equipment, including a first-stage cyclone preheater, a second-stage cyclone preheater, a third-stage cyclone preheater, a roasting main furnace, an air separator and a cyclone cooling system, the cyclone separator material pipe is connected to the material inlet of the cooling system, the exhaust port of the main roasting furnace is connected to the air inlet of the cyclone separator, the exhaust port of the cyclone separator is connected to the air inlet of the second-stage cyclone preheater, the air inlet of the third-stage cyclone preheater is connected to the exhaust port of the cooling system, the exhaust port of the third-stage cyclone preheater is connected to the air inlet of the main roasting furnace, and the discharge pipe of the third-stage cyclone preheater is connected to the material inlet of the roasting main furnace.

[0004] The above utility model patent introduces the air after heat exchange between the three-stage cyclone preheater and the material into the main roasting furnace instead of the airflow discharged from the cooling system, which reduces the air temperature of the main roasting furnace, increases the temperature of the material entering the main roasting furnace, reduces the temperature rise of the powder in the main roasting furnace, and reduces energy consumption to a certain extent. However, there are still problems such as low material separation efficiency during preheating and cooling, high material circulation rate in the system, and low production capacity, which increases the energy consumption of the system. Therefore, it is urgent to design a roasting system with high production capacity and low energy consumption. Utility Model Content

[0005] In view of the deficiencies in the above-mentioned background technology, the utility model proposes a novel energy-saving gaseous suspension roasting furnace system for aluminum hydroxide, which solves the technical problems of low separation efficiency of the existing gaseous suspension roasting furnace for aluminum hydroxide, resulting in high circulation rate of materials in the system and low production capacity, which in turn leads to high energy consumption of the roasting furnace system.

[0006] The technical solution of this application is:

[0007] A novel energy-saving gaseous suspension roasting furnace system for aluminum hydroxide comprises a feeding bin, a belt scale, a dryer, a first-stage preheating cyclone separator, a second-stage preheating cyclone separator, a main roasting furnace, a third-stage cyclone separator, a first-stage cooling cyclone separator, a second-stage cooling cyclone separator, a third-stage cooling cyclone separator, a fourth-stage cooling cyclone separator, and a cooler, which are arranged in sequence along the direction of the material. The first-stage preheating cyclone separator, the first-stage cooling cyclone separator, and the fourth-stage cooling cyclone separator are all parallel cyclone separators, the second-stage preheating cyclone separator comprises one or two preheating cyclone separators connected in series, and the second-stage preheating cyclone separator is connected to the third-stage cyclone separator via a U-shaped connecting pipe.

[0008] The parallel cyclone separator provided by the present technical solution configures a traditional large conical cyclone barrel into two small conical cyclone barrels connected in parallel, and retains an air inlet to connect the two air outlet pipes, thereby improving the separation efficiency of the first-stage preheating cyclone separator, the first-stage cooling cyclone separator and the fourth-stage cooling cyclone separator, and reducing the circulation amount of materials in the system; the U-shaped connecting pipe is connected between the air inlet pipe of the second-stage preheating cyclone separator and the air outlet pipe of the third-stage cyclone separator. After the material is separated by the first-stage preheating cyclone separator, it enters the second-stage preheating cyclone separator through the U-shaped connecting pipe with the rising flue gas of the third-stage cyclone separator, thereby extending the heat exchange time between the material and the high-temperature hot air of the system, improving the efficiency of removing crystal water, and further improving the heat exchange efficiency and thermal utilization rate of the roasting furnace system, improving the separation efficiency of the material in the system, and greatly reducing the gas energy consumption compared with the existing roasting furnace system, and further improving the production capacity.

[0009] When the secondary preheating cyclone separator includes two preheating cyclone separators connected in series, the two preheating cyclone separators in series are respectively a secondary preheating cyclone separator one and a secondary preheating cyclone separator two, the air outlet pipe of the secondary preheating cyclone separator one is connected to the air inlet pipe of the secondary preheating cyclone separator two, the air inlet pipe of the primary preheating cyclone separator is connected to the air outlet pipe of the dryer, the discharge pipe is connected to the air outlet pipe of the secondary preheating cyclone separator one, and the air outlet pipe is connected to a dust collector.

[0010] On the basis of the above technical scheme, the present technical scheme provides a connection method of the first-stage preheating cyclone separator in a two-stage second-stage preheating cyclone separator. The material entering the dryer is brought into the first-stage preheating cyclone separator by the rising flue gas. After cyclone separation, the material falls to the discharge pipe. The material passes through the outlet pipe of the second-stage preheating cyclone separator one and the inlet pipe of the second-stage preheating cyclone separator two in turn and enters the second-stage preheating cyclone separator two, and the generated flue gas enters the dust collector.

[0011] Furthermore, the air inlet pipe of the second-stage preheating cyclone separator one is connected to the air outlet pipe of the third-stage cyclone separator through a U-shaped connecting pipe, and the discharge pipe is connected to the main roasting furnace; the air outlet pipe of the second-stage preheating cyclone separator is connected to the dryer, and the discharge pipe is connected to the U-shaped connecting pipe.

[0012] On the basis of the above technical scheme, this technical scheme provides a connection method between a two-stage secondary preheating cyclone separator and a tertiary cyclone separator. The material separated by the secondary preheating cyclone separator 2 slides down to the U-shaped connecting pipe, and then enters the secondary preheating cyclone separator 1 through the U-shaped connecting pipe along with the rising flue gas of the tertiary cyclone separator. The flue gas enters the dryer and then flows into the dust collector. The secondary preheating cyclone separator 1 is provided with two discharge pipes. After the material is separated by the secondary preheating cyclone separator 1, it slides down to the main roasting furnace through the two discharge pipes. The flue gas enters the secondary preheating cyclone separator 2 and then flows into the dust collector.

[0013] Furthermore, when the secondary preheating cyclone separator includes one preheating cyclone separator, the air inlet pipe of the primary preheating cyclone separator is connected to the air outlet pipe of the dryer, the discharge pipe is connected to the air outlet pipe of the tertiary cyclone separator, and the air outlet pipe is connected to a dust collector.

[0014] On the basis of the above technical scheme, the present technical scheme provides a connection method of the first-stage preheating cyclone separator in a single-stage two-stage preheating cyclone separator. The material entering the dryer is brought into the first-stage preheating cyclone separator by the rising flue gas. After cyclone separation, the material falls to the discharge pipe, and the flue gas enters the dust collector along the outlet pipe.

[0015] Furthermore, the air inlet pipe of the secondary preheating cyclone separator is connected to the air outlet pipe of the tertiary cyclone separator through a U-shaped connecting pipe, the discharge pipe is connected to the main roasting furnace, and the air outlet pipe is connected to the dryer.

[0016] On the basis of the above technical scheme, the present technical scheme provides a connection method between a single-stage secondary preheating cyclone separator and a tertiary cyclone separator. The material separated by the primary preheating cyclone separator is driven by the rising flue gas of the tertiary cyclone separator and enters the secondary preheating cyclone separator through a U-shaped connecting pipe. The secondary preheating cyclone separator is provided with two discharge pipes. After the material is separated again by the secondary preheating cyclone separator, it slides down along the two discharge pipes to the main roasting furnace. The flue gas enters the dryer and then flows into the dust collector.

[0017] Furthermore, the dust collector is connected to an ash return mechanism, which includes multiple dust collecting bins. The ash discharge pipeline of the dust collecting bin is provided with two branches, the first branch is connected to the end of the straight pipe section of the air outlet pipe of the secondary cooling cyclone separator, and the second branch is connected to the first straight pipe section of the air outlet pipe of the secondary cooling cyclone separator. A lifting pump is provided on the second branch, and an air lock ash discharge valve is provided at the outlet of each dust collecting bin. The exhaust gas of the dust collector is sent to the chimney by a centrifugal fan, and the collected dust is returned to the production process by a chute or an air lifting pump.

[0018] On the basis of the above technical scheme, the present technical scheme provides an ash return method. The ash return mechanism can be provided with 12 or other number of dust collecting bins. The dust collected by the dust collector enters the air chute through the air lock ash unloading valves under the 12 dust collecting bins and is sent to the first straight pipe section after the tangential outlet bend of the secondary cooling cyclone separator; the wind of the air chute is supplied by the chute fan; the smoke from the dust collector is sent to the chimney and discharged outside through the induced draft fan.

[0019] Furthermore, the three-stage cyclone separator is provided with a high temperature resistant and wear resistant central tube, the air inlet pipe of the three-stage cyclone separator is connected to the air outlet pipe of the main roasting furnace, and the discharge pipe is connected to the first straight pipe section of the air outlet pipe of the secondary cooling cyclone separator.

[0020] Based on the above technical scheme, the present technical scheme provides a connection method for a three-stage cyclone separator. The material calcined in the main roasting furnace enters the three-stage cyclone separator. Therefore, the material of the center tube should be wear-resistant and high-temperature resistant. The outlet pipe of the secondary cooling cyclone separator includes a tangential outlet elbow, a first section of a straight pipe, a straight pipe section and a U-shaped duct. After the material is separated by the three-stage cyclone separator, it enters the first section of the straight pipe section after the tangential outlet elbow of the outlet pipe with the airflow of the secondary cooling cyclone separator.

[0021] Furthermore, the air inlet pipe of the primary cooling cyclone separator is connected to the air outlet pipe of the secondary cooling cyclone separator, the discharge pipe is connected to the connecting pipe of the air inlet pipe of the secondary cooling cyclone separator and the air outlet pipe of the tertiary cooling cyclone separator, and the air outlet pipe is connected to the main roasting furnace. The material enters the primary cooling cyclone separator along with the air flow of the air outlet pipe of the secondary cooling cyclone separator, and then enters the secondary cooling cyclone separator after separation.

[0022] Furthermore, the air inlet pipe of the four-stage cooling cyclone separator is connected to a cold air outlet, the discharge pipe is connected to two coolers, and the air outlet pipe is connected to the air inlet pipe of the three-stage cooling cyclone separator. After the material comes out of the two-stage cooling cyclone separator, it enters the three-stage cooling cyclone separator under the action of the airflow of the air outlet pipe of the four-stage cooling cyclone separator, and after separation again, it enters the four-stage cooling cyclone separator with the airflow of the cold air outlet for cooling and separation. After the four-stage cooling and separation, the material flows down into the cooler for cooling again, and the cooled material enters the alumina conveying system through the chute. The cooler can be a fluidized cooler, a vertical cooler or other cooler.

[0023] Furthermore, the connections between the dryer, the first-stage preheating cyclone separator, the second-stage preheating cyclone separator, the main roasting furnace, the third-stage cyclone separator, the first-stage cooling cyclone separator, the second-stage cooling cyclone separator, the third-stage cooling cyclone separator, the fourth-stage cooling cyclone separator, the dust collector, the cooler and the ash return mechanism are all smooth transition connections. All the crooked necks, tangent outlets and connecting pipe cones in the system are designed as smooth transition connections to reduce system resistance.

[0024] In this technical solution, the cyclone separator is a dry gas-solid separation device that uses the centrifugal force generated by the high-speed rotation of the gas-solid mixture to separate dust or particles from the airflow. Its main structure is a conical cylinder, with an air inlet pipe installed in the tangential direction of the upper section of the cylinder, an air outlet pipe inserted into the cylinder to a certain depth at the top of the cylinder, and a discharge pipe for receiving fine powder at the bottom of the cylinder. Since the structure and working principle of the cyclone separator belong to the existing technology, they will not be described here.

[0025] Compared with the prior art, the technical solution disclosed in the utility model has the following beneficial effects:

[0026] By setting up a parallel-type primary preheating cyclone separator, the separation efficiency of the primary preheating cyclone separator is improved, and the aluminum hydroxide material entering the dust collector is further reduced, thereby reducing the circulation amount of the material in the ash return mechanism that flows back into the system;

[0027] By setting two secondary preheating cyclone separators in series, setting a U-shaped connecting pipe and changing the connection mode of the secondary preheating cyclone separator and the tertiary cyclone separator, the heat exchange time between the material and the system air is prolonged, and the heat exchange efficiency and heat utilization rate are improved;

[0028] By setting up a high temperature resistant and wear resistant center tube of the three-stage cyclone separator, the material separation efficiency is increased by about 60%, and the circulation volume of materials in the system is greatly reduced; by setting up a parallel first-stage cooling cyclone separator and a parallel fourth-stage cooling cyclone separator, the separation efficiency of the first-stage cooling cyclone separator and the fourth-stage cooling cyclone separator is improved, and the circulation volume of materials in the system is reduced; by designing all the crooked necks, tangent outlets, and connecting pipe cones in the system into smooth transition bends, the system resistance is reduced;

[0029] In summary, this system fundamentally reduces system resistance, reduces the amount of material circulating in the system, improves heat utilization and heat exchange efficiency, reduces fuel usage, and reduces the energy consumption of the roasting furnace.

[0030] The utility model can be applied to new roasting furnace systems and can also be used for partial transformation of old roasting furnace systems. The overall structural design of the system is reasonable, simple, easy to manufacture and install, with low manufacturing and maintenance costs, low system resistance, high production capacity and low energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 It is a schematic diagram of the connection structure of the double-stage and two-stage preheating cyclone separator of the utility model;

[0033] Figure 2 It is a schematic diagram of the connection structure of the single-stage and two-stage preheating cyclone separator of the utility model.

[0034] Description of Figure Numbers:

[0035] 1 feeding bin, 2 belt scale, 3 dryer, 4 primary preheating cyclone separator, 5 secondary preheating cyclone separator, 501 secondary preheating cyclone separator one, 502 secondary preheating cyclone separator two, 6 main roasting furnace, 7 third-stage cyclone separator, 8 primary cyclone cooling separator, 9 secondary cyclone cooling separator, 10 third-stage cyclone cooling separator, 11 fourth-stage cyclone cooling separator, 12 dust collector, 13 cold air outlet, 14 cooler, 15 alumina conveying system, 16 ash return mechanism. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the core concept of the utility model and the following embodiments, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0037] Example 1, a novel energy-saving gas suspension roasting furnace system for aluminum hydroxide, such as Figure 1 As shown, it includes a feeding bin 1, a belt scale 2, a dryer 3, a first-stage preheating cyclone separator 4, a second-stage preheating cyclone separator 502, a second-stage preheating cyclone separator 1 501, a main roasting furnace 6, a third-stage cyclone separator 7, a first-stage cooling cyclone separator 8, a second-stage cooling cyclone separator 9, a third-stage cooling cyclone separator 10, a fourth-stage cooling cyclone separator 11, and a cooler 14, wherein the first-stage preheating cyclone separator 4, the first-stage cooling cyclone separator 8, and the fourth-stage cooling cyclone separator 11 are all parallel cyclone separators, and the second-stage preheating cyclone separator 5 includes a second-stage preheating cyclone separator 501 and a second-stage preheating cyclone separator 502 connected in series, and the second-stage preheating cyclone separator 5 is connected to the third-stage cyclone separator 7 through a U-shaped connecting pipe.

[0038] The parallel cyclone separator of the present technical solution configures a traditional large conical cyclone barrel into two small conical cyclone barrels connected in parallel, and retains an air inlet to connect the two air outlet pipes, thereby improving the separation efficiency of the first-stage preheating cyclone separator 4, the first-stage cooling cyclone separator 8 and the fourth-stage cooling cyclone separator 11, and reducing the circulation amount of materials in the system; the U-shaped connecting pipe is connected between the air inlet pipe of the second-stage preheating cyclone separator 5 and the air outlet pipe of the third-stage cyclone separator 7. After the material is separated by the first-stage preheating cyclone separator 4, it enters the second-stage preheating cyclone separator 5 through the U-shaped connecting pipe with the rising flue gas of the third-stage cyclone separator 7, thereby extending the heat exchange time between the material and the system wind, enhancing the heat exchange effect, and improving the heat exchange efficiency and thermal utilization rate, thereby saving gas and solving the problem of high energy consumption caused by the circulation of materials in the system and low system production capacity.

[0039] On the basis of the above embodiment, the air outlet pipe of the secondary preheating cyclone separator 1 501 is connected to the air inlet pipe of the secondary preheating cyclone separator 2 502, the air inlet pipe of the primary preheating cyclone separator 4 is connected to the air outlet pipe of the dryer 3, the discharge pipe is connected to the air outlet pipe of the secondary preheating cyclone separator 1 501, and the air outlet pipe is connected to the dust collector 12. The material entering the dryer 3 is brought into the primary preheating cyclone separator 4 by the rising flue gas, and the material falls to the discharge pipe after cyclone separation. The material passes through the air outlet pipe of the secondary preheating cyclone separator 1 501 and the air inlet pipe of the secondary preheating cyclone separator 2 502 in sequence and enters the secondary preheating cyclone separator 2 502, and the generated flue gas enters the dust collector.

[0040] On the basis of the above embodiment, the air inlet pipe of the secondary preheating cyclone separator 1 501 is connected to the air outlet pipe of the tertiary cyclone separator 7 through a U-shaped connecting pipe, and the discharge pipe is connected to the main roasting furnace 6. The air outlet pipe of the secondary preheating cyclone separator 2 502 is connected to the dryer 3, and the discharge pipe of the secondary preheating cyclone separator 2 502 is connected to the U-shaped connecting pipe. The material separated by the secondary preheating cyclone separator 2 502 slides down to the U-shaped connecting pipe, and then enters the secondary preheating cyclone separator 1 501 through the U-shaped connecting pipe along with the rising flue gas of the tertiary cyclone separator 7. The flue gas enters the dryer 3 and then flows into the dust collector 12. The secondary preheating cyclone separator 1 501 is provided with two discharge pipes. After the material is separated by the secondary preheating cyclone separator 1 501, it slides down to the main roasting furnace 6 through the two discharge pipes. The flue gas enters the secondary preheating cyclone separator 2 502 and then flows into the dust collector 12.

[0041] On the basis of the above embodiment, the dust collector 12 is connected to an ash return mechanism 16, which includes a plurality of dust collecting bins. The ash outlet pipeline of the dust collecting bin is provided with two branches. The first branch is connected to the end of the straight pipe section of the air outlet pipe of the secondary cooling cyclone separator 9, and the second branch is connected to the first section of the straight pipe of the air outlet pipe of the secondary cooling cyclone separator 9. A lifting pump is provided on the second branch, and an air locking ash unloading valve is provided at the outlet of each dust collecting bin.

[0042] Specifically, the ash return mechanism can be provided with 12 or other number of dust collecting bins. The dust collected by the dust collector enters the air chute through the air lock ash unloading valve under each dust collecting bin and is sent to the first straight pipe section after the tangential outlet bend of the secondary cooling cyclone separator 9; the wind of the air chute is supplied by the chute fan; the smoke from the dust collector 12 is sent to the chimney and discharged outside through the induced draft fan.

[0043] Based on the above embodiment, the three-stage cyclone separator 7 is provided with a high temperature resistant and wear-resistant central tube, the air inlet pipe of the central tube is connected to the main roasting furnace 6, and the discharge pipe is connected to the first straight pipe section of the air outlet pipe of the secondary cooling cyclone separator 9.

[0044] Specifically, the material roasted in the main roasting furnace 6 enters the central tube of the three-stage cyclone separator 7, so the central tube should be wear-resistant and high-temperature resistant. The outlet pipe of the secondary cooling cyclone separator 9 includes a tangential outlet elbow, a first section of a straight pipe, a straight pipe section and a U-shaped duct. After the material is separated by the three-stage cyclone separator 7, it enters the first section of a straight pipe section after the tangential outlet elbow of the outlet pipe along with the airflow of the secondary cooling cyclone separator 9.

[0045] On the basis of the above embodiment, the air inlet pipe of the first-stage cooling cyclone separator 8 is connected to the air outlet pipe of the second-stage cooling cyclone separator 9, the discharge pipe is connected to the connecting pipe of the air inlet pipe of the second-stage cooling cyclone separator 9 and the air outlet pipe of the third-stage cooling cyclone separator 10, and the air outlet pipe is connected to the main roasting furnace 6.

[0046] Specifically, the material enters the primary cooling cyclone separator 8 along with the airflow of the air outlet pipe of the secondary cooling cyclone separator 9, and then enters the secondary cooling cyclone separator 9 after separation.

[0047] On the basis of the above embodiment, the air inlet pipe of the four-stage cooling cyclone separator 11 is connected to the cold air port 13 , the discharge pipe is connected to two coolers 14 , and the air outlet pipe is connected to the air inlet pipe of the three-stage cooling cyclone separator 10 .

[0048] Specifically, after the material comes out of the secondary cooling cyclone separator 9, it enters the tertiary cooling cyclone separator 10 under the action of the airflow of the outlet pipe of the quaternary cooling cyclone separator 11, and after separation again, it enters the quaternary cooling cyclone separator 11 with the airflow of the cold air outlet 13 for cooling and separation. After the quaternary cooling and separation, the material flows down into the cooler 14 for cooling again, and the cooled material enters the alumina conveying system 15 through the chute. The cooler 14 can be a fluidized cooler, a vertical cooler or other coolers.

[0049] On the basis of the above embodiment, the connections between the dryer 3, the first-stage preheating cyclone separator 4, the second-stage preheating cyclone separator 5, the main roasting furnace 6, the third-stage cyclone separator 7, the first-stage cooling cyclone separator 8, the second-stage cooling cyclone separator 9, the third-stage cooling cyclone separator 10, the fourth-stage cooling cyclone separator 11, the dust collector 12, the cooler 14 and the ash return mechanism 16 are all smooth transition connections. All the crooked necks, tangent outlets and connecting pipe cones in the system are designed as smooth transition connections to reduce system resistance.

[0050] like Figure 1As shown, when the secondary preheating cyclone separator 5 is two preheating cyclone separators connected in series, the process flow of the system is as follows: the AH material from the flat plate or AH bin is sent to the feeding bin 1 by the aluminum hydroxide feeding belt, and is sent to the screw feeder after being weighed by the electronic quantitative feeding belt scale 2, and then sent to the dryer 3 by the screw feeder. The material entering the dryer 3 is lifted to the primary preheating cyclone separator 4 by the rising flue gas, and after cyclone separation, the material is sent to the secondary preheating cyclone separator 2 502 with the rising flue gas of the secondary preheating cyclone separator 1 501, and the flue gas enters the dust collector 12; the material of the secondary preheating cyclone separator 2 502 enters the secondary preheating cyclone separator 1 501 with the rising flue gas of the tertiary cyclone separator 7, and the flue gas enters the dryer 3; the material of the secondary preheating cyclone separator 1 501 slides down to the main roasting furnace 6, and the flue gas enters the secondary preheating cyclone separator 2 502. The material roasted in the main roasting furnace 6 enters the three-stage cyclone separator 7 with the air flow for separation. The separated material slides down to the first straight pipe section after the tangent outlet bend of the air outlet pipe of the secondary cyclone cooling separator 9, and is then sent to the primary cyclone cooling separator 8 by the air flow to start cooling. The hot flue gas of the three-stage cyclone separator 7 enters the secondary preheating cyclone separator 501 to preheat the material. The hot material entering the primary cyclone cooling separator 8 slides down to the riser of the air outlet pipe of the three-stage cyclone cooling separator 10 after gas-solid separation, and is sent to the secondary cyclone cooling separator 9 by the air flow. The hot air flow of the primary cyclone cooling separator 8 enters the furnace of the main roasting furnace 6; enters the second After separation, the materials in the first-stage cyclone cooling separator 9 are sent to the third-stage cyclone cooling separator 10 by the rising air flow of the fourth-stage cyclone cooling separator 11, and the air flow of the second-stage cyclone cooling separator 9 enters the first-stage cyclone cooling separator 8; after separation, the materials in the third-stage cyclone cooling separator 10 are sent to the fourth-stage cyclone cooling separator 11 along with the cold air sent in by the cold air port 13; the materials in the fourth-stage cyclone cooling separator 11 are adjusted by the pneumatic flap valve and enter the two coolers 14, the gas of the fourth-stage cyclone cooling separator 11 enters the third-stage cyclone cooling separator 10, the fluidizing air of the cooler 14 is supplied by two Roots blowers, and the cooled materials are sent to the alumina conveying system 15 by the chute.

[0051] The dust return process of the system is as follows: the dust collected by the dust collector 12 enters the air chute through the air lock ash unloading valves under the 12 dust collecting bins and is sent to the first straight pipe section after the tangential outlet bend of the air outlet pipe of the secondary cyclone cooling separator 9. The wind in the air chute is supplied by the chute fan, and the smoke from the dust collector 12 is sent to the chimney for discharge through the induced draft fan.

[0052] The dryer 3 in this embodiment may be a Venturi dryer or other dryers, and the cooler 14 may be a fluidized cooler or a vertical cooler, and the fluidized cooler may be a fluidized bed cooler.

[0053] Example 2, a novel energy-saving gaseous suspension roasting furnace system for aluminum hydroxide, such as Figure 2 As shown, the system includes a feeding bin 1, a belt scale 2, a dryer 3, a first-stage preheating cyclone separator 4, a second-stage preheating cyclone separator 5, a main roasting furnace 6, a third-stage cyclone separator 7, a first-stage cooling cyclone separator 8, a second-stage cooling cyclone separator 9, a third-stage cooling cyclone separator 10, a fourth-stage cooling cyclone separator 11, and a cooler 14, which are arranged in sequence along the direction of the material. The first-stage preheating cyclone separator 4, the first-stage cooling cyclone separator 8, and the fourth-stage cooling cyclone separator 11 are all parallel cyclone separators, the second-stage preheating cyclone separator 5 includes a preheating cyclone separator, and the second-stage preheating cyclone separator 5 is connected to the third-stage cyclone separator 7 through a U-shaped connecting pipe.

[0054] On the basis of the above embodiment, the air inlet pipe of the primary preheating cyclone separator 4 is connected to the discharge pipe of the dryer 3, the discharge pipe is connected to the air outlet pipe of the third-stage cyclone separator 7, and the air outlet pipe is connected to the dust collector 12. Specifically, the material entering the dryer 3 is brought into the primary preheating cyclone separator 4 by the rising flue gas, and after cyclone separation, the material falls to the discharge pipe, and the flue gas enters the dust collector 12 along the air outlet pipe.

[0055] On the basis of the above-mentioned embodiment, the air inlet pipe of the secondary preheating cyclone separator 5 is connected to the air outlet pipe of the tertiary cyclone separator 7 through a U-shaped connecting pipe, the discharge pipe is connected to the main roasting furnace 6, and the air outlet pipe is connected to the dryer 3. Specifically, the material separated by the primary preheating cyclone separator 4 is driven by the rising flue gas of the tertiary cyclone separator 7 and enters the secondary preheating cyclone separator 5 through the U-shaped connecting pipe. Two discharge pipes are provided for the secondary preheating cyclone separator 5. After the material is separated again by the secondary preheating cyclone separator 5, it slides down along the two discharge pipes to the main roasting furnace 6. The flue gas enters the dryer 3 and then flows into the dust collector 12.

[0056] The other connection structures of this embodiment are the same as those of embodiment 1.

[0057] like Figure 2 As shown, when the secondary preheating cyclone separator 5 includes a preheating cyclone separator, the process flow of the system is:

[0058] The AH material from the flat plate or AH bin is sent to the feeding bin 1 by the aluminum hydroxide feeding belt, and then sent to the screw feeder after being weighed by the electronic quantitative feeding belt 2, and then sent to the dryer 3 by the screw feeder. The material entering the dryer 3 is lifted by the rising flue gas to the first-stage preheating cyclone separator 4, and after cyclone separation, the material is sent to the second-stage preheating cyclone separator 5 with the rising flue gas of the third-stage cyclone separator 7, and the flue gas enters the dust collector 12; the material separated by the second-stage preheating cyclone separator 5 flows down into the main roasting furnace 6, and the flue gas enters the dryer 3. The material roasted in the main roasting furnace 6 enters the three-stage cyclone separator 7 with the air flow for separation, and slides down to the first straight pipe section after the tangent outlet bend of the outlet pipe of the secondary cyclone cooling separator 9, and is sent to the first-stage cyclone cooling separator 8 by the air flow to start cooling. The hot flue gas of the three-stage cyclone separator 7 enters the second-stage preheating cyclone separator 5 to preheat the material, and the hot material entering the first-stage cyclone cooling separator 8 is separated by gas and solid, and then slides down to the riser of the three-stage cyclone cooling separator 10, and is sent to the second-stage cyclone cooling separator 9 by the air flow. The hot air flow of the first-stage cyclone cooling separator 8 enters the furnace of the main roasting furnace 6. The materials entering the secondary cyclone cooling separator 9 are sent to the tertiary cyclone cooling separator 10 by the rising airflow of the quaternary cyclone cooling separator 11 after separation, and the air of the secondary cyclone cooling separator 9 flows into the primary cyclone cooling separator 8; the materials in the tertiary cyclone cooling separator 10 are sent to the tertiary cyclone cooling separator 11 with the cold air entering from the cold air port 13 after separation. The materials in the tertiary cyclone cooling separator 11 are adjusted by the pneumatic flap valve and enter the two coolers 14, and the gas of the tertiary cyclone cooling separator 11 enters the tertiary cyclone cooling separator 10. The fluidizing air of the cooler 14 is supplied by two Roots blowers K02A and K02B, and the cooled materials are sent to the alumina conveying system 15 by the chute.

[0059] The dust return process of the system is as follows: the dust collected by the dust collector 12 enters the air chute through the air lock ash unloading valves under the 12 dust collecting bins and is sent to the first straight pipe section after the tangential outlet bend of the air outlet pipe of the secondary cyclone cooling separator 9. The wind in the air chute is supplied by the chute fan, and the smoke from the dust collector 12 is sent to the chimney for discharge through the induced draft fan.

[0060] The dryer 3 in this embodiment may be a Venturi dryer or other dryers, and the cooler 14 may be a fluidized cooler or a vertical cooler, and the fluidized cooler may be a fluidized bed cooler.

[0061] The parts not described in detail in the present invention are all conventional technical means known to those skilled in the art.

[0062] The above content shows and describes the basic principle, main features and beneficial effects of the utility model. The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. An energy-saving gaseous suspension roasting furnace system for aluminum hydroxide, comprising a feed bin (1), a belt scale (2), a dryer (3), a primary preheating cyclone separator (4), a secondary preheating cyclone separator (5), a main roasting furnace (6), a tertiary cyclone separator (7), a primary cooling cyclone separator (8), a secondary cooling cyclone separator (9), a tertiary cooling cyclone separator (10), a quaternary cooling cyclone separator (11), and a cooler (14), which are arranged in sequence along the direction of the material. Features: The first-stage preheating cyclone separator (4), the first-stage cooling cyclone separator (8), and the fourth-stage cooling cyclone separator (11) are all parallel-type cyclone separators. The second-stage preheating cyclone separator (5) comprises one or two preheating cyclone separators connected in series. The second-stage preheating cyclone separator (5) is connected to the third-stage cyclone separator (7) via a U-shaped connecting pipe.

2. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 1, Features: When the secondary preheating cyclone separator (5) includes two preheating cyclone separators connected in series, the two preheating cyclone separators connected in series are respectively a secondary preheating cyclone separator one (501) and a secondary preheating cyclone separator two (502); the air outlet pipe of the secondary preheating cyclone separator one (501) is connected to the air inlet pipe of the secondary preheating cyclone separator two (502); the air inlet pipe of the primary preheating cyclone separator (4) is connected to the discharge pipe of the dryer (3); the discharge pipe is connected to the air outlet pipe of the secondary preheating cyclone separator one (501); and the air outlet pipe is connected to a dust collector (12).

3. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 2, Features: The air inlet pipe of the second-stage preheating cyclone separator (501) is connected to the air outlet pipe of the third-stage cyclone separator (7) via a U-shaped connecting pipe, and the discharge pipe is connected to the main roasting furnace (6); the air outlet pipe of the second-stage preheating cyclone separator (502) is connected to the dryer (3), and the discharge pipe is connected to the U-shaped connecting pipe.

4. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 2, Features: When the secondary preheating cyclone separator (5) includes a preheating cyclone separator, the air inlet pipe of the primary preheating cyclone separator (4) is connected to the air outlet pipe of the dryer (3), the discharge pipe is connected to the air outlet pipe of the tertiary cyclone separator (7), and the air outlet pipe is connected to a dust collector (12).

5. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 4, Features: The air inlet pipe of the secondary preheating cyclone separator (5) is connected to the air outlet pipe of the tertiary cyclone separator (7) via a U-shaped connecting pipe, the discharge pipe is connected to the main roasting furnace (6), and the air outlet pipe is connected to the dryer (3).

6. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 2 or 4, Features: The dust collector (12) is connected to an ash return mechanism (16), which includes a plurality of dust collecting bins. The ash outlet pipeline of the dust collecting bins is provided with two branches, the first branch is connected to the end of the straight pipe section of the air outlet pipe of the secondary cooling cyclone separator (9), and the second branch is connected to the first section of the straight pipe of the air outlet pipe of the secondary cooling cyclone separator (9). The second branch is provided with a lifting pump, and the outlet of each dust collecting bin is provided with an air locking ash discharge valve.

7. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to any one of claims 1 to 5, Features: The three-stage cyclone separator (7) is provided with a high temperature resistant and wear resistant central tube, the air inlet pipe of the three-stage cyclone separator (7) is connected to the air outlet pipe of the main roasting furnace (6), and the discharge pipe is connected to the first straight pipe section of the air outlet pipe of the two-stage cooling cyclone separator (9).

8. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 7, Features: The air inlet pipe of the primary cooling cyclone separator (8) is connected to the air outlet pipe of the secondary cooling cyclone separator (9), the discharge pipe is connected to the connecting pipe between the air inlet pipe of the secondary cooling cyclone separator (9) and the air outlet pipe of the tertiary cooling cyclone separator (10), and the air outlet pipe is connected to the main roasting furnace (6).

9. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 8, Features: The air inlet pipe of the four-stage cooling cyclone separator (11) is connected to a cold air port (13), the discharge pipe is connected to two coolers (14), and the air outlet pipe is connected to the air inlet pipe of the three-stage cooling cyclone separator (10).

10. The aluminum hydroxide energy-saving gaseous suspension roasting furnace system according to claim 9, Features: The connections among the dryer (3), the first-stage preheating cyclone separator (4), the second-stage preheating cyclone separator (5), the main roasting furnace (6), the third-stage cyclone separator (7), the first-stage cooling cyclone separator (8), the second-stage cooling cyclone separator (9), the third-stage cooling cyclone separator (10), the fourth-stage cooling cyclone separator (11), the dust collector (12), the cooler (14) and the ash return mechanism (16) are all smooth transition connections.

Citation Information

Patent Citations

  • Energy-saving and environment-friendly aluminum hydroxide suspension roasting equipment

    CN213335523U

Cited By

  • Aluminum hydroxide low-temperature roasting system and technology

    CN120136149A