Combined assembly type prefabricated concrete electric jacking pipe
The combined assembled prefabricated concrete power jacking pipe addresses instability by using mounting blocks and connecting mechanisms to stabilize and connect adjacent pipes, improving installation and transportation efficiency.
Patent Information
- Application Number
- CN202420781070.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-16
AI Technical Summary
Existing combined assembled precast concrete power jacking pipes lack a connection device during installation, leading to instability and requiring multiple pipe pillows for fixation during transportation, which complicates the installation and transportation process.
A combined assembled prefabricated concrete power jacking pipe design featuring a first pipe body, a second pipe body with mounting blocks, positioning plates, prefabricated grooves, and a connecting mechanism with triangular limiting frames and plug plates to stabilize and connect adjacent pipes.
Stabilizes adjacent pipes during installation and allows for connected transportation without the need for pipe pillows, enhancing stability and practicality.
Smart Images

Figure CN222127622U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of combined assembled prefabricated concrete power jacking pipes, in particular to a combined assembled prefabricated concrete power jacking pipe. Background Art
[0002] With the accelerated development of cities, the contradiction between urban electricity demand and land resources, urban space, landscape requirements and other aspects has become increasingly prominent, and the society's requirements for the reliability of urban power supply are getting higher and higher. Therefore, burying cable lines underground is an effective way to resolve the above contradictions. For cable support and high-voltage cables in fixed tunnels, after investigation, the commonly used circular reinforced concrete power pipes have different requirements for internal pre-embedded reinforced concrete pipes as carriers due to the particularity of high-voltage cables in design and use according to the different high-voltage line voltages and cables.
[0003] The existing combined assembled precast concrete power jacking pipe does not have a connection device during installation and use. When multiple jacking pipes are installed side by side, the pipe bodies are not stable enough. In addition, during transportation, the connections between the jacking pipes are not fixed, and a large number of pipe pillows are required for fixation, which brings certain adverse effects to people's use process. In order to solve the shortcomings of the existing technology, we propose a combined assembled precast concrete power jacking pipe. Utility Model Content
[0004] The main purpose of the utility model is to provide a combined assembled prefabricated concrete power jacking pipe, which can effectively solve the problems in the background technology.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] A combined assembled precast concrete power jacking pipe comprises a first pipe body, a second pipe body is arranged on the right side of the first pipe body, a mounting block is arranged on the left outer surface of the first pipe body and the second pipe body, a first positioning plate and a second positioning plate are arranged on the right outer surface of the first pipe body and the second pipe body, a prefabricated lifting groove is arranged inside the first pipe body and the second pipe body, a prefabricated aisle is arranged inside the first pipe body and the second pipe body, an anti-corrosion layer is arranged on the outer wall of the first pipe body and the second pipe body, a plug plate is arranged inside the first positioning plate and the mounting block between the first pipe body and the second pipe body, four groups of storage cavities are symmetrically arranged inside the mounting block, a connecting rod is arranged in the storage cavity, a rotating shaft is arranged on the outer wall of the connecting rod, a triangular limiting frame is arranged at one end of the rotating shaft, a mounting through hole is arranged between the mounting block and the plug plate, a first mounting hole is arranged inside the first positioning plate, two groups of first movable grooves are symmetrically arranged inside the first positioning plate, a second mounting hole is arranged inside the second positioning plate, and two groups of second movable grooves are symmetrically arranged inside the second positioning plate.
[0007] Preferably, the triangular limit frame is fixedly connected to the rotating shaft, the rotating shaft and the connecting rod are sleeved, the rotating shaft is an angle-limited rotating shaft, and the angle limit is 90°, the storage cavity can completely accommodate the triangular limit frame, and the connecting rod is fixedly connected to the mounting block.
[0008] Preferably, the cross-section of the first movable groove is an inverted L-shape, the first movable groove can accommodate a triangular limit frame, the second movable groove can accommodate a triangular limit frame, the first positioning plate and the second positioning plate are centrally symmetrically distributed, and the height of the mounting block is the same as the distance between the first positioning plate and the second positioning plate.
[0009] Preferably, the surface of the prefabricated aisle is paved with an anti-slip mat, positioning pieces fixedly connected to the first tube body are provided on both sides of the prefabricated aisle, the first positioning plate and the second tube body are fixedly connected, the mounting block and the first tube body are fixedly connected, and the plug plate and the mounting block are plugged in through mounting holes.
[0010] Preferably, the plug plate is plugged into the first positioning plate through a first mounting hole, and the first mounting hole, the second mounting hole and the mounting through hole are at the same height.
[0011] Preferably, four groups of the storage cavities are provided in total, the material of the first tube body may be an MPP power tube, and the first tube body and the second tube body have the same specifications.
[0012] Beneficial Effects
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] 1. In the utility model, by providing the first positioning plate and the mounting block and other structures, the first tube body and the second tube body between two adjacent ones can be connected. During installation, the side-by-side tube bodies are fixed more stably. During transportation, the two top tubes can be kept connected when placed, and then the top tubes can be stacked again on top of the top tubes in this way, so there is no need to use a pipe pillow to maintain the stability of the top tubes when stacking.
[0015] 2. In the present invention, by providing the installation block and the first movable groove and other structures, the fixed structures have an elastic range of movement, thereby increasing the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 It is a schematic diagram of the combined structure of the mounting block and the triangular limiting frame of the utility model;
[0018] Figure 3This is a schematic diagram of the combined structure of the first positioning plate and the mounting block of the utility model;
[0019] Figure 4 It is a schematic diagram of the split structure of the first positioning plate and the second positioning plate of the utility model.
[0020] In the figure: 1. first tube body; 2. second tube body; 3. first positioning plate; 4. prefabricated lifting groove; 5. mounting block; 6. prefabricated aisle; 7. first movable groove; 8. rotating shaft; 9. anti-corrosion layer; 10. connecting rod; 11. second positioning plate; 12. first mounting hole; 13. second mounting hole; 14. second movable groove; 15. storage cavity; 16. mounting through hole; 17. triangular limit frame; 18. plug plate. DETAILED DESCRIPTION
[0021] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0022] like Figure 1-4 As shown, a combined assembled prefabricated concrete power jacking pipe, the cross section of the first movable groove 7 is an inverted L shape.
[0023] Place the first tube body 1 and the second tube body 2 side by side, and push the second tube body 2 toward the first tube body 1, that is, push the mounting block 5 toward the cavity between the first positioning plate 3 and the second positioning plate 11. In a natural state, the triangle of the triangular limit frame 17 is upward, but due to the resistance of the first positioning plate 3 and the second positioning plate 11, the triangular limit frame 17 is placed in the receiving cavity 15 of the mounting block 5 during the pushing process until the triangular limit frame 17 is pushed to the position of the first active groove 7 and the second active groove 14.
[0024] like Figure 1-4 As shown, a combined assembled prefabricated concrete power jacking pipe, the first movable groove 7 can accommodate a triangular limit frame 17.
[0025] The triangular limit frame 17 is moved upward again, and the mounting block 5 is pulled backward so that the triangular position of the triangular limit frame 17 is stuck on the square protrusions of the first movable groove 7 and the second movable groove 14 to complete the preliminary fixation, and then the plug plate 18 is inserted into the mounting through hole 16, the first mounting hole 12 and the second mounting hole 13 to prevent the mounting block 5 from shaking left and right between the second positioning plate 11 and the first positioning plate 3, affecting the fixing effect.
[0026] How it works
[0027] It should be noted that the utility model is a combined assembled precast concrete power jacking pipe. When in use, the first tube body 1 and the second tube body 2 are placed side by side, and the second tube body 2 is pushed toward the first tube body 1, that is, the mounting block 5 is pushed toward the cavity between the first positioning plate 3 and the second positioning plate 11. In a natural state, the triangle of the triangular limit frame 17 is upward, but due to the resistance of the first positioning plate 3 and the second positioning plate 11, the triangular limit frame 17 is placed in the receiving cavity 15 of the mounting block 5 during the pushing process until the triangular limit frame 17 is pushed to the position of the first movable groove 7 and the second movable groove 14.
[0028] The triangular limit frame 17 is moved upward again, and the mounting block 5 is pulled backward so that the triangular position of the triangular limit frame 17 is stuck on the square protrusions of the first movable groove 7 and the second movable groove 14 to complete the preliminary fixation, and then the plug plate 18 is inserted into the mounting through hole 16, the first mounting hole 12 and the second mounting hole 13 to prevent the mounting block 5 from shaking left and right between the second positioning plate 11 and the first positioning plate 3, affecting the fixing effect.
[0029] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A combined assembled prefabricated concrete power jacking pipe, comprising a first pipe body (1), characterized in that: A second tube body (2) is arranged on the right side of the first tube body (1); a mounting block (5) is arranged on the left outer surface of the first tube body (1) and the second tube body (2); a first positioning plate (3) and a second positioning plate (11) are arranged on the right outer surface of the first tube body (1) and the second tube body (2); a prefabricated hanging groove (4) is arranged inside the first tube body (1) and the second tube body (2); a prefabricated passage (6) is arranged inside the first tube body (1) and the second tube body (2); an anti-corrosion layer (9) is arranged on the outer wall of the first tube body (1) and the second tube body (2); a first positioning plate (3) and a mounting block (5) between the first tube body (1) and the second tube body (2) are arranged inside The insert plate (18) is provided with four groups of storage chambers (15) symmetrically arranged inside the mounting block (5), a connecting rod (10) is arranged inside the storage chamber (15), a rotating shaft (8) is arranged on the outer wall of the connecting rod (10), a triangular limit frame (17) is arranged at one end of the rotating shaft (8), a mounting through hole (16) is arranged between the mounting block (5) and the insert plate (18), a first mounting hole (12) is arranged inside the first positioning plate (3), two groups of first movable grooves (7) are symmetrically arranged inside the first positioning plate (3), a second mounting hole (13) is arranged inside the second positioning plate (11), and two groups of second movable grooves (14) are symmetrically arranged inside the second positioning plate (11).
2. The combined assembled prefabricated concrete power jacking pipe according to claim 1 is characterized by: The triangular limit frame (17) is fixedly connected to the rotating shaft (8), the rotating shaft (8) and the connecting rod (10) are sleeved, the rotating shaft (8) is an angle-limited rotating shaft, and the angle limit is 90°, the storage cavity (15) can completely accommodate the triangular limit frame (17), and the connecting rod (10) is fixedly connected to the mounting block (5).
3. The combined assembled prefabricated concrete power jacking pipe according to claim 1 is characterized by: The cross section of the first movable groove (7) is an inverted L-shape; the first movable groove (7) can accommodate a triangular limit frame (17); the second movable groove (14) can accommodate a triangular limit frame (17); the first positioning plate (3) and the second positioning plate (11) are centrally symmetrically distributed; the height of the mounting block (5) is the same as the distance between the first positioning plate (3) and the second positioning plate (11).
4. The combined assembled prefabricated concrete power jacking pipe according to claim 1 is characterized by: The surface of the prefabricated passage (6) is paved with an anti-slip mat, and positioning pieces fixedly connected to the first tube body (1) are provided on both sides of the prefabricated passage (6); the first positioning plate (3) and the second tube body (2) are fixedly connected, the mounting block (5) and the first tube body (1) are fixedly connected, and the plug plate (18) and the mounting block (5) are plugged in through the mounting through hole (16).
5. The combined assembled prefabricated concrete power jacking pipe according to claim 1 is characterized by: The plug plate (18) is plugged into the first positioning plate (3) through the first mounting hole (12); the first mounting hole (12), the second mounting hole (13) and the mounting through hole (16) are at the same height.
6. The combined assembled prefabricated concrete power jacking pipe according to claim 1, characterized in that: A total of four groups of the storage chambers (15) are provided. The material of the first tube body (1) may be an MPP power tube. The first tube body (1) and the second tube body (2) have the same specifications.