Construction waste and mine waste rock co-processing production line

By designing a collaborative disposal production line for construction waste and mine waste stones, and using integrated building and station layout and spray dust collector, the problems of environmental pollution and high costs in the treatment of construction waste and mine waste stones are solved, and efficient and environmentally friendly resource utilization and Improved product quality.

CN222132137UActive Publication Date: 2024-12-10WUHAN BUILDING MATERIAL IND DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323579483.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-12-10
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

The treatment of construction waste and mine waste is difficult to effectively reduce environmental pollution, and it is costly, resulting in waste of natural resources.

Method used

A production line for collaborative disposal of construction waste and mine waste stones was designed, including crushing, screening, separation, sand making and powder selection mechanisms, and adopts an integrated layout of the building station and combined with a spray dust collector to achieve efficient resource utilization and environmental protection.

Benefits of technology

It effectively reduces air, water and noise pollution, reduces operating costs, produces recycled aggregates and machined sand that meet standards, improves resource utilization efficiency, and achieves low energy consumption and clean production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222132137U_ABST
    Figure CN222132137U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction waste and mine waste rock co-processing production line which comprises a crushing mechanism, a muck screening mechanism, a construction waste separating mechanism, a medium and fine crushing mechanism, a brick concrete separating mechanism, an aggregate screening mechanism, a sand making and powder selecting mechanism and a storing and delivering mechanism. The muck screening mechanism is connected with the construction waste separating mechanism, the construction waste separating mechanism is connected with the medium fine crushing mechanism, and the medium fine crushing mechanism is connected with the brick concrete separating mechanism, the aggregate screening mechanism and the sand making and powder selecting mechanism. By means of reduction, harmlessness and recycling treatment of the construction waste, produced recycled aggregate resources replace natural gravel, the requirement for reducing natural gravel resource consumption advocated by the government is met, and comprehensive recycling of resources is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of material processing and the field of construction waste disposal, and specifically to a production line for coordinated disposal of construction waste and mine waste rock. Background Art

[0002] With the vigorous development of the construction industry, a large amount of construction waste is generated during the construction activities. Mines include coal mines, metal mines, non-metallic mines, building materials mines and chemical mines, etc. Mines generate a large amount of waste during the mining process.

[0003] The accumulated construction waste and mining waste rock cause environmental pollution, affecting people's quality of life and the natural environment. It is very difficult to deal with the construction waste and mining waste rock. The treatment cost of construction waste and mining waste rock is high, causing air, water and noise pollution. Abandoned construction waste and mining waste rock cause waste of natural resources. Utility Model Content

[0004] The purpose of the utility model is to provide a production line for the coordinated disposal of construction waste and mining waste rock to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a production line for coordinated disposal of construction waste and mine waste rock, comprising a crushing mechanism, a slag screening mechanism, a construction waste separation mechanism, a medium and fine crushing mechanism, a brick-concrete separation mechanism, an aggregate screening mechanism, a sand-making powder selection mechanism and a storage and shipping mechanism, wherein the crushing mechanism is connected to the slag screening mechanism and the construction waste separation mechanism, the slag screening mechanism is connected to the construction waste separation mechanism, the construction waste separation mechanism is connected to the medium and fine crushing mechanism, the medium and fine crushing mechanism is connected to the brick-concrete separation mechanism, the aggregate screening mechanism and the sand-making powder selection mechanism, and the slag screening mechanism, the construction waste separation mechanism, the brick-concrete separation mechanism, the aggregate screening mechanism and the sand-making powder selection mechanism are all connected to the storage and shipping mechanism;

[0006] The crushing mechanism includes a receiving hopper, a first feeder, a crusher, a first belt conveyor and a first dust collector, the slag screening mechanism includes a first vibrating screen, a second belt conveyor, a first bulk loader and a second dust collector, the construction waste separation mechanism includes an iron remover, a manual sorting room and a light material separator, the medium and fine crushing mechanism includes a medium crusher, a fine crusher, a second vibrating screen, a third belt conveyor, a first bucket elevator and a third dust collector, the brick-concrete separation mechanism includes a first silo, a brick-concrete separator, a fourth belt conveyor, a second bucket elevator, a second bulk loader and a fourth dust collector; the aggregate screening mechanism includes a third vibrating screen, a fifth belt conveyor, a third bucket elevator and a fifth dust collector; the sand making and powder selection mechanism includes a fourth vibrating screen, a pre-powder selection machine, a second silo, a second feeder, a sand making machine, a fourth bucket elevator, a sand making vibrating screen, a powder selection machine, a sixth belt conveyor, a fifth bucket elevator and a sixth dust collector; the storage and shipping mechanism includes a reservoir, a seventh belt conveyor, a third bulk loader and a weighbridge.

[0007] Preferably, the receiving hopper, the first feeder, the crusher and the first belt conveyor are connected in sequence.

[0008] Preferably, the outlet of the first belt conveyor is connected to the inlet of the first vibrating screen, and the slag outlet of the first vibrating screen, the second belt conveyor and the first bulk loader are connected in sequence.

[0009] Preferably, the construction waste outlet of the first vibrating screen is connected to the inlet of the iron remover, and the iron remover, the manual sorting room and the light material separator are connected in sequence.

[0010] Preferably, the construction waste outlet of the light material separator is connected to the inlet of the secondary crusher, the secondary crusher, the second vibrating screen, the third belt conveyor and the first bucket elevator are connected in sequence, the unqualified product outlet of the second vibrating screen is connected to the inlet of the fine crusher, and the outlet of the fine crusher is connected to the inlet of the second vibrating screen.

[0011] Preferably, the outlet of the first bucket elevator is connected to the inlet of the first silo, and the first silo, the brick-concrete separator, the fourth belt conveyor, the second bucket elevator and the second bulk loader are connected in sequence.

[0012] Preferably, the recycled aggregate outlet of the brick-concrete separator is connected to the inlet of the third vibrating screen, and the third vibrating screen, the fifth belt conveyor and the third bucket elevator are connected in sequence.

[0013] Preferably, the outlet of the third bucket elevator is connected to the inlet of the fourth vibrating screen, the fourth vibrating screen, the pre-powder classifier, the second silo, the second feeder, the sand making machine, the fourth bucket elevator, the sand making vibrating screen, the powder classifier, the sixth belt conveyor and the fifth bucket elevator are connected in sequence, and the outlet for unqualified products of the sand making vibrating screen is connected to the inlet of the second feeder.

[0014] Preferably, the outlet of the first bulk loader, the metal material outlet of the iron remover, the light material outlet of the light material separator, the outlet of the second bulk loader, the mine waste rock outlet of the third vibrating screen, the finished sand outlet of the powder classifier and the outlet of the fifth bucket elevator are all connected to the entrance of the reservoir, and the reservoir, the seventh belt conveyor, the third bulk loader and the weighing scale are connected in sequence.

[0015] Preferably, the first dust collector, the second dust collector, the third dust collector, the fourth dust collector, the fifth dust collector and the sixth dust collector are all spray dust collectors, the first dust collector is arranged at the receiving hopper, the second dust collector is arranged at the first bulk loader, the third dust collector is arranged at the first bucket elevator, the fourth dust collector is arranged at the second bulk loader, the fifth dust collector is arranged at the third bucket elevator, and the sixth dust collector is arranged at the fifth bucket elevator. Dust removal is performed at multiple positions by the dust collectors to reduce environmental pollution.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] 1. The utility model provides a construction waste and mine waste rock coordinated disposal production line, which takes necessary measures in the treatment of construction waste and mine waste rock and the production of machine-made sand and recycled concrete, will not cause air, water, and noise pollution, reduces pollution to the environment, and makes full use of mine waste rock resources.

[0018] 2. The utility model provides a production line for the coordinated disposal of construction waste and mine waste rock. The medium and fine crushing mechanism and the sand making and powder selection mechanism are all arranged in an integrated building-station type, with a simple process flow and a small footprint. The mine waste rock and construction waste disposal share a production line, and when disposing of construction waste, a bypass is taken through some special construction waste separation and disposal equipment to reduce operating costs.

[0019] 3. The utility model provides a production line for the coordinated disposal of construction waste and mine waste rock, which has high product quality, and the content of debris in recycled aggregate is less than 3%; the needle-like proportion of the original construction aggregate product is less than 10%, the mud content is less than 1%, and the mud block content is less than 0.2%, and the quality meets the standards of "Quality Standard for Crushed Stone and Pebbles for Construction" GBT 14685-2011 and "Standard for Construction Sand" GBT14684-2011; the fineness modulus of machine-made sand is 2.3-3.7; stone powder content: MB value ≤1.4 or fast test qualified ≤10%; MB value>1.4 or fast test unqualified ≤3%; mud block content: MB value ≤1.4 or fast test qualified ≤1%; MB value>1.4 or fast test unqualified ≤1%, and the particle grading meets the national standard GB / T14684-2011 "Construction Sand".

[0020] 4. The utility model provides a production line for the coordinated disposal of construction waste and mining waste, which improves the utilization efficiency of recycled materials and energy and maximizes the comprehensive utilization of recycled resources; the production workshop is fully sealed, and the materials in the production process are stored in a non-ground circular warehouse to achieve low energy consumption and clean production in the production process; high-efficiency energy-saving equipment is used in environmental protection and energy saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is the principle diagram of the utility model;

[0022] Figure 2 It is a system diagram of the utility model;

[0023] Figure 3 It is a schematic diagram of the crushing mechanism of the utility model;

[0024] Figure 4 It is a schematic diagram of the slag screening mechanism of the utility model;

[0025] Figure 5 It is a schematic diagram of the construction waste separation mechanism of the utility model;

[0026] Figure 6 It is a schematic diagram of the fine crushing mechanism in the utility model;

[0027] Figure 7 It is a schematic diagram of the brick-concrete separation mechanism of the utility model;

[0028] Figure 8 It is a schematic diagram of the aggregate screening mechanism of the utility model;

[0029] Fig. 9 It is a schematic diagram of the sand making and powder selection mechanism of the utility model;

[0030] Fig.10 It is a schematic diagram of the storage and shipping mechanism of the utility model.

[0031] In the figure: 1. Crushing mechanism; 2. Slag screening mechanism; 3. Construction waste separation mechanism; 4. Medium and fine crushing mechanism; 5. Brick-concrete separation mechanism; 6. Aggregate screening mechanism; 7. Sand making and powder selection mechanism; 8. Storage and shipping mechanism. DETAILED DESCRIPTION

[0032] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0033] See also Figure 1-10The utility model provides a production line for the coordinated disposal of construction waste and mine waste rock, including a crushing mechanism 1 including a receiving hopper, a first feeder, a crusher, a first belt conveyor and a first dust collector, a slag screening mechanism 2 including a first vibrating screen, a second belt conveyor, a first bulk machine and a second dust collector, a construction waste separation mechanism 3 including an iron remover, a manual sorting room and a light material separator, a medium and fine crushing mechanism 4 including a medium crusher, a fine crusher, a second vibrating screen, a third belt conveyor, a first bucket elevator and a third dust collector, a brick and concrete separator The separation mechanism 5 includes a first silo, a brick-concrete separator, a fourth belt conveyor, a second bucket elevator, a second bulk loader and a fourth dust collector; the aggregate screening mechanism 6 includes a third vibrating screen, a fifth belt conveyor, a third bucket elevator and a fifth dust collector; the sand making and powder selection mechanism 7 includes a fourth vibrating screen, a pre-powder selection machine, a second silo, a second feeder, a sand making machine, a fourth bucket elevator, a sand making vibrating screen, a powder selection machine, a sixth belt conveyor, a fifth bucket elevator and a sixth dust collector; the storage and shipping mechanism 8 includes a reservoir, a seventh belt conveyor, a third bulk loader and a weighbridge.

[0034] The receiving hopper, the first feeder, the crusher and the first belt conveyor are connected in sequence to crush and transport the original construction waste and mine waste rock.

[0035] The outlet of the first belt conveyor is connected to the inlet of the first vibrating screen, and the slag outlet of the first vibrating screen, the second belt conveyor and the first bulk loader are connected in sequence; the slag separated by the vibrating screen is transported to the slag pile shed by the belt conveyor, and a bulk loader is set up at the unloading point.

[0036] The construction waste outlet of the first vibrating screen is connected to the inlet of the iron remover, and the iron remover, manual sorting room and light material separator are connected in sequence; the metal material sorted by the iron remover enters the temporary storage room for storage through a chute, a manual sorting room is set up, and the sorted construction waste enters the temporary storage room for storage through a chute, a light material separator is set up, and the sorted light materials enter the light material packaging room for storage through the chute.

[0037] The construction waste outlet of the light material separator is connected to the inlet of the medium crusher, the medium crusher, the second vibrating screen, the third belt conveyor and the first bucket elevator are connected in sequence, the unqualified product outlet of the second vibrating screen is connected to the inlet of the fine crusher, and the outlet of the fine crusher is connected to the inlet of the second vibrating screen; a metering feeding device is set before feeding the medium and fine crushers, the vibrating screen is provided with four discharge ports, which are respectively connected to the transfer belts of different products, and each discharge port is provided with an electric gate valve to control the opening and closing. During production, the corresponding electric gate valve can be opened according to the target product type required to adjust the product type produced, and the bucket elevator is used for vertical transportation. The medium and fine crushers, vibrating screens, transfer belts, dust collectors and other auxiliary equipment are concentrated in one building station to form a building station distribution to save floor space.

[0038] The outlet of the first bucket elevator is connected with the inlet of the first silo, and the first silo, the brick-concrete separator, the fourth belt conveyor, the second bucket elevator and the second bulk loader are connected in sequence; a manual rod valve is arranged at the bottom of the silo to control the feeding amount of the brick-concrete separator, and the brick-concrete separator is provided with two discharge ports, corresponding to the sorted waste bricks and tiles and recycled aggregates respectively, and a separate storage is set up to store the sorted waste bricks and tiles, which are loaded for transportation through the bulk loader arranged under the storage, and the recycled aggregates are transported to the next work section through the belt conveyor and bucket elevator.

[0039] The recycled aggregate outlet of the brick-concrete separator is connected to the inlet of the third vibrating screen, and the third vibrating screen, the fifth belt conveyor and the third bucket elevator are connected in sequence; the vibrating screen is provided with four discharge ports, each of which is controlled by an electric gate valve and can be adjusted according to production needs. It can be transported to the finished product warehouse for storage through a belt conveyor as a product, or it can be used as raw material to enter the buffer bin in front of the sand making machine for sand making.

[0040] The outlet of the third bucket elevator is connected with the inlet of the fourth vibrating screen, the fourth vibrating screen, the pre-selector, the second silo, the second feeder, the sand making machine, the fourth bucket elevator, the sand making vibrating screen, the selector, the sixth belt conveyor and the fifth bucket elevator are connected in sequence, and the outlet of the unqualified products of the sand making vibrating screen is connected with the inlet of the second feeder; a pre-selector is arranged in front of the sand making machine, and a buffer bin is arranged, and the bottom of the buffer bin is fed by a metering scale. The products of different particle sizes selected by the sand making vibrating screen can be transported to the finished product warehouse as products for storage by adjusting the electric three-way valve arranged on the chute, and can also be returned to the buffer bin in front of the sand making machine. The dust collecting wind direction of the vibrating screen and each dust collecting pipeline is connected with the first dust inlet of the dust collector after passing through the pre-screening machine, so as to reduce the size of the dust collector and the fan selection, and the sand selected by the powder selector is sent to the finished product warehouse for storage, and the selected powder is transported to the stone powder warehouse through a zipper machine, a bucket elevator or an ash trough pump for storage and then shipped in bulk.

[0041] The outlet of the first bulk loader, the metal material outlet of the iron remover, the light material outlet of the light material separator, the outlet of the second bulk loader, the mine waste rock outlet of the third vibrating screen, the finished sand outlet of the powder selector and the outlet of the fifth bucket elevator are all connected to the entrance of the storage tank, and the storage tank, the seventh belt conveyor, the third bulk loader and the scale are connected in sequence; a total of 6 steel plate storage tanks and 2 concrete storage tanks are set up. Through the reasonable arrangement of double-layer belts, the storage distribution and arrangement of 1 type of sand, 2 types of recycled aggregates and 3 types of virgin aggregates are realized. A transfer belt is set at the bottom of the storage tank to transport them to the main building of the commercial concrete mixing station. At the same time, a bulk loader is set up for bulk transportation. An electronic scale is installed on the ground corresponding to the bottom of the storage tank for measurement. A double-shaft mixer is set at the bottom of the sand storage tank for humidification and mixing.

[0042] The first dust collector, the second dust collector, the third dust collector, the fourth dust collector, the fifth dust collector and the sixth dust collector are all spray dust collectors. The first dust collector is arranged at the receiving hopper, the second dust collector is arranged at the first bulk loader, the third dust collector is arranged at the first bucket elevator, the fourth dust collector is arranged at the second bulk loader, the fifth dust collector is arranged at the third bucket elevator, and the sixth dust collector is arranged at the fifth bucket elevator. When in use, dust is removed through the dust collector.

[0043] When the embodiment of the present application is used: the production line workflow is as follows: feeding, primary crushing, magnetic separation, manual sorting, secondary and tertiary crushing, primary screening, sorting and storage of finished construction waste and waste limestone sand making and storage;

[0044] Feeding: Mixed construction waste is transported from the source of construction waste or the government-designated location by car to the raw material shed in the factory area. The construction waste transported to the disposal site is quickly pre-sorted in the raw material shed according to its components. The raw materials are concrete blocks, bricks and tiles, and mine waste is transported to the site by truck after weighing on the scale; the mine waste and pre-sorted construction waste, with a particle size of less than or equal to 600mm, are fed into the unloading bucket by a loader and evenly fed by the vibrating feeder at the bottom of the hopper. It is a bar type with a bar gap of 100mm. The raw materials are divided into two parts by the feeder: the material on the bar, with a particle size of >100mm; the material under the bar, with a particle size of 0 < ≤100mm, is transported by the conveyor to the soil removal screen for screening. The material under the screen is slag, with a particle size of 0 < ≤10mm, which is transported to the slag bin. The material on the screen is small pieces of construction waste and ore, with a particle size of 10 < ≤100mm; the other route passes through the primary crushing of the mine and is directly transported to the 3000t concrete transfer warehouse through the transfer belt;

[0045] Primary crushing: the materials on the bars are evenly dropped into the jaw crusher for crushing. The particle size of the materials after crushing is less than 300mm.

[0046] Magnetic separation: After crushing, the materials on the screen are combined and transported, and the iron metals are recovered by the iron remover. The separated metals are piled up and sold in batches after reaching a certain amount;

[0047] Manual sorting: After the metal is recycled, the garbage is transported to the manual sorting platform, where it is picked up manually, sorted and stacked, and processed centrally, including debris such as aluminum alloy, cables, wood, etc.

[0048] Secondary and tertiary crushing: Bricks, tiles, construction waste and waste limestone enter the cone crusher for secondary crushing. The crushing particle size is set to 30mm. The crushed materials are sieved, and the sieved materials enter the buffer bin and are evenly fed to the tertiary cone crusher through the quantitative feeder under the bin;

[0049] Primary screening: The primary screening has three layers of screens, 5 / 10 / 31.5 mm. The materials after secondary and tertiary crushing are screened by a vibrating screen, and the materials larger than 31.5 mm are returned to the tertiary crushing.

[0050] Sorting and storage of finished construction waste products: After the first-level screening, the semi-finished construction waste with a diameter of 10 to 31.5 mm is separated by a light material separator and then transported to the finished recycled aggregate warehouse via a belt conveyor. The 0 to 10 mm construction waste aggregate is connected to the finished recycled aggregate warehouse;

[0051] Sand making and storage of waste limestone: After the first-level screening, the 5-31.5mm material passes through the 5 / 10 / 20mm vibrating screen of the finished product secondary screening in the sand making building, and is screened into 5-10mm, 10-20mm, and 20-31.5mm raw aggregates, which are stored separately in the finished product warehouse. After the secondary screening, the 5-31.5mm material is also considered for sand making. The 0-5mm material can be selected by the powder selector and then enter the sand making buffer bin for sand making. The sand making buffer bin is fed evenly to two vertical shaft impact crushers for sand making and shaping through the quantitative feeder under the bin. The shaped material is lifted by the elevator to two environmental protection screens. The material larger than 5mm is returned to the sand making machine. The 3-5mm material can be returned to the sand making machine or sent to the powder selector together with the 0-3mm material for sorting before going to the finished product warehouse.

[0052] The sand making building is equipped with a stone powder bulk system, which adopts centralized dust collection. The powder stored in the 700t circular warehouse is sent to the powder bulk truck through a bulk loader for shipment.

[0053] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A production line for coordinated disposal of construction waste and mining waste rock, comprising a crushing mechanism (1), a slag screening mechanism (2), a construction waste separation mechanism (3), a medium and fine crushing mechanism (4), a brick and concrete separation mechanism (5), an aggregate screening mechanism (6), a sand making and powder selection mechanism (7) and a storage and shipping mechanism (8), characterized in that: The crushing mechanism (1) is connected to the slag screening mechanism (2) and the construction waste separation mechanism (3), the slag screening mechanism (2) is connected to the construction waste separation mechanism (3), the construction waste separation mechanism (3) is connected to the medium and fine crushing mechanism (4), the medium and fine crushing mechanism (4) is connected to the brick and concrete separation mechanism (5), the aggregate screening mechanism (6) and the sand making and powder selection mechanism (7), and the slag screening mechanism (2), the construction waste separation mechanism (3), the brick and concrete separation mechanism (5), the aggregate screening mechanism (6) and the sand making and powder selection mechanism (7) are all connected to the storage and shipping mechanism (8); The crushing mechanism (1) comprises a receiving hopper, a first feeder, a crusher, a first belt conveyor and a first dust collector; the slag screening mechanism (2) comprises a first vibrating screen, a second belt conveyor, a first bulk loader and a second dust collector; the construction waste separation mechanism (3) comprises an iron remover, a manual sorting room and a light material separator; the medium and fine crushing mechanism (4) comprises a medium crusher, a fine crusher, a second vibrating screen, a third belt conveyor, a first bucket elevator and a third dust collector; the brick and concrete separation mechanism (5) comprises a first silo, The brick-concrete separator, the fourth belt conveyor, the second bucket elevator, the second bulk loader and the fourth dust collector; the aggregate screening mechanism (6) includes the third vibrating screen, the fifth belt conveyor, the third bucket elevator and the fifth dust collector; the sand making and powder selection mechanism (7) includes the fourth vibrating screen, the pre-powder selection machine, the second silo, the second feeder, the sand making machine, the fourth bucket elevator, the sand making vibrating screen, the powder selection machine, the sixth belt conveyor, the fifth bucket elevator and the sixth dust collector; the storage and shipping mechanism (8) includes the storage, the seventh belt conveyor, the third bulk loader and the weighbridge.

2. The coordinated disposal production line of construction waste and mining waste according to claim 1 is characterized by: The receiving hopper, the first feeder, the crusher and the first belt conveyor are connected in sequence.

3. The production line for coordinated disposal of construction waste and mining waste according to claim 1 is characterized by: The outlet of the first belt conveyor is connected to the inlet of the first vibrating screen, and the slag outlet of the first vibrating screen, the second belt conveyor and the first bulk loader are connected in sequence.

4. The production line for coordinated disposal of construction waste and mining waste according to claim 1 is characterized in that: The construction waste outlet of the first vibrating screen is connected to the inlet of the iron remover, and the iron remover, the manual sorting room and the light material separator are connected in sequence.

5. The production line for coordinated disposal of construction waste and mining waste according to claim 1 is characterized by: The construction waste outlet of the light material separator is connected to the inlet of the medium crusher, the medium crusher, the second vibrating screen, the third belt conveyor and the first bucket elevator are connected in sequence, the unqualified product outlet of the second vibrating screen is connected to the inlet of the fine crusher, and the outlet of the fine crusher is connected to the inlet of the second vibrating screen.

6. The coordinated disposal production line of construction waste and mining waste according to claim 1 is characterized by: The outlet of the first bucket elevator is connected to the inlet of the first silo, and the first silo, the brick-concrete separator, the fourth belt conveyor, the second bucket elevator and the second bulk loader are connected in sequence.

7. The coordinated disposal production line of construction waste and mining waste according to claim 1 is characterized by: The regenerated aggregate outlet of the brick-concrete separator is connected to the inlet of the third vibrating screen, and the third vibrating screen, the fifth belt conveyor and the third bucket elevator are connected in sequence.

8. The construction waste and mining waste coordinated disposal production line according to claim 1 is characterized by: The outlet of the third bucket elevator is connected to the inlet of the fourth vibrating screen, and the fourth vibrating screen, pre-powder classifier, second silo, second feeder, sand making machine, fourth bucket elevator, sand making vibrating screen, powder classifier, sixth belt conveyor and fifth bucket elevator are connected in sequence, and the outlet of unqualified products of the sand making vibrating screen is connected to the inlet of the second feeder.

9. The production line for coordinated disposal of construction waste and mining waste according to claim 1 is characterized by: The outlet of the first bulk loader, the metal material outlet of the iron remover, the light material outlet of the light material separator, the outlet of the second bulk loader, the mine waste rock outlet of the third vibrating screen, the finished sand outlet of the powder classifier and the outlet of the fifth bucket elevator are all connected to the entrance of the reservoir, and the reservoir, the seventh belt conveyor, the third bulk loader and the weighing scale are connected in sequence.

10. The production line for coordinated disposal of construction waste and mining waste according to claim 1, characterized in that: The first dust collector, the second dust collector, the third dust collector, the fourth dust collector, the fifth dust collector and the sixth dust collector are all spray dust collectors. The first dust collector is arranged at the receiving hopper, the second dust collector is arranged at the first bulk loader, the third dust collector is arranged at the first bucket elevator, the fourth dust collector is arranged at the second bulk loader, the fifth dust collector is arranged at the third bucket elevator, and the sixth dust collector is arranged at the fifth bucket elevator.