Gravel pile reinforcing device and gravel pile

By adopting a combined structure of reinforced sleeves, anti-offset positioning connectors and load-force buffer pads in gravel piles, the strength and load-bearing capacity of gravel piles are improved, and the problem of insufficient strength of existing gravel piles is solved. Enhanced reinforcement effect on weak interlayer roadbeds.

CN222140001UActive Publication Date: 2024-12-10CHINA 19TH METALLURGICAL CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420266939.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-03
Publication Date
2024-12-10
Estimated Expiration
2034-02-03

AI Technical Summary

Technical Problem

The strength of existing gravel piles is low, which affects the reinforcement effect on weak interlayer roadbeds.

Method used

The crushed pile reinforcement device including reinforcement sleeves, anti-offset positioning connectors and load buffer pads is adopted. The load-bearing capacity of the pile body is improved through the mesh hole structure and fiberboard material of the reinforcement sleeves, and the anti-offset positioning connection is connected. Parts and fiber reinforcement ensure the accuracy and strength of construction.

Benefits of technology

It effectively improves the strength and bearing capacity of gravel piles, enhances the reinforcement effect on weak interlayer roadbeds, and reduces the lateral deformation of the pile body and the possibility of loosening of gravel and sand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222140001U_ABST
    Figure CN222140001U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of road construction, in particular to a gravel pile reinforcing device and a gravel pile, the gravel pile reinforcing device comprises a reinforcing sleeve, the upper end and the lower end of the reinforcing sleeve are provided with openings, the middle of the reinforcing sleeve is provided with a vertically-through pile body filling through hole, and the side wall of the reinforcing sleeve is provided with grid holes distributed in a grid mode. The grating holes are communicated with the pile body filling through holes, the pile body is arranged in the pile body filling through holes of the reinforcing sleeve, and the reinforcing sleeve wraps the pile body, so that the possibility that the pile body transversely deforms and gravel and gravel loosen is reduced, the bearing capacity of the pile body is effectively improved, and the strength of the gravel pile is improved; and the reinforcing effect on the weak intercalated subgrade is further enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction, in particular to a gravel pile reinforcement device and a gravel pile. Background Art

[0002] During the road construction process, soft interlayer roadbed is often encountered. Due to the small viscosity coefficient, poor shear strength, small porosity and high water content of the soft interlayer roadbed, if certain measures are not taken, the soft interlayer roadbed is prone to uneven settlement under the action of external loads.

[0003] The reinforcement method for the soft interlayer roadbed is to use the crushed stone pile method, which is to add crushed stone piles to the soft interlayer roadbed to achieve the reinforcement of the soft interlayer roadbed. At present, the construction process of crushed stone piles is: first, the crushed stone pile holes are punched out in the soft interlayer roadbed through the pile pipe, and then the crushed stone and sand are filled into the crushed stone pile holes, and the crushed stone and sand are vibrated and compacted to form a crushed stone pile. Since the crushed stone pile is only composed of crushed stone and sand, the strength is low, which affects the reinforcement effect of the soft interlayer roadbed. Utility Model Content

[0004] The technical problem solved by the utility model is to provide a gravel pile reinforcement device which can improve the strength of the gravel pile.

[0005] The utility model adopts the following technical solution to solve the technical problem: a gravel pile reinforcement device comprises a reinforcement sleeve with openings at both ends, a pile body filling through hole penetrating from top to bottom is arranged in the middle of the reinforcement sleeve, grille holes distributed in a grid are arranged on the side wall of the reinforcement sleeve, and the grille holes are connected with the pile body filling through hole.

[0006] Furthermore, the reinforcing sleeve is made of fiberboard.

[0007] Furthermore, there are multiple reinforcement sleeves, and all the reinforcement sleeves are connected together in sequence from bottom to top.

[0008] Furthermore, an anti-deviation positioning connector is connected to the outer side wall of the reinforcement sleeve, the upper end of the anti-deviation positioning connector extends to the top of the reinforcement sleeve, and the lower end of the anti-deviation positioning connector extends to the bottom of the reinforcement sleeve;

[0009] The upper and lower adjacent reinforcement sleeves are connected via an anti-deviation positioning connector.

[0010] Furthermore, the anti-deviating positioning connector includes at least three connecting ribs, all of which are evenly distributed on the outer side wall of the reinforcing sleeve, and the upper end of the connecting rib is provided with a connecting sleeve;

[0011] The connecting ribs of two adjacent upper and lower reinforcing sleeves are connected together through a connecting sleeve.

[0012] Furthermore, the connecting reinforcement is fiber reinforced reinforcement.

[0013] In addition, the technical problem solved by the utility model is to provide a gravel pile with higher strength.

[0014] The gravel pile comprises a pile body and the gravel pile reinforcement device mentioned above, wherein the pile body is matched and arranged in the pile body filling through hole of the reinforcement sleeve.

[0015] Preferably, it further comprises a plurality of load-bearing buffer pads, and all the load-bearing buffer pads are sequentially and spaced apart from bottom to top in the pile body.

[0016] Preferably, the load buffer pad is carbon fiber cloth.

[0017] The beneficial effects of the utility model are as follows: the gravel pile reinforcement device and the gravel pile of the utility model include a reinforcement sleeve with openings at both ends, a pile body filling through hole which passes through from top to bottom is arranged in the middle of the reinforcement sleeve, grille holes distributed in a grid are arranged on the side wall of the reinforcement sleeve, the grille holes are connected with the pile body filling through holes, the pile body is arranged in the pile body filling through holes of the reinforcement sleeve, the reinforcement sleeve wraps the pile body, reduces the possibility of lateral deformation of the pile body and looseness of gravel and sand and gravel, effectively improves the bearing capacity of the pile body, improves the strength of the gravel pile, and further enhances the reinforcement effect on the soft interlayer roadbed. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of a gravel pile reinforcement device;

[0019] Figure 2 is an axial schematic diagram of a reinforcement sleeve and components connected thereto;

[0020] Figure 3 yes Figure 2 A schematic diagram of the main view;

[0021] Marked as: reinforcement sleeve 1, pile filling through hole 2, grille hole 3, anti-deviation positioning connector 4, connecting rib 5, connecting sleeve 6, load force buffer pad 7. DETAILED DESCRIPTION

[0022] The utility model is further described below in conjunction with the accompanying drawings and specific implementation methods.

[0023] like Figure 1 , Figure 2 and Figure 3 As shown, the gravel pile reinforcement device of the utility model comprises a reinforcement sleeve 1 with openings at both ends, a pile body filling through hole 2 which passes through from top to bottom is arranged in the middle of the reinforcement sleeve 1, and grid holes 3 distributed in a grid are arranged on the side wall of the reinforcement sleeve 1, and the grid holes 3 are connected with the pile body filling through hole 2.

[0024] The upper and lower ends of the reinforcement sleeve 1 are both opened, and the openings are connected to the pile body filling through hole 2, so that the pile body can be set in the pile body filling through hole 2. The grille holes 3 can ensure that the gravel and sand in the pile body filling through hole 2 are vibrated and compacted, and the air and moisture in the pile body can be discharged. In order to ensure the use effect of the grille holes 3, the cross-sectional shape is preferably circular, and the diameter is smaller than the diameter of the gravel to prevent the gravel from leaking along the grille holes 3.

[0025] The shape of the pile body is usually cylindrical, so the reinforcement sleeve 1 is cylindrical, and the pile body filling through hole 2 is also cylindrical. In order to ensure the use effect of the reinforcement sleeve, the material of the reinforcement sleeve 1 is preferably fiberboard, which has strong tensile strength, corrosion resistance, aging resistance and other characteristics, and is particularly suitable for use in soft sandwich roadbed.

[0026] For some gravel piles with higher height, the height of the pile body is also higher, and multiple reinforcement sleeves 1 need to be provided, and all the reinforcement sleeves 1 are connected together in sequence from bottom to top, such as Figure 1 As shown, the center lines of the pile filling through holes 2 in all the reinforcement sleeves 1 are on the same vertical straight line, ensuring the vertical verticality of the pile body.

[0027] The gravel pile is formed by vibrating and compacting gravel and sand. When the pile is high, the pile is constructed from bottom to top in sections, that is, after the construction of the lower section is completed, the upper section is constructed until all the piles are completed. In order to ensure the construction quality of the pile, reduce the possibility of deviation between the upper and lower sections, and ensure the verticality of the pile, Figure 1 , Figure 2 and Figure 3As shown, the utility model is provided with an anti-deviation positioning connector 4 on the outer wall of the reinforcement sleeve 1, the upper end of the anti-deviation positioning connector 4 extends to the top of the reinforcement sleeve 1, and the lower end of the anti-deviation positioning connector 4 extends to the bottom of the reinforcement sleeve 1, and the upper and lower adjacent reinforcement sleeves 1 are connected by the anti-deviation positioning connector 4. The anti-deviation positioning connector mainly plays a positioning connection role, so that the upper and lower adjacent reinforcement sleeves 1 do not deviate in the height direction, thereby reducing the possibility of the pile body in the upper and lower adjacent reinforcement sleeves 1 deviating. During the construction of gravel piles, first install the relatively lower reinforcement sleeve 1 in the gravel pile hole, then fill the reinforcement sleeve 1 with gravel and sand, and vibrate the gravel and sand to form the pile body after vibration compaction. The upper end of the pile body is flush with the upper end of the corresponding reinforcement sleeve 1, and then install the anti-deviation positioning connector 4 relatively on the upper side on the anti-deviation positioning connector 4 of the lower reinforcement sleeve 1 to achieve the connection between the upper and lower adjacent reinforcement sleeves 1, and finally fill the connecting section of the upper and lower adjacent reinforcement sleeves 1 and the relatively upper reinforcement sleeve 1 with gravel and sand, and vibrate the gravel and sand to form the pile body after vibration compaction, and so on, until the construction of the gravel pile is completed. Since the anti-deviation positioning connector is located on the outside of the reinforcement sleeve 1, it can also effectively increase the strength of the reinforcement sleeve 1.

[0028] In order to improve the use effect of the anti-deviation positioning connector 4, a preferred structure of the anti-deviation positioning connector 4 of the utility model is: Figure 2 , Figure 3 As shown, the anti-deviated positioning connector 4 includes at least three connecting ribs 5, all of which are evenly distributed on the outer wall of the reinforcement sleeve 1. A connecting sleeve 6 is provided at the upper end of the connecting rib 5, and the connecting ribs 5 of the upper and lower adjacent reinforcement sleeves 1 are connected together through the connecting sleeve 6. A connecting hole is provided in the middle of the connecting sleeve 6, and the connecting rib 5 relatively located at the lower side is provided in the lower half of the connecting hole, and the connecting rib 5 relatively located at the upper side is provided in the upper half of the connecting hole. The connecting sleeve 6 facilitates connecting the connecting ribs 5 of the upper and lower adjacent reinforcement sleeves 1 together. In order to ensure the use effect of the connecting rib 5, the connecting rib 5 is preferably a fiber reinforced steel bar.

[0029] The gravel pile comprises a pile body and the gravel pile reinforcement device mentioned above, wherein the pile body is matched and arranged in the pile body filling through hole 2 of the reinforcement sleeve 1 .

[0030] The reinforcement sleeve 1 wraps the pile body, reducing the possibility of lateral deformation of the pile body and loosening of gravel and sand, effectively improving the bearing capacity of the pile body, increasing the strength of the gravel pile, and further enhancing the reinforcement effect on the soft interlayer roadbed.

[0031] During the construction of the gravel pile of the utility model, firstly, the reinforcement sleeve 1 relatively located at the lower side is installed in the gravel pile hole, and then gravel and sand are filled into the reinforcement sleeve 1, and the gravel and sand are vibrated to form the pile body after vibration and compaction, and the upper end of the pile body is flush with the upper end of the corresponding reinforcement sleeve 1, and then the anti-deviation positioning connector 4 relatively located at the upper side is installed on the anti-deviation positioning connector 4 of the reinforcement sleeve 1 at the lower side to achieve the connection of the upper and lower adjacent reinforcement sleeves 1, and finally, gravel and sand are filled into the connecting sections of the upper and lower adjacent reinforcement sleeves 1 and the reinforcement sleeve 1 relatively located at the upper side, and the gravel and sand are vibrated to form the pile body after vibration and compaction, and so on, until the construction of the gravel pile is completed.

[0032] In order to further improve the bearing capacity of the gravel pile, the utility model is further provided with a plurality of load buffer pads 7, all of which are sequentially arranged in the pile body from bottom to top, and the load buffer pads 7 are preferably made of carbon fiber cloth.

Claims

1. Gravel pile reinforcement device, Features: The invention comprises a reinforcement sleeve (1) with openings at both upper and lower ends, a pile body filling through hole (2) penetrating from top to bottom provided in the middle of the reinforcement sleeve (1), grid holes (3) distributed in a grid pattern provided on the side wall of the reinforcement sleeve (1), and the grid holes (3) being connected to the pile body filling through hole (2).

2. The gravel pile reinforcement device according to claim 1, Features: The material of the reinforcement sleeve (1) is fiberboard.

3. The gravel pile reinforcement device according to claim 1, Features: There are multiple reinforcement sleeves (1), and all the reinforcement sleeves (1) are connected together in sequence from bottom to top.

4. The gravel pile reinforcement device according to claim 3, Features: An anti-deviation positioning connector (4) is connected to the outer side wall of the reinforcement sleeve (1), the upper end of the anti-deviation positioning connector (4) extends above the reinforcement sleeve (1), and the lower end of the anti-deviation positioning connector (4) extends below the reinforcement sleeve (1); Two adjacent upper and lower reinforcement sleeves (1) are connected via an anti-deviating positioning connector (4).

5. The gravel pile reinforcement device according to claim 4, Features: The anti-deviating positioning connector (4) comprises at least three connecting ribs (5), all of which are evenly distributed on the outer side wall of the reinforcing sleeve (1), and a connecting sleeve (6) is provided at the upper end of the connecting rib (5); The connecting ribs (5) of two adjacent upper and lower reinforcing sleeves (1) are connected together via a connecting sleeve (6).

6. The gravel pile reinforcement device according to claim 5, Features: The connecting reinforcement (5) is a fiber reinforcement.

7. Gravel pile, including pile body, Features: It also comprises the gravel pile reinforcement device according to any one of claims 1 to 6, wherein the pile body is matched and arranged in the pile body filling through hole (2) of the reinforcement sleeve (1).

8. The gravel pile according to claim 7, Features: It also comprises a plurality of load-bearing force buffer pads (7), and all the load-bearing force buffer pads (7) are sequentially arranged in intervals in the pile body from bottom to top.

9. The gravel pile according to claim 8, Features: The load buffer pad (7) is made of carbon fiber cloth.