Protection device for concrete anti-collision guardrail

By setting up plastic cloth on the concrete collision guardrail and using a packaging belt and snapping system, the water dispersion and pollution problems during the construction process are solved, efficient moisture preservation and pollution prevention are achieved, and construction quality and site cleanliness are improved.

CN222160940UActive Publication Date: 2024-12-13THE 2ND ENG CO LTD MBEC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420118564.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-12-13
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

Concrete anti-collision guardrails are prone to water dispersion and dry shrinkage cracks during construction, and the equipment oil stains and concrete grouting materials are easily dropped from the contaminated guardrails during construction of the upper highway. Traditional geotextile covers watering and maintenance efficiency are low and inconvenient for synchronous construction.

Method used

A protective device for concrete anti-collision guardrails was designed, and plastic cloth was used instead of geotextile. By setting up pull rods, broken joints and fixing holes on the concrete anti-collision guardrails, and fixing plastic cloth was secured by using a packaging belt and a snapping system to ensure that it was Firmly fit the surface of the guardrail, preserve moisture for a long time and prevent pollution.

Benefits of technology

It effectively reduces the frequency of workers' sprinkling, avoids concrete surface cracks, improves construction quality and site cleanliness, avoids oil pollution and concrete pollution, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222160940U_ABST
    Figure CN222160940U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of concrete anti-collision guardrail maintenance, in particular to a protection device for concrete anti-collision guardrails, which comprises a bridge floor, the concrete anti-collision guardrails are correspondingly mounted on the left side and the right side of the end face of the bridge floor, and pull rods are arranged on the front side and the rear side of the concrete anti-collision guardrails. A breaking joint is formed in the concrete anti-collision guardrail, the outer wall of the concrete anti-collision guardrail is wrapped with plastic cloth, the plastic cloth replaces traditional geotechnical cloth for covering and watering maintenance, the plastic cloth can preserve moisture for a long time, the frequency of watering maintenance of workers is greatly reduced, and concrete surface cracks caused by untimely watering of the workers are avoided; meanwhile, one-time investment and long-term use can be achieved, the investment is small, the effect is good, and the anti-collision guardrail is effectively prevented from being polluted by falling oil stains and concrete in the construction process of the upper-layer expressway through the plastic cloth.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete anti-collision guardrail maintenance, in particular to a protective device for concrete anti-collision guardrail. Background Art

[0002] Concrete crash barriers are safety facilities used on the edge of roads or bridges, designed to reduce serious accidents caused by vehicles accidentally leaving the road. This type of guardrail is usually made of concrete blocks or concrete components. The maintenance of concrete crash barriers on bridge decks is difficult, and they are close to the river, with strong winds. The concrete surface of the concrete guardrail loses water quickly, and the surface of the crash barrier is prone to many shrinkage cracks, and there are many quality problems. During the construction of the crash barriers on the lower first-level highway, the frame piers and segmental beams of the upper highway are also being constructed simultaneously. Equipment oil, concrete and grouting materials can easily fall onto the lower bridge deck and pollute the crash barriers.

[0003] Traditional concrete anti-collision guardrails are covered with geotextiles and watered for maintenance. If workers fail to water in time or the geotextiles are dried out by strong winds, cracks will occur on the concrete surface. In addition, the frame piers and segmental beams of the upper highway are also being constructed simultaneously. Equipment oil, concrete and grouting materials can easily fall onto the lower bridge deck and pollute the anti-collision guardrails. Therefore, a protective device for concrete anti-collision guardrails is needed to improve the above problems. Utility Model Content

[0004] The utility model aims to provide a protective device for a concrete anti-collision guardrail to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A protective device for a concrete anti-collision guardrail comprises a bridge deck, concrete anti-collision guardrails are installed on the end surface of the bridge deck and on the left and right sides thereof, pull rods are provided on the concrete anti-collision guardrails and on the front and rear sides thereof, a fracture is provided on the concrete anti-collision guardrails, a plastic sheet is wrapped on the outer wall of the concrete anti-collision guardrail, first fixing holes are provided on the left and right side walls of the plastic sheet corresponding to the pull rods, second fixing holes are provided on the left and right side walls of the concrete anti-collision guardrail corresponding to the fracture, a first strapping tape is wrapped on the outer wall of the plastic sheet corresponding to the first fixing hole, a second strapping tape is wrapped on the outer wall of the plastic sheet corresponding to the second fixing hole, a female buckle is installed on one end of the first strapping tape and the second strapping tape, and a sub-buckle is installed on the other end of the first strapping tape and the second strapping tape.

[0007] As a preferred solution of the utility model, one end of the first strapping belt passes through the first fixing hole and the pull rod in sequence, and one end of the second strapping belt passes through the second fixing hole and the break in sequence.

[0008] As a preferred solution of the present invention, the connection method between the female buckle and the sub-buckle is snap connection.

[0009] As a preferred solution of the utility model, the diameters of the pull rod, the first fixing hole and the second fixing hole are equal, and the widths of the female buckle and the sub-buckle are smaller than the diameter of the pull rod.

[0010] As a preferred solution of the present invention, the width of the second strapping tape is smaller than the break.

[0011] As a preferred solution of the utility model, the thickness of the plastic cloth is 0.96 mm, and the thickness of the first strapping tape and the second strapping tape is 1.55 mm.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. In the utility model, by setting a plastic sheet in a protective device for a concrete anti-collision guardrail, the plastic sheet replaces the traditional geotextile for covering and watering maintenance. The plastic sheet can retain moisture for a long time, greatly reducing the frequency of workers' watering maintenance, avoiding concrete surface cracks caused by workers' untimely watering. At the same time, this method can be invested once and used for a long time, with low investment and good effect; the setting of the plastic sheet effectively avoids the cracking of the concrete surface caused by rapid water loss due to sudden temperature drop and strong wind, thereby improving the construction quality of the concrete;

[0014] 2. In the utility model, by arranging plastic sheeting in a protective device for a concrete anti-collision guardrail, the use of the plastic sheeting makes the construction site clean and tidy as a whole, and the civilized construction has a high degree of standardization; the plastic sheeting effectively prevents the oil stains and concrete that fall during the construction of the upper highway from polluting the anti-collision guardrail. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0016] Figure 2 It is a schematic diagram of the concrete anti-collision guardrail and the fracture structure of the utility model;

[0017] Figure 3 It is a schematic diagram of the partial cutaway structure of the utility model;

[0018] Figure 4 This is a schematic diagram of the structure of point A of the present utility model.

[0019] In the figure: 1. Bridge deck; 2. Concrete anti-collision guardrail; 3. Pull rod; 4. Break; 5. Plastic sheeting; 6. First fixing hole; 7. Second fixing hole; 8. First strapping tape; 9. Second strapping tape; 10. Mother buckle; 11. Child buckle. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0021] Example: See Figure 1-3 The protective device for a concrete anti-collision guardrail shown in the figure comprises a bridge deck 1, concrete anti-collision guardrails 2 are installed on the end surface of the bridge deck 1 and on the left and right sides thereof, tie rods 3 are provided on the concrete anti-collision guardrail 2 and on the front and rear sides thereof, a break 4 is provided on the concrete anti-collision guardrail 2, a plastic sheet 5 is wrapped on the outer wall of the concrete anti-collision guardrail 2, first fixing holes 6 are provided on the left and right side walls of the plastic sheet 5 and corresponding to the tie rods 3, second fixing holes 7 are provided on the left and right side walls of the concrete anti-collision guardrail 2 and corresponding to the break 4, a first packing tape 8 is wrapped on the outer wall of the plastic sheet 5 and corresponding to the first fixing hole 6, and the outer wall of the plastic sheet 5 A second strapping tape 9 is wrapped on and corresponding to the second fixing hole 7, a female buckle 10 is installed at one end of the first strapping tape 8 and the second strapping tape 9, and a sub-buckle 11 is installed at the other end of the first strapping tape 8 and the second strapping tape 9. The plastic sheet 5 replaces the traditional geotextile for covering and watering maintenance. The plastic sheet 5 can retain moisture for a long time, greatly reducing the frequency of workers' watering maintenance, and avoiding cracks on the concrete surface caused by workers' untimely watering. At the same time, this method can be invested once and used for a long time, with small investment and good effect; the plastic sheet 5 effectively avoids the pollution of the anti-collision guardrail by oil stains and concrete dropped during the construction of the upper highway.

[0022] In this embodiment, refer to Figure 1 , 3 As shown in FIG. 4 , one end of the first strapping belt 8 passes through the first fixing hole 6 and the pull rod 3 in sequence, and one end of the second strapping belt 9 passes through the second fixing hole 7 and the slit 4 in sequence; the connection method of the female buckle 10 and the sub-buckle 11 is a snap connection; the connection method of the female buckle 10 and the sub-buckle 11 is a snap connection, so that the first strapping belt 8 and the second strapping belt 9 are more convenient and quick to connect at both ends when bundling the plastic sheet 5;

[0023] In this embodiment, refer to Figure 1-4As shown, the diameters of the tie rod 3, the first fixing hole 6 and the second fixing hole 7 are equal, the widths of the female buckle 10 and the sub-buckle 11 are smaller than the diameter of the tie rod 3; the width of the second strapping tape 9 is smaller than the break 4; the thickness of the plastic sheet 5 is 0.96 mm, and the thicknesses of the first strapping tape 8 and the second strapping tape 9 are 1.55 mm; the widths of the female buckle 10 and the sub-buckle 11 are smaller than the diameter of the tie rod 3, so that the female buckle 10 and the sub-buckle 11 can smoothly pass through the tie rod 3, and the plastic sheet 5 is firmly fixed on the concrete surface;

[0024] Working principle: When the protective device for concrete anti-collision guardrail is in use, the staff wraps the plastic sheet 5 on the outer wall of the concrete anti-collision guardrail 2 and fits it on the surface of the concrete anti-collision guardrail 2, so that the first fixing hole 6 and the pull rod 3 are in corresponding positions, and the second fixing hole 7 and the break 4 are in corresponding positions. The staff first takes the female buckle 10 with the corresponding first strapping tape 8 and passes through the first fixing hole 6, and then the pull rod 3 passes through the first fixing hole 6, and then the staff takes the female buckle 10 with the corresponding second strapping tape 9 and passes through the second fixing hole 7, the break 4 in turn. After passing through the second fixing hole 7, the mother buckle 10 and the child buckle 11 are snapped together, and the plastic sheet 5 is firmly fixed on the surface of the concrete anti-collision guardrail 2. The plastic sheet 5 replaces the traditional geotextile for covering and watering maintenance. The plastic sheet 5 can retain moisture for a long time, greatly reducing the frequency of workers' watering maintenance, and avoiding cracks on the concrete surface caused by workers' untimely watering. At the same time, this method can be invested once and used for a long time, with low investment and good effect; the plastic sheet 5 effectively avoids the pollution of the anti-collision guardrail by oil stains and concrete dropped during the construction of the upper highway.

[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A protective device for a concrete anti-collision guardrail, comprising a bridge deck (1), characterized in that: Concrete anti-collision guardrails (2) are installed on the end surface of the bridge deck (1) and on the left and right sides, respectively, pull rods (3) are provided on the concrete anti-collision guardrails (2) and on the front and rear sides, a slit (4) is provided on the concrete anti-collision guardrails (2), a plastic sheet (5) is wrapped on the outer wall of the concrete anti-collision guardrail (2), first fixing holes (6) are provided on the left and right side walls of the plastic sheet (5) and corresponding to the pull rods (3), and the left and right side walls of the concrete anti-collision guardrails (2) are provided with a plurality of fixing holes (6). A second fixing hole (7) is provided on the plastic sheet (5) and corresponds to the broken seam (4); a first strapping tape (8) is wrapped on the outer wall of the plastic sheet (5) and corresponds to the first fixing hole (6); a second strapping tape (9) is wrapped on the outer wall of the plastic sheet (5) and corresponds to the second fixing hole (7); a female buckle (10) is installed at one end of the first strapping tape (8) and the second strapping tape (9); and a sub-buckle (11) is installed at the other end of the first strapping tape (8) and the second strapping tape (9).

2. A protective device for a concrete anti-collision guardrail according to claim 1, characterized in that: One end of the first strapping belt (8) passes through the first fixing hole (6) and the pull rod (3) in sequence, and one end of the second strapping belt (9) passes through the second fixing hole (7) and the break seam (4) in sequence.

3. The protective device for concrete anti-collision guardrail according to claim 1, characterized in that: The connection method between the female buckle (10) and the sub-buckle (11) is snap connection.

4. The protective device for concrete anti-collision guardrail according to claim 1, characterized in that: The diameters of the pull rod (3), the first fixing hole (6) and the second fixing hole (7) are equal, and the widths of the female buckle (10) and the sub-buckle (11) are smaller than the diameter of the pull rod (3).

5. The protective device for concrete anti-collision guardrail according to claim 1, characterized in that: The width of the second packing belt (9) is smaller than the break seam (4).

6. The protective device for concrete anti-collision guardrail according to claim 1, characterized in that: The thickness of the plastic sheet (5) is 0.96 mm, and the thickness of the first strapping tape (8) and the second strapping tape (9) is 1.55 mm.