The existing water conservancy construction cofferdam device has a complex structure and is unsafe, and cannot effectively prevent the harm of water leakage accidents to staff.
A water conservancy construction cofferdam device including assembly devices and inner enclosure devices is designed. By setting up structures such as card blocks, limit grooves, climbing ladders, etc., simplifying the splicing process and blocking the water flow in the case of water leakage, providing escape time.
Simplification of structure and improving safety of staff, delaying water flow into the cofferdam area, and giving personnel enough time to escape.
Smart Images

Figure CN222161328U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cofferdam devices, in particular to a water conservancy construction cofferdam device. Background Art
[0002] At present, in the process of water conservancy construction, some construction sites need to be constructed on the ground of the river, that is, underwater construction is required. In order to facilitate construction, the water in the construction area needs to be drained to facilitate manual operation. At present, the common method is to use a cofferdam to surround the construction area, isolate the water flow inside the construction area from the outside, and after the water flow in the cofferdam is drained, manual construction is carried out inside the cofferdam.
[0003] However, the existing cofferdam devices still have the following shortcomings: 1. The cofferdam devices on the market have too many complex structures and are not easy to install. Therefore, we propose a water conservancy construction cofferdam device; 2. The cofferdam devices on the market do not have the function of ensuring the safety of the workers. When the workers are working in the cofferdam, if a water leakage accident occurs, the consequences will be disastrous. Utility Model Content
[0004] The main purpose of the utility model is to provide a water conservancy construction cofferdam device, which can effectively solve the problems in the background technology.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] A water conservancy construction cofferdam device includes an assembly device and an inner enclosure device, wherein four assembly devices are provided, the four assembly devices are clamped with connecting columns, the inner wall surfaces of the four assembly devices are fixedly connected with fixing blocks, and four inner enclosure devices are provided, the outer inner surfaces of the four inner enclosure devices are fixedly connected with connecting plates, and the four connecting plates are threadedly connected with screws.
[0007] Preferably, the assembly device includes an outer plate, a first clamping block is fixedly connected to the left end of the outer plate, a second clamping block is fixedly connected to the left end of the first clamping block, a limiting groove is provided at the right end of the outer plate, and two clamping rings are fixedly connected to the inner wall surface of the outer plate.
[0008] Preferably, the inner enclosure device includes an inner enclosure plate, a convex strip is fixedly connected to the right end of the inner enclosure plate, the inner enclosure plate is provided with a groove, a plurality of climbing ladders are fixedly connected to the inner wall surface of the inner enclosure plate, and the outer surface of the inner enclosure plate is fixedly connected to the outer side surface of the fixed block.
[0009] Preferably, the four peripheral plates are clamped together into a circle through the first clamping block, the second clamping block and the limiting groove.
[0010] Preferably, the thickness of the inner panel is flush with the thickness of the outer panel.
[0011] Preferably, the fixing blocks are grouped in groups of three, the outer side surfaces of the four groups of fixing blocks are respectively fixedly connected to the outer surfaces of the corresponding inner panels, and the inner side surfaces of the four groups of fixing blocks are fixedly connected to the inner wall surface of the outer panel.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] 1. In the utility model, an assembly device is provided, a first clamping block and a second clamping block are provided at the left end of the outer panel, and a limiting groove is provided at the right end of the outer panel. When a crane is used for splicing, it is only necessary to align the clamping blocks of other outer panels with the limiting grooves of the original outer panels to clamp them. The structure is simple and convenient.
[0014] 2. In the utility model, an inner enclosure device is provided. After the assembly device is spliced by using a crane, the inner enclosure device is also spliced under the drive of a fixed block. The staff works in the inner enclosure device. In case of danger, after the outer enclosure plate leaks, the inner enclosure plate can block the water flow and delay the time for the water flow to enter the area surrounded by the inner enclosure plate, giving people enough time to escape and climb up to the ground through the provided climbing ladder, thereby further increasing the safety of the safety staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the overall structure of a water conservancy construction cofferdam device of the utility model;
[0016] Figure 2 It is a structural schematic diagram of an assembly device of a water conservancy construction cofferdam device of the utility model;
[0017] Figure 3 It is a structural schematic diagram of an inner enclosure device of a water conservancy construction cofferdam device of the utility model;
[0018] Figure 4 The utility model is a schematic diagram of the splicing structure of the inner enclosure device of a water conservancy construction cofferdam device.
[0019] In the figure: 1, assembly device; 2, connecting column; 3, fixing block; 4, inner peripheral device; 5, connecting plate; 6, screw; 11, outer peripheral plate; 12, first clamping block; 13, second clamping block; 14, limiting groove; 15, clamping ring; 41, inner peripheral plate; 42, convex strip; 43, groove; 44, climbing ladder DETAILED DESCRIPTION
[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0021] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0022] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0023] See also Figure 1-4 , the utility model provides a technical solution:
[0024] A water conservancy construction cofferdam device comprises an assembly device 1 and an inner enclosure device 4, wherein four assembly devices 1 are provided, and the four assembly devices 1 are clamped with connecting columns 2, and the inner wall surfaces of the four assembly devices 1 are fixedly connected with fixing blocks 3, and four inner enclosure devices 4 are provided, and the outer inner surfaces of the four inner enclosure devices 4 are fixedly connected with connecting plates 5, and the four connecting plates 5 are threadedly connected with screws 6.
[0025] In this embodiment, the assembly device 1 includes an outer plate 11, a first clamping block 12 is fixedly connected to the left end of the outer plate 11, a second clamping block 13 is fixedly connected to the left end of the first clamping block 12, a limiting groove 14 is provided at the right end of the outer plate 11, the size of the limiting groove 14 is adapted to the size of the first clamping block 12 and the second clamping block 13, two clamping rings 15 are fixedly connected to the inner wall surface of the outer plate 11, and when multiple outer plates 11 are clamped, the connecting column 2 is placed in the clamping ring 15 to further increase the fixation.
[0026] In this embodiment, the inner enclosure device 4 includes an inner enclosure plate 41, a convex strip 42 is fixedly connected to the right end of the inner enclosure plate 41, a groove 43 is opened on the inner enclosure plate 41, and the groove 43 is adapted to the convex strip 42. A plurality of climbing ladders 44 are fixedly connected to the inner wall surface of the inner enclosure plate 41. In case of emergency, the staff can climb up to the land through the climbing ladders 44. The outer surface of the inner enclosure plate 41 is fixedly connected to the outer side surface of the fixed block 3; the four outer panels 11 are clamped into a circle by the first clamping block 12, the second clamping block 13 and the limiting groove 14; the thickness of the inner enclosure plate 41 is flush with the thickness surface of the outer panel 11; the fixed blocks 3 are grouped in groups of three, and the outer side surfaces of the four groups of fixed blocks 3 are respectively fixedly connected to the outer surfaces of the corresponding inner enclosure plates 41, and the inner side surfaces of the four groups of fixed blocks 3 are fixedly connected to the inner wall surfaces of the outer panels 11.
[0027] It should be noted that the utility model is a water conservancy construction cofferdam device. In the specific use process, by setting an assembly device 1, a first clamping block 12 and a second clamping block 13 are set at the left end of the outer plate 11, and a limiting groove is set at the right end of the outer plate 11. When a crane is used for splicing, it is only necessary to align the clamping blocks of other outer plates with the limiting grooves 14 of the original outer plate to clamp them. The structure is simple and convenient. After the assembly device 1 is spliced by using a crane, the inner enclosure device 4 is also spliced under the drive of the fixed block 3. The staff works in the inner enclosure device 4. In case of danger, the inner enclosure plate 4 can block the water flow after the outer plate 11 leaks, delaying the time for the water flow to enter the area surrounded by the inner enclosure plate 41, giving people enough time to escape, and climbing up to the ground through the provided climbing ladder 44, further increasing the safety of the staff.
[0028] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A water conservancy construction cofferdam device, comprising an assembly device (1) and an inner cofferdam device (4), characterized in that: The four assembling devices (1) are provided with connecting columns (2) clamped on the four assembling devices (1); the inner wall surfaces of the four assembling devices (1) are fixedly connected with fixing blocks (3); the four inner peripheral devices (4) are provided with four connecting plates (5) fixedly connected on the outer inner surfaces of the four inner peripheral devices (4); the four connecting plates (5) are threadedly connected with screws (6); The assembly device (1) comprises an outer plate (11), the left end of the outer plate (11) is fixedly connected to a first clamping block (12), the left end of the first clamping block (12) is fixedly connected to a second clamping block (13), the right end of the outer plate (11) is provided with a limiting groove (14), and the inner wall surface of the outer plate (11) is fixedly connected to two clamping rings (15).
2. A water conservancy construction cofferdam device according to claim 1, characterized in that: The inner enclosure device (4) comprises an inner enclosure plate (41), a convex strip (42) is fixedly connected to the right end of the inner enclosure plate (41), a groove (43) is opened on the inner enclosure plate (41), a plurality of climbing ladders (44) are fixedly connected to the inner wall surface of the inner enclosure plate (41), and the outer surface of the inner enclosure plate (41) is fixedly connected to the outer side surface of the fixed block (3).
3. A water conservancy construction cofferdam device according to claim 1, characterized in that: The four peripheral plates (11) are clamped together into a circle through a first clamping block (12), a second clamping block (13) and a limiting groove (14).
4. A water conservancy construction cofferdam device according to claim 2, characterized in that: The thickness of the inner panel (41) is flush with the thickness of the outer panel (11).
5. A water conservancy construction cofferdam device according to claim 4, characterized in that: The fixing blocks (3) are grouped in groups of three, the outer side surfaces of the four groups of fixing blocks (3) are respectively fixedly connected to the outer surfaces of the corresponding inner panels (41), and the inner side surfaces of the four groups of fixing blocks (3) are fixedly connected to the inner wall surface of the outer panel (11).