Steel pipe supporting structure
The steel pipe support structure with shock-absorbing connectors and elastic members addresses vibration issues, stabilizing the pipe and pre-filter, reducing damage and noise, and enhancing their longevity.
Patent Information
- Application Number
- CN202420986348.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-05-08
AI Technical Summary
The existing steel pipe support structures for tractors suffer from vibration damage due to the transmission of swaying and vibrations from the cab, leading to reduced service life of the steel pipe and air pre-filter, exacerbated by loose connections over time.
A steel pipe support structure incorporating a fixed connector, shock-absorbing connectors with perpendicular connecting plates and shock absorbers, featuring elastic members and bolts for vertical and horizontal shock absorption, to stabilize the steel pipe and reduce vibration impact.
The structure effectively absorbs shocks in both vertical and horizontal directions, preventing direct impact on the steel pipe and air pre-filter, reducing noise and extending their service life.
Smart Images

Figure CN222162787U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tractors, in particular to a steel pipe supporting structure. Background Art
[0002] The air intake system of a tractor generally includes an air pre-filter and an air filter. After being pre-filtered by the air pre-filter, the air enters the air filter for purification, and the purified air enters the engine for use by the engine. In order to ensure that the air pre-filter is in a good working environment, the air pre-filter is usually placed at the highest point of the tractor and connected to the air filter through a steel pipe fixed to the side of the cab.
[0003] At present, an auxiliary tie rod is usually used to fix the steel pipe to the side of the cab. However, due to the independent swaying characteristics of the cab, coupled with the up and down vibrations generated when the engine is working, and the auxiliary tie rod is a rigid connector, it is very easy for the tractor's swaying and vibration to be transmitted to the steel pipe and the air pre-filter, causing the steel pipe and the air pre-filter to suffer varying degrees of vibration damage, seriously affecting their service life. In particular, with the increase in working hours, the auxiliary tie rod generally becomes looser and finally the support fails. Utility Model Content
[0004] In view of the above defects existing in the prior art, the utility model aims to provide a steel pipe supporting structure, which has the function of buffering and shock absorption, can stably support the steel pipe, and reduce the vibration impact on the steel pipe and the air pre-filter.
[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0006] A steel pipe support structure includes a fixed connector, a shock-absorbing connector and a pipe clamp, the shock-absorbing connector includes a first connecting plate and a second connecting plate that are perpendicular to each other, and an intermediate connecting plate connected between the first connecting plate and the second connecting plate, the first connecting plate is connected to the fixed connector and a first shock absorber for shock absorption in the vertical direction is arranged between the two; the second connecting plate is connected to the pipe clamp and a second shock absorber for shock absorption in the horizontal direction is arranged between the two.
[0007] Wherein, the first shock absorber and the second shock absorber both include an elastic member and a bolt, the bolt of the first shock absorber passes through the first connecting plate and the elastic member of the first shock absorber to be threadedly connected to the fixed connecting member, or the bolt of the first shock absorber passes through the fixed connecting member and the elastic member of the first shock absorber to be threadedly connected to the first connecting plate; the bolt of the second shock absorber passes through the second connecting plate and the elastic member of the second shock absorber to be threadedly connected to the pipe clamp, or the bolt of the second shock absorber passes through the pipe clamp and the elastic member of the second shock absorber to be threadedly connected to the second connecting plate.
[0008] Wherein, a through hole is arranged in the elastic member along the length direction, a sleeve for the bolt to pass through is fixedly arranged in the through hole, and the length of the sleeve is shorter than the length of the elastic member.
[0009] Wherein, both ends of the sleeve are located in the through hole.
[0010] Wherein, one end of the sleeve is flush with the corresponding end of the elastic member, and the other end of the sleeve is located in the through hole.
[0011] In which, the sleeve is provided with an internal thread structure, and the end of the first shock absorber whose sleeve is flush with the elastic member is close to the fixed connecting member, and the bolt of the first shock absorber passes through the first connecting plate and is threadedly connected with the sleeve of the first shock absorber and the fixed connecting member in sequence; or the first shock absorber whose sleeve is flush with the elastic member is close to the first connecting plate, and the bolt of the first shock absorber passes through the fixed connecting member and is threadedly connected with the sleeve of the first shock absorber and the first connecting plate in sequence; the second shock absorber whose sleeve is flush with the elastic member is close to the pipe clamp, and the bolt of the second shock absorber passes through the second connecting plate and is threadedly connected with the sleeve of the second shock absorber and the pipe clamp in sequence; or the second shock absorber whose sleeve is flush with the elastic member is close to the second connecting plate, and the bolt of the second shock absorber passes through the pipe clamp and is threadedly connected with the sleeve of the second shock absorber and the second connecting plate in sequence.
[0012] Wherein, the elastic member is an elastic rubber block or a spring.
[0013] Wherein, the intermediate connecting plate is a 90° torsion plate.
[0014] Wherein, the first connecting plate, the middle connecting plate and the second connecting plate are integrally arranged.
[0015] Wherein, the pipe clamp includes two symmetrically arranged clamping members, the clamping members include an arc-shaped clamping section, a first connecting straight section arranged at one end of the arc-shaped clamping section, and a second connecting straight section arranged at the other end of the arc-shaped clamping section, the first connecting straight sections of the two clamping members are connected, the second connecting straight sections of the two clamping members are connected, and the arc-shaped clamping sections of the two clamping members cooperate with each other to clamp the steel pipe; the two first connecting straight sections or the two second connecting straight sections are connected to the second connecting plate.
[0016] By adopting the above technical solution, the beneficial effects of the utility model are:
[0017] The steel pipe supporting structure provided by the utility model has a first shock absorber for absorbing shock in the vertical direction and a second shock absorber for absorbing shock in the horizontal direction. Therefore, it is possible to effectively prevent external impacts in the vertical and horizontal directions from directly acting on the steel pipe, thereby achieving stable support of the steel pipe, reducing vibration impact on the steel pipe and the air pre-filter, reducing noise caused by vibration, and extending the service life of the steel pipe and the air pre-filter. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the use state of the steel pipe support structure of the utility model;
[0019] Figure 2 yes Figure 1 Structural diagram of the steel pipe support structure;
[0020] In the figure: a, air pre-filter; b, cab; c, steel pipe; d, steel pipe supporting structure; 1, fixed connecting piece; 2, shock-absorbing connecting piece; 21, first connecting plate; 22, second connecting plate; 23, middle connecting plate; 3, pipe clamp; 31, clamping piece; 311, arc-shaped clamping section; 312, first connecting straight section; 313, second connecting straight section; 4, first shock absorber; 41, elastic piece; 42, sleeve; 5, second shock absorber. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0022] like Figure 1As shown, the air intake system of the tractor generally includes an air pre-filter a and an air filter (not shown in the figure). After being pre-filtered by the air pre-filter a, the air enters the air filter for purification, and the purified air enters the engine (not shown in the figure) for use by the engine. In order to ensure that the air pre-filter a is in a good working environment, the air pre-filter a is usually placed at the highest point of the tractor and connected to the air filter through a steel pipe c fixed to the side of the cab b.
[0023] The present embodiment discloses a steel pipe support structure d, through which a steel pipe c is fixed to the side of a cab b. The steel pipe support structure d includes a fixed connector 1, a shock-absorbing connector 2 and a pipe clamp 3. The shock-absorbing connector 2 includes a first connecting plate 21 and a second connecting plate 22 that are perpendicular to each other, and an intermediate connecting plate 23 connected between the first connecting plate 21 and the second connecting plate 22. The first connecting plate 21 is connected to the fixed connector 1, and a first shock absorber 4 for shock absorption in the vertical direction is arranged therebetween; the second connecting plate 22 is connected to the pipe clamp 3, and a second shock absorber 5 for shock absorption in the horizontal direction is arranged therebetween.
[0024] The steel pipe support structure d in this embodiment has a first shock absorber 4 for shock absorption in the vertical direction and a second shock absorber 5 for shock absorption in the horizontal direction. Therefore, it can effectively prevent external impacts in the vertical and horizontal directions from directly acting on the steel pipe c, thereby achieving stable support for the steel pipe c, reducing the vibration impact on the steel pipe c and the air pre-filter a, reducing the noise caused by vibration, and extending the service life of the steel pipe c and the air pre-filter a.
[0025] In this embodiment, the first shock absorber 4 and the second shock absorber 5 both include an elastic member 41 and a bolt (not shown in the figure). When installing the first shock absorber 4, the bolt of the first shock absorber 4 can be threadedly connected to the fixed connecting member 1 through the first connecting plate 21 and the elastic member 41 of the first shock absorber 4, or the bolt of the first shock absorber 4 can be threadedly connected to the first connecting plate 21 through the fixed connecting member 1 and the elastic member 41 of the first shock absorber 4; when installing the second shock absorber 5, the bolt of the second shock absorber 5 can be threadedly connected to the pipe clamp 3 through the second connecting plate 22 and the elastic member 41 of the second shock absorber 5, or the bolt of the second shock absorber 5 can be threadedly connected to the second connecting plate 22 through the pipe clamp 3 and the elastic member 41 of the second shock absorber 5. The above installation methods of the first shock absorber 4 and the second shock absorber 5 can be selected according to actual needs, and this embodiment does not limit this.
[0026] In order to facilitate the bolt to pass through the elastic member 41 smoothly, in this embodiment, a through hole is set in the elastic member 41 along the length direction, and a sleeve 42 for the bolt to pass through is fixed in the through hole. The length of the sleeve 42 is shorter than the length of the elastic member 41 to reserve the compression amount of the elastic member 41.
[0027] In the first installation method of the sleeve 42 and the elastic member 41 in this embodiment, both ends of the sleeve 42 are located in the through hole, that is, there is a distance between the two end faces of the elastic member 41 and the corresponding end faces of the sleeve 42, and compression is left at both ends of the elastic member 41. In this installation method, the compression at both ends of the elastic member 41 is 2 to 3 mm. In actual applications, the compression should be designed according to actual needs, and this embodiment does not limit this.
[0028] The second installation method of the sleeve 42 and the elastic member 41 is: one end face of the sleeve 42 is flush with the corresponding end face of the elastic member 41, that is, there is no distance between the end face of the sleeve 42 and the corresponding end face of the elastic member 41, and the end of the elastic member 41 that is flush with the sleeve 42 has no compression; the other end face of the sleeve 42 is located in the through hole, that is, there is a distance between the end of the sleeve 42 and the corresponding end face of the elastic member 41, and the end of the elastic member 41 that is not flush with the sleeve 42 has compression. In this installation method, the compression amount of the end of the elastic member 41 that has compression is 4 to 6 mm. In actual applications, the compression amount should be designed according to actual needs, and this embodiment does not limit this.
[0029] The designer may select the above two installation methods of the sleeve 42 and the elastic member 41 according to actual needs, and this embodiment does not limit this.
[0030] In the second installation method of the sleeve 42 and the elastic member 41 , an internal thread structure may be selectively provided in the sleeve 42 to increase the connection strength.
[0031] In this way, when installing the first shock absorber 4, place the end of the first shock absorber 4 whose sleeve 42 is flush with the elastic member 41 close to the fixed connecting member 1, and after the bolt of the first shock absorber 4 passes through the first connecting plate 21, it is threadedly connected with the sleeve 42 of the first shock absorber 4 and the fixed connecting member 1 in sequence; or place the end of the first shock absorber 4 whose sleeve 42 is flush with the elastic member 41 close to the first connecting plate 21, and after the bolt of the first shock absorber 4 passes through the fixed connecting member 1, it is threadedly connected with the sleeve 42 of the first shock absorber 4 and the first connecting plate 21 in sequence.
[0032] When installing the second shock absorber 5, place the end of the second shock absorber 5 whose sleeve 42 is flush with the elastic member 41 close to the pipe clamp 3, and pass the bolts of the second shock absorber 5 through the second connecting plate 22 and threadedly connect them with the sleeve 42 of the second shock absorber 5 and the pipe clamp 3 in sequence; or place the end of the second shock absorber 5 whose sleeve 42 is flush with the elastic member 41 close to the second connecting plate 22, and pass the bolts of the second shock absorber 5 through the pipe clamp 3 and threadedly connect them with the sleeve 42 of the second shock absorber 5 and the second connecting plate 22 in sequence.
[0033] The designer may select the installation method of the first shock absorber 4 and the second shock absorber 5 according to actual needs, and this embodiment does not limit this.
[0034] Since the elastic rubber block has the functions of shockproofing, vibration reduction, sound insulation and noise reduction, the elastic member 41 in this embodiment is preferably an elastic rubber block. Of course, a spring can also be selected, and this embodiment does not limit this.
[0035] In order to increase the connection strength, in this embodiment, the middle connecting plate 23 is preferably a 90° twist plate, and the first connecting plate 21, the middle connecting plate 23 and the second connecting plate 22 are integrally arranged.
[0036] The pipe clamp 3 in this embodiment includes two symmetrically arranged clamping members 31, and the clamping members 31 include an arc-shaped clamping section 311, a first connecting straight section 312 arranged at one end of the arc-shaped clamping section, and a second connecting straight section 313 arranged at the other end of the arc-shaped clamping section 311. When in use, the first connecting straight sections 312 of the two clamping members 31 are connected, and the second connecting straight sections 313 of the two clamping members 31 are connected, and the arc-shaped clamping sections 311 of the two clamping members 31 cooperate with each other to clamp the steel pipe c.
[0037] In this embodiment, the two first connecting straight sections 312 are connected to the second connecting plate 22. Of course, the two second connecting straight sections 313 may also be selected to be connected to the second connecting plate 22, and this embodiment does not limit this.
[0038] In this embodiment, the fixed connection member 1 is used to connect with the cab b, and the structure is various, which will not be described here.
[0039] A preferred embodiment of the steel pipe support structure of the utility model is described in detail above. The utility model is not limited to the above specific implementation methods. Various changes made by ordinary technicians in this field based on the above conception without creative labor all fall within the protection scope of the utility model.
Claims
1. A steel pipe support structure, It is characterized in that Including fixed connectors, shock-absorbing connectors and pipe clamps, The shock-absorbing connecting member includes a first connecting plate and a second connecting plate which are perpendicular to each other, and an intermediate connecting plate connected between the first connecting plate and the second connecting plate; the first connecting plate is connected to the fixed connecting member and a first shock absorber for shock absorption in the vertical direction is arranged between the two; the second connecting plate is connected to the pipe clamp and a second shock absorber for shock absorption in the horizontal direction is arranged between the two.
2. The steel pipe support structure according to claim 1, It is characterized in that The first shock absorber and the second shock absorber each include an elastic member and a bolt, The bolt of the first shock absorber passes through the first connecting plate and the elastic member of the first shock absorber and is threadedly connected to the fixed connecting member, or the bolt of the first shock absorber passes through the fixed connecting member and the elastic member of the first shock absorber and is threadedly connected to the first connecting plate; The bolt of the second shock absorber passes through the second connecting plate and the elastic member of the second shock absorber to be threadedly connected to the pipe clamp, or the bolt of the second shock absorber passes through the pipe clamp and the elastic member of the second shock absorber to be threadedly connected to the second connecting plate.
3. The steel pipe support structure according to claim 2, It is characterized in that A through hole is arranged in the elastic member along the length direction, a sleeve for the bolt to pass through is fixedly arranged in the through hole, and the length of the sleeve is shorter than the length of the elastic member.
4. The steel pipe support structure according to claim 3, It is characterized in that Both ends of the sleeve are located in the through hole.
5. The steel pipe support structure according to claim 3, It is characterized in that One end of the sleeve is flush with the corresponding end of the elastic member, and the other end of the sleeve is located in the through hole.
6. The steel pipe support structure according to claim 5, It is characterized in that The sleeve is provided with an internal thread structure. The end of the sleeve of the first shock absorber flush with the elastic member is close to the fixed connection member, and the bolt of the first shock absorber passes through the first connection plate and is threadedly connected to the sleeve of the first shock absorber and the fixed connection member in sequence; or the end of the sleeve of the first shock absorber flush with the elastic member is close to the first connection plate, and the bolt of the first shock absorber passes through the fixed connection member and is threadedly connected to the sleeve of the first shock absorber and the first connection plate in sequence; The end of the second shock absorber with the sleeve flush with the elastic member is close to the pipe clamp, and the bolt of the second shock absorber passes through the second connecting plate and is threadedly connected with the sleeve of the second shock absorber and the pipe clamp in sequence; or the end of the second shock absorber with the sleeve flush with the elastic member is close to the second connecting plate, and the bolt of the second shock absorber passes through the pipe clamp and is threadedly connected with the sleeve of the second shock absorber and the second connecting plate in sequence.
7. The steel pipe support structure according to claim 2, It is characterized in that The elastic member is an elastic rubber block or a spring.
8. The steel pipe support structure according to claim 1, It is characterized in that The middle connecting plate is a 90° twist plate.
9. The steel pipe support structure according to claim 8, It is characterized in that The first connecting plate, the middle connecting plate and the second connecting plate are integrally arranged.
10. The steel pipe support structure according to claim 1, It is characterized in that The pipe clamp includes two symmetrically arranged clamping members, each of which includes an arc-shaped clamping section, a first connecting straight section arranged at one end of the arc-shaped clamping section, and a second connecting straight section arranged at the other end of the arc-shaped clamping section. The first connecting straight sections of the two clamping members are connected, and the second connecting straight sections of the two clamping members are connected. The arc-shaped clamping sections of the two clamping members cooperate with each other to clamp the steel pipe; the two first connecting straight sections or the two second connecting straight sections are connected to the second connecting plate.