Foundation pit construction intelligent video supervision system based on Internet of Things

Through the intelligent video supervision system for foundation pit construction based on the Internet of Things, video modules and data modules are used for real-time monitoring and data processing, the shortcomings of manual monitoring in foundation pit construction are solved, and all-weather and no blind spot monitoring is achieved, which improves supervision accuracy and Safety performance reduces labor consumption and safety hazards.

CN222169875UActive Publication Date: 2024-12-13YAZHENG TECH GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420505036.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-12-13
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

During the construction of the foundation pit, manual monitoring is impossible all-weather, large measurement intervals, large safety hazards, and large labor consumption, resulting in untimely early warnings and the frequent entry and exit of the foundation pit by technicians is at risk.

Method used

Design an intelligent video supervision system for foundation pit construction based on the Internet of Things, including video modules, data modules, wireless transmission modules and data processing modules. Real-time monitoring and data processing are carried out through the video modules and data modules on the guardrail, and sliding installation is carried out. The frame and roller-driven cameras achieve all-weather, no blind spot monitoring, reduce manual monitoring labor consumption, and improve supervision accuracy and safety performance.

Benefits of technology

Real-time monitoring of foundation pits is realized, which reduces labor consumption of technicians, improves supervision accuracy and safety performance, ensures the stability and clarity of monitoring, and reduces safety hazards in foundation pit construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222169875U_ABST
    Figure CN222169875U_ABST
Patent Text Reader

Abstract

The utility model relates to an intelligent video supervision system for foundation pit construction based on the Internet of Things, and relates to the technical field of intelligent construction sites. The foundation pit video monitoring system comprises a guardrail arranged on the periphery of a foundation pit in a surrounding mode, a video module arranged on the guardrail, a data module arranged on the guardrail and penetrating into a foundation of the foundation pit, a wireless transmission module arranged on the guardrail and a data processing module, and the video module is used for conducting video monitoring on the foundation pit. The data module is used for monitoring the water content of soil in the side of a foundation pit, and the video module and the data processing module are electrically connected with the data processing module through the wireless transmission module. The device has the advantages that images and data of the foundation pit can be collected conveniently, labor consumption of technicians is reduced, and potential safety hazards of the technicians and the foundation pit are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of smart construction sites, and in particular to an intelligent video monitoring system for foundation pit construction based on the Internet of Things. Background Art

[0002] Foundation pit monitoring is an important part of foundation pit construction. It refers to various observations and analyses of changes in foundation pit rock and soil properties, support structure displacement, and surrounding environmental conditions during foundation pit excavation and underground engineering construction. The monitoring results are fed back in a timely manner to predict the deformation and stable state that will result from further construction, and to determine the extent of the impact of the construction on the surrounding environment based on the prediction.

[0003] Supervision during foundation pit construction is often carried out manually. Technical personnel need to carry relevant image acquisition equipment to the site to conduct on-site data collection and image collection, and import the data into the early warning platform for modeling and analysis. The early warning platform detects the images collected by the technical personnel and issues early warnings when the foundation pit deformation is too large or the water level rises too fast.

[0004] However, since data collection on the foundation pit site needs to be done manually, the manual collection method cannot achieve all-weather monitoring, and the measurement time interval is large, it is easy for safety hazards to be undiscovered in time, resulting in untimely warnings. If the measurement interval is shortened, the labor consumption of technical personnel will be large, and there is a certain risk of technical personnel frequently entering and exiting the foundation pit, so this needs to be improved. Utility Model Content

[0005] In order to facilitate the collection of images and data of foundation pits, reduce the labor consumption of technical personnel, and reduce the safety hazards of technical personnel and foundation pits, the present application provides an intelligent video monitoring system for foundation pit construction based on the Internet of Things.

[0006] The present application provides an intelligent video monitoring system for foundation pit construction based on the Internet of Things, which adopts the following technical solutions:

[0007] An intelligent video monitoring system for foundation pit construction based on the Internet of Things, comprising a guardrail arranged around the periphery of the foundation pit, a video module arranged on the guardrail, a data module arranged on the guardrail and extending deep into the foundation of the foundation pit, a wireless transmission module and a data processing module arranged on the guardrail, wherein the video module is used for video monitoring of the foundation pit, the data module is used for monitoring the soil moisture content in the side of the foundation pit, and the video module and the data processing module are both electrically connected to the data processing module via the wireless transmission module; the video module comprises a mounting frame slidably arranged on the guardrail and a camera element arranged on the mounting frame, the mounting frame is also provided with a sliding member for driving the mounting frame to slide along the guardrail, and the guardrail is also provided with a cleaning component for cleaning the surface of the camera element.

[0008] By adopting the above technical solution, during the foundation pit construction, the soil moisture content of the foundation pit and the condition of the soil on the side of the foundation pit are monitored through the set video module and the data processing module;

[0009] By means of the guardrail and the mounting frame slidingly arranged on the guardrail, when image monitoring is performed in the foundation pit, the entire camera slides along the guardrail, thereby realizing monitoring of the side of the foundation pit without blind spots, and at the same time, the number of camera sets can be reduced, thereby reducing the corresponding cost; the data processing module is set to monitor the water content in the soil, and the image information of the camera and the data information of the water content are processed through the wireless transmission module, thereby realizing monitoring of the foundation pit, and the sliding member drives the mounting frame and the camera to slide, thereby realizing all-weather real-time monitoring of the foundation pit, improving the accuracy of supervision of the foundation pit, reducing the labor consumption of technicians for manual monitoring, and improving the safety performance of foundation pit construction;

[0010] Furthermore, a cleaning component is provided to clean the surface of the camera element, thereby reducing the problem of soil splashing onto the surface of the camera element during foundation pit construction and affecting monitoring accuracy, thereby improving the clarity and reliability of the camera element in monitoring the foundation pit.

[0011] Optionally, the sliding member includes a track arranged on the inner periphery of the guardrail and a roller rotatably arranged on the mounting frame and adapted to the track, a receiving groove is provided on the outer peripheral wall of the roller, the receiving groove is arranged around the roller, and the width of the receiving groove is consistent with the width of the track.

[0012] By adopting the above technical solution, the set track and roller facilitate the sliding drive of the entire camera element, and through the accommodating groove set on the roller and the set track, when the camera element is driven to slide, the accommodating groove and the track are clamped together, thereby achieving the limitation of the entire camera module, realizing the stable sliding of the camera element, and not easily deviating.

[0013] Optionally, there are multiple groups of tracks, and the multiple groups of tracks are arranged in parallel and spaced apart along the same horizontal plane. There are also multiple groups of receiving grooves, and the multiple groups of receiving grooves correspond one-to-one to the multiple groups of tracks.

[0014] By adopting the above technical solution, multiple groups of tracks are set. Since the multiple groups of tracks are located in the same horizontal plane, when the camera is driven to slide, the multiple groups of rollers are clamped with the multiple groups of accommodating grooves, so that the camera is not easily offset in the horizontal direction when adjusted, and the stability of the camera when sliding adjustment is further improved. The multiple groups of rollers that are set also improve the convenience of sliding adjustment of the camera.

[0015] Optionally, the cleaning component includes a shell covering the camera component, a mud removal component provided on the shell, and a dust collection component provided on the shell. The shell is provided with a transparent cover plate at one end of the camera component, and the camera component is arranged toward the transparent cover plate. The mud removal component is used to clean the surface of the cover plate, and the dust collection component is provided at the other end of the camera component.

[0016] By adopting the above technical scheme, the outer shell provided on the outer peripheral wall of the camera element is suitable for protecting the camera element in different weather conditions, reducing the difficulty in monitoring the foundation pit in rainy weather, thereby realizing all-weather real-time monitoring of the foundation pit during construction; at the same time, the mud removal component and the dust suction component are provided. When the camera element is in normal use, the mud removal component cleans the mud and water on the cover plate, thereby reducing the adhesion of mud and water on the cover plate, thereby improving the clarity of the camera element in real-time monitoring of the foundation pit, and at the same time, the dust suction component is provided to cool the camera element and suction dust, thereby reducing the impact of dust entering the shell on the clarity of the camera element, thereby improving the service life of the camera element and the accuracy of real-time monitoring;

[0017] The dust collecting component and the mud removing component are arranged on two opposite sides of the camera component, so as to realize heat dissipation, dust removal and mud scraping of the camera component.

[0018] Optionally, the mud removal component includes a cleaning plate slidably arranged on the shell, the cleaning plate is in contact with the cover plate, the cleaning plate slides periodically on the shell, and the shell is also provided with a sliding component for slidingly adjusting the cleaning plate.

[0019] By adopting the above technical solution, the cleaning plate is periodically slid and adjusted on the sliding part to realize the lifting and lowering adjustment of the scraper, so that the cleaning plate can scrape the cover plate back and forth to realize the cleaning operation of the cover plate. At the same time, since the cleaning plate slides periodically on the shell, the cover plate can be periodically scraped of mud, thereby improving the clarity of the camera's real-time monitoring of the foundation pit.

[0020] Optionally, the sliding member includes a rotating screw rod rotatably disposed on the mounting frame, the cleaning plate is threadedly assembled on the rotating screw rod, and the rotating screw rod periodically reciprocates.

[0021] By adopting the above technical scheme, the rotating screw rod is set to drive the cleaning plate assembled with the thread to rise and fall and slide when it rotates, thereby realizing the adjustment and lifting of the cleaning plate. The rotating screw rod is set to rotate reciprocatingly to realize the reciprocating lifting and lowering of the cleaning plate, realize the reciprocating scraping of the cover plate, and realize clear monitoring of the camera.

[0022] Optionally, a limit block is provided on the rotating shaft of the roller, a limit rod is provided on the rotating screw, the limit block and the limit rod are movably fitted together, and the limit rod and the limit block are movably fitted together, and an elastic part is fixedly connected to the rotating shaft of the rotating screw, and the elastic part drives the rotating screw to rotate.

[0023] By adopting the above technical solution, during the movement of the camera element and the mounting bracket, as the roller rotates, the limit block rotates, the limit block rotates against the limit rod and rotates, driving the rotating screw to rotate, thereby driving the cleaning plate to rise / fall, and achieving stable scraping and fitting of the cover plate. When the roller rotates until the limit rod and the limit block are separated, the rotating screw rotates under the elastic restoring force of the elastic member. At this time, the rotating screw rotates, driving the cleaning plate to fall / rise, thereby realizing a cycle rotation of the rotating screw, thereby realizing the reciprocating lifting and lowering of the cleaning plate.

[0024] Optionally, one end of the shell away from the cover plate is open, and the dust collector includes cooling blades rotatably arranged in the shell and a filter cloth arranged at the open end of the shell. The shell is also provided with a driving member for rotating the cooling blades.

[0025] By adopting the above technical scheme, the cooling blades and the filter cloth are set, the heat accumulation generated by the camera during operation is reduced, and the camera is cooled. At the same time, the opening shape is convenient for the heat dissipation of the camera during operation; the filter cloth is set to reduce the external dust from entering the shell through the opening, thereby reducing the adhesion of dust to the camera, and at the same time does not affect the heat dissipation of the camera by the cooling blades.

[0026] In summary, the present application includes at least one of the following beneficial technical effects:

[0027] 1. Through the installation frame, sliding member and camera member, the camera member and the installation member slide along the guardrail under the action of the sliding member, so as to realize the real-time monitoring of the foundation pit around the clock, and realize the monitoring of all parts of the foundation pit without blind spots, and transmit the captured image information and the data information of the data module to the data processing module through the wireless transmission module for processing, so as to realize the intelligent monitoring of the foundation pit construction;

[0028] 2. By providing a track, a roller, and a receiving groove on the roller that matches the track, when the camera and the mounting frame are driven to slide, the receiving groove matches the track, so that it is not easy to deviate during the sliding process, thereby improving the stability of the camera during movement;

[0029] 3. By setting up the shell, mud removal parts and dust collection parts, the problem of the camera being unusable in rainy and snowy weather is reduced, and the clarity and service life of the camera are improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;

[0031] Figure 2 It is a schematic diagram of the connection structure of the video module.

[0032] Figure numerals: 1. guardrail; 11. foundation pit; 2. video module; 21. camera element; 22. mounting frame; 23. sliding element; 231. track; 232. roller; 233. receiving groove; 3. data module; 31. resistive hygrometer; 4. wireless transmission module; 41. data processing module; 5. cleaning component; 51. shell; 511. cover plate; 52. mud removal element; 521. cleaning plate; 522. rotating screw; 523. positioning rod; 53. dust collection element; 531. cooling blade; 532. filter cloth; 54. limit rod; 541. limit block; 542. limit spring. DETAILED DESCRIPTION

[0033] The following is combined with Figure 1-2 This application is described in further detail.

[0034] The present application embodiment discloses an intelligent video monitoring system for foundation pit construction based on the Internet of Things. Figure 1 An intelligent video monitoring system for foundation pit construction based on the Internet of Things includes a guardrail 1 arranged around a foundation pit 11, a video module 2, a data module 3, a wireless transmission module 4 and a data processing module 41. The video module 2 is used for real-time video detection in the foundation pit 11, and the data module 3 is used for monitoring the humidity of the soil on the side of the foundation pit 11. The video module 2 and the data module 3 are electrically connected to the data processing module 41 through the wireless transmission module 4. The data module 3 processes and analyzes the image data collected by the video module 2 and the soil moisture content data collected by the data module 3, thereby realizing real-time monitoring and supervision of the construction of the foundation pit 11.

[0035] Reference Figure 1 and Figure 2The guardrail 1 is arranged around the side of the foundation pit 11, and the data module 3 includes a resistive hygrometer 31. The resistive hygrometer 31 is inserted into the soil on the side of the foundation pit 11, and the two motors of the resistive hygrometer 31 are used to monitor the humidity of the soil in real time.

[0036] Reference Figure 1 and Figure 2 The video module 2 includes a mounting frame 22 slidably mounted on the guardrail 1 and a camera 21 rotatably mounted on the mounting frame 22. The camera 21 is arranged toward the inside of the foundation pit 11, and the mounting frame 22 is also provided with a power supply for powering the camera 21. The mounting frame 22 is arranged vertically, and the rotation axis of the camera 21 is consistent with the height direction of the mounting frame 22. A first adjustment handle and a second adjustment handle are also provided at the rotation axis of the camera 21. The first adjustment handle and the second adjustment handle are relatively arranged on opposite sides of the camera 21, and the first adjustment handle The hand thread is arranged at the rotating shaft and is movably pressed against the side wall of the camera element 21. The second adjusting handle is fixedly connected to the side wall of the camera element 21. When it is necessary to adjust the angle of the camera element 21 according to the excavation depth of the foundation pit 11, the relevant staff first turns the first adjusting handle to unlock the camera element 21, and then the staff turns the second adjusting handle to adjust the rotation angle of the camera element 21 until the angle of the camera element 21 is rotated to an appropriate angle. At this time, the technician turns the first adjusting handle to fix the angle of the camera element 21.

[0037] Reference Figure 2 The guardrail 1 is also provided with a sliding member 23 for slidingly driving the mounting frame 22. The sliding member 23 includes a track 231 arranged around the inner circumference of the guardrail 1 and a roller 232 arranged on the mounting frame 22 and slidingly adapted to the track 231. The outer circumferential wall of the roller 232 is provided with a receiving groove 233. The receiving groove 233 is consistent with the width of the track 231, and the receiving groove 233 is slidingly adapted to the track 231. At the same time, the track 231 is provided with multiple groups, and the multiple groups of tracks 231 are all Arranged in parallel at intervals along the same horizontal plane, corresponding rollers 232 are also provided in multiple groups, and the multiple groups of rollers 232 correspond one-to-one to the multiple groups of tracks 231. In the present application, two groups of rollers 232 and two groups of tracks 231 are provided. In other embodiments, the rollers 232 and the tracks 231 can also be provided in three groups, four groups, etc. The arrangement method is consistent with the present application, and the stable sliding of the mounting frame 22 can be achieved; and in the present application, two groups of rollers 232 are provided along the extension direction of the track 231.

[0038] Reference Figure 2A cleaning assembly 5 for cleaning the surface of the camera element 21 is also provided on the mounting frame 22. The cleaning assembly 5 includes a shell 51 arranged on the outer periphery of the camera element 21. The shell 51 is in a rectangular shape, and both ends of the shell 51 are open. The camera element 21 is arranged in the shell 51. The cleaning assembly 5 includes a mud removal component 52 arranged at the opening at one end of the shell 51 and a dust collection component 53 arranged at the opening at the other end of the shell 51.

[0039] Reference Figure 2 The mud removing member 52 includes a cover plate 511 arranged at the end opening of the shell 51 and a cleaning plate 521 slidably arranged on the cover plate 511. The cleaning plate 521 is lifted and lowered on the cover plate 511, and the cleaning plate 521 is movably fitted with the surface of the cover plate 511. The shell 51 is also provided with an adjusting member for lifting and lowering the cleaning plate 521. The adjusting member includes a rotating screw rod 522 which is reciprocatingly and periodically rotated on the mounting frame 22. The cleaning plate 521 is threadedly assembled on the rotating screw rod 522. The cleaning plate 521 is rotatably connected to the end of the cleaning plate 521 away from the rotating screw rod 522. The positioning rod 523 limits the sliding direction of the cleaning plate 521.

[0040] In order to facilitate the reciprocating rotation adjustment of the rotating screw rod 522, a limit block 541 is fixedly connected to the rotating shaft of the roller 232, and the two ends of the limit block 541 are inclined. The limit rod 54 is fixedly connected to the rotating screw rod 522, and the limit rod 54 is arranged perpendicular to the limit block 541, and the limit rod 54 and the limit block 541 are movably fitted. An elastic member is also provided on the rotating screw rod 522. The elastic member in this application is a limit spring 542 fixed on the limit rod 54, and the limit spring 542 is away from the end fixedly connected to the limit rod 54 and the installation The seat is fixedly connected; when the roller 232 rotates, that is, the mounting frame 22 moves along the track 231, the limit block 541 is automatically driven to rotate, and the limit block 541 drives the limit rod 54 to rotate, thereby driving the rotating screw rod 522 to rotate, thereby driving the cleaning plate 521 to descend, and the mud and water on the cover plate 511 are scraped off. When the limit rod 54 is separated from the limit block 541, the rotating screw rod 522 automatically rotates under the elastic restoring force of the limit spring 542, thereby realizing the rising of the cleaning plate 521 and scraping the cover plate 511.

[0041] At the same time, a water tank is provided at the top of the shell 51, and a water leakage hole is provided at the bottom side of the water tank. An elastic protrusion is elastically provided at the water leakage hole, and the elastic protrusion is movably fitted with the top side of the cleaning plate 521, that is, when the rotating screw rod 522 is acted upon by the elastic restoring force of the limit spring 542, it will rotate beyond the elastic limit, thereby achieving the fit between the cleaning plate 521 and the elastic protrusion. At this time, the water in the water tank falls through the water leakage hole, thereby cleaning the cover plate 511 and improving the clarity of the cover plate 511 during the scraping process of the scraper.

[0042] Reference Figure 2 The dust collecting member 53 includes a cooling blade 531 disposed at one end of the housing 51 away from the mud removing member 52, and a filter cloth 532 is disposed at the end opening of the housing 51 to block the opening end. The cooling blade 531 is driven by a small drive motor, and a solar panel for supplying power to the drive motor is disposed on the top side of the housing 51. That is, when the temperature is high, the heat dissipation of the camera 21 is realized, and at the same time, the filter cloth 532 is disposed to reduce the problem that external dust enters the housing 51 and adheres to the camera 21.

[0043] The implementation principle of the intelligent video monitoring system for foundation pit construction based on the Internet of Things in the embodiment of the present application is as follows: at this time, the entire camera 21 slides along the guardrail 1, so as to realize the monitoring of the side of the foundation pit 11 without blind spots, and at the same time, the number of camera groups 21 can be reduced, thereby reducing the corresponding cost; the data processing module 41 is set to monitor the water content in the soil, and the image information of the camera 21 and the water content data information are processed through the wireless transmission module 4, so as to realize the monitoring of the foundation pit 11, and the sliding member 23 drives the mounting frame 22 and the camera 21 to slide, so as to realize all-weather real-time monitoring of the foundation pit 11, improve the accuracy of the supervision of the foundation pit 11, reduce the labor consumption of technical personnel in manual monitoring, and improve the safety performance of the construction of the foundation pit 11.

[0044] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An intelligent video monitoring system for foundation pit construction based on the Internet of Things, characterized by: The invention comprises a guardrail (1) arranged around the periphery of a foundation pit (11), a video module (2) arranged on the guardrail (1), a data module (3) arranged on the guardrail (1) and extending into the foundation of the foundation pit (11), a wireless transmission module (4) arranged on the guardrail (1), and a data processing module (41), wherein the video module (2) is used for video monitoring of the foundation pit (11), the data module (3) is used for monitoring the soil moisture content on the side of the foundation pit (11), and the video module (2) and the data module (3) are both electrically connected to the data processing module (41) via the wireless transmission module (4); The video module (2) comprises a mounting frame (22) slidably mounted on the guardrail (1) and a camera element (21) mounted on the mounting frame (22); the mounting frame (22) is also provided with a sliding member (23) for driving the mounting frame (22) to slide along the guardrail (1); and the guardrail (1) is also provided with a cleaning component (5) for cleaning the surface of the camera element (21).

2. According to claim 1, an intelligent video monitoring system for foundation pit construction based on the Internet of Things is characterized by: The sliding member (23) comprises a track (231) arranged on the inner periphery of the guardrail (1) and a roller (232) rotatably arranged on the mounting frame (22) and adapted to the track (231); an accommodating groove (233) is provided on the outer peripheral wall of the roller (232); the accommodating groove (233) is arranged around the roller (232), and the width of the accommodating groove (233) is consistent with the width of the track (231).

3. According to claim 2, an intelligent video monitoring system for foundation pit construction based on the Internet of Things is characterized by: The rails (231) are provided in multiple groups, and the multiple groups of rails (231) are arranged in parallel and spaced apart along the same horizontal plane. The accommodating grooves (233) are also provided in multiple groups, and the multiple groups of accommodating grooves (233) correspond one-to-one to the multiple groups of rails (231).

4. According to claim 3, an intelligent video monitoring system for foundation pit construction based on the Internet of Things is characterized by: The cleaning component (5) comprises a shell (51) arranged to cover the camera element (21), a mud removal component (52) arranged on the shell (51), and a dust suction component (53) arranged on the shell (51); the shell (51) is provided with a transparent cover plate (511) at one end of the camera element (21); the camera element (21) is arranged toward the transparent cover plate (511); the mud removal component (52) is used to clean the surface of the cover plate (511); and the dust suction component (53) is arranged at the other end of the camera element (21).

5. According to claim 4, an intelligent video monitoring system for foundation pit construction based on the Internet of Things is characterized by: The mud removing member (52) comprises a cleaning plate (521) slidably arranged on the shell (51), the cleaning plate (521) being in contact with the cover plate (511), the cleaning plate (521) periodically sliding on the shell (51), and an adjusting member for slidingly adjusting the cleaning plate (521) being further provided on the shell (51).

6. According to claim 5, an intelligent video monitoring system for foundation pit construction based on the Internet of Things is characterized by: The sliding member (23) comprises a rotating screw rod (522) rotatably arranged on the mounting frame (22); the cleaning plate (521) is threadedly mounted on the rotating screw rod (522); and the rotating screw rod (522) periodically reciprocates.

7. The intelligent video monitoring system for foundation pit construction based on the Internet of Things according to claim 6 is characterized by: A limit block (541) is provided on the rotating shaft of the roller (232), a limit rod (54) is provided on the rotating screw rod (522), the limit block (541) and the limit rod (54), and the limit rod (54) and the limit block (541) are movably fitted, and an elastic member is fixedly connected to the rotating shaft of the rotating screw rod (522), and the elastic member drives the rotating screw rod (522) to rotate.

8. The intelligent video monitoring system for foundation pit construction based on the Internet of Things according to claim 7 is characterized by: One end of the shell (51) away from the cover plate (511) is open, and the dust collecting member (53) comprises a cooling blade (531) rotatably arranged in the shell (51) and a filter cloth (532) arranged at the open end of the shell (51), and the shell (51) is also provided with a driving member for driving the cooling blade (531) to rotate.

Citation Information

Cited By

  • Water leakage monitoring system for foundation pit support structure

    CN120947920A