Construction dust falling device
By designing the spray barrel and control mechanism in construction, increasing the connection between the nozzle and the ball joints, and adjusting the spray angle, the problems of low spray efficiency and uneven atomization effect in the prior art are solved, and more efficient dust drop and Clearance protects the health of staff.
Patent Information
- Application Number
- CN202422785054.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-15
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-11-15
AI Technical Summary
The existing construction dust removal device has low spray efficiency and uneven atomization effect, which cannot effectively reduce the impact of dust on human health.
A construction dust reduction device is designed, including a spray cylinder, a fan, a spray assembly, a box and a control mechanism. By increasing the connection between the nozzle and the ball joint, the spray angle of the nozzle is adjusted, the spray amount and efficiency are improved, while maintaining the atomization effect. , guide columns and guide vanes are used to stabilize air flow, and spray liquid is provided using water tanks and pump bodies.
Improve spray efficiency and uniformity, enhance the atomization effect, ensure effective landing and removal of dust, and reduce health hazards to staff.
Smart Images

Figure CN222173526U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of building construction, and in particular relates to a construction dust reduction device. Background Art
[0002] With the continuous acceleration of urban modernization, a large number of construction sites have inevitably appeared in the city. Various construction sites have caused very adverse effects on the surrounding environment. The first to be affected is dust pollution. This type of dust has small particle size, high dispersion, large relative surface area, strong respirability, and wide diffusion surface, which increases the harm to the human body. In addition, gas adsorption reduces the wetting and condensation properties of dust. In addition, under the influence of wind flow and various agitations in the working environment, it will float in the air for a long time and drift everywhere, which will also cover the construction site with a thick layer of dust. Moreover, there are a large number of substances harmful to the human body in these dusts, which will affect the health of the workers. Now most of the shock absorption sites use spraying to reduce the dust content in the air.
[0003] The existing Chinese patent with publication number CN110180289B discloses a dust removal device for construction, including an air duct, an air supply duct, a box, a first servo motor and a rotating frame, the two sides of the box are equipped with walking wheels through bearings, one side of the walking wheel is fixedly equipped with a universal wheel, the side of the box is provided with four groups of water level observation holes, one side of the water level observation holes is fixedly equipped with two groups of solar panels, a water tank is provided inside the box, one side of the water tank is connected to a water pump through a water inlet, a first servo motor is installed on the inner side of the frame, an air duct is installed on the top of the frame through a knob, an air supply duct is installed on one side of the air duct, and a spray device is fixedly installed inside the air supply duct.
[0004] Although the above-mentioned dust removal device increases the spray range, its spray efficiency is lower as the spray range increases, and improvements are made to this end. Utility Model Content
[0005] The purpose of this application is to provide a construction dust reduction device to address the above-mentioned technical problems, improve spray efficiency and ensure spray uniformity.
[0006] The present application provides a construction dust reduction device, comprising:
[0007] A jet tube, including an air inlet and an air outlet;
[0008] The fan is installed at the air inlet end of the ejector tube.
[0009] The spray assembly is installed at one end of the air outlet of the spray cylinder;
[0010] The box body is provided with moving wheels;
[0011] A control mechanism is installed between the spray cylinder and the box;
[0012] Among them, the spray assembly includes a first delivery pipe, a second delivery pipe, a connecting pipe, and a nozzle. The connecting pipe is connected between the first delivery pipe and the second delivery pipe. The nozzle is provided with a mounting seat connected to the first delivery pipe and the second delivery pipe. The nozzle is provided with a spray head, and the spray head and the mounting seat are connected through a ball joint.
[0013] A fan is installed in the spray barrel. The fan works to allow air to enter through the air inlet and be discharged from the air outlet. The generated airflow sprays the atomized water droplets sprayed by the spray assembly to a longer distance. The spray barrel is installed on the box through a control mechanism. The box is easy to move through the moving wheels. The spray range of the spray barrel is controlled by the control mechanism for movable adjustment. When the spray barrel sprays reciprocatingly at the same time, its average spray volume is reduced. The spray volume of the spray barrel is increased by providing a first delivery pipe, a second delivery pipe, and nozzles installed on the first delivery pipe and the second delivery pipe, thereby improving its spray efficiency. However, when the number of nozzles is increased, too many nozzles spray in the same direction at the same time, which will cause the atomization effect to deteriorate. The nozzles are connected by threads on the mounting seat. It is evenly installed on the first delivery pipe and the second delivery pipe, and the spray angle of the spray head is controlled by the ball joint connection between the spray head and the mounting seat. The first delivery pipe and the second delivery pipe are annular, and the diameter of the first delivery pipe is larger than the diameter of the second delivery pipe. The first delivery pipe and the second delivery pipe are connected by a connecting pipe and have high structural strength. By making the angle of the spray range of the nozzle on the first delivery pipe larger than the angle of the spray range of the nozzle on the second delivery pipe, it is ensured that the atomization effect is maintained while increasing the spray efficiency. The nozzle is evenly installed on the first delivery pipe and the second delivery pipe. After the installation is completed, the angle is adjusted according to the installation position through the ball joint structure to improve the convenience of adjustment.
[0014] Furthermore, the nozzle comprises:
[0015] A joint seat connected to a mounting seat;
[0016] The ball head is connected to the nozzle head and is adapted to the joint seat;
[0017] The first sealing pad is placed in the joint seat and abuts against the ball head and the mounting seat.
[0018] Furthermore, the first delivery pipe is provided with a first connecting seat, and the first connecting seat is connected to the air outlet via a fastener.
[0019] Furthermore, the spray tube also includes:
[0020] A guide column is placed in the injection tube and is aligned with the axis of the injection tube;
[0021] The guide vane is placed between the guide column and the inner wall surface of the injection tube;
[0022] Wherein, the guide vanes are evenly distributed around the axis of the guide column.
[0023] Furthermore, the control mechanism includes:
[0024] A bracket is hinged to the box body;
[0025] A driving device is installed in the box and connected to the bracket;
[0026] A driving cylinder is installed between the bracket and the outer wall surface of the injection tube;
[0027] Wherein, the bracket is provided with an articulated seat, the spraying tube is provided with an articulated shaft, and the articulated seat and the articulated shaft are connected via a bearing.
[0028] Furthermore, the box body is provided with a water tank, and the water tank is installed on a side close to the air outlet.
[0029] The beneficial effects of this application are:
[0030] 1. Increase the spray volume of the spray barrel by adding nozzles, improve its spray efficiency, and ensure the atomization effect by adjusting the spray direction of the nozzle.
[0031] 2. The nozzle is evenly installed on the first delivery pipe and the second delivery pipe through the threaded connection of the mounting seat, and the spraying direction of the nozzle is adjusted through the ball joint connection between the nozzle head and the mounting seat.
[0032] 3. The joint seat and the ball head are matched to facilitate the installation and connection of the nozzle. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a schematic diagram of the structure of the dust suppression device of the present application;
[0034] Figure 2 For this application Figure 1 A magnified view of point A;
[0035] Figure 3 A schematic diagram of the structure of the nozzle of the present application;
[0036] Figure 4 A cross-sectional view of the nozzle of the present application;
[0037] Figure 5 This is a schematic diagram of the structure of Embodiment 3 of the present application;
[0038] The reference numerals in the figure are: 100, spray tube; 101, hinge shaft; 110, air inlet; 120, air outlet; 130, guide column; 131, guide vane; 200, spray assembly; 210, first delivery pipe; 211, connecting pipe; 220, second delivery pipe; 230, nozzle; 231, mounting seat; 232, spray head; 233, joint seat; 234, ball head; 235, first sealing gasket; 236, atomizing seat; 237, atomizing chamber; 238, small hole; 239, elastic member; 240, first connecting seat; 300, box body; 310, moving wheel; 400, control mechanism; 410, bracket; 411, hinged seat; 420, drive cylinder; 500, water tank. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.
[0040] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0041] The following provides a detailed description of the embodiments of the present application through specific embodiments and their application scenarios in conjunction with the accompanying drawings.
[0042] Embodiment 1:
[0043] like Figure 1-Figure 4 As shown, the embodiment of the present application provides a construction dust reduction device, comprising:
[0044] The spray tube 100 includes an air inlet 110 and an air outlet 120;
[0045] The fan is installed at one end of the air inlet 110 of the ejection tube 100
[0046] The spray assembly 200 is installed at one end of the air outlet 120 of the spray cylinder 100;
[0047] The box body 300 is provided with a moving wheel 310;
[0048] The control mechanism 400 is installed between the spray cylinder 100 and the box 300;
[0049] Among them, the spray assembly 200 includes a first delivery pipe 210, a second delivery pipe 220, a connecting pipe 211, and a nozzle 230. The connecting pipe 211 is connected between the first delivery pipe 210 and the second delivery pipe 220. The nozzle 230 is provided with a mounting seat 231 connected to the first delivery pipe 210 and the second delivery pipe 220. The nozzle 230 is provided with a spray head 232, and the spray head 232 is connected to the mounting seat 231 through a ball joint.
[0050] A fan is installed in the spray barrel 100. The fan allows air to enter through the air inlet 110 and be discharged from the air outlet 120. The generated airflow sprays the atomized water droplets sprayed by the spray assembly 200 to a longer distance. The spray barrel 100 is installed on the box 300 through the control mechanism 400. The box 300 is easy to move through the moving wheels 310. The spray range of the spray barrel 100 is controlled by the control mechanism 400 for movable adjustment. When the spray barrel 100 sprays and reciprocates at the same time, its average spray volume is reduced. The spray volume of the spray barrel 100 is increased by providing a first delivery pipe 210, a second delivery pipe 220, and nozzles 230 installed on the first delivery pipe 210 and the second delivery pipe 220, thereby improving its spray efficiency. However, when the number of nozzles 230 is increased, too many nozzles 230 spray in the same direction at the same time, which will cause the atomization effect to deteriorate. The nozzles 230 are mounted on the mounting seat 23 The threaded connection is evenly installed on the first delivery pipe 210 and the second delivery pipe 220. The spray angle of the spray head 232 is controlled by the ball joint connection between the spray head 232 and the mounting seat 231. The first delivery pipe 210 and the second delivery pipe 220 are annular, and the diameter of the first delivery pipe 210 is greater than the diameter of the second delivery pipe 220. The first delivery pipe 210 and the second delivery pipe 220 are connected by the connecting pipe 211, and have high structural strength. By making the spray range angle of the nozzle 230 on the first delivery pipe 210 greater than the spray range angle of the nozzle 230 on the second delivery pipe 220, it is ensured that the spray efficiency is increased while maintaining its atomization effect. The nozzle 230 is evenly installed on the first delivery pipe 210 and the second delivery pipe 220. After the installation is completed, the angle is adjusted according to the installation position through the ball joint structure to improve the convenience of adjustment.
[0051] Furthermore, the nozzle 230 includes:
[0052] The joint seat 233 is connected to the mounting seat 231;
[0053] The ball head 234 is connected to the spray head 232 and is adapted to the joint seat 233;
[0054] The first sealing gasket 235 is disposed in the joint seat 233 and abuts against the ball head 234 and the mounting seat 231 .
[0055] The joint seat 233 and the mounting seat 231 are connected by threads, and the joint seat 233 and the ball head 234 cooperate to achieve the installation of the spray head 232 on the nozzle 230. The ball head 234 and the spray head 232 are integrally connected, and the sealing between the joint seat 233, the mounting seat 231, and the ball head 234 is improved by the first sealing gasket 235.
[0056] Embodiment 2:
[0057] like Figure 1-Figure 2 As shown, an embodiment of the present application provides a construction dust reduction device. In addition to the above-mentioned technical features, further, the first conveying pipe 210 is provided with a first connecting seat 240, and the first connecting seat 240 is connected to the air outlet 120 by fasteners.
[0058] The first connecting seat 240 is placed on the first delivery pipe 210 and connected integrally. The spray assembly 200 is fixedly installed by the first connecting seat 240 and the fasteners, thereby improving the stability of the installation structure.
[0059] Furthermore, the spraying tube 100 also includes:
[0060] The guide column 130 is disposed in the injection tube 100 and is aligned with the axis of the injection tube 100;
[0061] The guide vane 131 is disposed between the guide column 130 and the inner wall surface of the injection tube 100;
[0062] The guide vanes 131 are evenly distributed around the axis of the guide column 130 .
[0063] The guide column 130, the guide vane 131 and the spray barrel 100 are fixedly connected. The guide column 130 and the guide vane 131 improve the stability of the air flow in the spray barrel 100, and further ensure the performance of the spray.
[0064] Furthermore, the control mechanism 400 includes:
[0065] The bracket 410 is hinged on the box body 300;
[0066] A driving device, installed in the box 300 and connected to the bracket 410;
[0067] The driving cylinder 420 is installed between the bracket 410 and the outer wall surface of the spraying tube 100;
[0068] The bracket 410 is provided with an articulated seat 411, and the spraying tube 100 is provided with an articulated shaft 101, and the articulated seat 411 and the articulated shaft 101 are connected via a bearing.
[0069] The bracket 410 is hinged to the box 300, and the driving device is installed in the box 300 using a motor. The driving device controls the rotation of the bracket 410. When the bracket 410 rotates, the spray tube 100 is controlled to swing in the horizontal direction. The driving cylinder 420 is connected between the bracket 410 and the spray tube 100 to adjust the spray elevation angle of the spray channel. The bracket 410 and the spray tube 100 are movably connected through the hinge seat 411, the hinge shaft 101, and the bearing, which is convenient for adjusting the driving cylinder 420.
[0070] Furthermore, the housing 300 is provided with a water tank 500 , and the water tank 500 is installed on a side close to the air outlet 120 .
[0071] The water tank 500 is separable from the box body 300 , and the water tank 500 is connected to the spray assembly 200 via a pipeline, and the pipeline is connected to the pump body, and the water in the water tank 500 is pumped into the spray assembly 200 through the pump body.
[0072] Embodiment 3:
[0073] like Figure 5 As shown, the embodiment of the present application provides a construction dust suppression device. In addition to the above-mentioned technical features, the nozzle 230 is further provided with an atomizing seat 236 installed in the ball head 234, an atomizing chamber 237 is provided between the atomizing seat 236 and the nozzle head 232, the atomizing seat 236 is provided with a plurality of small holes 238, and an elastic member 239 is provided between the atomizing seat 236 and the ball head 234.
[0074] The atomizer seat 236 is installed in the ball head 234, and an atomizer cavity 237 is formed between the atomizer seat 236 and the nozzle. The atomization effect of the atomizer seat 236 is improved through the small hole 238. The elastic member 239 adopts a spring, etc. When the water pressure is greater, the atomizer cavity 237 becomes smaller, and the faster the flow rate, the better the atomization effect.
[0075] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.
[0076] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
Claims
1. A construction dust suppression device, characterized in that: include: The spray cylinder (100) comprises an air inlet (110) and an air outlet (120); A fan is installed at one end of the air inlet (110) of the ejector tube (100) A spray assembly (200) is mounted on one end of the air outlet (120) of the spray cylinder (100); The box body (300) is provided with moving wheels (310); A control mechanism (400) is installed between the spray cylinder (100) and the box (300); The spray assembly (200) comprises a first delivery pipe (210), a second delivery pipe (220), a connecting pipe (211), and a nozzle (230); the connecting pipe (211) is connected between the first delivery pipe (210) and the second delivery pipe (220); the nozzle (230) is provided with a mounting seat (231) connected to the first delivery pipe (210) and the second delivery pipe (220); the nozzle (230) is provided with a spray head (232); the spray head (232) and the mounting seat (231) are connected via a ball joint.
2. The construction dust suppression device according to claim 1, characterized in that: The nozzle (230) comprises: The joint seat (233) is connected to the mounting seat (231); A ball head (234) connected to the spray head (232) and adapted to the joint seat (233); The first sealing gasket (235) is placed in the joint seat (233) and abuts against the ball head (234) and the mounting seat (231).
3. The construction dust suppression device according to claim 1, characterized in that: The first delivery pipe (210) is provided with a first connection seat (240), and the first connection seat (240) is connected to the air outlet (120) via a fastener.
4. The construction dust suppression device according to claim 1, characterized in that: The injection cylinder (100) further comprises: A guide column (130) is disposed in the injection cylinder (100) and has the same axis as the injection cylinder (100); A guide vane (131) is disposed between the guide column (130) and the inner wall surface of the injection cylinder (100); The guide vanes (131) are evenly distributed around the axis of the guide column (130).
5. The construction dust suppression device according to claim 1, characterized in that: The control mechanism (400) comprises: A bracket (410) is hinged to the box body (300); A driving device, installed in the box (300) and connected to the bracket (410); A driving cylinder (420) is installed between the bracket (410) and the outer wall surface of the injection tube (100); The support (410) is provided with an articulated seat (411), the spraying tube (100) is provided with an articulated shaft (101), and the articulated seat (411) and the articulated shaft (101) are connected via a bearing.
6. The construction dust suppression device according to claim 1, characterized in that: The box body (300) is provided with a water tank (500), and the water tank (500) is installed on a side close to the air outlet (120).