Pipe transportation device for construction
By designing manual telescopic rods and clamping devices, the handling difficulties caused by the weight of PE pipelines are solved, and the construction speed of the pipeline network and the labor intensity are improved. They are suitable for pipes of multiple pipe diameters.
Patent Information
- Application Number
- CN202420748839.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-04-11
AI Technical Summary
During construction, the weight of PE pipelines makes manual handling difficult, increasing labor intensity and reducing construction speed.
A pipe transportation device for construction was designed, and the manual telescopic rod stretching and contracting bracket is used to combine U-shaped clamping blocks, U-shaped gaskets, clamps and guides to achieve stable clamping and movement of PE pipes, reducing the Labor intensity.
Through this device, PE pipelines are easy to carry, reduce the labor intensity of staff, improve the construction speed of pipeline networks, and are suitable for pipelines of multiple pipe diameters.
Smart Images

Figure CN222179574U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction material transportation equipment, in particular to a pipe transportation device for construction. Background Art
[0002] Building construction refers to the production activities during the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. Pipeline layout and installation are often required at the construction site.
[0003] For example, water supply pipes are made of PE materials. Such PE pipes need to be hot-melt welded one by one during pipe network construction. However, each PE pipe is heavy and inconvenient to carry manually, which increases the labor intensity of the staff and reduces the speed of pipe network construction. In order to solve the above problems, a construction pipe transportation device is proposed to solve the above problems. Utility Model Content
[0004] In view of this, the utility model provides a construction pipe transportation device. The utility model can use a manual telescopic rod to stretch the contraction bracket according to the different lengths of the pipes, put the pipes on the contraction bracket, and use the U-shaped clamping block and the U-shaped gasket to support and clamp the two ends of the pipe. The middle part of the pipe is clamped and fixed by using a clamp and a groove to prevent the pipe from falling when the contraction bracket moves, and the moving device drives the contraction bracket to move through the cooperation of the guide and the guide rod.
[0005] In order to solve the above technical problems, the utility model provides a construction pipe transportation device, including a contraction bracket, telescopic fixtures are provided at the four corners of the contraction bracket, a manual telescopic rod is provided between the telescopic fixtures, U-shaped clamping blocks are provided on the upper surfaces of both ends of the contraction bracket, a slot is provided on one side of the upper surface of the contraction bracket, a fixing block is provided on the other side of the upper surface of the contraction bracket, a clamp is provided above the fixing block and the slot, a moving device is provided below the two ends of the contraction bracket, and guide rods are provided at both ends of the contraction bracket.
[0006] One end of the clamp is provided with a buckle for clamping and fixing with the clamping slot, and the buckle is clamped and connected with the clamping slot.
[0007] The other end of the clamp is provided with a positioning block for connecting the clamp with the shrink bracket, the lower surface of the positioning block is connected to the upper surface of the fixing block, the lower surface of the fixing block is fixed to the upper surface of the shrink bracket, and the lower surface of the clamping groove is fixed to the upper surface of the shrink bracket.
[0008] A plurality of sockets for socket connection with the positioning bolts are arranged on both sides of the upper surface of the U-shaped clamping block, and a U-shaped gasket for improving the support of the U-shaped clamping block for the PE pipe is arranged above the U-shaped clamping block, and the U-shaped gasket fits the U-shaped clamping block.
[0009] A positioning bolt is provided in the plug interface for connecting and fixing the U-shaped clamping block and the U-shaped gasket. A gasket fixer is provided on the upper end of the positioning bolt for connecting the positioning bolt and the U-shaped gasket. The surface of the gasket fixer is welded and fixed to the U-shaped gasket, and the positioning bolt is connected to the plug interface in a socket connection.
[0010] A guide for guiding the guide rod to move is arranged at the lower end of the guide rod, one side of the guide is fixed to the end face of the contraction bracket, and a guide handle for the staff to hold is arranged at the upper end of the guide rod.
[0011] The lower surfaces of both ends of the shrink bracket are provided with connecting plates for connecting the connecting block with the shrink bracket, the lower surfaces of the connecting plates are provided with connecting blocks for connecting the support rod with the connecting plates, and the lower surfaces of the connecting blocks are provided with support rods for fixing the connecting rods.
[0012] A connecting rod for fixing the connecting shaft is arranged at the lower end of the supporting rod, and connecting shafts for connecting the connecting rod with the moving device are arranged at both ends of the connecting rod, and the connecting shaft is connected with the moving device.
[0013] In summary, compared with the prior art, the present application has at least one of the following beneficial technical effects:
[0014] 1. Use a manual telescopic rod to stretch the shrinkage bracket according to the different lengths of the pipe, put the pipe on the shrinkage bracket, use the U-shaped clamping block with the U-shaped gasket to support and clamp the two ends of the pipe, use the clamp with the slot to clamp the middle part of the pipe to prevent the pipe from falling when the shrinkage bracket moves, and use the guide to cooperate with the guide rod to drive the mobile device to move the shrinkage bracket, so that the PE pipe is easy to carry, thereby reducing the labor intensity of the staff and improving the speed of pipeline construction.
[0015] 2. A number of sockets for socket connection with the positioning bolts are provided on both sides of the upper surface of the U-shaped clamping block. A U-shaped gasket for improving the support of the U-shaped clamping block for the PE pipe is provided above the U-shaped clamping block. The U-shaped gasket fits the U-shaped clamping block, and the U-shaped gasket increases the friction between the PE pipe and the U-shaped clamping block, thereby improving the stability of the PE pipe when moving.
[0016] 3. A positioning block is provided at the other end of the clamp for connecting the clamp to the shrink bracket. The lower surface of the positioning block is connected to the upper surface of the fixing block. The lower surface of the fixing block is fixed to the upper surface of the shrink bracket. The lower surface of the clamping groove is fixed to the upper surface of the shrink bracket. The clamp can fix pipes of various different diameters, which improves its practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the main structure of a construction pipe transportation device of the utility model;
[0018] Figure 2It is a schematic diagram of the partial structure of C of the utility model;
[0019] Figure 3 It is a side sectional view of the utility model;
[0020] Figure 4 It is a partial cross-sectional view of B of the utility model;
[0021] Figure 5 It is a side sectional view of the main body of the utility model;
[0022] Figure 6 A is a partial cross-sectional view of the utility model;
[0023] Figure 7 It is a front view structural schematic diagram of the utility model.
[0024] Description of reference numerals:
[0025] 100, retractable bracket; 101, telescopic fixture; 102, manual telescopic rod; 200, U-shaped clamping block; 201, plug interface; 202, U-shaped gasket; 203, positioning bolt; 204, gasket fixture; 300, slot; 301, fixing block; 302, clamp; 303, buckle; 304, positioning block; 400, moving device; 401, guide rod; 402, guide; 403, guide handle; 404, connecting plate; 405, connecting block; 406, support rod; 407, connecting rod; 408, connecting shaft. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical scheme and advantages of the embodiment of the utility model clearer, the following will be combined with the appended drawings of the embodiment of the utility model. Figure 1-7 The technical scheme of the embodiment of the utility model is clearly and completely described. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the described embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field are within the scope of protection of the utility model.
[0027] like Figure 1-7As shown: This embodiment provides a construction pipe transportation device, including a shrink bracket 100, wherein the four corners of the shrink bracket 100 are provided with telescopic fixtures 101 for fixing a manual telescopic rod 102, the telescopic fixtures 101 are connected and fixed to the inner wall of the shrink bracket 100 by rivets, a manual telescopic rod 102 for manually stretching the shrink bracket 100 is provided between the telescopic fixtures 101, and U-shaped clamping blocks 200 for fixing the two ends of the PE pipe are provided on the upper surfaces of both ends of the shrink bracket 100, and a card groove 300 for connecting with a clamp 302 is provided on one side of the upper surface of the shrink bracket 100, and the lower surface of the card groove 300 is connected to the upper surface of the shrink bracket 100. The surfaces are connected and fixed by rivets, and a fixing block 301 for connecting the positioning block 304 with the shrinkage bracket 100 is provided on the other side of the upper surface of the shrinkage bracket 100, the upper surface of the fixing block 301 and the lower surface of the positioning block 304 are connected and fixed by rivets, and the lower surface of the fixing block 301 and the upper surface of the shrinkage bracket 100 are connected and fixed by bolts, and a clamp 302 for fixing PE pipes of different diameters is provided above the fixing block 301 and the slot 300, and a moving device 400 for driving the shrinkage bracket 100 to move is provided below both ends of the shrinkage bracket 100, and guide rods 401 for controlling the moving direction of the shrinkage bracket 100 are provided at both ends of the shrinkage bracket 100.
[0028] When in use, the manual telescopic rod 102 is used to stretch the shrinkage bracket 100 according to the different lengths of the pipes, and the pipes are placed on the shrinkage bracket 100, so that the U-shaped clamping block 200 and the U-shaped gasket 202 support and clamp the two ends of the pipe, and the clamp 302 and the groove 300 are used to clamp and fix the middle part of the pipe to prevent the pipe from falling when the shrinkage bracket 100 moves, and the moving device 400 drives the shrinkage bracket 100 to move through the cooperation of the guide 402 and the guide rod 401.
[0029] This embodiment provides a construction pipe transportation device,
[0030] like Figure 1 , 2 As shown in 6: One end of the clamp 302 is provided with a buckle 303 for clamping and fixing with the slot 300, the clamp 302 is made of elastic material, the buckle 303 is clamped and connected with the slot 300, and the other end of the clamp 302 is provided with a positioning block 304 for connecting the clamp 302 with the shrinkage bracket 100, the lower surface of the positioning block 304 is connected and fixed to the upper surface of the fixing block 301 by rivets, the lower surface of the fixing block 301 is connected and fixed to the upper surface of the shrinkage bracket 100 by bolts, and the lower surface of the slot 300 is connected and fixed to the upper surface of the shrinkage bracket 100 by rivets.
[0031] like Figure 3 , 4As shown in 7: a plurality of plug interfaces 201 for socket connection with the positioning bolt 203 are provided on both sides of the upper surface of the U-shaped clamping block 200, a U-shaped gasket 202 for improving the support of the U-shaped clamping block 200 for the PE pipe is provided above the U-shaped clamping block 200, the U-shaped gasket 202 is fitted with the U-shaped clamping block 200, and a positioning bolt 203 for connecting and fixing the U-shaped clamping block 200 and the U-shaped gasket 202 is provided in the plug interface 201, the U-shaped gasket 202 can be customized with gaskets of different pipe diameters, and a gasket fixer 204 for connecting the positioning bolt 203 and the U-shaped gasket 202 is provided on the upper end of the positioning bolt 203, the surface of the gasket fixer 204 is welded and fixed to the U-shaped gasket 202, and the positioning bolt 203 is connected to the plug interface 201 with a socket connection.
[0032] like Figure 1 , 7 As shown: a guide 402 for guiding the guide rod 401 to move is provided at the lower end of the guide rod 401, the guide rod 401 is mechanically connected to the guide 402, one side of the guide 402 is fixed to the end face of the retractable bracket 100 by bolts, and a guide handle 403 for the staff to hold is provided at the upper end of the guide rod 401, the guide handle 403 and the guide rod 401 can be fixed by welding, and a sheath can be added to the surface of the guide handle 403 to improve the friction when operating the guide rod 401.
[0033] like Figure 1 , 7 As shown: connecting plates 404 for connecting connecting blocks 405 to the shrinkage bracket 100 are provided on the lower surfaces of both ends of the shrinkage bracket 100, the shrinkage bracket 100 and the connecting plates 404 are fixed by bolts, connecting blocks 405 for connecting support rods 406 to the connecting plates 404 are provided on the lower surface of the connecting plates 404, the connecting blocks 405 and the connecting plates 404 are fixed by bolts, a support rod 406 for fixing a connecting rod 407 is provided on the lower surface of the connecting block 405, the support rod 406 is fixed by welding to the connecting block 405, a connecting rod 407 for fixing a connecting shaft 408 is provided at the lower end of the support rod 406, the connecting rod 407 is fixed by welding to the support rod 406, connecting shafts 408 for connecting the connecting rod 407 to the moving device 400 are provided at both ends of the connecting rod 407, the connecting rod 407 is mechanically connected to the connecting shaft 408, and the connecting shaft 408 is mechanically connected to the moving device 400.
[0034] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0035] The above is a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A construction pipe transportation device, characterized in that: The invention comprises a contraction bracket (100), wherein four corners of the contraction bracket (100) are provided with telescopic fixers (101), a manual telescopic rod (102) is provided between the telescopic fixers (101), U-shaped clamping blocks (200) are provided on the upper surfaces of both ends of the contraction bracket (100), a clamping groove (300) is provided on one side of the upper surface of the contraction bracket (100), a fixing block (301) is provided on the other side of the upper surface of the contraction bracket (100), a clamp (302) is provided above the fixing block (301) and the clamping groove (300), a moving device (400) is provided below both ends of the contraction bracket (100), and a guide rod (401) is provided at both ends of the contraction bracket (100).
2. A construction pipe transport device as claimed in claim 1, characterized in that: A buckle (303) is provided at one end of the clamp (302), and the buckle (303) is engaged and connected with the clamping groove (300).
3. A construction pipe transport device as claimed in claim 2, characterized in that: A positioning block (304) is provided at the other end of the clamp (302); the lower surface of the positioning block (304) is connected to the upper surface of the fixing block (301); the lower surface of the fixing block (301) is fixed to the upper surface of the shrink bracket (100); and the lower surface of the clamping slot (300) is fixed to the upper surface of the shrink bracket (100).
4. A construction pipe transport device as claimed in claim 3, characterized in that: A plurality of plug interfaces (201) are provided on both sides of the upper surface of the U-shaped clamping block (200), and a U-shaped gasket (202) is provided above the U-shaped clamping block (200), and the U-shaped gasket (202) is fitted with the U-shaped clamping block (200).
5. A construction pipe transport device as claimed in claim 4, characterized in that: A positioning bolt (203) is provided in the plug interface (201), a gasket fixer (204) is provided at the upper end of the positioning bolt (203), the surface of the gasket fixer (204) is welded and fixed to the U-shaped gasket (202), and the positioning bolt (203) is connected to the plug interface (201) in a socket-and-socket manner.
6. A construction pipe transport device as claimed in claim 5, characterized in that: A guide (402) is provided at the lower end of the guide rod (401), one side of the guide (402) is fixed to the end surface of the contraction bracket (100), and a guide handle (403) is provided at the upper end of the guide rod (401).
7. A construction pipe transport device as claimed in claim 6, characterized in that: The lower surfaces of both ends of the shrink bracket (100) are provided with connecting plates (404), the lower surfaces of the connecting plates (404) are provided with connecting blocks (405), and the lower surfaces of the connecting blocks (405) are provided with supporting rods (406).
8. A construction pipe transport device as claimed in claim 7, characterized in that: A connecting rod (407) is provided at the lower end of the support rod (406), and connecting shafts (408) are provided at both ends of the connecting rod (407), and the connecting shafts (408) are connected to the moving device (400).
Citation Information