Lateral connecting structure of tower crane

Through the design of the lateral connection structure of the tower crane, the length of the telescopic arm is adjusted by hydraulic drive and slide rail technology, and the connection strength is enhanced by the steel plate, the problem of inconsistent connection distance between the tower crane and the prefabricated floor slab is solved, and construction convenience and connection stability are improved.

CN222181618UActive Publication Date: 2024-12-17CHINA RAILWAY 10TH BUREAU GRP (SHANGHAI) CONSTR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421065938.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2024-12-17
Estimated Expiration
2034-05-15

AI Technical Summary

Technical Problem

Due to the unfixed position of the construction site in the tower crane during the construction of high-rise buildings, the distance between the lateral connecting rods and the prefabricated floor slabs is different, and customized production is required, which increases the construction complexity and inconvenience.

Method used

A lateral connection structure of tower crane is designed, including a connecting frame, a rotating connecting arm, a sliding telescopic arm and a hydraulic drive member. The length of the telescopic arm is adjusted through the hydraulic cylinder, and combined with the slide rail and the connecting block to achieve prefabricated floor connections at different distances. , and strengthen the connection strength through steel plates.

Benefits of technology

It realizes convenient connection between tower cranes and prefabricated floor slabs, reduces construction complexity, improves connection stability and strength, and adapts to the needs of prefabricated floor slabs at different distances.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222181618U_ABST
    Figure CN222181618U_ABST
Patent Text Reader

Abstract

The utility model relates to a tower crane lateral connecting structure which comprises a connecting frame, a connecting arm is rotationally connected to the connecting frame, a telescopic arm is slidably connected to the connecting arm, and a driving part used for driving the telescopic arm to move on the connecting arm is arranged on the connecting frame. The tower crane has the effect of facilitating connection of the tower crane and the prefabricated floor slab.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tower cranes, and in particular to a lateral connection structure of a tower crane. Background Art

[0002] Tower crane is a kind of lifting equipment commonly used on construction sites. It is used to transport materials on construction sites, which greatly facilitates the construction process.

[0003] Prefabricated assembled buildings are mainly made of prefabricated concrete floor slabs. When the building floors are higher, the height of the tower crane will also increase accordingly. In order to increase the stability of the tower crane, lateral connecting rods are usually added to the tower crane to connect with the prefabricated floor slabs in the building. However, since the installation position of the tower crane at the construction site is not fixed, the distance between the lateral connecting rods and the prefabricated floor slabs in the building is different. Each lateral connecting rod needs to be measured on site and customized. This increases the complexity of the construction operation and is inconvenient to use. Utility Model Content

[0004] In order to facilitate the connection between the tower crane and the prefabricated floor slab, the present application provides a lateral connection structure of the tower crane.

[0005] The present application provides a tower crane lateral connection structure, which adopts the following technical solution:

[0006] A lateral connection structure of a tower crane comprises a connection frame, a connection arm is rotatably connected to the connection frame, a telescopic arm is slidably connected to the connection arm, and a driving member for driving the telescopic arm to move on the connection arm is arranged on the connection frame.

[0007] By adopting the above technical solution, the connecting frame is installed on the tower crane. When it is necessary to connect with the prefabricated floor slab, the connecting arm rotates, and the telescopic arm moves under the action of the driving member to adjust the extension distance, so as to adapt to the connection of prefabricated floor slabs at different distances, thereby facilitating the connection between the tower crane and the prefabricated floor slab.

[0008] Preferably, the driving member is a hydraulic cylinder fixedly connected in the connecting arm, and the piston rod of the hydraulic cylinder is fixedly connected to the telescopic arm.

[0009] By adopting the above technical solution, through the setting of the hydraulic cylinder, the hydraulic cylinder is started, the piston rod of the hydraulic cylinder moves, and the movement of the piston rod drives the telescopic arm to move, thereby realizing the adjustment of the extension length of the telescopic arm.

[0010] Preferably, a slide rail is provided in the connecting arm, and the telescopic arm is slidably connected to the slide rail.

[0011] By adopting the above technical solution and setting the slide rail, the sliding of the telescopic arm in the connecting arm is guided, thereby effectively increasing the sliding stability of the telescopic arm.

[0012] Preferably, one end of the telescopic arm away from the connecting arm is fixedly connected to a connecting block, a steel plate is detachably connected to the connecting block, and the steel plate is fixedly connected to the prefabricated floor slab.

[0013] By adopting the above technical solution, the steel plate is prefabricated together with the prefabricated floor slab through the arrangement of the steel plate, which increases the strength of the prefabricated floor slab on the one hand, and increases the connection strength with the connecting block on the other hand.

[0014] Preferably, the connecting block includes a first connecting seat and a second connecting seat, a third connecting seat is fixedly connected to the steel plate, and the first connecting seat, the second connecting seat and the third connecting seat are all provided with through holes with the same aperture.

[0015] By adopting the above technical solution, through the setting of the first connecting seat, the second connecting seat, and the third connecting seat, when it is necessary to connect the telescopic arm to the steel plate, move the telescopic arm until the through holes on the first connecting seat, the second connecting seat and the through holes on the third connecting seat are aligned, and then insert the connecting column into the corresponding through hole position and tighten the nut.

[0016] Preferably, the connecting frame includes a first crossbeam and a second crossbeam, two of each of the first crossbeam and the second crossbeam are provided, the second crossbeam is detachably connected to the first crossbeam, two ends of one of the first crossbeams are respectively connected to a second crossbeam, two ends of one of the second crossbeams are respectively connected to a first crossbeam, and the connecting arm is rotatably connected to the first crossbeam.

[0017] By adopting the above technical solution, through the arrangement of the first crossbeam and the second crossbeam, the connecting frame forms a rectangle surrounding the tower crane, which is convenient for the assembly and forming of the connecting frame on the one hand, and on the other hand, the connecting frame is arranged to embrace the tower crane, which is convenient for stably supporting the tower crane.

[0018] Preferably, a plurality of connecting arms are provided.

[0019] By adopting the above technical solution and providing a plurality of connecting arms, it is convenient to select a suitable distance for connection from different positions.

[0020] Preferably, a positioning block for positioning the first cross beam is fixedly connected to the first cross beam.

[0021] By adopting the above technical solution and setting the positioning blocks, when the connecting frame is installed on the tower crane, the first beam is installed first and positioned by the positioning blocks on the first beam, and then the second beam is installed on the first beam to connect the second beam to the first beam.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. Through the arrangement of the connecting frame, the connecting arm, the telescopic arm and the driving member, when it is necessary to connect the prefabricated floors at different distances, the connecting arm can be rotated and the telescopic arm can be driven to move by the driving member, thereby adjusting the extension length of the telescopic arm to connect the prefabricated floors at different distances, which is convenient for connecting the prefabricated floors at different distances;

[0024] 2. Through the arrangement of the first crossbeam and the second crossbeam, the connecting frame is assembled on the tower crane, and the assembled connecting frame encloses the tower crane, which effectively increases the connection stability;

[0025] 3. By setting the steel plate, the steel plate is prefabricated together with the prefabricated floor slab, which increases the strength of the prefabricated floor slab on the one hand, and increases the connection strength with the connecting block on the other hand. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is an axonometric diagram mainly showing the overall structure in the embodiment of the present application;

[0027] Figure 2 This is an axonometric diagram mainly showing the positioning block structure in the embodiment of the present application;

[0028] Figure 3 It is an axonometric schematic diagram mainly showing the hydraulic cylinder structure in the embodiment of the present application.

[0029] Figure numerals: 1, connecting frame; 11, first crossbeam; 12, second crossbeam; 2, connecting arm; 3, telescopic arm; 4, hydraulic cylinder; 5, slide rail; 6, connecting block; 61, first connecting seat; 62, second connecting seat; 7, steel plate; 8, third connecting seat; 9, through hole; 10, positioning block. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1 -Attached Figure 3 This application is described in further detail.

[0031] An embodiment of the present application discloses a lateral connection structure of a tower crane.

[0032] like Figure 1 and 2As shown, a lateral connection structure of a tower crane includes a connection frame 1, the connection frame 1 includes a first cross beam 11 and a second cross beam 12, the first cross beam 11 includes two angle frames and a connection beam, the connection beam is columnar, the angle frame is triangular, the connection beam is connected to the angle frame by bolts, the two angle frames are symmetrically installed at both ends of the connection beam, the angle frame is connected to the tower crane by bolts, and the second cross beam 12 is connected to the angle frame by bolts, wherein a connection frame 1 includes two first cross beams 11 and two second cross beams 12, the two ends of a first cross beam 11 are respectively connected to a second cross beam 12, and the two ends of a second cross beam 12 are respectively connected to a The first crossbeam 11 is connected so that the connecting frame 1 forms a rectangular frame, enclosing the tower crane. In order to facilitate installation, a positioning block 10 for positioning the first crossbeam 11 is also formed on the corner frame, and the positioning block 10 has a positioning groove for positioning the tower crane. When in use, the corner frame is first positioned on the tower crane through the positioning block 10 and connected, and then the connecting beam is placed in the two corner frames and connected, thereby completing the connection of the first crossbeam 11, and then the second crossbeam 12 is installed between the first crossbeams 11 on both sides and connected, thereby completing the connection of the second crossbeam 12 and realizing the installation of the connecting frame 1 on the tower crane.

[0033] like Figure 1 , Figure 2 , Figure 3 As shown, a connecting arm 2 is rotatably connected to the corner frame of the first crossbeam 11, and a plurality of connecting arms 2 are provided. In the present embodiment, four connecting arms 2 are provided, and one connecting arm 2 is rotatably connected to one corner frame, so that the four corner frames are all connected with connecting arms 2. The connecting arms 2 are used in pairs when in use. The tower crane is usually installed in the middle of a building. The two connecting arms 2 facing the left side of the building are used as a group, and the two connecting arms 2 facing the right side of the building are used as a group, which can effectively increase the connection strength between the tower crane and the building. A telescopic arm 3 is slidably connected to the connecting arm 2, and a slide rail 5 cooperating with the telescopic arm 3 is formed inside the connecting arm 2 to facilitate the sliding of the telescopic arm 3 in the connecting arm 2. A driving member for driving the telescopic arm 3 to move is installed inside the connecting arm 2, and the driving member is a hydraulic cylinder 4 installed inside the connecting arm 2. For ease of use, an avoidance groove for facilitating adjustment of the hydraulic cylinder 4 from the outside is provided on the connecting arm 2. The staff can adjust the hydraulic cylinder 4 through the avoidance groove to control the extension length of the hydraulic cylinder 4, and the piston rod of the hydraulic cylinder 4 is fixedly connected to the telescopic arm 3. When in use, the connecting arm 2 is rotated so that the connecting arm 2 is facing the prefabricated floor in the building, and then the user starts the hydraulic cylinder 4 through external equipment to control the piston rod of the hydraulic cylinder 4 to extend. The movement of the piston rod of the hydraulic cylinder 4 drives the telescopic arm 3 to move. The movement of the telescopic arm 3 realizes the adjustment of the length of the telescopic arm 3, which is convenient for adapting to the distance between the tower crane and the prefabricated floor.

[0034] like Figure 1 , Figure 2 , Figure 3 As shown, a connecting block 6 is formed at one end of the telescopic arm 3 away from the connecting arm 2, and the connecting block 6 includes a first connecting seat 61 and a second connecting seat 62, the first connecting seat 61 is located above the second connecting seat 62, and the first connecting seat 61 and the second connecting seat 62 are spaced apart, and a steel plate 7 is detachably connected to the connecting block 6, and the steel plate 7 is fixedly connected to the prefabricated floor slab and formed together with the prefabricated floor slab, and a third connecting seat 8 is welded and fixed to the steel plate 7, and the third connecting seat 8 can be inserted into the gap between the first connecting seat 61 and the second connecting seat 62, and the first connecting seat 61, the second connecting seat 62, and the third connecting seat 8 are all provided with through holes 9 with the same aperture ... The through holes 9 opened on the three connecting seats 8 are aligned and can be penetrated by a straight rod. When in use, when the telescopic arm 3 moves and extends, the movement of the telescopic arm 3 will cause the first connecting seat 61 and the second connecting seat 62 to move. The staff needs to adjust the position of the telescopic arm 3 so that the third connecting seat 8 is inserted between the first connecting seat 61 and the second connecting seat 62, and then insert the connecting column into the through holes 9 in the first connecting seat 61, the second connecting seat 62, and the third connecting seat 8 and lock it with a nut to achieve the connection between the connecting arm 2 and the prefabricated floor slab. When in use, in order to make the connection stable, it is usually necessary to connect two connecting arms 2 on a prefabricated floor slab, and the connection method of each connecting arm 2 to the prefabricated floor slab is the same.

[0035] The implementation principle of the embodiment of the present application is as follows: when put into actual use, the angle bracket is first positioned on the tower crane through the positioning block 10 and connected, and then the connecting beam is placed in the two angle brackets and connected, thereby completing the connection of the first beam 11, and then the second beam 12 is installed between the first beams 11 on both sides and connected, thereby completing the connection of the second beam 12. After the first beam 11 and the second beam 12 are assembled, the connecting frame 1 can be connected and installed on the tower crane. During the installation of the connecting frame 1, the connecting arm 2 will also be installed accordingly, and then the connecting arm 2 is rotated and the telescopic arm 3 is driven to move through external equipment, so that the first connecting seat 61 and the second connecting seat 62 at the end of the telescopic arm 3 are aligned with the third connecting seat 8 on the steel plate 7, and then the connecting column is inserted into the through hole 9 in the first connecting seat 61, the second connecting seat 62, and the third connecting seat 8 and locked by a nut, so that the connection arm 2 and the prefabricated floor slab can be connected, thereby completing the lateral connection of the tower crane.

[0036] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A tower crane lateral connection structure, Features: The invention comprises a connecting frame (1), a connecting arm (2) being rotatably connected to the connecting frame (1), a telescopic arm (3) being slidably connected to the connecting arm (2), and a driving member for driving the telescopic arm (3) to move on the connecting arm (2) being provided on the connecting frame (1).

2. A tower crane lateral connection structure according to claim 1, Features: The driving member is a hydraulic cylinder (4) fixedly connected inside the connecting arm (2), and the piston rod of the hydraulic cylinder (4) is fixedly connected to the telescopic arm (3).

3. A tower crane lateral connection structure according to claim 1, Features: A slide rail (5) is provided inside the connecting arm (2), and the telescopic arm (3) is slidably connected to the slide rail (5).

4. A tower crane lateral connection structure according to claim 1, Features: One end of the telescopic arm (3) away from the connecting arm (2) is fixedly connected to a connecting block (6), and a steel plate (7) is detachably connected to the connecting block (6), and the steel plate (7) is fixedly connected to the prefabricated floor slab.

5. A tower crane lateral connection structure according to claim 4, Features: The connecting block (6) comprises a first connecting seat (61) and a second connecting seat (62); a third connecting seat (8) is fixedly connected to the steel plate (7); and through holes (9) having the same aperture are formed on the first connecting seat (61), the second connecting seat (62) and the third connecting seat (8).

6. A tower crane lateral connection structure according to claim 1, Features: The connecting frame (1) comprises a first crossbeam (11) and a second crossbeam (12), two of each of the first crossbeam (11) and the second crossbeam (12), the second crossbeam (12) being detachably connected to the first crossbeam (11), two ends of one of the first crossbeam (11) being respectively connected to one of the second crossbeams (12), and two ends of one of the second crossbeams (12) being respectively connected to one of the first crossbeams (11), and the connecting arm (2) being rotatably connected to the first crossbeam (11).

7. A tower crane lateral connection structure according to claim 6, Features: The connecting arms (2) are provided in plurality.

8. A tower crane lateral connection structure according to claim 6, Features: A positioning block (10) for positioning the first cross beam (11) is fixedly connected to the first cross beam (11).