Supercharger compressor air outlet pipe assembly and engine

By setting a gap and annular boss in the supercharger compressor air outlet assembly, the contact between high-temperature gas and the hose assembly is reduced, and the problems of falling off and air leakage caused by high temperature are solved, and the stability and service life of the engine are improved. .

CN222184924UActive Publication Date: 2024-12-17WEICHAI POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420925078.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2024-12-17
Estimated Expiration
2034-04-29

AI Technical Summary

Technical Problem

The rubber falls off, cracks and air leakage due to high temperature and high pressure, and affects the service life and stability of the engine.

Method used

By providing a first gap and a second gap in the supercharger compressor outlet assembly, and providing an annular boss and thermal insulation material in the gap, the contact between the high-temperature gas and the hose assembly is reduced, and the working temperature of the hose assembly is reduced.

Benefits of technology

It effectively reduces the temperature of the high-temperature hose assembly, extends the service life of the supercharger, and improves the working stability of the engine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222184924U_ABST
    Figure CN222184924U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of engine supercharging, in particular to a supercharger compressor air outlet pipe assembly and an engine. The supercharger compressor air outlet pipe assembly comprises a first air outlet pipe, a second air outlet pipe and a high-temperature rubber pipe assembly. The first end of the first air outlet pipe is used for communicating with a supercharger body, and the second end of the first air outlet pipe is detachably connected with the second end of the second air outlet pipe through a high-temperature rubber pipe assembly. In the radial direction of the second end of the second air outlet pipe, a first gap is formed between the inner wall of the second end of the second air outlet pipe and the outer wall of the second end of the first air outlet pipe, a second gap is formed between the outer wall of the second end of the second air outlet pipe and the high-temperature rubber pipe assembly, and the first gap communicates with the second gap. Gas in the first gas outlet pipe and the second gas outlet pipe can flow into the first gap, and at least one annular boss is arranged in the first gap. According to the supercharger compressor air outlet pipe assembly, the problem that the temperature of the high-temperature rubber pipe assembly is too high can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engine supercharging, in particular to a supercharger compressor outlet pipe assembly and an engine. Background Art

[0002] A supercharger is a device that increases the intake pressure of the engine cylinder. The air before entering the engine cylinder is first compressed by the supercharger to increase the density of the air, allowing more air to enter the cylinder, thereby increasing the power of the engine. With the development and application of large-bore engines, the temperature and pressure of the gas after supercharged by the supercharger are getting higher and higher, which will cause the temperature and pressure of the hose at the supercharger outlet to increase. Long-term use will cause the surface rubber of the hose to fall off, the rubber to crack and leak, and the rubber to the connected pipe to stick and bond. Utility Model Content

[0003] In view of this, an embodiment of the utility model provides a supercharger compressor outlet pipe assembly and an engine, wherein the first gap and the second gap in the supercharger compressor outlet pipe assembly can play a role in blocking the high temperature in the first outlet pipe. In addition, the annular boss can also prevent part of the high-temperature gas from passing through the first gap and the second gap and contacting the high-temperature hose assembly, so as to solve the problem of excessive temperature of the high-temperature hose assembly.

[0004] In a first aspect, the supercharger compressor outlet pipe assembly provided by an embodiment of the utility model comprises: a first outlet pipe, a second outlet pipe and a high-temperature hose assembly; the first end of the first outlet pipe is used to communicate with the supercharger body, the first end of the second outlet pipe is used to output the gas, and the second end of the first outlet pipe is detachably connected to the second end of the second outlet pipe through the high-temperature hose assembly; wherein, along the radial direction of the second end of the second outlet pipe, there is a first gap between the inner wall of the second end of the second outlet pipe and the outer wall of the second end of the first outlet pipe, and there is a second gap between the outer wall of the second end of the second outlet pipe and the high-temperature hose assembly, the first gap is connected to the second gap, the gas in the first outlet pipe and the second outlet pipe can flow into the first gap, and at least one annular boss is provided in the first gap.

[0005] A first gap and a second gap are formed between the first outlet pipe and the second outlet pipe in the outlet pipe assembly of the supercharger compressor in the present application, and the first gap and the second gap are connected, and the first gap and the second gap can play a role in blocking the high temperature in the first outlet pipe. In addition, the high-temperature gas in the first outlet pipe and the second outlet pipe can enter the first gap, and at least one annular boss is provided in the first gap, and the annular boss can reduce the amount of high-temperature gas entering the first gap, and the high-temperature gas needs to pass through the first gap and the second gap before it can contact the high-temperature hose assembly, so that the heat transferred to the high-temperature hose assembly can be further reduced to reduce the working temperature of the high-temperature hose assembly.

[0006] In one embodiment, along the direction from the first end to the second end of the first air outlet pipe, the outer wall of the second end of the first air outlet pipe includes a first mounting surface and at least one first step surface, and the at least one first step surface forms the first gap with the inner wall of the second end of the second air outlet pipe, and the first mounting surface is used to connect to the high-temperature hose assembly.

[0007] In one embodiment, the at least one annular boss is provided on the first step surface.

[0008] In one embodiment, along the direction from the first end to the second end of the second air outlet pipe, the outer wall of the second end of the second air outlet pipe includes a second mounting surface and at least one second step surface, the second mounting surface is used to connect to the high-temperature hose assembly, and the second gap is formed between the second step surface and the high-temperature hose assembly.

[0009] In one embodiment, the inner wall of the second end of the second air outlet pipe includes at least one third mounting surface, and the third mounting surface and the at least one first step surface are arranged opposite to each other along the radial direction of the second end of the second air outlet pipe to form the first gap.

[0010] In one embodiment, the at least one annular boss is provided on the third mounting surface.

[0011] In one embodiment, the high temperature hose assembly includes a high temperature hose, a first clamp and a second clamp;

[0012] The first end of the high temperature hose is sleeved on the first mounting surface, the second end of the high temperature hose is sleeved on the second mounting surface, the first clamp is arranged on the first end of the high temperature hose, and the second clamp is arranged on the second end of the high temperature hose.

[0013] In one embodiment, the first gap is filled with a heat insulating material.

[0014] In one embodiment, the second gap is filled with a heat insulating material.

[0015] In a second aspect, the present application provides an engine, comprising an engine body, a supercharger body, and a supercharger compressor outlet pipe assembly in any technical solution of the first aspect, wherein the supercharger compressor outlet pipe assembly is connected to the supercharger body, and the supercharger body is arranged on the engine body. Since the high-temperature hose assembly on the supercharger compressor outlet pipe assembly can operate at a relatively low temperature, the service life of the supercharger and the stability of the supercharger operation can be increased, thereby improving the stability of the engine operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A cross-sectional view of a supercharger compressor outlet pipe assembly provided in an embodiment of the utility model;

[0017] Figure 2 for Figure 1 A partial schematic diagram of .

[0018] Icons: 10 - first air outlet pipe; 11 - first mounting surface; 12 - first step surface; 20 - second air outlet pipe; 21 - second mounting surface; 22 - second step surface; 23 - third mounting surface; 30 - high temperature hose assembly; 40 - first gap; 50 - second gap; 60 - annular boss. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] The hydraulic pump seat assembly and the bearing provided in the embodiment of the utility model are described in detail below in conjunction with the accompanying drawings.

[0021] Figure 1 A cross-sectional view of a supercharger compressor outlet pipe assembly provided in an embodiment of the utility model, Figure 2 for Figure 1 A partial enlarged view of the Figure 1 and Figure 2The supercharger compressor outlet pipe assembly provided in the embodiment of the utility model includes: a first outlet pipe 10, a second outlet pipe 20 and a high-temperature hose assembly 30; the first end of the first outlet pipe 10 is used to communicate with the supercharger body, the first end of the second outlet pipe 20 is used to output the gas, and the second end of the first outlet pipe 10 is detachably connected to the second end of the second outlet pipe 20 through the high-temperature hose assembly 30; wherein, along the radial direction of the second end of the second outlet pipe 20, there is a first gap 40 between the inner wall of the second end of the second outlet pipe 20 and the outer wall of the second end of the first outlet pipe 10, and there is a second gap 50 between the outer wall of the second end of the second outlet pipe 20 and the high-temperature hose assembly 30, the first gap 40 is connected to the second gap 50, and the gas in the first outlet pipe 10 and the second outlet pipe 20 can flow into the first gap 40, and at least one annular boss 60 is provided in the first gap 40. The first gap 40 and the second gap 50 can play a role in blocking the high temperature in the first outlet pipe 10. In addition, the high-temperature gas in the first air outlet pipe 10 and the second air outlet pipe 20 can enter the first gap 40. At least one annular boss 60 is provided in the first gap 40. The annular boss 60 can reduce the amount of high-temperature gas entering the first gap 40, and the high-temperature gas also needs to pass through the first gap 40 and the second gap 50 before it can contact the high-temperature hose assembly 30. In this way, the heat transferred to the high-temperature hose assembly 30 can be further reduced to reduce the operating temperature of the high-temperature hose assembly 30.

[0022] It is worth mentioning that the number of the annular bosses 60 can be one, two, three or more, and the specific number needs to be adjusted according to actual needs.

[0023] Continue to refer to Figure 1 and Figure 2 , the direction of arrow a is from the first end to the second end of the first outlet pipe 10, and the outer wall of the second end of the first outlet pipe 10 includes a first mounting surface 11 and at least one first step surface 12. The at least one first step surface 12 forms a first gap 40 with the inner wall of the second end of the second outlet pipe 20, and the first mounting surface 11 is used to connect with the high-temperature hose assembly 30. In this way, the extension direction of the first gap 40 can be the same as the extension direction of the second end of the first outlet pipe 10, and the setting of the first gap 40 can play a role in blocking the high temperature in the first outlet pipe 10, so as to reduce the temperature of the high-temperature hose assembly 30.

[0024] The direction of arrow b is from the first end to the second end of the second outlet pipe 20. The outer wall of the second end of the second outlet pipe 20 includes a second mounting surface 21 and at least one second step surface 22. A second gap 50 is formed between the second step surface 22 and the high-temperature hose assembly 30. The extension direction of the second gap 50 can be the same as the extension direction of the second end of the second outlet pipe 20. The setting of the second gap 50 can play a role in blocking the high temperature in the first outlet pipe 10 to reduce the temperature of the high-temperature hose assembly 30. The second mounting surface 21 is used to connect with the high-temperature hose assembly 30 to fix the high-temperature hose assembly 30. The inner wall of the second end of the second outlet pipe 20 includes at least one third mounting surface 23, and the third mounting surface 23 is arranged opposite to the at least one first step surface 12 along the radial direction of the second end of the second outlet pipe 20. A first gap 40 is formed between the at least one first step surface 12 and the third mounting surface 23.

[0025] When the first outlet pipe 10 and the second outlet pipe 20 are matched, at least one first step surface 12 is arranged opposite to the third mounting surface 23, and a first gap 40 is formed, wherein the inlet of the first gap 40 is connected to the interior of the first outlet pipe 10. The high-temperature hose assembly 30 seals and fixes the first outlet pipe 10 through the first mounting surface 11 and the second mounting surface 21, and there is a gap between the high-temperature hose and the second step surface 22 along the radial direction of the second ends of the first outlet pipe 10 and the second outlet pipe 20 to form a second gap 50, and the first gap 40 and the second gap 50 are connected to each other, and the high-temperature gas in the first outlet pipe 10 can flow into the second gap 50 through the first gap 40, wherein the inlet of the first gap 40 is located on the side of the first step surface 12 away from the first mounting surface 11, and the communication port of the first gap 40 and the second gap 50 is located on the side close to the first mounting surface 11, so as to increase the flow path of the high-temperature gas in the first gap 40, thereby reducing the heat transferred to the high-temperature hose assembly 30.

[0026] In some embodiments, there may be multiple first step surfaces 12. In this case, there may also be multiple third mounting surfaces 23. Multiple third mounting surfaces 23 and multiple first step surfaces 12 may be arranged one by one to further increase the flow path of the high-temperature gas.

[0027] In one embodiment, at least one annular boss 60 may be provided on the first step surface 12. More specifically, when there is one first step surface 12, one annular boss 60 may be provided on one first step surface 12, and there is a gap between the annular boss 60 and the third mounting surface 23. Multiple annular bosses 60 may also be provided on one first step surface 12, and the multiple annular bosses 60 are spaced apart along the axial direction of the second end of the first air outlet pipe 10. When there are multiple first step surfaces 12, one annular boss 60 may be provided on each first step surface 12, or multiple annular bosses 60 may be provided on each first step surface 12, or one annular boss 60 may be provided on a portion of the first step surfaces 12, and multiple annular bosses 60 may be provided on another portion of the first step surfaces 12.

[0028] In one embodiment, at least one annular boss 60 is disposed on the third mounting surface 23. Specifically, when there is one third mounting surface 23, one annular boss 60 may be disposed on one first mounting surface 11, and there is a gap between the annular boss 60 and the first step surface 12. Multiple annular bosses 60 may also be disposed on one third mounting surface 23, and the multiple annular bosses 60 are spaced apart along the axial direction of the second end of the first air outlet pipe 10. When there are multiple third mounting surfaces 23, one annular boss 60 may be disposed on each third mounting surface 23, or multiple annular bosses 60 may be disposed on each third mounting surface 23, or one annular boss 60 may be disposed on a portion of the third mounting surfaces 23, and multiple annular bosses 60 may be disposed on another portion of the third mounting surfaces 23.

[0029] In some other embodiments, both the first step surface 12 and the third mounting surface 23 may be provided with an annular boss 60 .

[0030] In the above-mentioned embodiment, the provision of the annular boss 60 can reduce the amount of high-temperature gas entering the first gap 40 , and when there are multiple annular bosses 60 , it can also increase the path for the high-temperature gas to move in the first gap 40 to reduce the temperature of the high-temperature hose assembly 30 .

[0031] In one embodiment, in order to further improve the heat-blocking capabilities of the first gap 40 and the second gap 50 , the first gap 40 and the second gap 50 may be filled with heat-insulating materials.

[0032] In the above-mentioned embodiment, the high-temperature hose assembly 30 may include a high-temperature hose, a first clamp and a second clamp; the first end of the high-temperature hose is sleeved on the first mounting surface 11, the second end of the high-temperature hose is sleeved on the second mounting surface 21, the first clamp is arranged on the first end of the high-temperature hose, and the second clamp is arranged on the second end of the high-temperature hose.

[0033] The high temperature hose can also be connected by other detachable means such as bolts and nuts, which are explained in detail here.

[0034] The present application provides an engine, comprising an engine body, a supercharger body, and a supercharger compressor outlet pipe assembly in any technical solution of the first aspect, wherein the supercharger compressor outlet pipe assembly is connected to the supercharger body, and the supercharger body is arranged on the engine body. Since the high-temperature hose assembly 30 on the supercharger compressor outlet pipe assembly can operate at a relatively low temperature, the service life of the supercharger and the stability of the supercharger operation can be increased, thereby improving the stability of the engine operation.

[0035] Obviously, those skilled in the art can make various changes and modifications to the embodiments of the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A supercharger compressor outlet pipe assembly, characterized in that: include: A first air outlet pipe, a second air outlet pipe and a high-temperature hose assembly; The first end of the first air outlet pipe is used to communicate with the supercharger body, the first end of the second air outlet pipe is used to output the gas, and the second end of the first air outlet pipe is detachably connected to the second end of the second air outlet pipe through a high-temperature hose assembly; Among them, along the radial direction of the second end of the second air outlet pipe, there is a first gap between the inner wall of the second end of the second air outlet pipe and the outer wall of the second end of the first air outlet pipe, and there is a second gap between the outer wall of the second end of the second air outlet pipe and the high-temperature hose assembly, the first gap is connected to the second gap, the gas in the first air outlet pipe and the second air outlet pipe can flow into the first gap, and at least one annular boss is provided in the first gap.

2. The supercharger compressor outlet pipe assembly according to claim 1, characterized in that: Along the direction from the first end to the second end of the first air outlet pipe, the outer wall of the second end of the first air outlet pipe includes a first mounting surface and at least one first step surface, and the at least one first step surface forms the first gap with the inner wall of the second end of the second air outlet pipe. The first mounting surface is used to connect to the high-temperature hose assembly.

3. The supercharger compressor outlet pipe assembly according to claim 2, characterized in that: The at least one annular boss is disposed on the first step surface.

4. The supercharger compressor outlet pipe assembly as claimed in claim 2, characterized in that: Along the direction from the first end to the second end of the second air outlet pipe, the outer wall of the second end of the second air outlet pipe includes a second mounting surface and at least one second step surface, the second mounting surface is used to connect with the high-temperature hose assembly, and the second gap is formed between the second step surface and the high-temperature hose assembly.

5. The supercharger compressor outlet pipe assembly as claimed in claim 4, characterized in that: The inner wall of the second end of the second air outlet pipe includes at least one third mounting surface, and the third mounting surface is arranged opposite to the at least one first step surface along the radial direction of the second end of the second air outlet pipe to form the first gap.

6. The supercharger compressor outlet pipe assembly as claimed in claim 5, characterized in that: The at least one annular boss is disposed on the third mounting surface.

7. The supercharger compressor outlet pipe assembly according to any one of claims 4 to 6, characterized in that: The high temperature hose assembly comprises a high temperature hose, a first clamp and a second clamp; The first end of the high temperature hose is sleeved on the first mounting surface, the second end of the high temperature hose is sleeved on the second mounting surface, the first clamp is arranged on the first end of the high temperature hose, and the second clamp is arranged on the second end of the high temperature hose.

8. The supercharger compressor outlet pipe assembly according to any one of claims 1 to 6, characterized in that: The first gap is filled with a heat insulating material.

9. The supercharger compressor outlet pipe assembly according to any one of claims 1 to 6, characterized in that: The second gap is filled with a heat insulating material.

10. An engine, characterized in that: It comprises an engine body, a supercharger body and the supercharger compressor outlet pipe assembly according to any one of claims 1 to 9, wherein the supercharger compressor outlet pipe assembly is connected to the supercharger body, and the supercharger body is arranged on the engine body.