Whole-process project cost consultation information storage device based on BIM
By setting up calculation and actual information display boards in the BIM engineering cost consulting information storage device, combined with cost numerical scale lines and marking mechanisms, the problem of lack of cost comparison function in the existing technology is solved, and the use of funds before and after the project cost is realized Accurate display and storage.
Patent Information
- Application Number
- CN202420888186.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-04-26
AI Technical Summary
The existing building information models lack accurate and intuitive comparison functions of early prediction and later actual investment funds in engineering cost consultation, resulting in insufficient comprehensive storage and display of engineering cost information.
A full-process engineering cost consulting information storage device based on BIM is designed, including an engineering cost consulting information storage display column, calculation information display board and actual information display board. Through cost numerical scale lines and marking mechanisms, the use of funds in the early and late periods is realized. Accurate and intuitive display.
By setting up the comparison function between the actual information display board and the calculation information display board, intuitive display and all-round storage of the project cost are realized before and after the later stages, which facilitates the accurate comparison and analysis of cost consulting information.
Smart Images

Figure CN222190248U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering information, in particular to a full-process engineering cost consulting information storage device based on BIM. Background Art
[0002] BIM (Building Information Modeling) is a method of creating and managing building information by digitizing each stage of the construction process. In terms of engineering cost consulting, BIM can provide comprehensive information, accurate data and analysis from the design stage to the construction, operation and maintenance stage, helping to manage costs and optimize project efficiency.
[0003] The existing building information model will pre-calculate the funds used in each process of the entire project cost, and then store and display the corresponding information. However, the above-mentioned building information model lacks the function of comparing the actual funds invested in the later actual project construction, that is, there is a lack of accurate and intuitive information comparison function between the pre-calculation of the project cost in the early stage and the actual investment settlement in the later stage;
[0004] Therefore, in view of the above-mentioned problems, the present technical solution proposes a BIM full-process engineering cost consulting information storage device. Utility Model Content
[0005] The purpose of the utility model is to provide a full-process engineering cost consulting information storage device based on BIM to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a full-process engineering cost consulting information storage device based on BIM, including an engineering cost consulting information storage display column and a column base; the column base is fixedly installed at the bottom of the engineering cost consulting information storage display column, and a calculation information display board and an actual information display board are symmetrically arranged at the upper and lower parts of the front side of the engineering cost consulting information storage display column. The calculation information display board is used to display the budget information of the whole process of engineering cost calculated based on BIM, and the actual information display board is used to display the actual investment settlement information of the whole process of engineering cost. In order to accurately and intuitively display the cost information of the entire project before and after the construction, cost numerical scale lines are arranged on the vertical plane on the same side of the actual information display board and the calculated information display board. The cost numerical scale lines are used to accurately display the corresponding cost information. At the same time, a marking mechanism is movably arranged on the side relatively far away from the actual information display board and the calculated information display board. The marking mechanism cooperates with the cost numerical scale lines to accurately mark the corresponding fund usage conditions of each stage in the project construction on the actual information display board and the calculated information display board. Through the cooperation between the above-mentioned components and structures, the fund usage conditions before and after the construction cost can be accurately and intuitively displayed.
[0007] Compared with the prior art, the beneficial effect of the utility model is: by setting an actual information display board and a calculation information display board on the engineering cost consulting information storage display column, the calculation and settlement results of the engineering cost before and after are intuitively displayed, and at the same time, it has its own comparison function, which facilitates the comprehensive storage and display of cost consulting information. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 This is a first-person structural diagram of a BIM-based full-process engineering cost consulting information storage device.
[0009] Figure 2 This is a second perspective structural diagram of the full-process engineering cost consulting information storage device based on BIM.
[0010] Figure 3 for Figure 1 Schematic diagram of the main structure.
[0011] Figure 4 for Figure 2 Schematic diagram of the enlarged structure of A.
[0012] Figure 5 It is a structural diagram of the marking components in the BIM-based full-process engineering cost consulting information storage device;
[0013] Among them: engineering cost consulting information storage display column 10, column base 11, control panel 12, mobile mechanism warehouse 13, engineering progress marking plate 14, actual information display board 15, measurement information display board 16, cost value scale line 17, electric telescopic rod 18, connecting rod 19, marking assembly 20, rod shaft 21, screw 22, marking plate 23, pressing plate 24, buffer rod 25, spring 26, buffer groove 27. DETAILED DESCRIPTION
[0014] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0015] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0016] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0017] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0018] See also Figure 1-Figure 4The whole process engineering cost consulting information storage device based on BIM includes an engineering cost consulting information storage display column 10 and a column base 11; the column base 11 is fixedly installed at the bottom of the engineering cost consulting information storage display column 10, and the upper and lower parts of the front side of the engineering cost consulting information storage display column 10 are symmetrically provided with a calculation information display board 16 and an actual information display board 15. The calculation information display board 16 is used to display the budget information of the whole process of engineering cost based on BIM calculation, and the actual information display board 15 is used to display the actual investment in the whole process of engineering cost settlement information. By comparing the information in the actual information display board 15 with the information in the calculation information display board 16, it is accurate and intuitive. To display the cost information of the entire project before and after the construction, a cost numerical scale line 17 is set on the vertical surface on the same side of the actual information display board 15 and the measured information display board 16. The cost numerical scale line 17 is used to accurately display the corresponding cost information. At the same time, a marking mechanism is movably set on the side relatively far away from the actual information display board 15 and the measured information display board 16. The marking mechanism cooperates with the cost numerical scale line 17 to accurately mark the corresponding fund usage status of each stage in the project construction on the actual information display board 15 and the measured information display board 16. Through the cooperation between the above-mentioned components and structures, the fund usage status before and after the construction cost can be accurately and intuitively displayed.
[0019] In the embodiment of the present invention, a plurality of engineering progress marking plates 14 are arranged at equal intervals along the transverse direction on the outer side walls of the end portions of the actual information display board 15 and the measurement information display board 16 corresponding to the marking mechanism, and the names of the various stages of the engineering construction are marked on the engineering progress marking plates 14, so that the marking mechanism can mark on the actual information display board 15 or the measurement information display board 16 to provide corresponding stage information, wherein the names of the various stages of the engineering construction include: the early stage;
[0020] Feasibility study phase: Conduct project feasibility study, preliminary design and preliminary estimation.
[0021] Budget stage: Prepare a budget and determine the preliminary cost of the project.
[0022] Design phase:
[0023] Basic design stage: Conduct scheme design and preliminary construction drawing design according to project design requirements.
[0024] Construction drawing design stage: deepen the design, prepare construction drawings, and determine the construction technology, methods, materials, etc.
[0025] Bidding stage:
[0026] Tender preparation stage: prepare tender documents, including tender announcement, bid documents, draft contract, etc.
[0027] Bidding stage: issuing bidding notice, accepting bids, reviewing bid documents, and determining the successful bidder.
[0028] Construction phase:
[0029] Construction preparation phase: Organize the preparatory work before construction, such as site cleaning, material procurement, etc.
[0030] Construction phase: Implement the construction plan and carry out engineering construction.
[0031] Late stage of construction: completion acceptance and project delivery.
[0032] Later stages:
[0033] Settlement stage: Carry out project settlement, including bill of quantities review, project changes, claims processing, etc.
[0034] Cost analysis stage: Analyze the project cost, identify cost control issues, and make improvement suggestions.
[0035] For each of the above stages, a certain amount of capital investment will be incurred.
[0036] In one embodiment of the present invention, the marking mechanism includes a mobile mechanism warehouse 13 provided on the inner side of the ends of the actual information display board 15 and the measured information display board 16, a lead screw 22 is rotatably provided inside the mobile mechanism warehouse 13, and rod shafts 21 are installed at both ends of the lead screw 22, wherein one end of the rod shaft 21 is rotatably connected to the inner wall of the mobile mechanism warehouse 13, and the other end of the rod shaft 21 is connected to a servo motor, a nut is threadedly connected to the lead screw 22, and a guide device for limiting its rotation is provided on the nut, a slideway is provided on the top of the mobile mechanism warehouse 13 corresponding to the nut, the servo motor is started to drive the lead screw 22 to rotate, and then the nut is driven to move back and forth along the lead screw 22, and the nut is connected to the outside of the actual information display board 15 and the measured information display board 16 with an electric telescopic rod 18, and the end of the electric telescopic rod 18 is connected to a marking component 20 through a connecting rod 19, that is, the marking component 20 moves along the distribution of each stage of the engineering construction under the movement of the nut, and then the marking component 20 cooperates with the actual information display board 15 and the measured information display board 16 to mark the cost information of the corresponding stage;
[0037] The electric telescopic rod 18 and the servo motor are electrically connected to a control panel 12 installed on the front side wall of the fence base 11. By manipulating the control panel 12, the electric telescopic rod 18 and the servo motor are controlled to move accurately to a corresponding distance.
[0038] See also Figure 5As a preferred embodiment of the present invention, the marking assembly 20 includes a marking base installed at the end of the engineering cost consulting information storage display column 10, and a buffer groove 27 is provided on the side of the marking base facing the actual information display board 15 and the measurement information display board 16. A buffer rod 25 is telescopically connected inside the buffer groove 27, and a pressing plate 24 is installed at the end of the buffer rod 25 away from the actual information display board 15 and the measurement information display board 16, and a marking plate 23 is installed at the other end. The side of the marking plate 23 facing the inside of the buffer groove 27 is evenly elastically connected to the inner wall of the buffer groove 27 through a plurality of springs 26. Under the elastic action of the springs 26 , keep the marking plate 23 separated from the actual information display plate 15 and the measured information display plate 16, and when applying pressure to the pressing plate 24, control the marking plate 23 to move toward the surface of the actual information display plate 15 and the measured information display plate 16, thereby leaving corresponding marks at the corresponding positions of the actual information display plate 15 and the measured information display plate 16, and the side of the mark facing the cost value scale line 17 corresponds to the cost value information, and the side facing the moving mechanism warehouse 13 corresponds to the corresponding stage of the engineering construction, and the corresponding cost information is accurately and intuitively displayed on the actual information display plate 15 and the measured information display plate 16 by using the principle of the coordinate system;
[0039] Among them, the formation of the mark after the contact between the marking plate 23 and the actual information display plate 15 and the measured information display plate 16 can be achieved in a variety of ways. For example, a paper board is pasted on the surface of the actual information display plate 15 and the measured information display plate 16, and then an ink stamp is used on the marking plate 23. A mark can be formed when the two are in contact. Alternatively, a mark can be formed by using a magnetic display method. The mark is easy to form and easy to clean and modify. The specific choice depends on the actual situation and will not be described in detail here.
[0040] The working principle of the utility model is: in the idle part of the device, all the driving parts mentioned above, which refer to power elements, electrical components and adapted power supplies, are connected through wires, and the electrical components are electrically connected in a sequential working order. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process, and does not explain the electrical control. When in use, the whole process engineering cost information budget based on BIM calculation is driven by the servo motor in the measurement information display board 16 to move horizontally along the measurement information display board 16 according to the corresponding stage, and the size of the cost value scale line 17 corresponding to the budget result is marked on the measurement information display board 16. Then, in the subsequent actual engineering investment settlement, according to the size of the corresponding cost value scale line 17, the servo motor and the electric telescopic rod 18 in the actual information display board 15 are driven to move the marking plate 23, and the corresponding mark is made on the actual information display board 15. At the same time, it is intuitively displayed and compared with the corresponding stage mark on the measurement information display board 16, so as to judge the information display storage situation between the previous calculation and the subsequent settlement.
[0041] The above describes in detail the preferred implementation of this patent, but this patent is not limited to the above implementation. Various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of this patent.
Claims
1. A BIM-based full-process engineering cost consulting information storage device, characterized in that: The invention comprises a construction cost consulting information storage and display column (10) and a column base (11); the column base (11) is fixedly mounted on the bottom of the construction cost consulting information storage and display column (10); a calculation information display board (16) and an actual information display board (15) are symmetrically arranged at the upper and lower parts of the front side of the construction cost consulting information storage and display column (10); a cost value scale line (17) is arranged on the vertical surface on the same side of the actual information display board (15) and the calculation information display board (16); and a marking mechanism is movably arranged on the side of the actual information display board (15) and the calculation information display board (16) that is relatively far away.
2. The BIM-based full-process engineering cost consulting information storage device according to claim 1 is characterized in that: A plurality of engineering progress marking plates (14) are arranged at equal intervals along the transverse direction on the outer side walls of the end portions of the actual information display plate (15) and the measurement information display plate (16) corresponding to the marking mechanism, and the names of the various stages of the engineering construction are marked on the engineering progress marking plates (14).
3. The BIM-based full-process engineering cost consulting information storage device according to claim 2 is characterized in that: The marking mechanism comprises a mobile mechanism compartment (13) provided on the inner side of the ends of the actual information display board (15) and the measured information display board (16); a lead screw (22) is rotatably provided inside the mobile mechanism compartment (13); rod shafts (21) are installed at both ends of the lead screw (22); one end of the rod shaft (21) is rotatably connected to the inner wall of the mobile mechanism compartment (13); the other end of the rod shaft (21) is connected to a servo motor; a nut is threadedly connected to the lead screw (22); a guide device for limiting the self-rotation of the nut is provided on the nut; and a slideway is provided on the top of the mobile mechanism compartment (13) corresponding to the nut.
4. The BIM-based full-process engineering cost consulting information storage device according to claim 3 is characterized in that: The nut is connected to the outside of the actual information display board (15) and the measured information display board (16) with an electric telescopic rod (18), and the end of the electric telescopic rod (18) is connected to a marking component (20) via a connecting rod (19).
5. The BIM-based full-process engineering cost consulting information storage device according to claim 4 is characterized in that: The electric telescopic rod (18) and the servo motor are electrically connected to a control panel (12) mounted on the front side wall of the fence base (11).
6. The BIM-based full-process engineering cost consulting information storage device according to claim 5 is characterized in that: The marking assembly (20) comprises a marking base installed at the end of the engineering cost consulting information storage display column (10), a buffer groove (27) is provided on the side of the marking base facing the actual information display board (15) and the measured information display board (16), a buffer rod (25) is telescopically connected inside the buffer groove (27), a pressing plate (24) is installed at the end of the buffer rod (25) away from the actual information display board (15) and the measured information display board (16), and a marking plate (23) is installed at the other end, and the side of the marking plate (23) facing the inside of the buffer groove (27) is elastically connected to the inner wall of the buffer groove (27) evenly through a plurality of springs (26).