Conveying frame structure of material box

The conveying frame structure automates the transportation of material boxes between logistics and processing stations, addressing manual disruptions and workload issues, ensuring efficient and space-efficient material box movement.

CN222225165UActive Publication Date: 2024-12-24GAC GONOW AUTOMOBILE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420411301.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Priority Date
2023-12-28
Filing Date
2024-03-04
Publication Date
2024-12-24
Estimated Expiration
2034-03-04

AI Technical Summary

Technical Problem

The manual transportation of material boxes between logistics and processing stations in automobile assembly lines disrupts production and increases employee workload, affecting efficiency.

Method used

A conveying frame structure with a conveying track, recovery track, and transfer mechanisms, including lifting mechanisms and telescopic cylinders, to automate the movement of material boxes between stations, reducing manual intervention.

Benefits of technology

The system efficiently transports material boxes between stations, minimizing disruption to production and reducing employee workload by automating the process, while optimizing space usage and enhancing operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222225165U_ABST
    Figure CN222225165U_ABST
Patent Text Reader

Abstract

The utility model relates to a conveying frame structure of a material box. The utility model is applicable to the technical field of part transportation equipment. According to the technical scheme, the conveying frame structure of the material box is characterized by comprising a conveying track, the inlet end of the conveying track is arranged in a logistics station, the outlet end of the conveying track is arranged in an installation station, and the conveying track can convey the material box into the installation station from the logistics station; the inlet end of the recycling track is arranged in the mounting station, the outlet end of the recycling track is arranged in the logistics station, and the recycling track can transport the material box into the logistics station from the mounting station; and the transferring mechanism is arranged in the mounting station, the outlet end of the conveying rail is connected with the inlet end of the transferring mechanism, the outlet end of the transferring mechanism is connected with the inlet end of the recycling rail, and the material box at the outlet end of the conveying rail can be conveyed to the inlet end of the recycling rail.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a conveying frame structure of a material box, which is applicable to the technical field of parts transportation equipment. Background Art

[0002] The level of automation in automobile production is increasing day by day, and automobile production often adopts assembly line production to improve production efficiency. In the process of assembly line production, each process is carried out at each processing station, and a certain amount of workpieces need to be stored at each processing station. After the workpieces in the processing station are fully used, the new workpieces need to be transported to the processing station by the material cart. At present, the method of personnel transportation is often used, that is, personnel push the material cart and form workpiece replenishment. However, when replenishing workpieces, it will affect the assembly line production. At the same time, the back and forth transportation of personnel will also increase the workload of employees and affect work efficiency. Utility Model Content

[0003] The technical problem to be solved by the utility model is: in order to solve the above technical problem, the utility model provides a conveying frame structure of a material box.

[0004] The technical solution adopted by the utility model is: a material box conveying frame structure, characterized in that: it has:

[0005] A conveying track, the entrance end of which is arranged in the logistics station, and the exit end of which is arranged in the installation station. The conveying track can transport the material box from the logistics station to the installation station;

[0006] A recovery track, the inlet end of which is arranged in the installation station, and the outlet end of which is arranged in the logistics station. The recovery track can transport the material box from the installation station to the logistics station;

[0007] The transfer mechanism is arranged in the installation station, the outlet end of the conveying track is connected to the inlet end of the transfer mechanism, and the outlet end of the transfer mechanism is connected to the inlet end of the recovery track, and can transport the material box at the outlet end of the conveying track to the inlet end of the recovery track;

[0008] The conveying track comprises a first track, a first lifting mechanism and a second track, the entrance end of the first track is located in the logistics station, the lower end of the first lifting mechanism is located at the exit end of the first track, the exit end of the first lifting mechanism is connected to the entrance end of the second track, the exit end of the second track is connected to the entrance end of the transfer mechanism, the entrance end of the first track is higher than the exit end of the first track, and the entrance end of the second track is higher than the exit end of the second track. In this way, when the personnel in the logistics station places the material box storing the workpiece on the first track, the material box on the first track moves to the lower end position of the first lifting mechanism under the action of its own weight, and the material box rises to the upper end position of the first lifting mechanism under the action of the lifting of the first lifting mechanism and enters the second track, and the material box in the second track moves to the entrance end of the transfer mechanism under the action of its own weight, and the personnel in the installation station can take the workpiece in the material box on the transfer mechanism at this time; after the workpiece in the material box is completely used, the transfer mechanism transports the material box to the entrance end of the recycling track, and transports it back to the logistics station along the recycling track under the action of the self-weight of the material box, and so on.

[0009] The first lifting mechanism has a first frame arranged at the exit end of the first track, a first winder is installed in the first frame, a first winder is wound up with a first winder rope, and a first placement platform is installed at the end of the first winder rope. In this way, after the material box is moved to the first placement platform, it can be moved between the lower end position and the upper end position of the first lifting mechanism under the action of the first winder, so that after the material box moves to the first placement platform at the lower end position of the first lifting mechanism along the first track, the first placement platform, i.e., the material box, is raised to the upper end position of the first lifting mechanism under the action of the first winder, and the material box is moved into the second track.

[0010] The first placement platform is provided with a first telescopic cylinder capable of pushing the material box on the first placement platform to the second track. Thus, when the first lifting mechanism drives the material box to rise to the upper end position of the first lifting mechanism, the material box is pushed into the second track under the action of the first telescopic cylinder.

[0011] A first slide rail arranged in a vertical direction is installed on the inner side wall of the first frame, a first slider is slidably installed on the first slide rail, and the first placement platform is fixedly connected to the first slider. In this way, the movement of the first placement platform in the first frame is guided, and the service life of the first winder is increased.

[0012] The second track has a third track, a fourth track and a fifth track, the entrance end of the third track is located at the upper end of the first lifting mechanism, the entrance end of the fourth track is connected to the exit end of the third track, the entrance end of the fifth track is connected to the exit end of the fourth track, the exit end of the fifth track is connected to the entrance end of the transfer mechanism, the entrance end of the third track is higher than the exit end of the third track, the entrance end of the fourth track is higher than the exit end of the fourth track, and the entrance end of the fifth track is higher than the exit end of the fifth track. In this way, the material box can move smoothly on the second track even when the distance between the first lifting mechanism and the transfer mechanism is short.

[0013] The third track and the fifth track are parallel to the first track on the horizontal plane, and the fourth track is perpendicular to the first track on the horizontal plane. In this way, the third track is arranged above the first track, and the fifth track is arranged above the recovery track, which greatly reduces the footprint of the conveyor structure while maintaining a good material box transportation function, facilitates the movement of personnel in the workshop, and makes the first track at a lower position, which is convenient for personnel in the logistics station to place the material box with workpieces on the first track.

[0014] The transfer mechanism is a second lifting mechanism, which has a second frame arranged at the exit end of the conveying track, a second winder is installed in the second frame, a second winding rope is wound on the second winder, a second placement platform is installed at the end of the second winding rope, the exit end of the conveying track is located at the upper end position of the second lifting mechanism, and the entrance end of the recovery track is located at the lower end position of the second lifting mechanism. In this way, when the second placement platform in the second lifting mechanism moves to the upper end position, it receives the material box transported from the conveying track, and under the action of the second winder, drives the second placement platform and the material box to move to the lower end position of the second lifting mechanism, which is convenient for personnel in the installation station to take the workpiece in the material box in the transfer mechanism in the installation station, and also convenient for the workpiece in the material box to be moved from the lower end position of the second lifting mechanism into the recovery track and transported back to the logistics station after use.

[0015] The second placement platform is provided with a second telescopic cylinder capable of pushing the material box on the second placement platform to the recovery track. Thus, the second placement platform, i.e., the material box, moves to the lower end of the second lifting mechanism in the second lifting mechanism, and the second telescopic cylinder operates to push the material box into the recovery track.

[0016] A second slide rail arranged in a vertical direction is installed on the inner side wall of the second frame, a second slider is slidably installed on the second slide rail, and the second placement platform is fixedly connected to the second slider. In this way, the movement of the second placement platform in the second frame is guided, and the service life of the first telescopic cylinder is increased.

[0017] A controller is installed in the installation station, and the transfer mechanism and the first lifting mechanism are both connected to the controller, and the controller can control the operation of the transfer mechanism and the first lifting mechanism. In this way, after the workpiece in the material box is used, the personnel in the installation station can control the transfer mechanism by controlling the controller to transport the used material box to the logistics station through the recycling track, and control the controller to control the first lifting mechanism to transport the unused material box to the transfer mechanism for use.

[0018] The beneficial effects of the utility model are as follows: the utility model arranges a conveying track and a recovery track between the logistics station and the processing station, so that the material box with the workpiece placed in the logistics station is transported to the processing station through the conveying track, and the material box after the workpiece is used in the processing station is transported to the logistics station through the recovery track; in this embodiment, a second lifting mechanism is arranged in the processing station, so that the material box transported to the processing station through the conveying track is transferred to the recovery track, which is convenient for personnel to use; in this embodiment, the conveying track is composed of a first track, a first lifting mechanism, a third track, a fourth track and a fifth track, the first track is arranged close to the recovery track, and the first track, the third track, the fifth track and the recovery track are parallel in the horizontal plane The third track is arranged above the first track, and the fifth track is arranged above the recovery track, which greatly reduces the layout area of ​​the conveyor frame structure and enables the logistics box to move smoothly on each track; the utility model arranges a first lifting mechanism at the outlet end of the first track, so that the material box transported from the first track is lifted by the first lifting mechanism and then transported to the third track, so that the first track is arranged at a lower position, which is convenient for personnel in the logistics workstation to place the material box with workpieces on the first track; in this embodiment, the entrance ends of the first track, the third track, the fourth track, the fifth track and the recovery track are all higher than the exit end, so that the material box in the first track, the third track, the fourth track, the fifth track and the recovery track slides only by its own weight. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 : The structural schematic diagram of the utility model.

[0020] Figure 2 : The structural schematic diagram of the utility model.

[0021] Figure 3 : A schematic diagram of the structure in which the first placement platform and the second placement platform in the utility model are moved to the bottom position.

[0022] Figure 4 : A schematic diagram of the structure in which the first placement platform and the second placement platform are moved to the top position in the utility model.

[0023] Figure 5 : Connection block diagram of the utility model.

[0024] In the figure: 1. first track; 2. third track; 3. fourth track; 4. fifth track; 5. first lifting mechanism; 5-1. first frame; 5-2. first winder; 5-3. first winder rope; 5-4. first placement platform; 5-5. first telescopic cylinder; 5-6. first slide rail; 5-7. first slider; 6. second lifting mechanism; 6-1. second frame; 6-2. second winder; 6-3. second winder rope; 6-4. second placement platform; 6-5. second telescopic cylinder; 6-6. second slide rail; 6-7. second slider; 7. recovery track; 8. controller. DETAILED DESCRIPTION

[0025] The present invention will be further described in detail below with reference to the accompanying drawings and through examples. The following examples are provided to explain the present invention, but the present invention is not limited to the following examples.

[0026] The present embodiment is a material box conveyor rack structure, which is used to transport a material box with workpieces installed in a logistics station to a processing station, and to transport a material box after use in a processing station to a logistics station, so as to avoid personnel transporting material boxes back and forth between the logistics station and the processing station.

[0027] In this embodiment, a conveying track and a recovery track 7 are arranged between the logistics station and the processing station, the inlet end of the conveying track is arranged in the logistics station, the outlet end of the conveying track is arranged in the installation station, the inlet end of the recovery track 7 is arranged in the installation station, and the outlet end of the recovery track 7 is arranged in the logistics station. The material box in the logistics station is transported to the processing station via the conveying track, and the material box in the processing station is transported to the logistics station via the recovery track 7. A fence is provided in the conveying frame structure to prevent the material box from falling off.

[0028] In this embodiment, the conveying track has a first track 1, a first lifting mechanism 5, a third track 2, a fourth track 3 and a fifth track 4. The first track 1 is arranged along the connecting line between the logistics station and the processing station. The third track 2, the fifth track 4 and the recovery track 7 are parallel to the first track 1 on the horizontal plane. The fourth track 3 is perpendicular to the first track 1 on the upper plane. The third track 2 is arranged above the first track 1, and the fifth track 4 is arranged above the recovery track 7. In this way, the first track 1 and the recovery track 7 are arranged at a lower position, which is convenient for personnel to put the material box with workpieces into the entrance end of the first track 1 and take out the material box from the exit end of the recovery track 7 after use.

[0029] The third track 2, the fourth track 3 and the fifth track 4 form the second track of the conveying track, which is used to transport the material box lifted by the first lifting mechanism 5 to the transfer mechanism. The second track can be arranged according to the actual situation on site.

[0030] In this embodiment, the entrance ends of the first track 1, the third track 2, the fourth track 3, the fifth track 4 and the recovery track 7 are all higher than the exit ends, so that the material box can move in the first track 1, the third track 2, the fourth track 3, the fifth track 4 and the recovery track 7 under the action of its own weight.

[0031] In this embodiment, the first lifting mechanism 5 is arranged at the exit end of the first track 1 in the processing station, the lower end position of the first lifting mechanism 5 corresponds to the exit end position of the first track 1, and the upper end position of the first lifting mechanism 5 corresponds to the entrance end position of the third track 2. The first lifting mechanism 5 has a first frame 5-1 arranged at the exit end of the first track 1, and a first winder 5-2 is installed in the first frame 5-1 along the vertical direction. The first winder 5-2 winds up a first winding rope 5-3, and a first placement platform 5-4 is installed at the end of the first winding rope 5-3. The first winder 5-2 can drive the first placement platform 5-4 to move between the lower end position and the upper end position of the first lifting mechanism 5. When the first placement platform 5-4 is at the lower end position of the first lifting mechanism 5, the material box moves to the first placement platform 5-4 with the first track 1. At this time, under the action of the first winder 5-2, the first placement platform 5-4 and the material box can be raised to the upper end position of the first lifting mechanism 5, and it is convenient to transport the material box to the third track 2.

[0032] In this embodiment, a first slide rail 5-6 is installed on the inner wall of the first frame 5-1 along the moving direction of the first placement platform 5-4, and a first slider 5-7 is slidably installed on the first slide rail 5-6. The first slider 5-7 is fixedly connected to the first placement platform 5-4, which guides the sliding of the first placement platform 5-4, enhances the stability of the lifting and lowering of the first placement platform 5-4, and at the same time increases the service life of the first winder 5-2.

[0033] In this embodiment, a first telescopic cylinder 5-5 is installed on the first placement platform 5-4. The first telescopic cylinder 5-5 is used to push the material box onto the third track 2 when the first placement platform 5-4 and the material box are raised to the upper end position of the first lifting mechanism 5.

[0034] In this embodiment, a transfer mechanism is provided in the installation station. Since the fifth track 4 of the conveying track is arranged above the recovery track 7, the transfer mechanism in this embodiment is a second lifting mechanism 6. The second lifting mechanism 6 is arranged at the exit end position of the fifth track 4 in the processing station, the upper end position of the second lifting mechanism 6 corresponds to the exit end position of the fifth track 4, and the lower end position of the second lifting mechanism 6 corresponds to the entrance end position of the recovery track 7. The second lifting mechanism 6 has a second frame 6-1 arranged at the exit end of the fifth track 4, a second winder 6-2 is installed in the second frame 6-1, a second winder 6-2 is wound on the second winder 6-2, a second winding rope 6-3 is wound, a second placement platform 6-4 is installed at the end of the second winding rope 6-3, and the second winder 6-2 can drive the second placement platform 6-4 to move between the lower end position and the upper end position of the second lifting mechanism 6. When the second placement platform 6-4 is at the upper end of the second lifting mechanism 6, the material box moves to the second placement platform 6-4 along with the fifth track 4. At this time, the second placement platform 6-4 and the material box can be lowered to the lower end of the second lifting mechanism 6 under the action of the second winder 6-2, and the material box can be transported to the recovery track 7. When the material box is in the transfer mechanism, the personnel in the processing station can take the workpiece in the material box and install it.

[0035] In this embodiment, a second slide rail 6-6 is installed on the inner wall of the second frame 6-1 along the moving direction of the second placement platform 6-4, and a second slider 6-7 is slidably installed on the second slide rail 6-6. The second slider 6-7 is fixedly connected to the second placement platform 6-4, which guides the sliding of the second placement platform 6-4, enhances the stability of the lifting and lowering of the second placement platform 6-4, and at the same time increases the service life of the second winder 6-2.

[0036] In this embodiment, a second telescopic cylinder 6-5 is installed on the second placement platform 6-4. The second telescopic cylinder 6-5 is used to push the material box onto the recovery track 7 when the second placement platform 6-4 and the material box are raised to the lower end position of the second lifting mechanism 6.

[0037] In this embodiment, a controller 8 is installed in the installation station, and the controller 8 is connected to the first winder 5-2, the first telescopic cylinder 5-5, the second winder 6-2 and the second telescopic cylinder 6-5. The personnel in the installation station can control the operation of the first winder 5-2, the first telescopic cylinder 5-5, the second winder 6-2 and the second telescopic cylinder 6-5 through the controller 8 to transport the material box in the conveyor frame structure. The installation station is provided with a first button and a second button, and the first button and the second button are both connected to the controller 8. After the personnel in the installation station press the first button, the controller 8 will drive the first winder 5-2, the first telescopic cylinder 5-5, the second winder 6-2 and the second telescopic cylinder 6-5 to operate. The winder 5-2 drives the first placement platform 5-4 and the material box to the upper end position of the first lifting mechanism 5, and controls the first telescopic cylinder 5-5 to push the material box to move to the third track 2, and then controls the first winder 5-2 and the first telescopic cylinder 5-5 to reset; after the personnel in the installation station presses the second button, the controller 8 will drive the second winder 6-2 to drive the second placement platform 6-4 and the material box to the lower end position of the second lifting mechanism 6, and control the second telescopic cylinder 6-5 to push the material box to move to the recovery track 7, and then control the second winder 6-2 and the second telescopic cylinder 6-5 to reset.

[0038] The operation method of this embodiment is:

[0039] The personnel in the logistics station place the workpiece in the material box and place the material box on the first track 1, so that the material box moves along the first track 1 to the first placement platform 5-4 at the lower end of the first lifting mechanism 5;

[0040] The personnel in the processing station press the first button to make the material box rise in the first lifting mechanism 5 to the upper end position of the first lifting mechanism 5 and control the first telescopic cylinder 5-5 to push the material box into the third track 2, and then the first lifting mechanism 5 is reset;

[0041] The material box is transported to the second placement platform 6-4 at the upper end of the transfer mechanism, i.e., the second lifting mechanism 6, through the third track 2, the fourth track 3 and the fifth track 4. At this time, the personnel in the processing station can take the workpiece in the material box on the second placement platform 6-4;

[0042] After all the workpieces in the material box are used up, the personnel in the processing station press the second button to make the material box descend to the lower end of the second lifting mechanism 6 in the second lifting mechanism 6 and control the second telescopic cylinder 6-5 to push the material box into the recovery track 7, and transport the material box to the logistics station, and then the second lifting mechanism 6 is reset;

[0043] The personnel in the logistics station take out the material box at the exit end of the recovery track 7, place the workpiece in the material box and place the material box on the first track 1 to realize the circulation operation.

[0044] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A material box conveyor frame structure, characterized in that: have: A conveying track, the entrance end of which is arranged in the logistics station, and the exit end of which is arranged in the installation station. The conveying track can transport the material box from the logistics station to the installation station; A recovery track (7), wherein the inlet end of the recovery track (7) is arranged in the installation station, and the outlet end of the recovery track (7) is arranged in the logistics station, and the recovery track (7) can transport the material box from the installation station to the logistics station; The transfer mechanism is arranged in the installation station, the outlet end of the conveying track is connected to the inlet end of the transfer mechanism, and the outlet end of the transfer mechanism is connected to the inlet end of the recovery track (7), so that the material box at the outlet end of the conveying track can be transported to the inlet end of the recovery track (7); The conveying track comprises a first track (1), a first lifting mechanism (5) and a second track. The entrance end of the first track (1) is located in a logistics station. The lower end of the first lifting mechanism (5) is located at the exit end of the first track (1). The exit end of the first lifting mechanism (5) is connected to the entrance end of the second track. The exit end of the second track is connected to the entrance end of the transfer mechanism. The entrance end of the first track (1) is higher than the exit end of the first track (1). The entrance end of the second track is higher than the exit end of the second track.

2. A material box conveyor structure according to claim 1, characterized in that: The first lifting mechanism (5) comprises a first frame (5-1) arranged at the exit end of the first track (1), a first winder (5-2) being installed in the first frame (5-1), a first winding rope (5-3) being wound on the first winder (5-2), and a first placement platform (5-4) being installed at the end of the first winding rope (5-3).

3. A material box conveyor structure according to claim 2, characterized in that: A first telescopic cylinder (5-5) capable of pushing the material box on the first placement platform (5-4) toward the second track is installed on the first placement platform (5-4).

4. A material box conveyor structure according to claim 2, characterized in that: A first slide rail (5-6) arranged along the moving direction of the first placement platform (5-4) is installed on the inner side wall of the first frame (5-1), a first slider (5-7) is slidably installed on the first slide rail (5-6), and the first placement platform (5-4) is fixedly connected to the first slider (5-7).

5. The conveying frame structure of a material box according to claim 1, characterized in that: The second track comprises a third track (2), a fourth track (3) and a fifth track (4); the entrance end of the third track (2) is located at the upper end of the first lifting mechanism (5); the entrance end of the fourth track (3) is connected to the exit end of the third track (2); the entrance end of the fifth track (4) is connected to the exit end of the fourth track (3); the exit end of the fifth track (4) is connected to the entrance end of the transfer mechanism; the entrance end of the third track (2) is higher than the exit end of the third track (2); the entrance end of the fourth track (3) is higher than the exit end of the fourth track (3); and the entrance end of the fifth track (4) is higher than the exit end of the fifth track (4).

6. A material box conveyor structure according to claim 5, characterized in that: The third track (2) and the fifth track (4) are parallel to the first track (1) on a horizontal plane, the fourth track (3) is perpendicular to the first track (1) on a horizontal plane, the third track (2) is arranged above the first track (1), and the fifth track (4) is arranged above the recovery track (7).

7. The conveying frame structure of a material box according to claim 1, characterized in that: The transfer mechanism is a second lifting mechanism (6), which has a second frame (6-1) arranged at the outlet end of the conveying track, a second winder (6-2) is installed in the second frame (6-1), a second winding rope (6-3) is wound on the second winder (6-2), and a second placement platform (6-4) is installed at the end of the second winding rope (6-3), the outlet end of the conveying track is located at the upper end position of the second lifting mechanism (6), and the inlet end of the recovery track (7) is located at the lower end position of the second lifting mechanism (6).

8. The material box conveyor frame structure according to claim 7, characterized in that: A second telescopic cylinder (6-5) capable of pushing the material box on the second placement platform (6-4) toward the recovery track (7) is installed on the second placement platform (6-4).

9. The material box conveyor frame structure according to claim 7, characterized in that: A second slide rail (6-6) arranged in a vertical direction is installed on the inner side wall of the second frame (6-1), a second slider (6-7) is slidably installed on the second slide rail (6-6), and the second placement platform (6-4) is fixedly connected to the second slider (6-7).

10. The material box conveyor frame structure according to claim 1, characterized in that: A controller (8) is installed in the installation station. The transfer mechanism and the first lifting mechanism (5) are both connected to the controller (8). The controller (8) can control the operation of the transfer mechanism and the first lifting mechanism (5).