Special site hoisting device for boiler construction site
By designing a lifting device for boiler construction site, the cylinder, motor and gear systems are used to achieve smooth drop and position adjustment of the boiler, which solves the high cost of large lifting equipment and cannot meet the needs of small cranes, and improves work safety and efficiency.
Patent Information
- Application Number
- CN202421008729.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-12-27
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
At the boiler construction site, existing large lifting equipment is expensive, small cranes cannot meet the needs of rapid lifting of boiler components, and the boiler is easily tilted and cannot adjust its position during the lifting process.
A special site hoisting device for boiler construction site is designed, including guide rails, brackets, motors, pulleys, gears, cylinders and jaws. The cylinder drives the sprocket movement, and the motor drives the belt transmission and gear rotation simultaneously to achieve a smooth drop of the boiler. Move left and right and backward, and jaws fix the boiler to ensure safety and stability.
The boiler is accurately and smoothly lowered and position adjustment is achieved, and the work safety and efficiency is improved, the boiler is tilted and dropped, and the engineering cost is reduced.
Smart Images

Figure CN222249811U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hoisting devices, in particular to a special site hoisting device for a boiler construction site. Background Art
[0002] Boilers are important equipment in the production of many enterprises. After the steel frame, water-cooled wall, downcomer and other large parts of a large boiler are hoisted, if large hoisting machinery is used for the later installation of small parts and the improvement of the main body, it will lead to an increase in project costs and even affect the boiler installation period; as the main hoisting equipment for the later installation of the boiler, cranes are indispensable mechanical equipment, but the cost of using large machinery for operations in the later stage of boiler installation is very high; however, due to the limited operating radius, small hoisting equipment cannot quickly hoist the parts into place, and it is necessary to change workstations around the boiler many times; tower cranes can be used, but the installation and disassembly costs of tower cranes are very high, and the use time is short, so it is very uneconomical; therefore, a device is needed to solve the problem that the cost of large hoisting equipment is too high and small cranes cannot meet the needs of existing large boilers during the later installation of parts.
[0003] The boiler construction site dedicated site hoisting device still has the following defects when in use: the boiler is not fixed stably during hoisting, the boiler is easily tilted during hoisting, thereby damaging the boiler, and the distance cannot be adjusted according to the required position of the boiler after hoisting. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a special site hoisting device for a boiler construction site.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a special site hoisting device for boiler construction site, comprising a guide rail and a bracket, the bracket is fixedly connected to a motor, the output end of the motor is fixedly connected to a pulley, the pulley is provided with a belt, the belt is provided with a pulley, the pulley is fixedly connected to a rotating shaft, the rotating shaft is rotatably connected to the bracket, the rotating shaft is fixedly connected to a gear, the gear is meshed with a rack, the rack is fixedly connected to the guide rail, and the output end of the motor is fixedly connected to the pulley. A pulley three is fixedly connected thereto, a belt two is arranged on the pulley three, a pulley four is arranged on the belt two, a rotating shaft two is fixedly connected to the pulley four, the rotating shaft two is rotatably connected to the bracket one, a gear one is fixedly connected to the rotating shaft two, the gear one is meshingly connected to the rack, a sliding rod is fixedly connected to the bracket one, one end of the sliding rod is fixedly connected to the bracket two, a wheel is rotatably connected to the bottom of the bracket two, a guide rail two is slidably connected to the bracket two, the wheel is attached to the guide rail two, the rotating shaft one slides on the guide rail one, and the rotating shaft two slides on the guide rail one.
[0006] As a further description of the above technical solution: the bracket one is fixedly connected to the motor two, the output end of the motor two is fixedly connected to the threaded screw one, one end of the threaded screw one is rotatably connected to the bracket two, the threaded screw one is threadedly connected to a fixing plate, and the fixing plate is slidably connected to the sliding rod.
[0007] As a further description of the above technical solution: the bracket one is fixedly connected to a cylinder, the output end of the cylinder is fixedly connected to a chain, the chain is meshed with a sprocket one, the sprocket one is rotatably connected to the bracket one, the chain is meshed with a sprocket two, the sprocket two is rotatably connected to a fixed plate, one end of the chain is rotatably connected to a hanger, the hanger is rotatably connected to a connecting rod one, one end of the connecting rod one is rotatably connected to a clamping claw two, a threaded sleeve one is slidably connected to the connecting rod one, a threaded screw rod two is threadedly connected to the threaded sleeve one, one end of the threaded screw rod two is fixedly connected to a handle, a threaded screw rod two is threadedly connected to the threaded sleeve two, a connecting rod two is slidably connected to the threaded sleeve two, the connecting rod two is rotatably connected to the hanger, and one end of the connecting rod two is rotatably connected to a clamping claw one.
[0008] As a further description of the above technical solution: the second threaded screw rod is provided with two sets of opposite threads, and the first threaded sleeve and the second threaded sleeve are respectively arranged on both sides of the second threaded screw rod.
[0009] As a further description of the above technical solution: the sliding rods are provided with two groups, and the sliding rods penetrate the fixed plate.
[0010] As a further description of the above technical solution: the connecting rod 1 is provided with two groups that are symmetrically arranged, the connecting rod 2 is provided with two groups that are symmetrically arranged, and the clamping jaw 1 and the clamping jaw 2 are symmetrically arranged.
[0011] As a further description of the above technical solution: the wheels are provided with two groups which are symmetrically arranged, and the gear one and the gear two are symmetrically arranged.
[0012] The utility model has the following beneficial effects:
[0013] 1. In the utility model, when using the special site hoisting device for the boiler construction site, the sprocket is driven to move by the cylinder, and the staff can accurately control the movement of the hanger to ensure that the boiler can be smoothly lowered to the required height. The reverse thread setting of the threaded screw rod 2 drives the connecting rod 1 and the connecting rod 2, so that the clamping jaw 1 and the clamping jaw 2 move inward synchronously, thereby firmly fixing and clamping the boiler, effectively preventing the boiler from falling or shaking during the hoisting process, and greatly improving the work safety.
[0014] 2. In the utility model, when using the special site hoisting device for the boiler construction site, the staff can easily move the boiler left and right through the control of motor 2 and screw rod 1, without manual adjustment, thereby improving work efficiency. By turning on motor 1 to drive the belt transmission, the forward and backward movement of the boiler is achieved. At the same time, the synchronous rotation of gear 1, gear 2 and two sets of wheels ensures the stability and stability of the boiler during the movement. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the structure of a special site hoisting device for boiler construction site proposed by the utility model Figure 1 ;
[0016] Figure 2 This is a schematic diagram of the structure of a special site hoisting device for boiler construction site proposed by the utility model Figure 2 ;
[0017] Figure 3 This is a schematic diagram of the structure of a special site hoisting device for boiler construction site proposed by the utility model Figure 3 ;
[0018] Figure 4 for Figure 3 Enlarged view of point A in the middle.
[0019] Legend:
[0020] 1. Guide rail one; 2. Guide rail two; 3. Rack; 4. Gear one; 5. Bracket one; 6. Motor one; 7. Pulley one; 8. Belt one; 9. Pulley two; 10. Rotating shaft one; 11. Gear two; 12. Pulley three; 13. Belt two; 14. Pulley four; 15. Rotating shaft two; 16. Sliding rod; 17. Bracket two; 18. Wheel; 19. Motor two; 20. Threaded screw one; 21. Fixed plate; 22. Cylinder; 23. Chain; 24. Sprocket one; 25. Sprocket two; 26. Hanger; 27. Connecting rod one; 28. Connecting rod two; 29. Clamp one; 30. Clamp two; 31. Threaded screw two; 32. Handle; 33. Threaded sleeve one; 34. Threaded sleeve two. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] Reference Figure 1-Figure 4The utility model provides an embodiment: a special site hoisting device for a boiler construction site, comprising a guide rail 1 and a bracket 5, a motor 6 is fixedly connected to the bracket 5, a pulley 7 is fixedly connected to the output end of the motor 6, a belt 8 is provided on the pulley 7, a pulley 2 9 is provided on the belt 8, a rotating shaft 10 is fixedly connected to the pulley 2 9, the rotating shaft 10 is rotatably connected to the bracket 5, a gear 2 11 is fixedly connected to the rotating shaft 10, a rack 3 is meshedly connected to the gear 2 11, the rack 3 is fixedly connected to the guide rail 1, a pulley 3 12 is fixedly connected to the output end of the motor 6, a belt 2 13 is provided on the pulley 3 12, a pulley 4 14 is provided on the belt 2 13, a rotating shaft 2 15 is fixedly connected to the pulley 4 14, the rotating shaft 2 15 is rotatably connected to the bracket 5, and the rotating shaft 2 15 is fixedly connected to the gear 1 4. Gear 14 is meshedly connected to rack 3. Slide bar 16 is fixedly connected to bracket 15. One end of slide bar 16 is fixedly connected to bracket 2 17. The bottom of bracket 2 17 is rotatably connected to wheel 18. Guide rail 2 2 is slidably connected to bracket 2 17. Wheel 18 fits on guide rail 2 2. Rotating shaft 10 slides on guide rail 1. Rotating shaft 2 15 slides on guide rail 1. When using the special site hoisting device for boiler construction site, the sprocket is driven to move by cylinder 22. The staff can accurately control the movement of hanger 26 to ensure that the boiler can be smoothly lowered to the required height. The reverse thread setting of threaded screw 2 31 drives connecting rod 1 27 and connecting rod 2 28, so that clamping jaw 1 29 and clamping jaw 2 30 move inward synchronously, thereby firmly fixing and clamping the boiler, effectively preventing the boiler from falling or shaking during the hoisting process, and greatly improving work safety.
[0023] The bracket 15 is fixedly connected to a motor 21, the output end of the motor 21 is fixedly connected to a threaded screw 20, one end of the threaded screw 20 is rotatably connected to the bracket 17, the threaded screw 20 is threadedly connected to a fixing plate 21, the fixing plate 21 is slidably connected to the slide bar 16, the bracket 15 is fixedly connected to a cylinder 22, the output end of the cylinder 22 is fixedly connected to a chain 23, the chain 23 is meshed with a sprocket 24, the sprocket 24 is rotatably connected to the bracket 15, and the chain 23 is meshed with a Sprocket 25, sprocket 25 is rotatably connected to the fixed plate 21, one end of the chain 23 is rotatably connected to the hanger 26, the hanger 26 is rotatably connected to the connecting rod 1 27, one end of the connecting rod 1 27 is rotatably connected to the clamping claw 2 30, the connecting rod 1 27 is slidably connected to the threaded sleeve 1 33, the threaded sleeve 1 33 is threadedly connected to the threaded screw rod 2 31, one end of the threaded screw rod 2 31 is fixedly connected to the handle 32, the threaded screw rod 2 31 is threadedly connected to the threaded sleeve 2 34, the threaded sleeve 2 34 is slidably connected to the threaded screw rod 2 A connecting rod 28 is connected, and the connecting rod 28 is rotatably connected to the hanger 26. One end of the connecting rod 28 is rotatably connected to a clamping claw 29. The threaded screw rod 21 is provided with two sets of opposite threads. The threaded sleeve 133 and the threaded sleeve 24 are respectively provided on both sides of the threaded screw rod 21. The sliding rod 16 is provided with two sets. The sliding rod 16 passes through the fixed plate 21. The connecting rod 17 is provided with two sets of symmetrical settings. The connecting rod 28 is provided with two sets of symmetrical settings. The clamping claw 29 and the clamping claw 230 are symmetrically set. The wheel 18 is provided with There are two groups that are symmetrically arranged, gear 1 4 and gear 2 11 are symmetrically arranged. When using the special site hoisting device at the boiler construction site, through the control of motor 2 19 and threaded screw 1 20, the staff can easily move the boiler left and right without manual adjustment, thereby improving work efficiency. By turning on motor 1 6 to drive the belt transmission, the boiler can be moved forward and backward. At the same time, through the synchronous rotation of gear 1 4, gear 2 11 and two groups of wheels 18, the stability and stability of the boiler during movement are guaranteed.
[0024] Working principle: When using the special site hoisting device for the boiler construction site, the staff first turns on the cylinder 22. The rise of the cylinder 22 causes the chain 23 to drive the hanger 26 to move downward through the rotation of the sprocket 1 24 and the sprocket 25. When it moves downward to the required height according to the height of the boiler, the staff twists the handle 32. The handle 32 drives the threaded sleeve 1 33 and the threaded sleeve 2 34 to move inward synchronously through the setting of two sets of reverse threads. The threaded sleeve 1 33 and the threaded sleeve 2 34 simultaneously drive the two sets of connecting rods 1 27 and connecting rods 28 to rotate on the hanger 26. At the same time, when the distance between the connecting rod 1 27 and the connecting rod 28 is reduced, the threaded sleeve 1 33 and the threaded sleeve 2 34 move inward according to the angle between the connecting rod 1 27 and the connecting rod 28. Correspondingly, it slides on one set of connecting rods 1 27 and connecting rods 2 28, thereby driving clamping claws 1 29 and clamping claws 2 30 to move inward synchronously, thereby fixing and clamping the boiler to prevent the boiler from falling during the hoisting process, causing damage to the boiler, thereby increasing the cost. After the fixation is completed, the staff reversely opens the cylinder 22, and the cylinder 22 drives the chain 23 to move through the rotation of the sprocket 1 24 and the sprocket 2 25. The chain 23 drives the boiler on the hanger 26 to rise, thereby completing the hoisting of the boiler. When it is necessary to move the boiler left and right, the staff turns on the motor 2 19. The motor 2 19 drives the threaded screw 1 20 to rotate on the bracket 2 17, and the threaded screw 1 20 drives the fixing plate 21 to move left and right through the threaded connection. The fixing plate 21 The boiler on the hanger 26 is driven to move left and right by the chain 23. When the motor 219 is turned on, the cylinder 22 should be properly turned on to cooperate, so as to ensure that when the hanger 26 moves left and right, the length of the chain 23 will gradually change. The cylinder 22 should be properly turned on according to the moving distance of the fixed plate 21, so as to ensure that the boiler will not move up and down due to the movement of the fixed plate 21, so that the boiler can remain stable while moving left and right. When it is necessary to move the boiler forward and backward, the staff turns on the motor 6, the motor 6 drives the pulley 7 to rotate, the pulley 7 drives the belt 8 to rotate, the belt 8 drives the pulley 29 to rotate, the pulley 29 drives the rotating shaft 10 to rotate on the bracket 5, the rotating shaft 10 drives the gear 2 11 to rotate, and the motor 6 drives the pulley 7 to rotate, the belt 8 drives the pulley 29 to rotate, the pulley 29 drives the rotating shaft 10 to rotate on the bracket 5, and the rotating shaft 10 drives the gear 2 11 to rotate. Machine 1 6 drives pulley 3 12 to rotate, pulley 3 12 drives belt 2 13 to rotate, belt 2 13 drives pulley 4 14 to rotate, pulley 4 14 drives rotating shaft 2 15 to rotate on bracket 1 5, rotating shaft 2 15 drives gear 1 4 to rotate, so that gear 1 4 and gear 2 11 rotate synchronously on rack 3, and the rotation of gear 1 4 and rotating shaft 2 15 on rack 3 drives bracket 1 5 to move on guide rail 1, and bracket 1 5 drives bracket 2 17 through sliding rod 16 to move synchronously on guide rail 2 2 through rotation of wheel 18, thereby completing the forward and backward movement of the boiler, and through the synchronous rotation of gear 1 4, gear 2 11 and two sets of wheels 18, the boiler is more stable when moving forward and backward, thereby completing the safe lifting of the boiler.
[0025] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A boiler construction site special site hoisting device, comprising a guide rail (1) and a bracket (5), characterized in that: The support (5) is fixedly connected with a motor (6), the output end of the motor (6) is fixedly connected with a pulley (7), the pulley (7) is provided with a belt (8), the belt (8) is provided with a pulley (9), the pulley (9) is fixedly connected with a rotating shaft (10), the rotating shaft (10) is rotatably connected to the support (5), the rotating shaft (10) is fixedly connected with a gear (11), the gear (11) is meshed with a rack (3), the rack (3) is fixedly connected to the guide rail (1), the output end of the motor (6) is fixedly connected with a pulley (12), the pulley (12) is provided with a belt (13), the belt (13) is fixedly connected with a gear (11), the gear (11) is meshed with a rack (3), the rack (3) is fixedly connected to the guide rail (1), A pulley four (14) is provided, the pulley four (14) is fixedly connected with a rotating shaft two (15), the rotating shaft two (15) is rotatably connected to a bracket one (5), the rotating shaft two (15) is fixedly connected with a gear one (4), the gear one (4) is meshingly connected to a rack (3), the bracket one (5) is fixedly connected with a sliding rod (16), one end of the sliding rod (16) is fixedly connected with a bracket two (17), the bottom of the bracket two (17) is rotatably connected with a wheel (18), the bracket two (17) is slidably connected with a guide rail two (2), the wheel (18) is attached to the guide rail two (2), the rotating shaft one (10) slides on the guide rail one (1), and the rotating shaft two (15) slides on the guide rail one (1).
2. A boiler construction site-specific hoisting device according to claim 1, characterized in that: The bracket one (5) is fixedly connected to a motor two (19), the output end of the motor two (19) is fixedly connected to a threaded screw one (20), one end of the threaded screw one (20) is rotatably connected to the bracket two (17), the threaded screw one (20) is threadedly connected to a fixing plate (21), and the fixing plate (21) is slidably connected to the sliding rod (16).
3. A boiler construction site dedicated site hoisting device according to claim 2, characterized in that: The support (5) is fixedly connected with a cylinder (22), the output end of the cylinder (22) is fixedly connected with a chain (23), the chain (23) is meshedly connected with a sprocket (24), the sprocket (24) is rotatably connected to the support (5), the chain (23) is meshedly connected with a sprocket (25), the sprocket (25) is rotatably connected to the fixed plate (21), one end of the chain (23) is rotatably connected with a hanger (26), the hanger (26) is rotatably connected with a connecting rod (27), one end of the connecting rod (27) is A second clamping jaw (30) is rotatably connected to the first connecting rod (27), a threaded sleeve (33) is slidably connected to the first connecting rod, a second threaded screw rod (31) is threadedly connected to the first threaded sleeve (33), one end of the second threaded screw rod (31) is fixedly connected to a handle (32), a second threaded sleeve (34) is threadedly connected to the second threaded screw rod (31), a second connecting rod (28) is slidably connected to the second threaded sleeve (34), the second connecting rod (28) is rotatably connected to the hanger (26), and one end of the second connecting rod (28) is rotatably connected to the first clamping jaw (29).
4. A boiler construction site dedicated site hoisting device according to claim 3, characterized in that: The second threaded screw rod (31) is provided with two sets of opposite threads, and the first threaded sleeve (33) and the second threaded sleeve (34) are respectively arranged on both sides of the second threaded screw rod (31).
5. A boiler construction site-specific hoisting device according to claim 4, characterized in that: The sliding rods (16) are provided in two groups, and the sliding rods (16) penetrate the fixing plate (21).
6. A boiler construction site-specific hoisting device according to claim 5, characterized in that: The connecting rod 1 (27) is provided with two groups which are symmetrically arranged, the connecting rod 2 (28) is provided with two groups which are symmetrically arranged, and the clamping jaw 1 (29) and the clamping jaw 2 (30) are symmetrically arranged.
7. A boiler construction site-specific hoisting device according to claim 6, characterized in that: The wheels (18) are provided in two groups and are symmetrically arranged, and the gear 1 (4) and the gear 2 (11) are symmetrically arranged.
