Tunnel structure of tunnel type calcining furnace

By introducing a combination of spray pipe and conveyor belt in the tunnel calciner, the principle of evaporation absorption heat and fan blow-air cooling are used to solve the problem that objects cannot be taken out immediately after the tunnel calciner, the production efficiency is improved, and the water circulation system is optimized water resources use.

CN222257600UActive Publication Date: 2024-12-27HEFEI YUANZHEN ELECTRICAL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420923721.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-12-27
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

After use, the existing tunnel calciner cannot be taken out immediately and needs to wait for natural cooling, resulting in reduced efficiency.

Method used

A tunnel structure of a tunnel calciner furnace is designed, using a spray pipe and a conveyor belt to quickly cool down using the principle of evaporation and heat absorption, and blow-air cooling is achieved through fans and connecting plates, combining with water circulation system to reduce the use of water resources.

Benefits of technology

Fast cooling is achieved, natural cooling is avoided, overall efficiency is improved, and water resource consumption is reduced through the water circulation system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222257600U_ABST
    Figure CN222257600U_ABST
Patent Text Reader

Abstract

The utility model provides a tunnel structure of a tunnel type calcining furnace, which relates to the technical field of tunnel type calcining furnaces and comprises an integral structure and supporting structures, and the supporting structures are positioned at the front and rear positions of the two sides of the bottom of the integral structure; the overall structure comprises a tunnel furnace body, a furnace body is arranged on one side of the top of the tunnel furnace body, a cooling chamber is arranged on the other side of the top of the tunnel furnace body, spraying pipes are arranged on the two sides of the front inner surface and the rear inner surface of the cooling chamber in a penetrating mode, and a water containing tank is fixedly connected to the center of the top of the cooling chamber. According to the cooling device, after an object is conveyed into the cooling chamber through the conveying belt, water can be sprayed to the surface of the object through mutual cooperation of the first water suction pump, the first conveying pipeline, the water containing tank and the spraying pipe, and the water can be sprayed to the surface of the object through the principle of heat absorption by evaporation. The object can be rapidly lowered, and subsequent natural waiting for cooling is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel type calcining furnaces, in particular to a tunnel structure of a tunnel type calcining furnace. Background Art

[0002] The tunnel calcining furnace is a new type of mechanical equipment, which is mainly used in the industrial production of new energy products. It realizes the baking of new energy products through heat conduction, convection and radiation. It has a wide range of uses, including new energy products, new energy vehicle motor stators, rotors, controllers, batteries, lithium batteries, counter batteries, carbon fibers, hardware and chemical products, etc.

[0003] When the existing tunnel calcining furnace is in use, the objects cannot be taken out of the tunnel calcining furnace immediately after being calcined in the calcining area. It is necessary to wait for the natural cooling area to reach room temperature before taking them out. The natural cooling process often takes a long time, which reduces the overall efficiency. Therefore, we propose a tunnel structure of a tunnel calcining furnace to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to solve the problem in the prior art that after an object is calcined in a calcining area, it cannot be taken out from a tunnel calcining furnace immediately and it is necessary to wait for the natural cooling area to reach room temperature before it can be taken out, and the natural cooling process often takes a long time, which reduces the overall efficiency. A tunnel structure of a tunnel calcining furnace is proposed to solve the problem in the prior art that an object cannot be taken out from a tunnel calcining furnace immediately after being calcined in a calcining area and it is necessary to wait for the natural cooling area to reach room temperature before it can be taken out. The natural cooling process often takes a long time, which reduces the overall efficiency.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions: a tunnel structure of a tunnel-type calcining furnace, comprising an overall structure and a supporting structure, wherein the supporting structure is located at the front and rear positions of both sides of the bottom of the overall structure;

[0006] The overall structure includes a tunnel furnace body, a furnace body is arranged on one side of the top of the tunnel furnace body, a cooling chamber is arranged on the other side of the top of the tunnel furnace body, spray pipes are penetrated on both sides of the front and rear inner surfaces of the cooling chamber, a water tank is fixedly connected to the center of the top of the cooling chamber, a first water pump is fixedly installed at the center of the bottom of the water tank, a first conveying pipeline is penetrated at the water outlet end of the first water pump, an inclined plate is fixedly connected to the other side of the inner bottom of the tunnel furnace body, and a collecting box is fixedly connected to the other side of the bottom of the tunnel furnace body.

[0007] Preferably, a conveyor belt is fixedly installed at the center of the inner bottom of the tunnel furnace body, and a water inlet pipe is penetrated at the center of the top of the water tank.

[0008] Preferably, a connecting plate is fixedly connected to the furnace body and the top front and rear positions of the cooling chamber, and a fan is fixedly installed at the center of the inner surface of the connecting plate.

[0009] Preferably, the interior of the first delivery pipeline is communicated with the interior of the spray pipe.

[0010] Preferably, a connecting pipe is provided through the center of the top of the collecting box, and a second water pump is fixedly installed at the center of the front outer surface of the collecting box.

[0011] Preferably, a second delivery pipeline is provided through the water outlet end of the second water pump, and the interior of the second delivery pipeline is communicated with the interior of the water storage tank.

[0012] Preferably, the supporting structure comprises a supporting leg, a non-slip pad is fixedly connected to the bottom center of the supporting leg, and the top surface of the supporting leg is fixedly connected to the bottom surface of the tunnel furnace body.

[0013] Compared with the prior art, the advantages and positive effects of the utility model are:

[0014] 1. In the utility model, when the object is transported into the cooling chamber by the conveyor belt, water can be sprayed onto the surface of the object through the cooperation of the first water pump, the first conveying pipeline, the water tank and the spray pipe. The evaporation heat absorption principle is used to quickly reduce the problem of the object, avoiding the need to wait for natural cooling in the future, thereby speeding up the overall efficiency.

[0015] 2. In the utility model, through the cooperation between the connecting plate and the fan, the object can be cooled by blowing air, and the effect of preliminary cooling can be achieved. Through the cooperation between the inclined plate, the connecting pipe, the collecting box, the second water pump and the second delivery pipe, the waste water can be recycled. Through the cooperation between the second water pump and the second delivery pipe, the water can be re-delivered to the water storage tank to achieve water circulation and reduce the use of water resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A three-dimensional structural schematic diagram of a tunnel structure of a tunnel-type calcining furnace is proposed for the utility model;

[0017] Figure 2 The utility model proposes a tunnel structure of a tunnel type calcining furnace Figure 1 A schematic cross-sectional structure diagram of ;

[0018] Figure 3 It is a three-dimensional structural schematic diagram of the inclined plate and the water inlet pipe;

[0019] Figure 4 It is a schematic diagram of the three-dimensional structure of the collection box, the first water pump and the second water pump.

[0020] Legend: 1. Overall structure; 2. Support structure; 101. Tunnel furnace body; 102. Conveyor belt; 103. Furnace body; 104. Connecting plate; 105. Fan; 106. Second conveying pipeline; 107. Cooling chamber; 108. Spray pipe; 109. Inclined plate; 110. Connecting pipe; 111. Water inlet pipe; 112. First water pump; 113. First conveying pipeline; 114. Second water pump; 115. Collecting box; 116. Water tank; 201. Support leg; 202. Anti-slip mat. DETAILED DESCRIPTION

[0021] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0022] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0023] Embodiment 1, as Figure 1-Figure 4 As shown, a tunnel structure of a tunnel calcining furnace includes an overall structure 1 and a supporting structure 2, wherein the supporting structure 2 is located at the front and rear positions on both sides of the bottom of the overall structure 1; the overall structure 1 includes a tunnel furnace body 101, a furnace body 103 is arranged on one side of the top of the tunnel furnace body 101, a cooling chamber 107 is arranged on the other side of the top of the tunnel furnace body 101, spray pipes 108 are penetrated on both sides of the front and rear inner surfaces of the cooling chamber 107, a water tank 116 is fixedly connected at the center of the top of the cooling chamber 107, a first water pump 112 is fixedly installed at the center of the bottom of the water tank 116, a first conveying pipeline 113 is penetrated at the water outlet end of the first water pump 112, an inclined plate 109 is fixedly connected to the other side of the inner bottom of the tunnel furnace body 101, and a collecting box 115 is fixedly connected to the other side of the bottom of the tunnel furnace body 101.

[0024] The effect achieved by the entire embodiment 1 is as follows: Figure 2 and Figure 3 As shown, when the first water pump 112 discharges the water in the water tank 116, it will be pumped into the first delivery pipe 113, and finally delivered to the two spray pipes 108 through the delivery of the first delivery pipe 113. Then the water can be sprayed out by the spray pipe 108 so that it can be sprayed onto the surface of the object, thereby accelerating the reduction of the surface temperature and avoiding the need for natural cooling later.

[0025] Embodiment 2, as Figure 1-Figure 4As shown, a conveyor belt 102 is fixedly installed at the center of the inner bottom of the tunnel furnace body 101, a water inlet pipe 111 is penetrated at the center of the top of the water tank 116, a connecting plate 104 is fixedly connected to the front and rear positions of the top of the furnace body 103 and the cooling chamber 107, a fan 105 is fixedly installed at the center of the inner surface of the connecting plate 104, the interior of the first conveying pipe 113 is connected to the interior of the spray pipe 108, a connecting pipe 110 is penetrated at the center of the top of the collecting box 115, a second water pump 114 is fixedly installed at the center of the front outer surface of the collecting box 115, a second conveying pipe 106 is penetrated at the water outlet end of the second water pump 114, the interior of the second conveying pipe 106 is connected to the interior of the water tank 116, and the supporting structure 2 includes a supporting leg 201, a non-slip pad 202 is fixedly connected at the center of the bottom of the supporting leg 201, and the top surface of the supporting leg 201 is fixedly connected to the bottom surface of the tunnel furnace body 101.

[0026] The effect achieved by the entire embodiment 2 is as follows: Figure 3 and Figure 4 As shown, a filter is provided on the connecting pipe 110 to filter the water entering the connecting pipe 110 to ensure the cleanliness of the water resources. The connection plate 104 and the fan 105 cooperate with each other to achieve the airflow generated by the fan 105 to blow toward the object, thereby preliminarily cooling the object. The support legs 201 and the anti-slip pads 202 cooperate with each other to improve the overall stability during operation.

[0027] Working principle: First, the user puts the object onto the conveyor belt 102 from one side. After the object is put into the conveyor belt 102, the conveyor belt 102 runs to transport the object into the furnace body 103 and start calcining. After calcining, the object can be transported to the other side through the conveyor belt 102. When the object is transported between the furnace body 103 and the cooling chamber 107, the fan 105 is set to blow air on the object to achieve preliminary cooling. Then the object can be transported to the cooling chamber 107, and the first water pump 112 runs to pump the water in the water tank 116 into the first conveying pipe 113. The object can be finally transported through the first conveying pipe 113. After being sent to the spray pipe 108, the water can be sprayed out through the spray pipe 108 and sprayed onto the surface of the object, so that the temperature of the surface of the object can be effectively reduced to avoid the need for subsequent natural cooling. After cooling, the object is moved to the other side through the conveyor belt 102 again, and can eventually be moved out of the cooling chamber 107. The generated waste water can be transported through the inclined plate 109 and the connecting pipe 110, and can eventually be transported to the collection box 115. After collection, the water in the collection box 115 can be transported to the water storage tank 116 through the cooperation of the second water pump 114 and the second delivery pipe 106, so as to achieve water circulation and reduce the use of water resources.

[0028] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A tunnel structure of a tunnel calcining furnace, characterized in that: include: An overall structure (1) and a supporting structure (2), wherein the supporting structure (2) is located at front and rear positions on both sides of the bottom of the overall structure (1); The overall structure (1) comprises a tunnel furnace body (101), a furnace body (103) being arranged on one side of the top of the tunnel furnace body (101), a cooling chamber (107) being arranged on the other side of the top of the tunnel furnace body (101), spray pipes (108) being arranged through both sides of the front and rear inner surfaces of the cooling chamber (107), a water storage tank (116) being fixedly connected at the center of the top of the cooling chamber (107), a first water pump (112) being fixedly installed at the center of the bottom of the water storage tank (116), a first delivery pipeline (113) being arranged through the water outlet end of the first water pump (112), an inclined plate (109) being fixedly connected to the other side of the inner bottom of the tunnel furnace body (101), and a collecting box (115) being fixedly connected to the other side of the bottom of the tunnel furnace body (101).

2. The tunnel structure of a tunnel type calcining furnace according to claim 1, characterized in that: A conveyor belt (102) is fixedly installed at the center of the inner bottom of the tunnel furnace body (101), and a water inlet pipe (111) is provided through the center of the top of the water tank (116).

3. The tunnel structure of a tunnel type calcining furnace according to claim 1, characterized in that: A connecting plate (104) is fixedly connected to the front and rear positions of the top of the furnace body (103) and the cooling chamber (107), and a fan (105) is fixedly installed at the center of the inner surface of the connecting plate (104).

4. The tunnel structure of a tunnel type calcining furnace according to claim 1, characterized in that: The interior of the first delivery pipe (113) is in communication with the interior of the spray pipe (108).

5. The tunnel structure of a tunnel type calcining furnace according to claim 1, characterized in that: A connecting pipe (110) is provided through the center of the top of the collection box (115), and a second water pump (114) is fixedly installed at the center of the front outer surface of the collection box (115).

6. The tunnel structure of a tunnel type calcining furnace according to claim 5, characterized in that: A second delivery pipeline (106) is provided through the water outlet end of the second water pump (114), and the interior of the second delivery pipeline (106) is in communication with the interior of the water storage tank (116).

7. The tunnel structure of a tunnel type calcining furnace according to claim 1, characterized in that: The support structure (2) comprises a support leg (201), an anti-slip pad (202) being fixedly connected at the center of the bottom of the support leg (201), and a top surface of the support leg (201) being fixedly connected to a bottom surface of the tunnel furnace body (101).