Cooperative removal system for flue gas pollutants of heating furnace
By setting up a desulfurization and dust removal device, a soot heat exchanger and a CO removal tower in the flue gas treatment system of the heating furnace, combined with an ammonia injection device, efficient removal of NOx, SO2, particulate matter and CO are achieved, and the existing technology is solved The poor deCO effect and large blast furnace gas consumption reduce operating costs.
Patent Information
- Application Number
- CN202323532356.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2033-12-22
AI Technical Summary
In the prior art, when removing NOx, SO2, particulate matter and CO in the flue gas of the rolled steel heating furnace, there are problems such as poor deCO removal effect, high blast furnace gas consumption, and high operating costs.
A coordinated removal system for flue gas pollutants in heating furnaces is designed, including a desulfurization and dust removal device, a soot heat exchanger and a CO removal tower arranged in sequence along the direction of coal smoke flow, and adopts dry flue gas desulfurization and filtering type. In the dust removal and selective catalytic reduction (SCR) denitrification process, the catalyst in the CO removal tower reacts with oxygen to generate carbon dioxide exothermic heat, and combines an ammonia spraying device to reduce NOx emissions.
It realizes efficient removal of NOx, SO2, particulate matter and CO, reduces the gas consumption of blast furnaces, and significantly reduces operating costs, reaching NOx no more than 50mg/Nm3, SO2 no more than 10mg/Nm3, particulate matter no more than 5mg/Nm3, CO Emission concentration greater than 1500mg/Nm3.
Smart Images

Figure CN222266719U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of flue gas treatment in heating furnaces, in particular to a system for collaboratively removing pollutants from flue gas in heating furnaces. Background Art
[0002] The steel rolling heating furnace is the main pollutant emission unit in the steel rolling process. The flue gas contains not only NOx, SO 2 In addition to particulate matter, coal smoke contains a large amount of CO. According to tests, the CO concentration in coal smoke can reach 20,000 ppm or even higher.
[0003] The patent "Ultra-low emission process for flue gas CO reduction and waste heat recovery in steel rolling heating furnace" (application number 202111359563.6) discloses a flue gas purification process for steel rolling heating furnace, which can remove NOx and SO 2 , particulate matter and CO, but the process route is denitrification, deCO, desulfurization, dust removal, SO in flue gas 2 It will increase the risk of poisoning of the de-CO catalyst and the operational reliability is low.
[0004] The process sequence described in the patent "A system and process for removing carbon monoxide by desulfurization and denitrification in a heating furnace" (application number 202211669402.1) is desulfurization, dust removal, ammonia injection, CO removal and denitrification. Although SO 2 The risk of poisoning the de-CO catalyst is not eliminated, but the contact between a large amount of denitrification reducing agent ammonia and the de-CO catalyst will still affect the de-CO effect. In addition, the air flue gas basically does not contain CO or has a low CO content. In the process of purifying the air flue gas, this patent still consumes a lot of blast furnace gas, and the operation economy is not good.
[0005] Therefore, it is urgent to develop a method that can efficiently and reliably remove NOx and SO from the flue gas of the heating furnace. 2 , particulate matter and CO, and can effectively reduce blast furnace gas consumption and effectively reduce operating costs. Utility Model Content
[0006] In order to overcome the deficiencies of the prior art, the utility model provides a system for collaboratively removing pollutants from flue gas of a heating furnace, which solves the problems of poor CO removal effect, high consumption of blast furnace gas, and high operating cost in the prior art.
[0007] The technical solution adopted by the utility model to solve the above problems is:
[0008] A system for collaboratively removing pollutants from flue gas from a heating furnace comprises a desulfurization and dust removal device, a coal smoke heat exchanger, a CO removal tower and an ammonia injection device which are sequentially arranged along the flow direction of the coal smoke and flue gas.
[0009] As a preferred technical solution, the desulfurization and dust removal device is a coal smoke desulfurization tower and a coal smoke dust collector, the ammonia injection device is a coal smoke ammonia injection device, and also includes a heating furnace, a coal smoke flue gas pipeline, and a coal smoke denitrification tower. The heating furnace, the coal smoke flue gas pipeline, the coal smoke heat exchanger, the coal smoke desulfurization tower, the coal smoke dust collector, the CO removal tower, the coal smoke ammonia injection device, and the coal smoke denitrification tower are connected in sequence, a CO removal catalyst is provided in the CO removal tower, and a coal smoke denitrification catalyst is provided in the coal smoke denitrification tower.
[0010] As a preferred technical solution, it also includes a coal smoke induced draft fan, a coal smoke chimney, a coal smoke denitrification tower, a coal smoke heat exchanger, a coal smoke induced draft fan, and a coal smoke chimney which are connected in sequence.
[0011] As a preferred technical solution, it also includes an air flue gas duct, an air flue gas desulfurization tower, and an air flue gas dust collector. The heating furnace, the air flue gas duct, the air flue gas desulfurization tower, and the air flue gas dust collector are connected in sequence.
[0012] As a preferred technical solution, it also includes an air smoke ammonia spraying device, an air smoke denitrification tower, an air smoke induced draft fan, and an air smoke chimney. The air smoke dust collector, the air smoke ammonia spraying device, the air smoke denitrification tower, the air smoke induced draft fan, and the air smoke chimney are connected in sequence.
[0013] As a preferred technical solution, it also includes a mixing fan, one end of the branch where the mixing fan is located is a connecting pipe between the coal smoke denitrification tower and the coal smoke heat exchanger, and the other end of the branch where the mixing fan is located is a connecting pipe between the air smoke duct and the air smoke desulfurization tower.
[0014] As a preferred technical solution, the desulfurization and dust removal device is a coal smoke desulfurization tower and a coal smoke dust collector, the ammonia injection device is a combined ammonia injection device, and also includes a heating furnace, a coal smoke flue gas pipeline, and a combined denitrification tower. The heating furnace, the coal smoke flue gas pipeline, the coal smoke desulfurization tower, the coal smoke dust collector, the coal smoke heat exchanger, the CO removal tower, the combined ammonia injection device, and the combined denitrification tower are connected in sequence, the CO removal tower is provided with a CO removal catalyst, and the combined denitrification tower is provided with a combined denitrification catalyst.
[0015] As a preferred technical solution, it also includes a combined chimney connected to the coal smoke heat exchanger.
[0016] As a preferred technical solution, it also includes an air flue gas duct, an air flue gas desulfurization tower, an air flue gas dust collector, and the heating furnace, the air flue gas duct, the air flue gas desulfurization tower, the air flue gas dust collector, the combined ammonia injection device, and the combined denitrification tower are connected in sequence.
[0017] As a preferred technical solution, it also includes a combined induced draft fan arranged on the connecting pipeline between the coal smoke heat exchanger and the combined chimney.
[0018] Compared with the prior art, the utility model has the following beneficial effects:
[0019] (1) The utility model realizes that the NOx emission concentration of the regenerative steel rolling heating furnace is no more than 50 mg / Nm 3 , SO 2 Emission concentration is not more than 10mg / Nm 3 , the particle emission concentration is not more than 5mg / Nm 3 , CO emission concentration is not more than 1500mg / Nm 3 ;
[0020] (2) Compared with the existing regenerative steel rolling heating furnace flue gas purification route, the utility model does not consume the blast furnace gas of the steel plant, and the operating cost is greatly reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is one of the structural diagrams of the utility model;
[0022] Figure 2 This is the second structural schematic diagram of the present utility model.
[0023] The symbols and their corresponding names in the attached drawings are as follows: 1-heating furnace; 2-smoke flue gas pipeline; 21-smoke heat exchanger; 22-smoke desulfurization tower; 23-smoke dust collector; 24-CO removal tower; 241-CO removal catalyst; 25-smoke denitrification tower; 251-smoke denitrification catalyst; 252-smoke ammonia injection device; 26-smoke induced draft fan; 27-smoke chimney; 28-smoke flue gas baffle; 3-air smoke flue gas pipeline; 31-air smoke desulfurization tower; 3 2-air smoke dust collector; 33-air smoke denitrification tower; 331-air smoke denitrification catalyst; 332-air smoke ammonia injection device; 34-air smoke induced draft fan; 35-air smoke chimney; 36-air smoke smoke baffle; 4-mixing fan; 5-hot blast furnace; 6-combined denitrification tower; 61-combined denitrification catalyst; 62-combined ammonia injection device; 7-combined induced draft fan; 8-combined chimney; T1-CO removal tower inlet temperature measuring point; T2-air smoke denitrification tower inlet temperature measuring point. DETAILED DESCRIPTION
[0024] The present invention will be further described in detail below in conjunction with the embodiments and drawings, but the implementation manner of the present invention is not limited thereto.
[0025] like Figure 1 to Figure 2 The utility model aims to provide a system for collaboratively removing pollutants from flue gas of a regenerative steel rolling heating furnace with a simple system and low operating cost, thereby reducing NOx and SO 2 At the same time, it can effectively remove CO from the smoke and flue gas, and use the heat generated in the CO removal process to meet the temperature window of flue gas denitrification without consuming blast furnace gas.
[0026] The exhaust gas of the regenerative steel rolling heating furnace includes coal smoke and air smoke. Under normal operating conditions, the initial exhaust temperature of the heating furnace ranges from 120 to 180°C. The main pollutants in the coal smoke are SO 2 , particulate matter, NOx and high concentrations of CO. The main pollutants in air flue gas are SO 2 , particulate matter and NOx, usually without CO.
[0027] In the utility model, the flue gas desulfurization adopts the dry flue gas desulfurization process, the desulfurizer selects alkaline powder or alkaline granular desulfurizer (such as sodium bicarbonate or calcium hydroxide), the flue gas dust removal adopts the filtering dust removal process, and the overall temperature drop of the desulfurization and dust removal process is not more than 5°C; the principle of removing carbon monoxide is to react with oxygen in the flue gas under the action of a catalyst to generate carbon dioxide and release heat. According to calculations, the flue gas temperature can be increased by about 0.9°C for every 100ppm of CO removed; the flue gas denitrification adopts the selective catalytic reduction (SCR) denitrification process, and the reducing agent can be liquid ammonia, ammonia water or urea; the flue gas heat exchanger can adopt a plate heat exchanger, a heat pipe heat exchanger or a shell and tube heat exchanger.
[0028] In the utility model, a CO removal tower 24 is provided for the coal smoke and flue gas.
[0029] In the utility model, the CO removal tower 24 of the coal smoke flue gas is arranged after the desulfurization and dust removal device (the coal smoke desulfurization tower 22 and the coal smoke dust collector 23), and before the denitrification and ammonia injection device (the coal smoke denitrification tower 25 and the coal smoke ammonia injection device 252 of Example 1, and the combined denitrification tower 6 and the combined ammonia injection device 62 of Example 2).
[0030] In the utility model, the heat exchange device of coal smoke (coal smoke heat exchanger 21) can be arranged before the desulfurization and dust removal device (coal smoke desulfurization tower 22 and coal smoke dust collector 23), or after the desulfurization and dust removal device (coal smoke desulfurization tower 22 and coal smoke dust collector 23).
[0031] In the utility model, the denitration towers for coal smoke and air smoke can be arranged separately or in combination.
[0032] It is worth explaining that, in the utility model, the word "combined" in the combined denitrification tower 6, the combined denitrification catalyst 61, the combined ammonia injection device 62, the combined induced draft fan 7 and the combined chimney 8 is for the purpose of distinguishing them from the prefixes related to coal smoke and air smoke, and refers to the merging of coal smoke flue gas and air smoke flue gas, and also means that it is in the coal smoke flue gas channel and the air smoke flue gas channel at the same time. Such naming should not be regarded as "unclear" or a limitation on the scope of protection.
[0033] Example 1
[0034] Combination Figure 1 Description of technical solution:
[0035] Smoke and flue gas treatment process: The smoke and flue gas generated by the heating furnace 1 (taking the regenerative heating furnace as an example) is discharged through the smoke and flue gas pipeline 2, and is heated to the reaction temperature of the CO removal catalyst 241 by heat exchange in the smoke heat exchanger 21, and then enters the CO removal tower 24 after completing desulfurization and dust removal in the smoke desulfurization tower 22 and the smoke dust collector 23. Under the action of the CO removal catalyst 241, CO in the smoke and flue gas reacts with oxygen in the flue gas and is removed, and a large amount of heat is released at the same time, so that the flue gas temperature rises by 50℃-100℃. After the temperature of the flue gas is raised, the temperature meets the reaction temperature requirements of the smoke denitration catalyst 251. After the smoke and flue gas with CO removed is fully mixed with the denitration reducing agent at the smoke ammonia injection device 252, it enters the smoke denitration tower 25, and the NOx in the smoke is removed under the catalytic action of the smoke denitration catalyst 251. The CO content in the purified coal smoke is already very low. A part of it is directly mixed with the air smoke emitted by the heating furnace 1 to heat the air smoke to meet the temperature required by the air smoke denitrification catalyst 331; the other part is indirectly heated in the coal smoke heat exchanger 21 to heat the original coal smoke emitted by the heating furnace 1, and after cooling, it is discharged into the atmosphere through the coal smoke chimney 27 through the coal smoke induced draft fan 26.
[0036] The air flue gas generated by the heating furnace 1 is discharged through the air flue gas pipeline 3, first mixed with the purified coal smoke to increase temperature, and then SO is removed in the air flue desulfurization tower 31 and the air flue dust collector 32 in sequence. 2 After being fully mixed with the denitration reducing agent at the air smoke ammonia injection device 332, it enters the air smoke denitration tower 33, and removes NOx under the catalytic action of the air smoke denitration catalyst 331. The purified air smoke is discharged to the atmosphere through the air smoke induced draft fan 34 and the air smoke chimney 35.
[0037] Since the negative pressure of coal smoke is greater, a mixing fan 4 is set to mix the purified coal smoke and air smoke. The mixing fan 4 adopts a variable frequency fan, and the output of the mixing fan 4 is adjusted according to the temperature of the CO removal tower inlet temperature measuring point T1 and the air smoke denitrification tower inlet temperature measuring point T2.
[0038] The hot air furnace 5 is only used to compensate the heat required by the system at the initial stage of system startup and when the exhaust gas temperature of the heating furnace 1 is extremely low under special working conditions. It does not need to be put into use when the system is working stably.
[0039] The coal smoke and air smoke are heated separately before desulfurization and dust removal, which improves the reaction activity of the desulfurizer, saves the consumption of the desulfurizer and reduces the operating cost.
[0040] Taking a steel mill heating furnace as an example, the smoke volume is 135000Nm 3 / h, exhaust gas temperature 125℃, SO 2 Original emission concentration 100mg / Nm 3, NOx original emission concentration 150mg / Nm 3 , the original emission concentration of particulate matter is 30mg / Nm 3 , CO original emission concentration 12000ppm; air smoke volume 135000Nm 3 / h, exhaust gas temperature 125℃, SO 2 Original emission concentration 100mg / Nm 3 , NOx original emission concentration 150mg / Nm 3 , the original emission concentration of particulate matter is 30mg / Nm 3 .
[0041] The coal smoke generated by the heating furnace 1 is heated from 125°C to 165°C in the coal smoke heat exchanger 21. The SO 2 and particle concentrations are 10 mg / Nm 3 and 5mg / Nm 3 , the temperature drops to about 160°C. In the CO removal tower 24, CO is removed to 1200ppm, and the flue gas temperature rises by 97.5°C to about 262.5°C. In the coal smoke denitrification tower 25, the NOx concentration is reduced from 150mg / Nm 3 Reduced to 50mg / Nm 3 , the flue gas temperature after denitrification is reduced to 259.5℃.
[0042] Under the action of the mixing fan 4, there is 70000Nm 3 / h The purified coal smoke and air smoke are directly mixed, and another 65000Nm 3 After the purified coal smoke gas is indirectly heat-exchanged with the original coal smoke gas produced by the heating furnace 1, the temperature is reduced to about 160°C to 165°C and is discharged into the atmosphere through the coal smoke chimney 27 via the coal smoke induced draft fan 26.
[0043] The air flue gas generated by the heating furnace 1 is mixed with the purified coal smoke and the temperature is raised to 184°C. After desulfurization, dust removal and denitrification are completed in sequence, SO 2 The emission concentration is reduced to no more than 10mg / Nm 3 , the particle emission concentration is reduced to no more than 5mg / Nm 3 , NOx emission concentration is reduced to no more than 50mg / Nm 3 After purification, the air flue gas at about 175°C is discharged into the atmosphere through the air flue chimney 35 via the air flue induced draft fan 34.
[0044] When the temperature at the inlet temperature measuring point T1 of the CO removal tower is higher than the set value, or the temperature at the inlet temperature measuring point T2 of the air smoke denitrification tower is lower than the set value, the output of the mixing fan 4 is increased.
[0045] In special working conditions, when the output of the mixing fan 4 reaches the maximum, but the temperatures of the removal tower inlet temperature measuring point T1 and the air smoke denitrification tower inlet temperature measuring point T2 are both lower than the set values, the hot air furnace 5 is started.
[0046] Example 2
[0047] like Figure 1 to Figure 2 As shown, as another implementation of the utility model:
[0048] Combination Figure 2 Description of technical solution:
[0049] Smoke and flue gas treatment process: The smoke and flue gas generated by the heating furnace 1 (taking the regenerative heating furnace as an example) is discharged through the smoke and flue gas pipeline 2. First, the smoke and flue gas is desulfurized and dusted in the smoke desulfurization tower 22 and the smoke dust collector 23, and then the smoke and flue gas heat exchanger 21 is heated to the reaction temperature of the CO removal catalyst 241, and then enters the CO removal tower 24. Under the action of the CO removal catalyst 241, the CO in the smoke and flue gas reacts with the oxygen in the flue gas and is removed, and a large amount of heat is released to increase the flue gas temperature by 50℃-100℃. The heated smoke and flue gas are combined with the air smoke and flue gas, and after being fully mixed with the denitrification reducing agent at the combined ammonia injection device 62, they enter the combined denitrification tower 6, and the NOx in the flue gas is removed under the catalytic action of the combined denitrification catalyst 61. After the denitrified flue gas is indirectly heat-exchanged and cooled with the original smoke and flue gas discharged from the heating furnace 1, it is discharged to the atmosphere through the combined chimney 8.
[0050] The combined induced draft fan 7 can be arranged before the combined chimney 8, and can also be arranged at other positions of the system according to actual conditions.
[0051] The flue gas generated by the heating furnace 1 is discharged through the flue gas pipe 3, and is desulfurized and dusted in the flue gas desulfurization tower 31 and the flue gas dust collector 32. It is combined with the soot gas at the outlet of the CO removal tower 24 and enters the combined denitrification tower 6, and is discharged after completing the subsequent purification process.
[0052] The hot air furnace 5 is only used to compensate the heat required by the system at the initial stage of system startup and when the exhaust gas temperature of the heating furnace 1 is extremely low under special working conditions. It does not need to be put into use when the system is working stably.
[0053] After desulfurization and dust removal, the coal smoke flue gas enters the coal smoke heat exchanger for heating, and the flue gas is cleaner, which is beneficial to prolonging the service life of the coal smoke heat exchanger. At the same time, it can also reduce the filtration area of the coal smoke dust collector and reduce the initial investment cost.
[0054] After desulfurization and dust removal, the air smoke is mixed with the coal smoke, which can reduce the filtration area of the air smoke dust collector and save equipment investment.
[0055] Taking a steel mill heating furnace as an example, the smoke volume is 135000Nm 3 / h, exhaust gas temperature 125℃, SO 2 Original emission concentration 100mg / Nm 3 , NOx original emission concentration 150mg / Nm 3 , the original emission concentration of particulate matter is 30mg / Nm 3 , CO original emission concentration 12000ppm; air smoke volume 135000Nm 3 / h, exhaust gas temperature 125℃, SO 2 Original emission concentration 100mg / Nm 3 , NOx original emission concentration 150mg / Nm 3 , the original emission concentration of particulate matter is 30mg / Nm 3 .
[0056] After desulfurization and dust removal, the coal smoke generated by heating furnace 1 2 and particulate matter concentrations were reduced to 10 mg / Nm 3 and 5mg / Nm 3 , the flue gas temperature is reduced to about 120°C. After heat exchange in the coal smoke heat exchanger 21, the temperature is raised from 120°C to 160°C, CO is removed to 1200ppm in the CO removal tower 24, and the flue gas temperature is raised by 97.5°C to about 262.5°C.
[0057] After desulfurization and dust removal, the flue gas generated by heating furnace 1 has SO 2 and particulate matter concentrations were reduced to 10 mg / Nm 3 and 5mg / Nm 3 , the flue gas temperature drops to about 120℃.
[0058] After the coal smoke and air smoke are mixed, the smoke temperature is about 205℃, and the NOx concentration is reduced to no more than 50mg / Nm 3 , the flue gas temperature is reduced to about 202° C. After the heat exchanger coal smoke heat exchanger 21 exchanges heat with the original coal smoke generated by the heating furnace 1, the temperature is reduced to about 175° C. to 180° C., and is discharged to the atmosphere through the combined chimney 8.
[0059] The hot air furnace 5 is only used to compensate the heat required by the system at the initial stage of system startup and when the exhaust gas temperature of the heating furnace 1 is extremely low under special working conditions. It does not need to be put into use when the system is working stably.
[0060] As described above, the utility model can be implemented well.
[0061] The above is only a preferred embodiment of the utility model and does not limit the utility model in any form. According to the technical essence of the utility model, within the spirit and principles of the utility model, any simple modification, equivalent replacement and improvement made to the above embodiment still falls within the protection scope of the technical solution of the utility model.
Claims
1. A system for collaboratively removing pollutants from flue gas from a heating furnace, characterized in that: The invention comprises a desulfurization and dust removal device, a coal smoke heat exchanger (21), a CO removal tower (24), and an ammonia injection device which are sequentially arranged along the flow direction of coal smoke and flue gas.
2. A system for collaboratively removing pollutants from flue gas from a heating furnace according to claim 1, characterized in that: The desulfurization and dust removal device comprises a soot desulfurization tower (22) and a soot dust collector (23); the ammonia injection device comprises a soot ammonia injection device (252); and the device further comprises a heating furnace (1), a soot flue gas pipeline (2), and a soot denitration tower (25); the heating furnace (1), the soot flue gas pipeline (2), the soot heat exchanger (21), the soot desulfurization tower (22), the soot dust collector (23), the CO removal tower (24), the soot ammonia injection device (252), and the soot denitration tower (25) are sequentially connected; a CO removal catalyst (241) is arranged in the CO removal tower (24); and a soot denitration catalyst (251) is arranged in the soot denitration tower (25).
3. A system for collaboratively removing pollutants from flue gas from a heating furnace according to claim 2, characterized in that: It also includes a coal smoke induced draft fan (26), a coal smoke chimney (27), and the coal smoke denitrification tower (25), a coal smoke heat exchanger (21), a coal smoke induced draft fan (26), and a coal smoke chimney (27) are connected in sequence.
4. A system for collaboratively removing pollutants from flue gas from a heating furnace according to claim 3, characterized in that: It also includes an air smoke flue gas pipeline (3), an air smoke desulfurization tower (31), and an air smoke dust collector (32). The heating furnace (1), the air smoke flue gas pipeline (3), the air smoke desulfurization tower (31), and the air smoke dust collector (32) are connected in sequence.
5. A system for collaboratively removing pollutants from flue gas from a heating furnace according to claim 4, characterized in that: It also includes an air smoke ammonia spraying device (332), an air smoke denitrification tower (33), an air smoke induced draft fan (34), and an air smoke chimney (35). The air smoke dust collector (32), the air smoke ammonia spraying device (332), the air smoke denitrification tower (33), the air smoke induced draft fan (34), and the air smoke chimney (35) are connected in sequence.
6. A system for collaboratively removing pollutants from flue gas from a heating furnace according to any one of claims 3 to 5, characterized in that: It also includes a mixing fan (4), one end of the branch where the mixing fan (4) is located is a connecting pipeline between the coal smoke denitrification tower (25) and the coal smoke heat exchanger (21), and the other end of the branch where the mixing fan (4) is located is a connecting pipeline between the air smoke flue gas pipeline (3) and the air smoke desulfurization tower (31).
7. The system for collaboratively removing pollutants from flue gas from a heating furnace according to claim 1 is characterized in that: The desulfurization and dust removal device comprises a coal smoke desulfurization tower (22) and a coal smoke dust collector (23); the ammonia injection device is a combined ammonia injection device (62); and the device further comprises a heating furnace (1), a coal smoke flue gas pipeline (2), and a combined denitration tower (6); the heating furnace (1), the coal smoke flue gas pipeline (2), the coal smoke desulfurization tower (22), the coal smoke dust collector (23), the coal smoke heat exchanger (21), the CO removal tower (24), the combined ammonia injection device (62), and the combined denitration tower (6) are sequentially connected; a CO removal catalyst (241) is provided in the CO removal tower (24); and a combined denitration catalyst (61) is provided in the combined denitration tower (6).
8. A system for collaboratively removing pollutants from flue gas from a heating furnace according to claim 7, characterized in that: It also includes a combined chimney (8) connected to the coal smoke heat exchanger (21).
9. A system for collaboratively removing pollutants from flue gas from a heating furnace according to claim 8, characterized in that: It also includes an air flue gas pipeline (3), an air flue gas desulfurization tower (31), and an air flue gas dust collector (32). The heating furnace (1), the air flue gas pipeline (3), the air flue gas desulfurization tower (31), the air flue gas dust collector (32), the combined ammonia injection device (62), and the combined denitration tower (6) are connected in sequence.
10. A heating furnace flue gas pollutant collaborative removal system according to claim 8 or 9, characterized in that: It also includes a combined induced draft fan (7) arranged on the connecting pipeline between the coal smoke heat exchanger (21) and the combined chimney (8).
